2006년 10월 17일, 홍콩 등록 가스운반선 Ennerdale호는 폴리 해상터미널(Fawley Marine Terminal, FMT)에 접안한 상태에서 화물 시료 채취 작업이 이루어지던 중 액화 프로판이 대량 누출되는 사고를 겪었다. 누출은 약 66톤의 프로판이 대기 중으로 손실된 뒤 29시간 만에 밀봉되었다.On 17 October 2006, the Hong Kong registered gas carrier Ennerdale experienced a major leak of liquefied propane, while cargo sampling operations were taking place, alongside Fawley Marine Terminal (FMT). The leak was sealed 29 hours later, after an estimated 66 tonnes of propane had been lost to atmosphere.
안전 쟁점Safety Issues
2번 화물 탱크 하역 라인의 비상차단(ESD) 밸브가 열린 채 걸려 있어 선박의 비상 화물 차단 시스템이 제 기능을 하지 못하였다the ESD valve on the discharge line of No. 2 cargo tank was jammed open, compromising the ship’s emergency cargo shut down system
시료 채취 설비에 대한 명확한 규제 요건이 없었다there was no clear regulatory requirement for sampling arrangements
선급과 기타 검사 당국이 최근 실시한 수많은 선박 검사에서 시료 채취 지점 설비에 대한 우려가 제기된 적이 없었다no concerns about the sampling point arrangement had been raised during any of the numerous recent ship surveys by class and other inspection authorities
점선 상자는 있었지만 쓰이지 않았거나 쓰였는지 모르는 것, 점선 화살표는 보고서가 추정한 관계입니다.
③ 원인 사슬
왼쪽에서 오른쪽으로, 무엇이 무엇으로 이어졌는지입니다. 상자(원인)는 보고서 근거 대목에서 가져왔고, 상자 사이 화살표는 보고서가 직접 적지 않은 경우 모델이 판단해 이은 것입니다.
보고서가 밝히지 못한 것
결함 ESD 밸브를 마지막으로 검사·시험·분해 정비한 시점(기록 없음)
권고·조치
SIGTTO·CDI·OCIMF: 시료 채취 설비와 절차에 관한 업계 지침 마련
로이드선급: 시료 채취 연결부 기준을 IACS 에 제안
로이드선급: ESD 밸브 설계·정기 시험에 관한 제안을 IACS 에 제출
there is a general lack of guidance on cargo sampling in the industry
ESD 밸브가 올바르게 작동하는지 확인하기 위해 정기적으로 압력 시험을 하거나 점검하도록 하는 명확한 규제 요건이나 업계 요건이 없었다there was no clear regulatory requirement or industry requirement for ESD valves to be regularly pressure tested or inspected to ensure the valve was functioning correctly
권고Recommendations
SIGTTO, 화학물질 유통 협회(Chemical Distribution Institute, CDI), 석유회사국제해사포럼(OCIMF)에 시료 채취 설비와 절차에 관한 업계 지침을 마련하도록 권고가 내려졌다. 로이드선급에는 시료 채취 연결부의 기준과 ESD 밸브의 설계 및 정기 시험에 관한 두 가지 제안을 국제선급연합회(IACS)에 제출하도록 권고하였다.Recommendations have been made to SIGTTO, Chemical Distribution Institute (CDI) and Oil Companies International Marine Forum (OCIMF) with regard to providing industry guidance on sampling arrangements and procedures. Lloyd’s Register has been recommended to take two proposals to IACS regarding the standard of sampling connections, and ESD valve design and periodic testing.
이 보고서는 2007년 5월 25일에 발행되었다.This report was published on 25 May 2007.
한국어는 모델 번역(검수 전)입니다. 표의 값은 흔한 말만 옮기고 나머지는 원문 그대로 둡니다.
본문
PDF 에서 뽑은 글 — 쪽 나눔·단 배치 때문에 줄 순서가 어긋난 곳이 있을 수 있습니다
한국어 번역 · 모델 · 검수 전
원문 보기
[Synopsis]
개요SYNOPSIS
한국어 번역 · 모델 · 검수 전
요약
(모든 시각은 BST, UTC+1)
2006년 10월 17일, 홍콩 등록 가스 운반선 Ennerdale호는 파울리 해상터미널(Fawley Marine Terminal, FMT)에 접안한 상태에서 화물 시료 채취 작업을 하던 중 액화 프로판이 대량 누출되는 사고를 겪었다. 누출은 29시간 뒤에 봉쇄되었으며, 그때까지 약 66톤의 프로판이 대기 중으로 손실된 것으로 추정된다.
완전 가압식 가스 운반선 Ennerdale호는 액화 프로판을 적재하기 위해 2006년 10월 15일 2300에 FMT의 2번 선석에 도착하였다. 적재 전 점검이 이루어졌고 곧이어 적재가 시작되었다. 10월 17일 1830에 '동결(freeze)' 시험을 하기 위해 화물 적재가 끝나기 약 2시간 전에 적재 작업이 중단되었다. 화물 검수원이 승선하여 자신의 화물 시료 채취 장비를 1번 탱크의 시료 채취 지점에 연결하였다. 이어 화물을 2~3분간 순환시켰다. 이 과정을 2번 탱크에서도 반복하였다. 시험 결과가 만족스러워 화물 적재가 계속되었고 2100에 완료되었다.
화물 검수원은 선박으로 돌아와 곧바로 1번 탱크의 시료 채취 지점으로 갔으며, 그곳에서는 일등항해사가 이미 준비하고 있었다. 화물 검수원은 나사 어댑터를 사용하여 시료 채취 장치를 선박의 시료 채취 연결부에 연결하였다. 이어 일등항해사가 대표성 있는 시료를 확실히 얻기 위해 심정 펌프(deep well pump)로 화물을 순환시켰다. 화물 검수원은 시료 채취 장치를 채우기 전에 세 차례 씻어 낸 다음 채웠다. 그는 이 과정을 반복하여 모두 네 개의 시료를 채취한 뒤, 2번 탱크의 시료 채취 지점으로 선미 쪽으로 이동하였다. 일등항해사가 1번 탱크를 안전하게 폐쇄하는 동안 화물 검수원은 자신의 장비를 2번 탱크의 시료 채취 지점에 장착할 준비를 하였다. 그가 시료 채취 연결부를 자기 쪽으로 돌리자 시료 채취 밸브 조립체가 손에서 빠져 나왔다.
일등항해사는 누출을 보고 소리를 들은 뒤 비상 차단(ESD) 밸브를 작동시켰다. 시료 채취 밸브를 다시 장착하려는 시도가 있었으나, 화물의 11 bar 압력과 연결부에 얼음이 형성된 탓에 불가능하였다. 곧 시료 채취 연결부와 같은 배관 위에서 탱크에 인접한 ESD 밸브가 완전히 닫히지 않았다는 것이 분명해졌다. 사고 직후 긴급 구조 기관에 통보되었고, 가스 구름을 분산시키기 위해 선박에 물분무가 이루어졌다. 2200에 사우샘프턴항은 모든 통항이 폐쇄되었다. 0000에 FMT의 모든 선박이 대피하였다. 10월 18일 0530에 상황이 안정되어 통항 제한이 Ennerdale호 주위 400 m 접근 금지 구역으로 완화되었고, 이에 따라 항구가 다시 통항에 개방되었다.
누출을 막을 몇 가지 방안을 검토한 끝에, 화물 배관에 핫탭(hot tap)을 하여 밀봉재를 주입해 가스 누출을 막기로 결정되었다. 파울리 정유소에서 정기적으로 이용하는 업체인 Furmanite가 10월 18일 1408에 배관에 성공적으로 천공하였다. 이어 밀봉재를 배관에 천천히 주입하여 다음 날 아침 0240에 누출을 막고 캡을 씌울 수 있었다. 그 뒤 Ennerdale호는 출항하여 솔런트(Solent)에 닻을 내리고, 수리에 대한 선급 승인과 하역항의 선박 수용 동의에 달려 있던 출항 허가를 기다렸다. 이것이 완료되자 같은 날 1814에 출항하였다.
가스 시료 채취에 사용된 조립체는 화물 배관 체계의 배수 지점으로 설계된 것이었으나, 이를 위해 원래 마련되어 있던 장치가 부적합하다고 판단되자 화물 시료 채취에 쓰이게 되었다. 가스 운반선에 대한 규제 요건에는 화물 시료 채취에 관한 지침이 거의 없으며, 통일된 표준도 사용되지 않는다. 시료 채취에 관한 업계 지침도 부족하였다. 1989년 국제가스운반선·터미널운영자협회(Society of International Gas Tanker and Terminal Operators, SIGTTO)가 발간한 지침은 간과된 것으로 보이는데, Ennerdale호에 대한 업계 검사에서 시료 채취 장치에 관한 어떤 우려도 지적되지 않았기 때문이다.
액화 프로판의 누출을 닫아 막지 못한 ESD 밸브를 검사한 결과, 작은 버(burr)에 의해 열린 상태로 걸려 있었던 것으로 밝혀졌다. Ennerdale호의 ESD 밸브는 폐쇄 속도가 허용 범위인지 확인하는 시험을 받았으나, 밸브가 닫혀 있음을 표시하고 있다는 잘못된 가정이 있었다. 일부 ESD 밸브는 선원이 압력 시험을 한 것으로 보이나, 화물 양하 배관의 밸브는 이를 할 수 있는 쉬운 방법이 없어서 시험되지 않았다. 결함이 있던 ESD 밸브를 마지막으로 검사·시험·분해 정비한 시점에 대한 기록은 없었다. 더욱이 ESD 밸브를 일정한 주기로 시험하거나 내부를 검사하도록 하는 명확한 규제 요건도, 사용 중인 ESD 밸브를 정기적으로 시험하기 위한 업계 표준도 없다.
누출의 성격상 선원들은 스스로 누출을 막을 수 없었다. 선박, FMT 및 지역 긴급 구조 기관의 비상 대응은 양호하였으나, 선박 승무원과 FMT 사이의 연락은 이상적이지 않았다.
시료 채취 장치 및 절차에 관한 업계 지침을 마련하도록 SIGTTO, 화학물질 유통협회(Chemical Distribution Institute, CDI) 및 석유회사국제해사포럼(OCIMF)에 권고가 이루어졌다. 로이드선급(Lloyd’s Register)에는 시료 채취 연결부의 표준, 그리고 ESD 밸브의 설계와 정기 시험에 관한 두 가지 제안을 국제선급연합회(IACS)에 제출하도록 권고하였다.
그림 1원본 PDF 2쪽
원문 보기
(All times are BST, +1) On 17 October 2006, the Hong Kong registered gas carrier Ennerdale experienced a major leak of liquefied propane, while cargo sampling operations were taking place, alongside Fawley Marine Terminal (FMT). The leak was sealed 29 hours later, after an estimated 66 tonnes of propane had been lost to atmosphere. The fully pressurised gas carrier Ennerdale arrived at FMT’s No. 2 at 2300 on 15 October 2006, to load liquefied propane. Preloading checks were conducted and loading commenced shortly after. At 1830 on 17 October the loading operation was halted, approximately 2 hours before was due to be completed, to allow a ‘freeze’ test to be conducted. A cargo came aboard and attached his cargo sampling equipment to the sampling point of tank No. 1. The cargo was then circulated for 2-3 minutes. The process was repeated for tank No. 2. With the test results satisfactory, cargo loading continued and completed at 2100. The cargo surveyor returned to the ship and went straight to the sampling point of tank No. 1, where the was already preparing. The cargo surveyor used a thread adapter to connect the sampling device to the ship’s sampling connection. The chief officer then circulated the cargo, using the deep well , to ensure a good representative sample was obtained. The cargo surveyor flushed the sampling device through three times before filling it. He repeated the process, taking four samples in total, before moving aft to the sampling point of tank No. 2. While the chief officer secured tank No. 1, the cargo surveyor prepared to fit his equipment to the sampling point of tank No. 2. As he turned the sampling connection towards himself, the sampling
첨부 문서 2 EnnerdaleReport.pdf
한국어 번역 · 모델 · 검수 전
표지·법적 고지·저작권 안내
파울리 해상터미널(Fawley Marine Terminal)에 접안 중이던 가스 운반선 Ennerdale호의 대규모 LPG 누출 사고(2006년 10월 17일) 조사 보고서 영국 해양사고조사국(Marine Accident Investigation Branch)
Carlton HouseCarlton PlaceSouthamptonUnited KingdomSO15 2DZ보고서 번호 10/2007
2007년 5월
영국 상선(사고 보고 및 조사) 규정 2005(The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2005) 제5조 발췌: "상선(사고 보고 및 조사) 규정 2005에 따른 사고 조사의 유일한 목적은 사고의 원인과 상황을 규명함으로써 장래의 사고를 예방하는 것이다. 조사의 목적은 책임을 가리는 것이 아니며, 그 목적을 달성하는 데 필요한 경우를 제외하고는 과실을 배분하는 것도 아니다."
참고: 이 보고서는 소송을 염두에 두고 작성된 것이 아니며, 상선(사고 보고 및 조사) 규정 2005 제13조(9)에 따라 책임이나 과실을 귀속시키거나 배분하는 것을 목적(또는 목적 중 하나)으로 하는 모든 사법 절차에서 증거로 받아들여질 수 없다.
추가 인쇄본은 우편 주소로, 또는 다음을 통해 구할 수 있다.
이메일
maib@dft.gsi.gov.uk
전화
023 8039 5500
팩스
023 8023 2459
모든 보고서는 당국 웹사이트 www.maib.gov.uk 에서도 볼 수 있다.
목차
쪽
약어 및 두문자어 용어집
요약 1
1절 사실 정보 3
보고서 목차(쪽 번호는 원본 PDF 기준)
1.1 Ennerdale호 및 사고 개요 3
1.2 배경 6
1.2.1 선박 설명 6
1.2.2 액화석유가스 7
1.3 경위 8
1.3.1 화물 누출에 이르기까지의 상황 8
1.3.2 기상 11
1.3.3 비상 대응 11
1.3.4 LPG 누출을 막기 위한 주요 방안 14
1.3.5 사고 후 조치 14
1.4 선원 및 화물 검수원 15
1.5 화물 시료 채취 16
1.5.1 일반 16
1.5.2 Ennerdale호의 시료 채취 장치 16
1.5.3 시료 채취 밸브 조립체 검사 18
1.5.4 선내 시료 채취 절차 18
1.5.5 화물 검수원의 시료 채취 절차 18
1.6 비상 차단 밸브 18
1.6.1 일반 18
1.6.2 Ennerdale호 ESD 밸브 설명 18
1.6.3 밸브 제조업체 20
1.6.4 결함이 있던 ESD 밸브의 검사 21
1.7 IGC 코드 23
1.8 IACS 23
1.9 업계 지침 24
1.9.1 SIGTTO 24
1.9.2 ICS 24
1.10 선박 검사 25
1.10.1 배경 25
1.10.2 화학물질 유통 업계 25
1.10.3 OCIMF SIRE 25
1.10.4 터미널 검사 26
1.11 유사 사고 26
2절 분석 27
보고서 목차(쪽 번호는 원본 PDF 기준)
2.1 목적 27
2.2 사고 27
2.3 피로 27
2.4 시료 채취 절차 27
2.4.1 선원과 화물 검수원의 관계 27
2.4.2 제공된 지침 29
2.5 물리적 시료 채취 장치 30
2.5.1 설계 30
2.5.2 규제 요건 30
2.5.3 업계 모범 실무 31
2.6 비상 차단 밸브 31
2.6.1 설계 31
2.6.2 시험 및 정비 33
2.7 누출 이후의 조치 34
3절 결론 35
3.1권고로 이어진, 사고에 직접 기여한 안전 쟁점 353.2 조사 중 확인되었으나 권고로 이어지지는 않았고 조치된 안전 쟁점 35
4절 조치 사항 36
보고서 목차(쪽 번호는 원본 PDF 기준)
4.1 ICSM Pte Ltd 36
4.2 Intertek Caleb-Brett 37
4.3 SIGTTO 37
4.2 OCIMF 37
5절 권고 38부록 A 가스 운반선 최초 검사용 NKK 점검표부록 B 가스 시료 채취 밸브 조립체 검사 보고서
부록 C 선박 SMS 체제의 시료 채취 부분
부록 D 선박의 ESD 시험 기록 및 항해일지 관련 발췌 부록 E JIS 20 K ESD 밸브 점검·정비 매뉴얼 부록 F 1989년 SIGTTO가 발간한 액화가스 시료 채취 절차에 관한 작업반 보고서
원문 보기
[EnnerdaleReport.pdf]
Report on the investigation of a major leak from the gas carrier Ennerdale while alongside Fawley Marine Terminal 17 October 2006 Carlton House Carlton Place Southampton United Kingdom SO15 2DZ Report No 10/2007 May 2007
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2005 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2005 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 13(9) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2005, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. Further printed copies can be obtained via our postal address, or alternatively by: Email: maib@dft.gsi.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 All reports can also be found at our website: www.maib.gov.uk
CONTENTS Page GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 - FACTUAL INFORMATION 3 1.1 of Ennerdale and accident 3 1.2 Background 6 1.2.1 Ship description 6 1.2.2 Liquified petroleum gas 7 1.3 Narrative 8 1.3.1 Events leading up to the cargo leak 8 1.3.2 Weather 11 1.3.3 Emergency response 11 1.3.4 Main options for the LPG leak 14 1.3.5 Post accident action 14 1.4 and cargo 15 1.5 Cargo sampling 16 1.5.1 General 16 1.5.2 Sampling arrangement on Ennerdale 16 1.5.3 Sampling
약어·용어집GLOSSARY OF ABBREVIATIONS AND ACRONYMS
한국어 번역 · 모델 · 검수 전
약어 및 두문자어 용어집
2/O - 이등항해사(Second Officer)
3/O - 삼등항해사(Third Officer)
ASTM - 미국재료시험협회(American Society for Testing and Materials)
Bar absolute - 대기압을 포함한 bar 단위 압력(절대압)
Bar gauge - 내용물 압력계에 표시되는 bar 단위 압력(대기압 제외)(게이지압)
BSI - 영국표준협회(British Standards Institute)
BST - 영국 하계 표준시(British Summer Time)
CDI - 화학물질 유통협회(Chemical Distribution Institute)
ESD - 비상 차단(밸브)(Emergency shut down (valve))
FMT - 파울리 해상터미널(Fawley Marine Terminal)
HFRS - 햄프셔 소방구조대(Hampshire Fire and Rescue Service)
HS&E - 보건·안전·환경(Health, Safety & Environment)
IACS - 국제선급연합회(International Association of Classification Societies)
ICS - 국제해운회의소(International Chamber of Shipping)
ICSM - 인도차이나 선박관리(Indo China Ship Management)
IGC Code - 1993년판 산적 액화가스 운반선의 구조 및 설비에 관한 국제 코드(International Code for the Construction and Equipment of Ships Carrying Liquefied Gases in Bulk, 1993 Edition)
IMO - 국제해사기구(International Maritime Organization)
IMT - 국제해상운송(International Maritime Transport Ltd)
ISGOTT - 유조선 및 터미널 국제안전지침(International Safety Guide for Oil Tankers and Terminals)
LPG - 액화석유가스(Liquefied petroleum gas)
MARVS - 화물 탱크의 최대 허용 릴리프 밸브 설정압(Maximum allowable relief valve setting of cargo tank)
개요SYNOPSIS
한국어 번역 · 모델 · 검수 전
요약
(모든 시각은 BST, UTC+1)
2006년 10월 17일, 홍콩 등록 가스 운반선 Ennerdale호는 파울리 해상터미널(Fawley Marine Terminal, FMT)에 접안한 상태에서 화물 시료 채취 작업을 하던 중 액화 프로판이 대량 누출되는 사고를 겪었다. 누출은 29시간 뒤에 봉쇄되었으며, 그때까지 약 66톤의 프로판이 대기 중으로 손실된 것으로 추정된다.
완전 가압식 가스 운반선 Ennerdale호는 액화 프로판을 적재하기 위해 2006년 10월 15일 2300에 FMT의 2번 선석에 도착하였다. 적재 전 점검이 이루어졌고 곧이어 적재가 시작되었다. 10월 17일 1830에 '동결(freeze)' 시험을 하기 위해 화물 적재가 끝나기 약 2시간 전에 적재 작업이 중단되었다. 화물 검수원이 승선하여 자신의 화물 시료 채취 장비를 1번 탱크의 시료 채취 지점에 연결하였다. 이어 화물을 2~3분간 순환시켰다. 이 과정을 2번 탱크에서도 반복하였다. 시험 결과가 만족스러워 화물 적재가 계속되었고 2100에 완료되었다.
화물 검수원은 선박으로 돌아와 곧바로 1번 탱크의 시료 채취 지점으로 갔으며, 그곳에서는 일등항해사가 이미 준비하고 있었다. 화물 검수원은 나사 어댑터를 사용하여 시료 채취 장치를 선박의 시료 채취 연결부에 연결하였다. 이어 일등항해사가 대표성 있는 시료를 확실히 얻기 위해 심정 펌프(deep well pump)로 화물을 순환시켰다. 화물 검수원은 시료 채취 장치를 채우기 전에 세 차례 씻어 낸 다음 채웠다. 그는 이 과정을 반복하여 모두 네 개의 시료를 채취한 뒤, 2번 탱크의 시료 채취 지점으로 선미 쪽으로 이동하였다. 일등항해사가 1번 탱크를 안전하게 폐쇄하는 동안 화물 검수원은 자신의 장비를 2번 탱크의 시료 채취 지점에 장착할 준비를 하였다. 그가 시료 채취 연결부를 자기 쪽으로 돌리자 시료 채취 밸브 조립체가 손에서 빠져 나왔다.
일등항해사는 누출을 보고 소리를 들은 뒤 비상 차단(ESD) 밸브를 작동시켰다. 시료 채취 밸브를 다시 장착하려는 시도가 있었으나, 화물의 11 bar 압력과 연결부에 얼음이 형성된 탓에 불가능하였다. 곧 시료 채취 연결부와 같은 배관 위에서 탱크에 인접한 ESD 밸브가 완전히 닫히지 않았다는 것이 분명해졌다. 사고 직후 긴급 구조 기관에 통보되었고, 가스 구름을 분산시키기 위해 선박에 물분무가 이루어졌다. 2200에 사우샘프턴항은 모든 통항이 폐쇄되었다. 0000에 FMT의 모든 선박이 대피하였다. 10월 18일 0530에 상황이 안정되어 통항 제한이 Ennerdale호 주위 400 m 접근 금지 구역으로 완화되었고, 이에 따라 항구가 다시 통항에 개방되었다.
누출을 막을 몇 가지 방안을 검토한 끝에, 화물 배관에 핫탭(hot tap)을 하여 밀봉재를 주입해 가스 누출을 막기로 결정되었다. 파울리 정유소에서 정기적으로 이용하는 업체인 Furmanite가 10월 18일 1408에 배관에 성공적으로 천공하였다. 이어 밀봉재를 배관에 천천히 주입하여 다음 날 아침 0240에 누출을 막고 캡을 씌울 수 있었다. 그 뒤 Ennerdale호는 출항하여 솔런트(Solent)에 닻을 내리고, 수리에 대한 선급 승인과 하역항의 선박 수용 동의에 달려 있던 출항 허가를 기다렸다. 이것이 완료되자 같은 날 1814에 출항하였다.
가스 시료 채취에 사용된 조립체는 화물 배관 체계의 배수 지점으로 설계된 것이었으나, 이를 위해 원래 마련되어 있던 장치가 부적합하다고 판단되자 화물 시료 채취에 쓰이게 되었다. 가스 운반선에 대한 규제 요건에는 화물 시료 채취에 관한 지침이 거의 없으며, 통일된 표준도 사용되지 않는다. 시료 채취에 관한 업계 지침도 부족하였다. 1989년 국제가스운반선·터미널운영자협회(Society of International Gas Tanker and Terminal Operators, SIGTTO)가 발간한 지침은 간과된 것으로 보이는데, Ennerdale호에 대한 업계 검사에서 시료 채취 장치에 관한 어떤 우려도 지적되지 않았기 때문이다.
액화 프로판의 누출을 닫아 막지 못한 ESD 밸브를 검사한 결과, 작은 버(burr)에 의해 열린 상태로 걸려 있었던 것으로 밝혀졌다. Ennerdale호의 ESD 밸브는 폐쇄 속도가 허용 범위인지 확인하는 시험을 받았으나, 밸브가 닫혀 있음을 표시하고 있다는 잘못된 가정이 있었다. 일부 ESD 밸브는 선원이 압력 시험을 한 것으로 보이나, 화물 양하 배관의 밸브는 이를 할 수 있는 쉬운 방법이 없어서 시험되지 않았다. 결함이 있던 ESD 밸브를 마지막으로 검사·시험·분해 정비한 시점에 대한 기록은 없었다. 더욱이 ESD 밸브를 일정한 주기로 시험하거나 내부를 검사하도록 하는 명확한 규제 요건도, 사용 중인 ESD 밸브를 정기적으로 시험하기 위한 업계 표준도 없다.
분석의 목적은 향후 유사한 사고가 발생하는 것을 막기 위한 권고의 기초로서 사고의 기여 원인과 상황을 규명하는 것이다.
2.2 사고
LPG 가스의 최초 누출은 화물 검수원이 자신의 장비와 연결부를 맞추는 동안 가스 시료 채취 밸브를 약 ¼회전 풀어서 일어났다. 시료 채취 밸브가 화물 검수원의 손에서 빠져 나와 화물 격납 체계가 뚫렸고 LPG가 대기로 방출되었다. 사용된 시료 채취 지점은 원래 수동 글로브 밸브의 배수 콕으로 설치된 것이었다. 선내의 다른 고정식 시료 채취 방법이 업계 관행상 받아들일 수 없게 되자, 배수 콕이 화물 시료를 채취하는 쉽고 효과적인 수단이었으므로 그 대신 사용되었다.
비상 차단 체계가 작동하였음에도 시료를 채취하던 화물 양하 배관의 ESD 밸브가 닫히지 않아 누출을 막지 못하였다. 이 ESD 밸브는 나중에 열린 채 걸려 있었던 것으로 확인되었다. 이 밸브가 얼마나 오랫동안 이 상태였는지는 알 수 없다. 누출의 성격상 선원들은 스스로 누출을 막을 수 없었고 FMT의 지원이 제공되었다. 누출을 막는 데 29시간이 걸렸다.
2.3 피로
피로는 이 사고의 기여 요인으로 보지 않는다. 일등항해사는 충분히 쉬었고, 화물 검수원은 Ennerdale호에서 시료를 채취하기 불과 3시간 전에 근무를 시작하였다.
2.4 시료 채취 절차
2.4.1 선원과 화물 검수원의 관계
결론SECTION 3 - CONCLUSIONS
한국어 번역 · 모델 · 검수 전
3절 결론
3.1 권고로 이어진, 사고에 직접 기여한 안전 쟁점
1. 2번 화물 탱크 양하 배관의 ESD 밸브가 열린 채 걸려 있어 선박의 비상 화물 차단 체계가 손상되었다. [2.2]
2. IGC 코드는 고정되지 않은 나사식 부속을 허용한다. [2.5.2]
3. 시료 채취 장치에 대한 명확한 규제 요건이 없었다. [2.5.2]
4. 선급과 기타 검사 당국이 최근 실시한 수많은 선박 검사 중 어느 것에서도 시료 채취 지점 구성에 대한 우려가 제기되지 않았다. [2.5.3]
5. 업계에는 화물 시료 채취에 관한 지침이 전반적으로 부족하다. [2.5.3]
6. Ennerdale호의 ESD 밸브가 선급에 의해 승인되었음을 감안하면 '현장 수동 폐쇄(local manual closing)'의 정의는 명확히 할 필요가 있는 것으로 보인다. [2.6.2]
7. ESD 밸브가 올바르게 작동하는지 확인하기 위해 정기적으로 압력 시험을 하거나 검사하도록 하는 명확한 규제 요건이나 업계 요건이 없었다. [2.6.2]
3.2조사 중 확인되었으나 권고로 이어지지는 않았고 조치된 안전 쟁점(4절 참조)
1. 시료 채취 밸브가 손으로 풀릴 수 있었고 약 4분의 1회전 뒤에 분리되었다. [2.2]
2. 화물 검수원에 대한 브리핑과 감독은 화물 시료 채취가 안전하게 이루어질 수 있도록 하는 적절한 수단을 제공하지 못하였다. [2.4.1]
3. 화물 검수원은 화물 압력과의 사이에 최소 두 개의 밸브 격리가 있다고 가정하고 장비를 연결하고 있었으며, 이는 잘못된 것이었다. [2.4.1]
4. 시료 채취 지점의 나사식 부속이 선박 SMS가 요구하는 대로 고정되어 있지 않았으며, 그것이 풀렸다는 사실은 알아차려지지 않았다. [2.4.2]
5. 글로브 밸브 배수구를 정기적인 시료 채취 지점으로 사용하는 것은 점차 굳어진 것이었고 이 관행의 위험은 충분히 인식되지 않았다. [2.5.1]
6. 운영자와 많은 평가자는 JIS 20 K ESD 밸브 설계가 밸브 위치의 확실한 표시를 제공하지 않는다는 것을 알지 못하였다. [2.6.1]
7. 화물 배관과 일부 밸브는 압력 시험을 받았으나 양하 배관의 ESD 밸브는 닫히는지 확인하는 시험을 받지 않았다. [2.6.2]
8. 선박 직원과 해상 터미널 사이의 연락은 이상적이지 않았으나, 의사소통의 어려움이 누출을 막는 데 큰 정도로 지연을 초래하였을 가능성은 낮다. [2.7]
선박 관리 회사 ICSM Pte Ltd는 사고 후 자체 조사를 실시하였고 재발을 막기 위한 조치를 취하였다. Ennerdale호 선상에서 다음과 같은 개조가 이루어졌다.
›Ennerdale호의 수동 글로브 밸브 배수 콕을 풀리지 않도록 플랜지식 볼 밸브로 교체하였으며, 배수 콕은 더 이상 화물 시료 채취에 사용하지 않는다.
›양하 배관의 NRV 뒤에 화물 배관과 시료 채취 지점 사이에 밸브 두 개를 둔 전용 폐쇄 루프 시료 채취 체계를 설치하였다(그림 21).
›양하 배관의 것을 포함한 ESD 밸브를 매월 압력 시험하도록 선박 절차를 개정하였다.
›ESD 밸브는 또한 매 건선거 기간마다 분리하여 압력 시험을 하고 필요한 경우 분해 정비한다.
회사 안전 회보도 발간되었으며 다음을 포함한다.
›화물 작업의 안전에 대한 책임은 선박 직원에게 있으며, 육상 계약업체가 참여해야 하는 경우 면밀히 감독해야 한다는 점의 재강조.
›영구적인 설계 개조가 이루어질 때까지 시료 채취 연결부를 점검하고 모든 나사식 부속을 고정하도록 선박에 대한 지시.
개조된 2번 시료 채취 지점 그림 21
›선단의 모든 가스 운반선에 사용 중인 ESD 밸브 시험 체제를 마련하도록 하는 지시.
›
권고SECTION 5 - RECOMMENDATIONS
한국어 번역 · 모델 · 검수 전
5절 권고
SIGTTO, OCIMF 및 CDI에 다음을 권고한다.
2007/149 선급이 요구하는 기준을 충분히 고려하여, 시료 채취 장치에 관해 업계에 제공된 지침을 검토하고 개정할 것
로이드선급(Lloyd’s Register)에 다음을 권고한다.
2007/150 액화가스 운반선의 시료 채취 장치에 관한 통일 요건(UR)을 개발하자는 제안을 IACS에 제출할 것. 이 기준은 최소한 이번 조사에서 확인된 관련 미비점을, 특히 화물 체계로부터의 두 밸브 격리 확보와 나사식 커플링의 회피와 관련하여 다루어야 한다.
2007/151 ESD 밸브의 운영 및 설계에 관한 제안을 IACS에 제출할 것. 이 제안은 다음을 포함한다.
›효과적인 폐쇄를 검증하기 위해 선급 검사 시 ESD 밸브를 시험하고 검사하도록 요건을 규정할 것.
›현장 수동 폐쇄에 대한 IGC 코드 요건이 ESD 밸브를 손으로 확실히 닫을 수 있음을 뜻하도록 할 것.
›ESD 밸브 상태를 표시하는 장치가 밸브가 열려 있는지 닫혀 있는지를 정확하게 반영하도록 요구할 것.
영국 해양사고조사국(Marine Accident Investigation Branch)
2007년 5월
안전 권고는 어떠한 경우에도 과실이나 책임을 추정하게 하는 것이 아니다.
원문 보기
SIGTTO, and CDI are recommended to: 2007/149 Review and revise guidance provided to the industry on sampling arrangements, taking due account of any standard required by societies is recommended to: 2007/150 Take forward a proposal to
부록 A 가스 운반선 최초 검사용 NKK 점검표부록 B 가스 시료 채취 밸브 조립체 검사 보고서
당사 참조: RH/5710P01 귀하의 참조: 1/12/101 일자: 2006년 12월 19일 ○○ 씨, First Floor, Carlton House, Carlton Place, Southampton. SO15 2DZ
가스 시료 채취 밸브 조립체 검사담당자님께,
1.0 서론
1.1화물 탱크 1번과 화물 탱크 2번의 밸브 조립체 두 개(2)가 조사 목적으로 MSI-DSL에 제공되었다. 이 밸브 조립체들은 MT Ennerdale호에서 발생한 사고와 관련된 것으로, MSI-DSL은 정례적인 가스 시료 채취를 하던 중 화물 탱크 2번의 밸브가 실린더 조립체에서 분리되었다고 이해하고 있다.
그림 1: 전형적인 밸브 조립체원본 PDF 6쪽
10 Cambridge Road, Granby Industrial Estate, Weymouth, Dorset DT4 9XA telephone: +44 (0) 1305 760111 fax: +44 (0) 1305 760222 e-mail: Weymouth@msi-dsl.com website: www.msi-dsl.com MS INTERNATIONAL plc의 자회사 Certificate Number FM 32073 Registered in England No. 954839
2.0 검사
2.1밸브 조립체 1
MSI-DSL은 수령 즉시 밸브 조립체를 육안으로 검사하였다. 연결 나사산은 상태가 양호해 보이며 변형·부식의 흔적이 없다. 수나사는 손으로 조였을 때 완전한 나사산 여섯 개(6)가 맞물리며 밸브에서 바닥에 닿지 않았으므로, 최종 렌치 조임을 위한 충분한 나사산이 확보된다.
그림 2: 1번 탱크 수나사 그림 3: 1번 탱크 밸브 암나사원본 PDF 7쪽
2.2밸브 조립체 2
MSI-DSL은 수령 즉시 밸브 조립체를 육안으로 검사하였다. 연결 나사산은 비교적 양호해 보이며 변형·부식의 흔적이 없다. 수나사는 밸브 몸체 안에 완전히 맞물리며 손으로만 조였을 때 바닥에 닿으므로, PTFE 테이프를 감을 때 생기는 여유 외에는 렌치 조임을 위한 여유가 없다. 그럼에도 불구하고 조립체는 조일 수 있으며 요구되는 압력(18 bar로 여겨짐)에서 적절한 밀봉을 이루어야 한다.
그림 4: 2번 탱크 수나사 그림 5: 2번 탱크 밸브 암나사원본 PDF 7쪽
10 Cambridge Road, Granby Industrial Estate, Weymouth, Dorset DT4 9XA telephone: +44 (0) 1305 760111 fax: +44 (0) 1305 760222 e-mail: Weymouth@msi-dsl.com website: www.msi-dsl.com MS INTERNATIONAL plc의 자회사 Certificate Number FM 32073 Registered in England No. 954839
2.3이어 나사산을 측정하여 다음에 따라 R3/8(3/8 BSP 외부 테이퍼 나사)과 Rc 3/8(3/8" BSP 내부 테이퍼 나사)로 확인하였다.
›BS 21:1985 "나사산에서 압력 기밀 이음이 이루어지는 관 및 관 부속용 관용 나사(미터법 치수)(Pipe threads for tubes and fittings where pressure-tight joints are made on the threads (metric dimensions))".
BS 21:1985에 따르면 3/8 BSP 수나사는 유효 나사산 7.5개를 가져야 하며 그중 2.75개는 부속 조립용이다. 따라서 최소 맞물림은 약 4.75개 나사산이어야 한다.
2.4BS 21:1985는 다음과 같이 명시한다. "이 영국 표준은 다음 관용 나사에 대한 요건을 규정한다. a) 접합 나사, 즉 나사의 맞물림으로 압력 기밀이 되는 이음용 관용 나사로서 테이퍼 외부 나사, 테이퍼 내부 나사 또는 평행 내부 나사."
2.5조립 전에 압력 기밀 이음이 이루어지고 나사산이 눌어붙는 것을 막기 위해 나사산에 접합 매체를 바르는 것이 일반적인 관행임에 유의하여야 한다.
2.6모든 나사산은 완전한 형상이며 나사산의 파손을 나타내는 손상의 흔적이 없다. 줄질이나 재나사 가공으로 나사산이 변경되었다는 증거도 없는 것으로 보인다.
2.7밸브 조립체 1(1)은 페인트가 두껍게 칠해져 있었음에 유의하여야 한다. 이 때문에 수나사가 실제보다 밸브 몸체에 더 깊이 맞물려 있는 것 같은 인상을 준다. 밸브 2(2)는 MSI-DSL에 수령되기 전에 페인트가 제거되어 있었다.
그림 6: 1번 탱크 밸브 암나사원본 PDF 8쪽
10 Cambridge Road, Granby Industrial Estate, Weymouth, Dorset DT4 9XA telephone: +44 (0) 1305 760111 fax: +44 (0) 1305 760222 e-mail: Weymouth@msi-dsl.com website: www.msi-dsl.com MS INTERNATIONAL plc의 자회사 Certificate Number FM 32073 Registered in England No. 954839 10 Cambridge Road, Granby Industrial Estate, Weymouth, Dorset DT4 9XA telephone: +44 (0) 1305 760111 fax: +44 (0) 1305 760222 e-mail: Weymouth@msi-dsl.com website: www.msi-dsl.com MS INTERNATIONAL plc의 자회사 Certificate Number FM 32073 Registered in England No. 954839
3.0 결론
3.1위의 증거와 부착에 사용된 방법이 잘 알려진 업계 표준이라는 점에 비추어, MSI-DSL은 고장의 원인이 다음 중 하나로 볼 수 있다고 추정한다.
›밸브가 제 위치에 있는 동안의 밸브 회전(즉 진동 또는 밸브 조작으로 인한 밸브의 풀림).
또는
›잘못된 조립, 즉 완전히 조이지 않음.
3.2두 수나사 사이의 미묘한 차이는 제조업체가 서로 다른 데서 비롯되었을 수 있으나, 두 나사 형상 모두 영국 표준에 부합하므로 밸브 몸체의 암나사와 호환된다.
4.0 권고
4.1MSI-DSL은 테이퍼 나사를 O링 또는 접합 실(bonded seal)을 사용하는 평행 나사로 교체하는 것을 고려할 것을 권고한다. 이렇게 하면 조립과 이후의 검사가 모두 단순해질 것이다.
4.2조립체의 회전을 막는 기계식 잠금 장치를 설치하는 것도 고려하여야 한다. 이는 플랜지 고정 볼트에 부착한 직각 브래킷이나 밸브 몸체의 회전을 막는 잠금 와이어의 형태일 수 있으나 이에 한정되지 않는다.
4.3정기 정비 중에 철저한 검사를 방해하므로 밸브 조립체에 페인트를 칠하는 것은 피하여야 한다.
추가 정보가 필요하면 주저하지 말고 전화해 주시기 바랍니다.
삼가 올립니다
Richard Hanney Justin Waller선임 기술자(잠수 및 압력 계통) 기술 관리자부록 C 선박 SMS 체제의 시료 채취 부분
일자: 2005년 1월 11일 개정: 1 장: 5 가스 운반선 매뉴얼 5장 쪽: 매뉴얼 발췌
5.3.11 시료 채취
화물 시료 채취는 양하를 시작하기 전에 터미널 대표가 정례적으로 실시한다. 시료 채취는 두 가지 기본 이유로 실시된다. 화물 이송 전에 안전한 상태를 확립하기 위해서, 그리고 화물 이송의 여러 지점에서 화물이 상업적으로 합의된 규격 내에 있음을 확인하기 위해서이다.
터미널 대표나 검수원은 일반적으로 선내 배관 배치에 익숙하지 않으므로 이는 위험한 상황일 수 있다. 따라서 선박의 배관 배치를 철저히 숙지한 유능한 사관이 항상 터미널 대표와 동행하여야 한다.
시료 채취 지점의 퍼징과 실린더 공극 확보를 위해 일정량의 증기를 대기로 방출하는 것이 시료 채취에 항상 수반된다는 것은 일반적으로 받아들여진다. 다음 안전 조치를 따라야 한다.
어떤 경우에도 시료 용기의 배기, 퍼징 또는 공극 확보는 우세한 바람과 기상 조건을 충분히 고려하여 안전한 구역에서 실시하여야 한다.
채취하는 시료가 인화성 위험 외에 자극성 위험이 있을 수 있는 경우에는 그 물질을 안전한 구역에서 흡수하거나 분산시키는 수단이 마련되어야 한다. 예를 들어 암모니아의 경우 증기를 수면이나 물분무 구역으로 보내는 호스를 마련할 수 있다.
시료가 독성 수준일 수 있는 경우, 예를 들어 VCM이나 부타디엔인 경우에는 물질이 대기로 방출되는 것을 피하는 수단이 마련되어야 한다. 이 경우 폐쇄 루프 체계를 마련하거나 다음과 같이 연결하여 얻을 수 있다.
일자: 2005년 1월 11일 개정: 1 장: 5 가스 운반선 매뉴얼 5장 쪽: 매뉴얼 발췌 시료 채취 용기의 출구 밸브를 증기 시료 연결 지점이나 벤트 계통에 연결하는 것이다.
일부 화물은 질소 패드(nitrogen pad) 아래에서 운송하도록 요구된다(산화프로필렌, 산화에틸렌 또는 이들의 혼합물). 따라서 제품 시료는 탱크 바닥이나 액체 공간에서만 채취한다. 증기 공간은 질소 함량이 적절한지 확인하기 위해 시료를 채취한다.
시료 채취에 수반되는 또 다른 위험은 시료 채취 연결부가 우연히 느슨해지는 것이다. 지정된 시료 채취 지점에서는 설계 단계에서 보호 장치가 포함되어 있으므로 이런 일은 보통 일어나지 않는다. 그러나 때때로 화물 배관의 나사식 연결부에서 시료 채취가 이루어진다. 이는 특히 일부가 빈 탱크에서 이루어진다. 이를 막기 위해 이러한 연결부의 플랜지 부분을 고무 개스킷 한 토막과 결박용 와이어로 임시로 고정하여야 한다. 이를 가용접으로 고정하려 하지 말라. 용접의 열이 이러한 연결부에 있는 테플론 시트를 확실히 손상시키고 그 가스 기밀 건전성을 파괴할 것이다.
바닥 시료 채취에는 특이한 문제가 있다. 이는 항상 지정된 시료 채취 지점에서 이루어져야 한다. 섬프 배수구에서 시료를 채취하려 하지 말라. 섬프 배수구의 내용물은 결코 화물의 대표 시료가 아니다. 거기에는 이전의 여러 화물과 물의 흔적이 들어 있다. 대표성 있는 시료를 얻으려면 배수 배관 전 구간을 충분히 배기해야 한다. 이 문제는 지정된 시료 채취 지점에서 시료를 채취함으로써 쉽게 피할 수 있다. 과거에 이 때문에 화물이 거부된 적이 있다.
부록 D 선박의 ESD 시험 기록 및 항해일지 관련 발췌 부록 E JIS 20 K ESD 밸브 점검·정비 매뉴얼 부록 F 1989년 SIGTTO가 발간한 액화가스 시료 채취 절차에 관한 작업반 보고서
액화가스 시료 채취 절차에 관한 작업반 보고서
이용 약관 고지
이 문서에 제시된 조언은 현재 이용 가능한 최선의 정보를 사용하여 작성되었으나, 순전히 선주 자신의 책임 하에 사용되는 지침으로 의도된 것이다. 국제가스운반선·터미널운영자협회(Society of International Gas Tanker and Terminal Operators Ltd), 또는 정보나 자료의 제공, 편찬, 발간 또는 공인 번역에 어떤 식으로든 관여한 어떤 개인, 회사, 법인 또는 조직도, 여기에 제시된 정보나 조언의 정확성, 여기서의 누락, 또는 여기에 담긴 지침의 준수나 채택으로 직접 또는 간접적으로 발생한 어떠한 결과에 대해서도, 합리적인 주의를 다하지 못해 야기된 경우에도, 책임을 지지 않는다.
액화가스 시료 채취 절차에 관한 작업반 보고서
국제가스탱커·터미널운영자협회(SIGTTO) 액화가스 시료 채취 장비 및 절차 작업반 위임사항 1 작업반은 "SIGTTO 액화가스 시료 채취 장비 및 절차 작업반"이라 칭하며, 터미널, 가스운반선 및 기타 적절하다고 판단되는 기관의 대표로 구성한다. 작업반은 지명된 참가자 중에서 의장을 선출하며, 필요하다고 판단되는 경우 추가 참가자를 임명할 수 있다.
2 작업반의 임무는 액화가스운반선의 탱크에서 화물 시료를 채취할 때 수반되는 현재의 문제점과 잠재적 결과를 상세히 규명하는 사업의 제안서와 예산을 작성하는 것이다. 작업반은 단기 개선 방안을 권고하고 장기 기준을 제시하되, 이는 모두 액화가스 화물의 시료 채취에 수반되는 잠재적 위험을 최소화하는 것을 목적으로 한다. 작업반은 시료 채취 장비의 표준화 요건과, 시료 채취에 관여하는 터미널, 가스운반선 및 기타 인원에 대한 적정 최소 수준의 교육 요건을 다룬다.
3 작업반은 SIGTTO 일반목적위원회(General Purposes Committee)에 보고하며, 작업반 회의록은 이 위원회에 제공하고 사업 제안서 초안과 예산은 이 위원회에 제출하여 승인을 받는다.
4 작업반은 효율적이고 실행 가능한 범위에서 서면 교신으로 업무를 진행하며 가능한 한 신속히 임무를 완수한다. 1986년 5월 1일까지 승인을 받기 위한 사업 제안서 초안을 제출하는 것을 목표로 한다.
5 SIGTTO 런던 연락사무소가 작업반의 사무국 역할을 하며, 의장의 지도에 따라 필요하다고 판단되는 회의를 소집한다.
6 SIGTTO 일반목적위원회가 요청하는 경우 작업반은 그러한 요건을 포함하도록 임무 범위를 확대한다.
가스 시료 채취 절차액화가스 시료 채취 절차에 관한 작업반 보고서
요약
작업반은 1986년 4월 18일 처음 모여 부록 I로 첨부된 위임사항을 채택하고 ○○ 선장을 작업반 의장으로 선출하였다. 사업 제안서는 일반목적위원회의 승인을 받았으며, 47척의 LPG 탱커를 대상으로 한 조사를 통해 자료를 얻고 작업반 위원들을 통해 주요 터미널 운영자 4곳의 운영 경험을 수집하였다. 선박과 육상 각각의 독립적인 내부 시료 채취 절차는 한편으로는 ICS 탱커 안전 지침(액화가스)의 해당 절에서, 다른 한편으로는 ISO 국제표준 초안 4257(액화석유가스 - 방법 …)에서 일반적으로 다루어질 예정이라는 점이 작업반에 곧 분명해졌다. 따라서 작업반은 ICS 대표의 직접 참여를 통해 ICS와, 그리고 이 주제를 다루는 BSI 위원회의 사무국 임명 위원 자격을 통해 ISO 활동과 긴밀한 협력을 구하였고 이를 누렸다.
선박과 육상 양쪽의 내부 시료 채취 절차를 해당 환경에 익숙하고 당면 작업에 완전히 호환되는 장비를 갖춘 훈련된 인원이 수행한다면 위험은 미미하다는 데 의견이 일치하였다. 그러나 조사 결과, 인원이 자신에게 익숙하지 않은 곳에서 시료를 채취하려 할 때, 특히 맞지 않는 연결부를 사용하려 할 때 사고의 위험이 훨씬 더 크다는 점이 확인되었다. 육상 대표가 선박 탱크에서 시료를 채취해야 하는 경우가 이러한 상황의 가장 분명하고 빈번한 예이다. 이 점을 뒷받침하여, 한 위원은 1988년 1월에 발생한 사고를 알려 왔다. 한 기술자가 가압된 LPG 탱크에서 1인치 볼 밸브를 완전히 풀어 버렸는데, 그는 이 밸브를 시료 채취 지점으로 잘못 알아보았다. 다행히 LPG 누출은 신속히 억제되었다.
따라서 작업반은 표준화된 연결부에 관한 권고 1의 채택이 액화가스 화물의 시료 채취에 수반되는 잠재적 위험을 최소화하기 위해 (단기적으로 가능한) 가장 좋은 개선책이라는 데 만장일치로 의견을 같이한다. 표준화된 연결부에 관한 권고 1은 액화가스 화물의 시료 채취에 수반되는 잠재적 위험을 최소화하기 위해 (단기적으로 가능한) 가장 좋은 개선책이다. 권고 2~5는 운영 여건과 절차가 허용하는 대로 검토하고 적용하도록 제시한 것이다.
권고
1 시료 채취 연결 부속의 표준 선박 탱크의 시료 채취 접근 지점은 ISO 228/1에 따른 G ½ 암나사 평행나사 연결구로 끝나야 한다. 시료 채취 장비는 이에 대응하는 수나사 연결구로 끝나야 한다*. 예시 스케치를 첨부한다.
*이 권고 사항은 ISO/DIS 4257에도 반영되어 있다.
가스 시료 채취 절차
시료 채취 연결부까지의 배관 또는 튜브는 해상 사용을 견딜 수 있고 부착된 시료 용기의 무게 최대 3.5 kg을 지탱할 수 있을 만큼 견고하여야 한다. 시료 채취 연결부는 1차 밸브에서의 하이드레이트 생성에 대비하여 최소 1 미터 이상 떨어져 설치된 표준 볼 밸브 2개로 격리되어야 한다. 시료 채취 연결부는 연결과 분리의 통상적인 조작으로는 풀리지 않도록 잠금 처리되어야 한다. 연결 너트에 스패너로 접근하고 시료 용기를 장착할 수 있도록 스텁 피스 시료 채취 연결부 둘레에 반경 250 mm의 여유 공간이 있어야 한다. 사용하지 않을 때에는 스텁 피스에 밀봉면을 보호하는 연질 와셔가 들어 있는 나사 마개를 끼워 두어야 한다. 연결부에는 그 출처, 즉 탱크 번호와 상부·중간·하부 중 어느 위치인지가 명확히 표시되어야 한다. 시료를 얻기 위해 양하 펌프를 사용해야 하는 완전 냉동식 선박에서는 펌프 토출관에 (위와 같은) 표준 연결 지점을 설치하여야 한다.
2 폐회로 시료 채취 설비의 제공
시료 용기는 인정된 표준에 따라 제작하고 취급할 가스에 적합한 금속으로 만들어야 한다. 작업반은 다음의 설계 특징을 권고하는 데 만장일치로 의견을 같이한다.
›(a) 어떠한 경우에도 시료 용기의 배기, 퍼지 또는 공극(ullage) 조정은 당시의 풍향과 기상 상태를 충분히 고려하여 안전한 장소에서 수행하여야 한다.
›(b) 채취하는 시료가 가연성 위험 외에 자극성 위험도 가질 수 있는 경우에는 그 물질을 안전한 장소에서 흡수하거나 분산시킬 수단을 마련하여야 한다. 예를 들어 암모니아의 경우 호스를 사용하여 증기를 수면이나 분무 구역으로 보낼 수 있다.
›(c) 시료가 독성 위험을 가질 수 있는 경우, 예를 들어 VCM, 부타디엔의 경우에는 물질이 대기로 방출되는 것을 막을 수단을 마련하여야 한다. 예를 들어 폐회로 시스템을 설치하거나, 용기 출구 밸브를 증기 시료 채취 연결 지점 또는 통기 시스템에 연결하여 이를 구현할 수 있다.
›(d) 일부 화물(산화프로필렌, 산화에틸렌 또는 이들의 혼합물)은 질소 패드 상태로 운송하도록 되어 있으므로, 제품 시료는 탱크 바닥이나 액체 공간에서만 채취한다. 질소 함량이 충분한지 확인하기 위해 증기 공간에서도 시료를 채취한다. 추가 조언은 IMO 가스 코드와 아래 4.2항에서 언급하는 자료 시트에서 얻을 수 있다.
3 시료를 채취하고 운반하는 데 사용하는 용기의 표준/형식 시료 용기는 인정된 표준에 따라 제작하고 취급할 가스에 적합한 금속으로 만들어야 한다. 작업반은 다음의 설계 특징을 권고하는 데 만장일치로 의견을 같이한다.
3.1용기에는 사용 전에 적절한 불활성 가스로 "관통 흐름" 퍼지를 할 수 있도록 입구 밸브와 출구 밸브를 설치하여야 한다. (가스 크로마토그래피 분석에는 헬륨이 가장 적합한 것으로 인정되었으나, 헬륨의 높은 가격을 고려하여 질소의 사용 또한 업계에서 인정되는 관행으로 받아들여진다.)
3.2용기에는 채취하는 특정 액화가스에 대하여 안전한 작업용 공극을 항상 확보할 수 있도록 내부 공극관(ullage tube)을 설치하여야 한다.
3.3시료 용기의 보호에 적합한 등급의 파열판을 용기의 공극관 쪽 끝에 설치하여야 한다. 일부 제조업체는 이를 밸브 조립체에 통합하기도 한다.
가스 시료 채취 절차
3.4시료 용기 입구 밸브에는 블리드 밸브와 적절한 스위벨이 달린 T자 연결관을 부착하고, 그 끝은 ISO 228/1에 따른 평행나사 G ½의 수나사 연결 스텁으로 마감하여야 한다. 이는 선박의 대응하는 암나사 시료 채취 연결 지점과 맞물리게 하기 위한 것이다. 선박의 시료 채취 지점에 연결할 때 필요한 압력 밀봉은 수나사 연결부에 끼운 금속 또는 접착 와셔가 암나사 접속구의 나사 주변 면에 밀착되면서 이루어진다. 주: 밀봉은 나사산에서 이루어지는 것이 아니다.
4 시료를 채취하는 절차
4.1어떠한 경우에도 보호복, 장갑, 보안경 및 호흡구와 관련하여 ISO 4257 개정 초안에 제시된 지침을 준수하여야 한다. 이는 (원래 BS 3195에 수록되어 있던) 표준 지침이다.
4.2IGC 코드 18.1장에 규정된 바와 같이, 관계자 모두가 취급하는 화물의 성질과 준수해야 할 예방 조치에 관하여 적절히 안내를 받는 것이 필수적이다. 여기에는 물리적·화학적 성질의 상세한 설명, 우발적인 인체 접촉에 대한 대응책, 소화 및 기타 비상 절차가 포함되어야 한다. 이 정보는 터미널의 "HAZCHEM" 또는 "TREM" 카드와 같은 업계 자료 시트의 형태로, 또는 ICS 간행물 "탱커 안전 지침(액화가스)"의 부록 등에 수록된 형태로 이용할 수 있고 전파되어야 한다.
4.3터미널 대표나 제3자 검사원이 선박 탱크에서 시료를 채취할 때에는 책임 있는 사관이 입회하여야 한다. 그 사관은 모든 밸브의 작동 특성을 포함하여 선박 시료 채취 시스템의 모든 측면에 완전히 정통하여야 한다. 그는 실제로 누가 시료 채취 작업을 수행하든 상관없이, 시료 채취가 허가를 받아 안전한 방식으로 수행되도록 하는 것이 자신의 임무임을 분명히 인식하여야 한다.
4.4액체 시료를 채취할 때에는 온도가 주위 온도까지 상승함에 따른 액체의 팽창을 감안하여 시료 용기에 충분한 공극 또는 증기 공간을 남기는 것이 필수적이다. 채운 뒤 시료 용기를 세워(즉 공극관이 위로 가게) 들고 상부 밸브를 열어 액체가 아니라 증기만 나올 때까지 두면 적정 공극이 확인된다.
5 시료 채취가 기본적으로 필요한 이유에 관한 원칙
시료 채취는 두 가지 기본적인 이유로 수행된다는 데 의견이 일치하였다.
›(i) 화물 이송 전에 안전한 조건을 확인하기 위해.
›(ii) 여러 소유권 이전 지점에서 화물이 상업적으로 합의된 규격 내에 있음을 확인하기 위해.
따라서 시료 채취 요건의 차이는 당시의 생산 규격과 고객의 요구에서 비롯된다고 판단되었다. 그러므로 작업반이 유익한 조언을 할 수 있는 것은 연결부의 방법, 절차 및 표준에 한정된다는 데 의견이 일치하였다. 시료 채취의 원칙, 필요한 시료의 수준과 수량, 수취 탱크의 상태 조건은 계약 당사자들이 합의할 상업적 사안이라고 판단되었다. 그렇지만 생산자와 구매자가 시료 채취 요건, 규격, 지정 검사원 등을 합의한 경우에도 화물 운송인에게 제공되는 정보가 부족한 경우가 많다는 데에도 의견이 일치하였다. 예를 들어 LPG 화물 다수는 연료용 가스 시료 채취 절차 가스로 운송되며, 열량이 유지되기만 하면 많은 불순물에 대한 특별한 민감성이 없다. 다른 LPG 화물은 동굴 저장을 위한 것일 수 있어, 지하 영구동토층이나 지하수위 조건을 보호하기 위해 수취인이 메탄올 최대 함량 규격을 요구하기도 한다. 따라서 모든 당사자의 이익을 위해서는 분명히 조건과 민감성, 그리고 화물의 일반적인 설명과 위험성이 저장, 이송 또는 운송을 맡은 이들에게 알려지는 것이 모든 당사자의 이익이 됨은 분명하다. 이러한 정보 교환과 협력이 없기 때문에 각 당사자가 자기만의 시료를 요구하게 되며, 이는 잠재적으로 위험한 활동을 불필요하게 늘리는 것이 분명하다. 합의된 대표 시료의 분석 결과를 모든 이해 당사자가 받아들이는 협력을 통해 시료 채취의 필요성은 항상 최소화되어야 한다. 터미널 적재 시스템에서는 자동 시료 채취 장치를 사용하면 수동으로 채취하는 시료의 필요를 더욱 줄일 수 있다.
결론
작업반은 단기 및 중기적으로 현실적이고 효과적으로 달성할 수 있는 모든 사항에 대하여 권고를 마련하였다고 판단한다. 따라서 작업반은 보고서를 제출하여 승인을 청하며, 승인이 되면 권고가 위원들에게 배포되기를 요청한다. 작업반 위원들은 GPC가 장기적인 문제를 다시 다루는 것이 유익하다고 판단할 때 추가 연구를 기꺼이 검토할 것이다.
Annex A NKK checklist for gas carrier intial surveyAnnex B Report on examination of gas sampling assembliesOur reference: RH/5710P01 Your reference: 1/12/101 Date: 19 December 2006Mr ○○, First Floor, Carlton House, Carlton Place, Southampton. SO15 2DZExamination of Gas Sampling Assemblies
Dear Sir,
1.0 Introduction
1.1Two (2) in number assemblies,
assembly came off in his hand. The
chief officer
saw and heard a leak and activated the emergency shut down (ESD) valves. Attempts were made to refit the sampling
valve
but the 11 bar pressure of the cargo, and the formation of ice on the connection, made it impossible. It soon became apparent that the ESD
valve
adjacent to the tank on the same line as the sampling connection was not completely shut. The emergency services were alerted soon after the accident and the ship was doused in water sprays to disperse the gas cloud. At 2200, the
of Southampton was closed to all traffic. All ships at FMT were evacuated at 0000. At 0530 on 18 October, with the situation stabilised, traffic restrictions were reduced to a 400 m exclusion zone around Ennerdale, which allowed the
port
to reopen to traffic. After several options to stop the leak had been considered, it was decided to hot tap the cargo pipework and inject a sealing compound to stop the leak of gas. Furmanite, a company regularly used at Fawley refinery, successfully drilled into the pipework at 1408 on 18 October. The sealing compound was then slowly injected into the pipework, enabling the leak to be sealed and capped at 0240 the next morning. Ennerdale then sailed and anchored in the Solent, awaiting clearance to sail which was contingent upon class approval of the repair and the
port
agreeing to accept the vessel. This completed, she sailed at 1814 the same day. The assembly used for gas sampling was designed as a drain point for the cargo pipework system, but had come to be used for cargo sampling when the original arrangement provided for this was deemed unsuitable. The regulatory requirements for gas carriers include very
little guidance on cargo sampling, with no unified standard employed. Industry guidance on sampling was also lacking. Guidance, published in 1989 by the Society of International
and Terminal Operators (SIGTTO), appeared to have been overlooked as industry inspections of Ennerdale had not highlighted any concerns with the sampling arrangement. Inspection of the ESD
valve
, which failed to close and contain the leak of liquefied propane, revealed that it had been jammed open by a small burr. Although ESD valves onboard Ennerdale were tested to ensure their closure rates were acceptable, there was a false assumption that the valves were indicating that they were closed. Although some ESD valves appeared to have been pressure tested by ship’s staff, those on the cargo
discharge
lines were not, as there was no readily available method to do so. There were no records of when the faulty ESD
valve
was last inspected, tested or overhauled. Furthermore, there is no clear regulatory requirement for ESD valves to be tested or internally examined at periodic intervals, or industry standard for regularly testing of ESD valves in service. Due to the nature of the leak, the ship’s
were unable to secure the leak themselves. Although the emergency response by the ship, FMT, and local emergency services was good, liaison between ship’s staff and the FMT was not ideal. Recommendations have been made to SIGTTO, Chemical Distribution Institute (CDI) and
(
OCIMF
) with regard to providing industry guidance on sampling arrangements and procedures.
has been recommended to take two proposals to
regarding the standard of sampling connections, and ESD
27 2.4 Sampling procedures 27 2.4.1 Relationship between ship’s staff and cargo
surveyor
27 2.4.2 Guidance provided 29 2.5 Physical sampling arrangements 30 2.5.1 Design 30 2.5.2 Regulatory requirements 30 2.5.3 Industry best practice 31
2.6 Emergency shut down valves 31 2.6.1 Design 31 2.6.2 Testing and maintenance 33 2.7 Actions following the leak 34 SECTION 3 - CONCLUSIONS 35 3.1 Safety issues directly contributing to the accident which have resulted in recommendations 35 3.2 Safety issues identified during the investigation which have not resulted in recommendations but have been addressed 35 SECTION 4 - ACTION TAKEN 36 4.1 ICSM Pte Ltd 36 4.2 Intertek Caleb-Brett 37 4.3 SIGTTO 37 4.2
OCIMF
37 SECTION 5 - RECOMMENDATIONS 38 Annex A NKK checklist for gas carrier
Annex B Report on examination of gas sampling
valve
assemblies Annex C Sampling section from ship’s
system Annex D Ship’s ESD test log and relevant extracts of
Annex E Check and maintenance manual for JIS 20 K ESD
valve
Annex F Report of a working group on liquefied gas sampling procedures, published by SIGTTO in 1989
MCA - 영국 해사연안경비청(Maritime and Coastguard Agency)
NKK - 일본해사협회(Nippon Kaiji Kyokai)(선급)
NRV - 역지 밸브(Non return valve)
OCIMF - 석유회사국제해사포럼(Oil Companies International Marine Forum)
PMS - 계획정비시스템(Planned maintenance system)
PTFE - 폴리테트라플루오로에틸렌(Polytetrafluoroethylene)
SIGTTO - 국제가스운반선·터미널운영자협회(Society of International Gas Tanker and Terminal Operators)
SOLFIRE - 솔런트 및 사우샘프턴 워터 해상 비상 계획(Solent and Southampton Water marine emergency plan)
UK - 영국(United Kingdom)
URs - 통일 요건(Unified requirements)
UTC - 협정 세계시(Universal Time Constant)
Vapour pressure - 특정 온도에서 액화가스 위의 포화 증기가 이루는 평형 압력으로 절대 bar로 나타낸 것(증기압)
VLC - 초대형 원유(운반선)(Very Large Crude (Carrier))
VTS - 선박교통관제(Vessel Traffic Services)
원문 보기
2/O - Second 3/O - Third Officer ASTM - American Society for Testing and Materials Bar absolute - Pressure in bar including Bar gauge - Pressure in bar registered on content gauge (excludes atmospheric pressure) - British Standards Institute BST - British Summer Time CDI - Chemical Distribution Institute ESD - Emergency shut down () FMT - Fawley Marine Terminal HFRS - Hampshire HS&E - Health, Safety & Environment - International Association of Classification Societies - International Chamber of Shipping ICSM - Indo China Ship Management IGC Code - International Code for the and Equipment of Ships Carrying Liquefied Gases in Bulk, 1993 Edition - International Maritime Organization IMT - International Maritime Transport Ltd ISGOTT - International Safety Guide for Oil Tankers and Terminals - Liquefied petroleum gas MARVS - Maximum allowable relief valve setting of - Maritime and Coastguard Agency NKK - Nippon Kaiji Kyokai () NRV - Non return valve - Oil Companies International Marine Forum - Planned maintenance system PTFE - Polytetrafluoroethylene SIGTTO - Society of International and Terminal Operators SIR - (CDI Inspection) SIRE - Ship Inspection Report Programme (OCIMF inspection) - Safety Management System SOLFIRE - Solent and Southampton Water marine emergency plan UK - United Kingdom URs - Unified requirements - Universal Time Constant Vapour pressure - Equilibrium pressure of saturated vapour above the liquid gas expressed in bars absolute at a specific temperature VLC - Very Large Crude (Carrier) - Vessel Traffic Services
누출의 성격상 선원들은 스스로 누출을 막을 수 없었다. 선박, FMT 및 지역 긴급 구조 기관의 비상 대응은 양호하였으나, 선박 승무원과 FMT 사이의 연락은 이상적이지 않았다.
시료 채취 장치 및 절차에 관한 업계 지침을 마련하도록 SIGTTO, 화학물질 유통협회(Chemical Distribution Institute, CDI) 및 석유회사국제해사포럼(OCIMF)에 권고가 이루어졌다. 로이드선급(Lloyd’s Register)에는 시료 채취 연결부의 표준, 그리고 ESD 밸브의 설계와 정기 시험에 관한 두 가지 제안을 국제선급연합회(IACS)에 제출하도록 권고하였다.
그림 1원본 PDF 15쪽
원문 보기
(All times are BST, +1) On 17 October 2006, the Hong Kong registered gas carrier Ennerdale experienced a major leak of liquefied propane, while cargo sampling operations were taking place, alongside Fawley Marine Terminal (FMT). The leak was sealed 29 hours later, after an estimated 66 tonnes of propane had been lost to atmosphere. The fully pressurised gas carrier Ennerdale arrived at FMT’s No. 2 at 2300 on 15 October 2006, to load liquefied propane. Preloading checks were conducted and loading commenced shortly after. At 1830 on 17 October the loading operation was halted, approximately 2 hours before was due to be completed, to allow a ‘freeze’ test to be conducted. A cargo came aboard and attached his cargo sampling equipment to the sampling point of tank No. 1. The cargo was then circulated for 2-3 minutes. The process was repeated for tank No. 2. With the test results satisfactory, cargo loading continued and completed at 2100. The cargo surveyor returned to the ship and went straight to the sampling point of tank No. 1, where the was already preparing. The cargo surveyor used a thread adapter to connect the sampling device to the ship’s sampling connection. The chief officer then circulated the cargo, using the deep well , to ensure a good representative sample was obtained. The cargo surveyor flushed the sampling device through three times before filling it. He repeated the process, taking four samples in total, before moving aft to the sampling point of tank No. 2. While the chief officer secured tank No. 1, the cargo surveyor prepared to fit his equipment to the sampling point of tank No. 2. As he turned the sampling connection towards himself, the sampling assembly came off in his hand. The chief officer saw and heard a leak and activated the emergency shut down (ESD) valves. Attempts were made to refit the sampling valve but the 11 bar pressure of the cargo, and the formation of ice on the connection, made it impossible. It soon became apparent that the ESD valve adjacent to the tank on the same line as the sampling connection was not completely shut. The emergency services were alerted soon after the accident and the ship was doused in water sprays to disperse the gas cloud. At 2200, the of Southampton was closed to all traffic. All ships at FMT were evacuated at 0000. At 0530 on 18 October, with the situation stabilised, traffic restrictions were reduced to a 400 m exclusion zone around Ennerdale, which allowed the port to reopen to traffic. After several options to stop the leak had been considered, it was decided to hot tap the cargo pipework and inject a sealing compound to stop the leak of gas. Furmanite, a company regularly used at Fawley refinery, successfully drilled into the pipework at 1408 on 18 October. The sealing compound was then slowly injected into the pipework, enabling the leak to be sealed and capped at 0240 the next morning. Ennerdale then sailed and anchored in the Solent, awaiting clearance to sail which was contingent upon class approval of the repair and the port agreeing to accept the vessel. This completed, she sailed at 1814 the same day. The assembly used for gas sampling was designed as a drain point for the cargo pipework system, but had come to be used for cargo sampling when the original arrangement provided for this was deemed unsuitable. The regulatory requirements for gas carriers include very
little guidance on cargo sampling, with no unified standard employed. Industry guidance on sampling was also lacking. Guidance, published in 1989 by the Society of International and Terminal Operators (SIGTTO), appeared to have been overlooked as industry inspections of Ennerdale had not highlighted any concerns with the sampling arrangement. Inspection of the ESD valve, which failed to close and contain the leak of liquefied propane, revealed that it had been jammed open by a small burr. Although ESD valves onboard Ennerdale were tested to ensure their closure rates were acceptable, there was a false assumption that the valves were indicating that they were closed. Although some ESD valves appeared to have been pressure tested by ship’s staff, those on the cargo discharge lines were not, as there was no readily available method to do so. There were no records of when the faulty ESD valve was last inspected, tested or overhauled. Furthermore, there is no clear regulatory requirement for ESD valves to be tested or internally examined at periodic intervals, or industry standard for regularly testing of ESD valves in service. Due to the nature of the leak, the ship’s were unable to secure the leak themselves. Although the emergency response by the ship, FMT, and local emergency services was good, liaison between ship’s staff and the FMT was not ideal. Recommendations have been made to SIGTTO, Chemical Distribution Institute (CDI) and (OCIMF) with regard to providing industry guidance on sampling arrangements and procedures. has been recommended to take two proposals to regarding the standard of sampling connections, and ESD valve design and periodic testing. Figure 1
선적항
홍콩
기국
홍콩
종류
완전 가압식 액화가스 운반선
건조
1997년, Shin Kochi-Jyuko Co. Ltd, 일본
선급
Nipon Kaiji Kyokai(NKK)
구조
강철
전장
99.92 m
총톤수
4227
기관 출력 및/또는 형식
3089 kW, Akasaka 6UEC37LA
상용 속력
12노트
기타 관련 정보
고정피치 프로펠러 1기, 선수 추진기 없음
사고 세부 사항
시각 및 일자
2142 17/10/2006
사고 장소
파울리 해상터미널 2번 선석 접안 중
승선 인원
선원 19명 + 화물 검수원 1명
부상/사망
1명, 경미한 냉상(cold burn)
결과
LPG 66톤이 대기 중으로 손실됨
이 도면의 이어지는 가장자리는 어느 정도 겹쳐 있음에 유의할 것
그림 2원본 PDF 11쪽 (쪽 전체)
1.2 배경
1.2.1 선박 설명
Ennerdale호는 1997년에 화학제품·가스 운반선으로 건조되었다. 이 선박은 2005년 3월부터 관리 회사 ICSM Pte Ltd의 관리 아래 운항해 왔으며, 주로 액화석유가스(LPG)를 운송하였다. 사고 당시 ICSM Pte Ltd는 선박 9척을 관리하고 있었으며, LPG 운반선, 제품 운반선 및 VLC 운반선이 섞여 있었다.
Ennerdale호는 완전 가압식 가스 운반선으로, 게이지압 18 bar 이하, 온도 0°C 이상으로 설계된 수평 원통형 압력 용기에 화물을 상온으로 운송하였다. 반냉동식이나 완전 냉동식 가스 운반선과 달리 탱크에 두꺼운 단열이 되어 있지 않았고 선내에 화물 냉동 설비도 없었다. 화물 냉각 설비가 마련되어 있었으나 이는 산화프로필렌을 운송할 때에만 사용되었다.
그림 2는 화물 격납 배치를 보여 준다. 2000m3 탱크 두 개는 서로 거울상이었으며 좌현 또는 우현 매니폴드를 통해 적재 및 양하되었다(그림 3). 적재할 화물이 냉동된 것이면 가열기를 거치게 하여 화물 온도가 0°C 이상이 되도록 할 수 있었다. 각 탱크에는 적재 시 가스 증기를 육상으로 되돌려 보내고, 또한 선박의 압축기 두 대로 화물 증기를 가압하여 탱크로 돌려보낼 수 있도록 하는 증기 배관이 있었다.
좌현 화물 매니폴드
그림 3원본 PDF 12쪽
탱크 돔에서 적재 배관에는 탱크 바로 옆에 비상 차단(ESD) 밸브가 설치되어 있었고, 이어서 수동 나사식 글로브 밸브가 직렬로 설치되어 있었다. 양하 배관에서는 심정 펌프가 ESD 밸브, 수동 글로브 밸브 및 역지 밸브(그림 4)를 거쳐 매니폴드로 화물을 내보냈다. 화물 매니폴드에는 ESD 밸브와 수동 글로브 밸브가 설치되어 있었다. 증기 배관에도 탱크 돔과 매니폴드에 ESD 밸브와 수동 밸브가 설치되어 있었다. 10개의 ESD 밸브는 모두 같은 유압 계통으로 작동하였고, 유압이 제거되면 스프링 압력으로 자동으로 닫혔다.
이번 사고에서 사용된 시료 채취 지점은 탱크 양하 배관의 수동 글로브 밸브 아래에 있었다(그림 4). 대표성 있는 시료를 얻기 위해 화물은 심정 펌프를 사용하여 탱크에서 양하 배관을 거쳐 순환되었고 적재 배관을 거쳐 탱크로 되돌아갔다.
1.2.2 액화석유가스
LPG는 프로판, 부탄 및 이 둘의 혼합물로 이루어진다. LPG는 발전과 금속 절단 같은 기타 산업 용도를 포함하여 폭넓게 쓰이는 중요한 연료이다. LPG는 1934년부터 해상으로 운송되어 왔으며, 상당한 양이 지금도 해상으로 운송되고 있다.
이번 사례에서 운송된 가스인 프로판은 대기압에서의 끓는점이 -42°C이고 37.8°C에서의 증기압이 절대압 12.9 bar이다. 따라서 이를 액체로 운송하려면 가스를 냉동하거나 가압하거나 둘을 조합해야 한다.
1번 화물 양하 배관
그림 4원본 PDF 13쪽그림 속 글자 (5)
심정 펌프ESD 밸브나사식 글로브 밸브NRV전동기 제어장치
1.3 경위
(모든 시각은 BST, UTC+1)
1.3.1 화물 누출에 이르기까지의 상황
가스 운반선 Ennerdale호는 처음으로 2006년 10월 7일 파울리 해상터미널(FMT)을 방문하였다. 이 선박은 액화 프로판을 적재하고 포르투갈로 출항하여 레이상이스(Leixoes)와 리스본(Lisbon)에서 양하한 뒤 공선 상태로 영국에 돌아왔다. 10월 15일 2300에 FMT에 도착하여 2번 선석에 좌현 접안으로 계류하였다(해도 1). 정기 검사 및 수리 기간을 위해 선박이 건선거에 들어가기 전에, 포르투갈행 액화 프로판 화물을 한 차례 더 적재하려는 것이었다.
계류가 끝난 뒤 터미널 해무 감독이 Ennerdale호에 승선하였고 선박/육상 안전 점검표가 작성되었다. Intertek Caleb-Brett의 화물 검수원도 선박에 승선하여, 평소처럼 이전 화물의 증기가 아직 선내에 남아 있었기 때문에 일등항해사와 함께 잔류 화물 계산을 하였다. 그 뒤 일등항해사는 ESD 밸브 계통을 열고 화물 적재를 할 수 있도록 수동 밸브를 정렬하였다.
10월 16일 0006에 액화 프로판이 1번 및 2번 화물 탱크로 흘러 들어가기 시작하였다. 10월 17일 1830에 적재가 약 2시간 남은 상태에서 화물 작업이 중단되고 수동 매니폴드 밸브가 닫혔다. 화물의 수분 함량을 확인하는 동결 시험(freeze test)을 하기 위해 화물 검수원이 승선하였다. 그는 일등항해사의 안내로 1번 화물 탱크의 시료 채취 지점(그림 4)으로 갔다. 이어 화물 검수원은 자신의 동결 시험 장비를 시료 채취 지점의 엘보 부품 끝에 연결하였다. 일등항해사가 필요한 밸브를 열고 심정 펌프를 가동하여, 화물 검수원이 만족했다는 신호를 줄 때까지 2~3분간 화물을 순환시켰다. 이어 일등항해사와 화물 검수원은 동일한 시료 채취 장치가 있는 2번 화물 탱크로 이동하여 같은 과정을 반복하였으며 명백한 문제는 없었다. 화물 검수원이 동결 시험이 성공적이었음을 확인한 뒤 화물 적재가 재개되었다.
2100에 선박은 각 탱크에 약 900톤의 액화 프로판을 싣고 적재를 마쳤다. 액체 배관과 증기 배관의 수동 매니폴드 밸브와 1번 및 2번 수동 적재 밸브가 모두 닫혔다.
화물 검수원은 화물 시료를 얻고 선내 화물량을 확인하기 위해 선박에 다시 승선하였다. 그는 곧바로 1번 시료 채취 지점으로 갔다. 화물 검수원은 시료 채취 지점이 연결된 수동 글로브 밸브가 나사로 조여 있어 닫혀 있음을 볼 수 있었다. 그는 또한 시료 채취 지점과 탱크 사이의 ESD 밸브가 닫혀 있다고 가정하였다. 계속해도 안전하다고 판단하여, 시료 채취 장치의 나사형 엘보 부품과 시료 채취 장치 사이에 맞는 나사 어댑터를 찾았다(그림 5 및 6). 그는 시료 채취 장치를 연결하고 연결부를 손으로 조였다. 그 사이 일등항해사는 수동 화물 적재 밸브를 열었고, 화물 검수원이 준비되자 1번 탱크의 심정 펌프를 가동하였다. 이어 일등항해사는 양하 배관 수동 밸브를 살짝 열었고, 화물 순환을 시작하기 위해 이 밸브를 계속 천천히 열었다.
화물 검수원은 시료 채취 밸브와 시료 채취 장치 양 끝의 밸브 두 개를 열었다. 그는 시료 채취 장치를 채웠다가 대기로 배출하는 것을 세 차례 하여 씻어 낸 다음 채웠다. 그는 선박의 시료 채취 밸브를 닫고 시료 채취 장치를 분리하였다. 그는 다른 시료 채취 장치를 장착하여 같은 과정을 반복하였고, 결국 모두 네 개의 시료를 채취하였다. 마지막 시료 채취 장치는 약간
해도 1 파울리 해상터미널
HMSO 관리관 및 영국 수로국의 허가를 받아 영국 해군성 해도 2036에서 복제함
시료 채취 용기(Sampling bomb) 그림 5 나사 어댑터 그림 6 달랐는데, 구리 부식 시험에 사용될 것이었기 때문이다. 선박의 시료 채취 밸브가 마지막으로 닫히자 일등항해사는 양하 밸브를 닫고 심정 펌프를 정지시켰다. 그는 수동 적재 밸브를 닫으러 이동하였다.
화물 검수원은 장비를 분리하고 플라잉 브리지(flying bridge)를 따라 2번 탱크의 시료 채취 지점으로 선미 쪽으로 걷기 시작하였다. 그 사이 일등항해사는 캡 플러그를 끼웠는데도 시료 채취 지점 끝에서 증기가 계속 나오는 것을 알아차렸다. 그는 갑판 실습생을 불러 렌치를 가져와 플러그를 조이게 하였다. 이것으로 증기가 멈추지 않자 일등항해사는 실습생에게, 플러그의 나사산에 감아 기밀로 만들 PTFE 테이프를 화물제어실에서 가져오라고 지시하였다. 실습생이 돌아오자 일등항해사는 그를 두고 선미 쪽으로 향하였는데, 화물 검수원이 이미 2번 탱크의 시료 채취 지점에서 준비를 하고 있음을 의식하였기 때문이다.
화물 검수원은 수동 글로브 밸브가 닫혀 있는 것에 다시 안심하고 ESD 밸브가 닫혀 있다고 가정하여, 왼손에 나사 어댑터를 쥔 채 오른손으로 시료 채취 지점을 잡으려고 아래로 손을 뻗었다. 1번 시료 채취 지점과 달리 이번에는 시료 채취 밸브를 손으로 자기 쪽으로 돌려야 했다. 밸브는 나사 어댑터를 장착할 수 있도록 90도를 넘지 않게 돌려졌다. 화물 검수원이 밸브를 돌리자 밸브와 엘보 부품이 한 덩어리로 그의 손에서 빠져 나왔고, 액화 프로판이 나사식 스터드 부분에서 쏟아져 나오기 시작하였다. 그 시점의 배관 내 압력은 약 11 bar(게이지압)였다.
1.3.2 기상
사고 당시 기상은 약한 남동풍 8노트의 미풍이었고 흐렸으며 이따금 이슬비가 내렸다.
1.3.3 비상 대응
2140을 조금 지나 일등항해사는 플라잉 브리지를 따라 선미 쪽으로 걸어가던 중 증기 구름을 보았고 큰 쉬익 하는 소리를 들었다. 그는 2번 화물 탱크의 시료 채취 지점으로 달려가 화물 검수원에게 무슨 일인지 물었다. 화물 검수원은 대답 대신 가스 시료 채취 밸브를 내밀며 밸브가 빠져 버렸다고 말하였다. 일등항해사는 플라잉 브리지의 선체 중앙부로 달려 돌아가 비상 차단 버튼(그림 7)을 눌러 비상 차단을 작동시켰다.
화물 검수원은 밸브를 다시 장착하려 하였으나 실패하였으며, 그 과정에서 밸브를 증기 구름 속의 갑판에 떨어뜨렸다. 일등항해사는 밸브가 보이지 않아 발로 더듬어 회수한 뒤, 직접 밸브를 다시 장착해 보려고 선원들에게 걸레를 가져오라고 지시하였다. 그는 ESD 밸브가 작동되었으므로 누출의 원인은 배관 내 압력뿐이라고 생각하였다. 일등항해사는 장비 덮개를 방패로 삼아 밸브를 다시 연결하려 하였으나 새어 나오는 가스 때문에 물러서야 했다.
Ennerdale호의 선장은 선교에서 쉬익 하는 소리를 들었고, 이어 휴대용 무전기로 누출이 있었다는 것을 들었다. 그는 총원 경보를 울리고 선내 방송으로 화물 누출이 있었음을 알렸다. 선원들이 집결하였고 비상팀이 편성되어 호스를 준비하고 보호 장비를 착용하였다. 2150에 선장은 또한 새어 나오는 가스를 분산시키기 위해 선박의 갑판 물분무 장치를 가동하였다.
일등항해사는 엘보 부품을 밸브 밑에서 분리할 수 있도록 가스 시료 채취 밸브를 기관장에게 넘겨주도록 조치하였다. 엘보 부품을 분리하고 시료 채취 밸브를 연 상태로 하면 그것이 될 수 있을 것으로 기대하였다
쉽게 교체할 수 있을 것으로 기대하였다. 엘보 부품이 분리된 뒤, 호흡구와 화학 보호복을 착용한 비상팀원 한 명이 밸브를 다시 장착하려 하였으나, 글로브 밸브 밑면에서 돌출된 나사식 스터드 부분에 이미 얼음이 쌓여 있어 하지 못하였다. 시료 채취 밸브는 안전한 보관을 위해 다른 사관에게 되돌려졌다. ESD 밸브가 버티지 못하고 있으며 2번 화물 탱크가 대기로 가스를 방출하고 있다는 것이 점점 분명해졌다. 선장은 2200에 선박 관리 회사에 사고를 통보하였다. 사고가 전개되면서 회사는 비상 대응을 지원하기 위해 사무실에 비상관리팀을 구성하였다.
육상에서는 FMT 직원 한 명이 사고가 벌어지는 것을 보고 경보를 울렸다. 화물 작업이 중단되었고 2145에 긴급 구조 기관과 사우샘프턴 선박교통관제(VTS)에 사고가 통보되었다. 예방 조치로 VTS는 2200에 사우샘프턴항을 폐쇄하였다. 2220에 햄프셔 소방구조대(HFRS) 요원이 FMT의 잔교에 도착하여 사고 현장의 전반적인 통제를 맡았다. 2225에 사우샘프턴 항만장은 사고에 대응하여 SOLFIRE 'B'를 발령하였다. 해상 대응 센터가 사우샘프턴 독스의 VTS 센터에 설치되었다. 이어 긴급 구조 기관과 FMT의 대표들이 해상 대응 센터에 보고하였다. FMT의 육상 모니터와 추가 소방 호스를 투입하여 Ennerdale호에 대한 물분무를 늘려 가스 구름을 분산시켰다(그림 8). FMT에 상주하던 예선 두 척 중 한 척도 계속 추가 물분무에 투입되었다.
자정 직전 HFRS는 FMT에 계류한 선박들에서 필수 인원이 아닌 모든 인원의 대피를 명령하였다. 선장, 기관장 및 이등기관사는 Ennerdale호에 남았다. 대피에 앞서 기관장과 일등항해사는 화물 매니폴드로 가서 배관 안에 있던 화물을 선외로 배출하기 시작하였다. 일등항해사가 다른 모든 선원과 함께 육상으로 대피할 때 배관 압력은 서서히 떨어지고 있었다.
밤사이 HFRS, FMT, 선박 직원 및 선박 관리 회사 사이의 협의를 거쳐 여러 계획이 검토되고 조치가 취해졌다. 밸브를 다시 장착하려는 시도가 있었으나 형성된 얼음 덩어리가 이를 막았다. ESD 밸브를 닫으려고 작동기 밸브 스템을 잭으로 조여 닫으려는 시도가 있었고, 밸브가 착좌되도록 수동으로 열고 닫는 시도도 있었다. FMT 직원이 정기적으로 가스 모니터링을 하였다. 물분무는 새어 나오는 가스를 분산시키는 데 완전히 효과적인 것으로 확인되었으며 인화성 가스 구름이 형성될 위험은 최소였다. 상황이 안정되어 10월 18일 0530에 사우샘프턴항은 Ennerdale호 주위에 400m 접근 금지 구역을 둔 채 다시 개방되었다. 선원들은 자기 선박으로 돌아가는 것이 허용되었고 접근 금지 구역 밖에서는 정상 작업이 재개되었다. FMT 1번 선석에 계류한 유조선 한 척이 정상 작업을 재개할 수 없었던 유일한 다른 선박이었다.
플라잉 브리지의 ESD 버튼 그림 7 LPG 가스의 물분무 분산 그림 8
1.3.4 LPG 누출을 막기 위한 주요 방안
오전 중에 가스 누출을 막을 방안이 더 분명해졌다. 선박 직원은 1번 화물 탱크의 화물을 육상으로 양하한 뒤 2번 탱크의 내용물을 1번 탱크로 옮기는 방안을 제안하였다. 이는 12시간이 걸릴 것으로 추정되었다. 그러나 FMT 직원은 화물을 받을 여유 육상 저장 시설이 없었기 때문에 이를 최후의 수단으로 여겼다. 또한 FMT 직원은 12시간 안에 누출을 해결할 수 있다고 확신하였다.
선박 직원은 또한 두꺼운 나무 조각을 글로브 밸브 밑에 잭으로 받쳐 올려 일시적으로 누출을 막아 보자고 제안하였다. FMT는 얼음 덩어리의 크기와 배관이 더 손상될 위험 때문에 이를 비현실적이라고 판단하였다. 이 수리는 또한 매우 임시적인 성격이어서 선박이 하역항까지 항해할 수 있게 해 주지도 못하였을 것이다.
그다음 계획은, 밤새 어댑터와 커넥터가 이미 제작되고 있었는데, 2번 탱크 배수 섬프(drain sump)에 해수 호스를 장착하여 탱크에 해수를 주입하는 것이었다. 물이 심정 펌프를 거쳐 밀려 나가 누출 구멍을 통해 탱크 밖으로 나가기를 기대하였다. 누출구를 통해 물이 흐르면 얼음 덩어리를 제거할 수 있고, 11 bar의 물이 계속 흐르는 상태에서 열린 볼 밸브를 스터드 부분에 장착할 수 있을 것이었다. 장착이 끝나면 볼 밸브를 닫을 수 있었다. 이 방안은 물 흐름의 예측 불가능성, 배관 내 얼음 형성 및 오염 가능성 때문에 특별히 선호되지 않았다.
마지막으로 검토된 방안은 ESD 밸브와 수동 글로브 밸브 사이의 배관에 핫탭을 하고 배관에 누출을 막을 충전재를 주입하는 것이었다. 이 작업은 파울리 정유소가 24시간 호출 계약을 맺고 있던 하청업체 Furmanite가 수행할 것이었다. Furmanite는 파울리 정유소 부지에서 정기적으로 일해 왔으나, Ennerdale호에서와 같이 유조선 선상의 진행 중인 누출을 수리하는 데 투입된 적은 없었다.
10월 18일 약 1000에 핫탭 주입 방식이 누출을 막을 가장 좋은 가능성이라고 결정되었다. 1340에 준비가 끝났고 계약자들은 글로브 밸브의 플랜지에 구멍을 뚫기 시작하였다. 1425에 핫탭이 설치되었고 이들은 16 cc 패킷으로 공급되는 밀봉재 주입을 시작하였다. 처음에는 40~60패킷이 필요할 것으로 추정되었다. 그러나 10월 19일 0240에 93패킷이 주입되고 나서야 화물 흐름이 충분히 줄어 얼음 덩어리를 제거하고 누출구에 캡을 씌울 수 있었다. 배관을 막기 위해, ⅜" 스터드 부분에 나사로 연결되는 나사 어댑터가 달린 새 ½" 볼 밸브가 장착되었다(그림 9).
1.3.5 사고 후 조치
Ennerdale호가 가스 기밀 상태가 되자 FMT의 2번 선석을 비우기 위한 준비가 이루어졌다. 매니폴드 화물 호스의 화물이 배출되었고 로딩 암이 분리되었다. 탱크의 양을 측정하였고, 선박의 수치로 누출 중 66톤의 프로판이 손실된 것으로 추정되었다. MCA는 선박이 솔런트의 솔트미드(Saltmead) 묘박지로 항해하는 것을 허가하였다. Ennerdale호는 0905에 FMT 선석을 떠나 1030에 닻을 내렸다. 묘박지를 떠나기 전에 MCA는 누출 수리가 선급의 승인을 받을 것, 목적항이 화물을 받는 데 동의할 것, 선장이 최소 6시간 휴식을 취했을 것을 조건으로 정하였다.
리스본에서 화물을 받는다는 서면 확인이 도착하고 NKK로부터 선급 조건을 받은 뒤, Ennerdale호는 1814에 닻을 올렸다. 선장은 MCA에 5시간의 휴식을 취했다고 확인하였다. 탱크 용량 부족으로 약간 지연된 뒤 Ennerdale호는 리스본에서 화물을 양하하고 수리를 위해 네덜란드 블리싱언(Vlissigen)으로 출항하였다.
1.4 선원 및 화물 검수원
Ennerdale호에 승선한 선원은 모두 관리 회사의 자회사인 선원 공급 회사를 통해 고용된 필리핀인이었다.
51세의 선장은 II/2급 자격에 가스 한정(gas endorsement)을 가지고 있었으며 LPG 운반선에서 17년간 선장으로 근무하였다. 이 기간 동안 그는 완전 냉동식과 반가압식 LPG 운반선에서 승선하였으나, 대부분의 시간은 Ennerdale호와 같은 완전 가압식 가스 운반선에서 보냈다. 사고 당시 선장은 6개월 계약 중 5개월을 근무하였으며 Ennerdale호에서는 첫 계약이었다.
33세의 일등항해사는 1995년에 II/3급을 취득하였고 LPG 운반선에서 삼등항해사로 5회 계약 근무하였다. 이어 이등항해사로 4회 계약 근무한 뒤 가스 한정이 있는 II/2급을 취득하고 사고 9개월 전에 일등항해사로 승진하였다. Ennerdale호는 일등항해사로서 두 번째 계약이었으며 6개월 계약의 절반 동안 승선해 있었다. Ennerdale호에는 처음 승선하였으나 이전에 동형선에서 삼등항해사로 근무한 적이 있었다.
2번 시료 채취 지점 수리 그림 9 Furmanite 주입용 핫탭 지점 41세의 기관장은 2004년 9월부터 가스 한정이 있는 III/2급 자격을 가지고 있었으며 기관장으로 두 차례 계약 근무하였고 둘 다 LPG 운반선이었다. 그는 1994년에 선박 기관사로 경력을 시작하였다. 지난 8년 동안은 LPG 운반선에서만, 주로 반가압식에서 근무하였다. 사고 당시 기관장은 6개월 계약 중 5개월 동안 Ennerdale호에 승선해 있었다.
51세의 화물 검수원은 2006년 8월에 화물 검수원으로 Intertek Caleb-Brett에 입사하였다. 그 뒤 화물 시료 채취원으로 일할 수 있도록 회사 교육 과정을 이수하였다. 이전에는 17년 동안 상선 사관을 하였고 마지막 5년은 LPG 운반선의 선장이었다. 그는 1990년에 해사 분야가 아닌 직업으로 옮겼다가 2006년 8월에 화물 검수원으로 복귀하였다.
1.5 화물 시료 채취
1.5.1 일반
화물 시료 채취는 운송된 제품의 품질을 확인하는 데 필요하다. 이는 유조선 터미널에서 출항 및 입항 시 정기적으로 이루어진다. FMT에서는 Intertek Caleb-Brett가 터미널과 화물 용선자를 대신하여 육상과 선상에서 시료를 채취하도록 계약되어 있었다. 채취된 시료는 분석을 위해 파울리 정유소의 실험실로 가져갔다.
시료를 채취하려면 화물 격납 체계를 통제되고 안전한 방식으로 열어야 한다. 이번 경우에는 소량의 LPG를 대기 중으로 방출하는 것이 허용되었으므로 개방 루프(open-loop) 방식의 시료 채취가 사용되었다. 더 위험한 제품에는, 시료로 필요하지 않아 방출되는 제품이 탱크로 되돌아가도록 하는 폐쇄 루프(closed-loop) 시료 채취 체계가 요구된다.
1.5.2 Ennerdale호의 시료 채취 장치
Ennerdale호의 탱크에서 액체 시료를 채취하기 위한 원래의 설계 의도(부록 A)는 섬프 배수구(그림 10)를 통하거나 슬립 튜브(그림 11)를 사용하는 것이었다. 화물 증기 시료는 탱크 돔의 시료 채취 밸브에서 채취할 수 있었다.
섬프 배수구는 탱크 바닥이 물이나 이전에 운송한 화물로 오염되어 있을 수 있으므로 선호되는 시료 채취 지점이 아니었다. 슬립 튜브는 탱크 레벨 플로트 게이지가 고장 났을 때를 대비한 예비 장치로 설치되었다. 슬립 튜브는 눈금이 새겨진 두 개의 튜브로 이루어져 탱크를 관통하였으며, 하나는 탱크 아래 절반에, 다른 하나는 위 절반에 있었다. 튜브를 탱크 밖으로 올리고, 슬립 튜브 벤트를 열어 가스를 방출하며, 벤트에서 가스 대신 액체가 나오는 것이 보일 때까지 슬립 튜브를 내리면 탱크 내용물의 공극(ullage)을 측정할 수 있었다. 이것이 탱크의 액면을 나타냈다. 이어 슬립 튜브의 눈금을 읽어 공극 값을 얻을 수 있었다. 시료 채취에 쓸 때에는 벤트에서 액체가 시료 용기로 나오도록 슬립 튜브를 위치시켰다.
지난 10년 동안 업계 모범 실무의 변화로 슬립 튜브를 시료 채취에 정기적으로 사용하는 일은 사실상 중단되었다. 이 방식에는 폐쇄 루프 시료 채취 체계가 아니라는 점을 포함하여 많은 위험이 내재해 있었다. 탱크 내용물과 대기 사이에 작은 벤트 밸브 하나에 의존하였다. 또한 슬립 튜브가 압력으로 탱크 돔에서 튀어나가 탱크로 열린 구멍을 남기고, 이를 막기 어려웠던 사고도 있었다.
탱크 돔의 슬립 튜브 그림 11 섬프 배수 배관 그림 10 Ennerdale호에서는 슬립 튜브를 더는 쓸 수 없고 탱크 섬프 배수구로는 대표성 있는 화물 시료를 얻을 수 없었으므로 시료를 얻을 다른 방법이 필요하였다. ESD 밸브와 직렬로 설치된 모든 나사식 글로브 밸브의 밑면에는 배수 콕이 있었다. 그리하여 간단한 해법으로, 양하 배관 수동 글로브 밸브의 배수 콕(그림 4)을 개방 루프 시료 채취 지점으로 채택하였다. 그러면 심정 펌프로 화물을 순환시켜 탱크 내용물의 대표성 있는 양질의 시료를 얻을 수 있었다.
1.5.3 시료 채취 밸브 조립체 검사
상세 검사를 위해 두 시료 채취 지점 조립체가 모두 선박에서 분리되었다. 검사 보고서 사본은 (부록 B)에 포함되어 있다. 배수 지점은 플랜지, 나사식 스터드 부분, 니들 밸브 및 엘보 부품으로 이루어져 있었다. 사용하지 않을 때는 엘보 부품 끝에 캡도 나사로 끼워져 있었다. 모든 나사산은 서로 호환되는 ⅜" BSP 테이퍼 나사로 확인되었다. 모든 나사산은 상태가 양호하였고 손상 흔적이 없었다. 완전히 조이면 배수 지점은 화물 탱크의 설계 한계인 18 bar(게이지압)까지 적절한 밀봉을 이루어야 한다. 그러나 조립체가 풀리지 않도록 나사산을 기계적으로 잠그는 수단은 마련되어 있지 않았다. 또한 밸브 중 하나에 페인트가 여러 겹 칠해져 있어 나사산 체결 깊이를 확인하기 어렵게 하였던 것도 관찰되었다.
1.5.4 선내 시료 채취 절차
회사의 가스 운반선 안전관리체제(SMS) 매뉴얼에는 화물 시료 채취에 관한 부분이 있었다(부록 C). 이 부분은 유능한 사관이 항상 화물 검수원과 동행할 것을 요구하였다. 시료 채취 연결부가 우연히 느슨해질 위험도 강조되어 있었고 예방 조치가 상세히 기술되어 있었다. 선원들은 시료 채취 지점이 풀릴 수 있다는 것을 알고 있었고 과거에 조립체를 조인 적이 있었다. 출항 준비를 위한 선내 절차의 일환으로 시료 채취 지점 부속이 단단히 조여 있는지 점검이 이루어졌다.
1.5.5 화물 검수원의 시료 채취 절차
Intertek Caleb-Brett 화물 검수원이 따르는 시료 채취 과정은 Exxon Chemical Europe Inc.를 위해 1998/99년에 개발된 가스 운반선 계측 지침(Gas Ship Measurement Guidelines)을 따랐다. LPG 시료 채취에 사용된 구체적인 표준은 ASTM D1265-97이었다. 화물 검수원이 다양한 화물의 시료를 안전하게 채취할 수 있도록, 이들은 특정 종류의 화물을 채취하기에 적합하다고 승인될 때까지 사내에서 교육과 감독을 받았다.
1.6 비상 차단 밸브
1.6.1 일반
ESD 밸브는 비상 시 화물 탱크를 밀봉하도록 되어 있다. IGC 코드는 ESD 밸브가 원격으로 작동할 수 있고 해로운 역압 서지를 막기 위해 정해진 일정한 속도로 닫혀야 한다고 요구한다.
1.6.2 Ennerdale호 ESD 밸브 설명
Ennerdale호에 설치된 ESD 밸브의 도면은 (그림 12)에 포함되어 있다. (그림 2)가 나타내듯이 화물 격납 체계에는 모두 같은 설계이지만 크기가 세 가지로 다른 10개의 ESD 밸브가 있었다. 증기 배관은 호칭 구경 125mm, 적재 및 양하 배관은 호칭 구경 150mm, 좌현 및 우현 액체 적재 매니폴드는 호칭 구경 200mm였다.
ESD 밸브 도면 그림 12
단일 유압 계통이 10개의 ESD 밸브 작동기 모두에 공급되었으며, 밸브를 열어야 할 때 이 작동기가 밸브 스핀들을 밸브 몸체 안으로 밀어 내렸다. 이 형식의 밸브에서 스핀들은 밸브 디스크에 부착되어 있지 않았는데, 먼저 밸브 디스크 중앙의 파일럿 밸브에 접촉해야 하기 때문이었다(그림 13). 파일럿 밸브 조립체는 밸브 디스크 양쪽의 초기 압력 차를 줄일 수 있게 해 주었다. 이로써 밸브 디스크를 더 작은 힘으로 열 수 있었고, 따라서 더 작은 유압 작동기로 충분하였다. 차단이 이루어질 때 ESD 밸브의 올바른 폐쇄 속도는 유압유 압력이 해제되는 속도와 계통 내 두 스프링의 힘에 의해 결정되었는데, 하나는 작동기에, 다른 하나는 밸브 디스크 아래에 있었다.
ESD 밸브의 폐쇄 속도는 선원이 정기적으로 시험하고 기록하였다. 매번 ESD 밸브의 일부만 시간을 측정하였다. Ennerdale호에서 마지막으로 기록된 ESD 시험은 2006년 10월 12일의 28초였으나 어떤 ESD 밸브를 시험했는지는 불분명하다. 이 시험과 이전의 ESD 밸브 시험은 모두 허용되는 폐쇄 시간을 기록하였다(부록 D). ESD 폐쇄 시간은 터미널 선박/육상 안전 점검표에서 요구되는 항목 중 하나였는데, 터미널 직원이 자신들의 배관 체계가 역압 서지로부터 보호되는지 확인하고자 하였기 때문이다.
1.6.3 밸브 제조업체
Ennerdale호의 ESD 밸브는 Nakakita Seisakusho Co Ltd가 제조하였다. 이 형식의 밸브는 1979년부터 제작되어 왔으며 2006년에도 구할 수 있었다. 이 형식으로 크기가 다양한 800개가 넘는 ESD 밸브가 생산되었다. 제조업체는 이 형식의 밸브에 대한 기본 '사용 설명서(Instruction Booklet)'와 '점검 및 정비 매뉴얼(Check and Maintenance Manual)'(부록 E)을 작성하였으나, 이 문서들의 사본은 Ennerdale호 선내에서 발견되지 않았다.
파일럿 밸브가 있는 ESD 밸브 디스크 그림 13
1.6.4 결함이 있던 ESD 밸브의 검사
건선거에 들어간 뒤 Ennerdale호의 모든 ESD 밸브가 분리되어 검사되었다. 2번 양하 배관의 ESD 밸브를 제외하고는 아무 문제도 발견되지 않았다. 이 밸브는 열린 채 걸려 있었던 것으로 밝혀졌고, ESD 밸브가 누출을 막지 못한 이유를 명백히 설명하였다(그림 14 및 15). 밸브 디스크와 스프링 조립체가 들어 있는 밸브 밑부분을 분리하였다(그림 16). 밸브 가이드의 작은 버가 밸브 디스크가 스프링의 힘으로 올라가 밸브 시트에 닿는 것을 막고 있었던 것으로 확인되었다(그림 17 및 18). 버는 가이드를 밸브 몸체 바닥에 고정한 두 군데 가용접 중 한 곳 옆에 있었다.
압력 쪽에서 본 2번 ESD 밸브 그림 14 2번 ESD 밸브 내부 - 위쪽에 시트, 아래쪽에 밸브 디스크 그림 15 밸브 밑부분 조립체 그림 16 밸브 가이드의 버 그림 17 밸브 디스크 몸체의 긁힘 손상 그림 18
1.7 IGC 코드
IGC 코드의 목적은 산적 액화가스와 일부 기타 물질의 안전한 해상 운송에 대한 국제 표준을 제공하는 것이다. 1993년판 IGC 코드는 1994년 10월 1일 이후 건조된 가스 운반선에 적용되었으며, 여기에는 Ennerdale호가 포함되었다. IGC 코드의 보충판이 1994년 이후 발간되었으나 이는 Ennerdale호가 건조된 뒤인 1998년 7월 1일에 발효하였다. IGC 코드의 전신은 가스 운반선 코드(Gas Carrier Code)였으며, 그 요건은 1976년 이후 건조 계약이 체결되었거나 1980년 이후 인도된 선박에 적용되었다.
IGC 코드는 복원성, 선박 배치, 화물 격납, 압력 배관 계통 및 화재 방호를 비롯한 수많은 요건을 상세히 규정한다. 선급은 IGC 코드의 요건과 가스 운반선에 대해 가질 수 있는 추가적인 선급 규칙에 비추어 선박을 평가한다.
IGC 코드에는 5.6절에 상세히 규정된 ESD 밸브에 관한 구체적인 요건이 여럿 있다. Ennerdale호에 적용된 발췌는 다음과 같다.
5.6.1모든 화물 배관 계통과 화물 탱크에는 해당되는 경우 다음 밸브를 갖추어야 한다. ...
.2 MARVS가 0.7 bar(게이지압)를 초과하는 화물 탱크의 경우, 안전 릴리프 밸브와 액면 계측 장치를 제외한 모든 액체 및 증기 연결부에 수동 조작 스톱 밸브와 원격 제어 비상 차단 밸브를 갖추어야 한다. 이 밸브들은 실행 가능한 한 탱크에 가깝게 설치되어야 한다...
5.6.4요구되는 모든 비상 차단 밸브의 제어 계통은, 선박의 최소 두 곳의 원격 위치에 있는 단일 제어장치로 이 모든 밸브를 작동시킬 수 있도록 배치되어야 한다. 이 위치 중 하나는 13.1.3에서 요구하는 제어 위치 또는 화물제어실이어야 한다. 제어 계통에는 또한 98°C에서 104°C 사이의 온도에서 녹도록 설계된 가용 요소가 있어 화재 시 비상 차단 밸브가 닫히도록 하여야 한다. 이러한 가용 요소의 위치에는 탱크 돔과 적재 장소가 포함되어야 한다. 비상 차단 밸브는 페일 클로즈드(fail-closed, 동력 상실 시 닫힘) 형식이어야 하며 현장에서 수동으로 닫을 수 있어야 한다. 액체 배관의 비상 차단 밸브는 모든 사용 조건에서 작동 후 30초 이내에 완전히 닫혀야 한다. 밸브의 폐쇄 시간과 작동 특성에 관한 정보를 선내에서 이용할 수 있어야 하며 폐쇄 시간은 검증 및 재현이 가능하여야 한다. 이러한 밸브는 부드럽게 닫혀야 한다.
가스 운반선 코드(Gas Carrier Code)에 따른 ESD 밸브 요건은 위와 크게 다르지 않았다. 이는 Nakakita Seisakusho Co Ltd가 Ennerdale호에 설치된 형식의 ESD 밸브를 처음 제조한 1979년에 적용되던 규정이었다.
1.8 IACS
국제선급연합회(IACS)는 또한 IMO(국제해사기구)가 승인한 IGC 코드의 통일 해석을 보유하고 있으며, 이는 코드의 모호한 부분을 여러 선급이 일관되게 다루도록 하기 위한 것이다. 사고 당시 ESD 밸브 요건이나 화물 시료 채취와 관련된 IACS 해석은 없었다.
IACS는 또한 회원 선급이 자신들의 규칙에 채택하도록 하는 최소 기준인 통일 요건(UR)을 보유하고 있다. 특히 주목할 것은 UR Z16 '산적 액화가스 운반선 화물 설비의 정기 검사(Periodic Surveys of Cargo Installations on ships carrying liquefied gas in bulk)'에 있는 요건으로, 배관 계통의 특별 검사 요건 항목에서 다음과 같이 규정한다.
2.3.1화물, 액체 질소 및 공정 배관 계통은 밸브, 작동기, 신축 이음 등을 포함하여 필요하다고 판단되는 대로 열어서 검사하여야 한다. 배관의 상태를 확인하기 위해 필요하다고 판단되는 대로 단열재를 제거하여야 한다. 육안 검사에서 배관의 건전성에 의문이 제기되면 해당 배관의 MARVS의 1.25배로 압력 시험을 하여야 한다. 재조립 후에는 배관 계통 전체의 누설 시험을 하여야 한다.
1.9 업계 지침
1.9.1 SIGTTO
국제가스운반선·터미널운영자협회(SIGTTO)는 액화가스 산업의 안전에 대한 신뢰를 유지하기 위해 전 세계적으로 높은 기준과 업계 모범 실무를 증진하고자 1979년에 설립되었다. 1982년 SIGTTO는 안전 문제에 관해 자문하는 공평한 전문 기구로서의 지위를 인정받아 IMO에서 옵서버 지위를 부여받았다. SIGTTO는 업계에 지침을 제공하는 많은 간행물을 제작하였으며 기구 웹사이트에 정보 자료실을 운영하고 있다.
1989년에 SIGTTO는 액화가스 시료 채취 절차에 관한 작업반 보고서를 발간하였다(사본은 부록 F에 포함되어 있다). 주된 권고는 표준화된 시료 채취 연결 부속을 채택해야 한다는 것이었다. 운영 상황이 허락하는 대로 검토하고 적용하도록 하는 추가 권고도 있었으며, 여기에는 시료 용기, 폐쇄 루프 시료 채취 및 시료 채취 절차가 포함되었다. 다음 발췌는 시료 채취 장치에 구체적으로 적용되었다.
시료 채취 연결부까지의 배관 또는 튜브는 해상 사용을 견디고 부착된 시료 실린더 무게 최대 3.5 kg을 견딜 만큼 견고하여야 한다. 시료 채취 연결부는 1차 밸브에서의 하이드레이트 형성에 대한 예방 조치로 최소 1미터 간격을 두고 설치된 표준 볼 밸브 두 개로 격리되어야 한다. 시료 채취 연결부는 연결을 만들고 해체하는 통상의 동작으로 풀릴 수 없도록 잠겨 있어야 한다....
시료 채취와 관련해서는 BSI가 발간한 HS&E 회보 07/2004도 하나 있었는데, 이는 시료 채취 장치에 과충전하는 위험을 강조하였다.
1.9.2 ICS
국제해운회의소(ICS)는 액화가스 운반선에 대한 유조선 안전 지침서를 발간하였으며, 이는 모범 실무 지침을 제공하고 화물 시료 채취에 관한 부분을 포함하였다. 그 발췌는 아래와 같다.
책임 사관은 화물 시료 채취가 이루어질 때 입회하여야 한다. 그는 모든 밸브의 작동 특성을 포함하여 선박의 시료 채취 체계의 모든 측면을 충분히 숙지하고 있어야 한다. 그는 실제 시료 채취 작업을 누가 수행하든, 시료 채취 작업이 시료 채취 과정에 필요한 것을 넘어 화물 액체나 증기가 대기로 유출되는 것을 막는 안전하고 효율적인 방식으로 이루어지도록 하는 책임이 전적으로 자신에게 있음을 분명히 인식하여야 한다.
책임 사관은 어떠한 시료 채취 작업을 시작하기 전에도 시료 채취 장비가 선박의 시료 채취 지점과 호환되는지 스스로 확인하여야 한다.
1.10 선박 검사
1.10.1 배경
유조선 업계는 선급 검사와 기국 당국 검사 외의 감시도 받는다. 업계 단체들은 선박의 물적·운영상 품질을 가늠하기 위해 추가 검사를 실시한다. 검사는 화학물질 유통 업계(Chemical Distribution Industry, CDI), 석유회사국제해사포럼(OCIMF) 및 LPG 터미널 자체가 실시한다.
1.10.2 화학물질 유통 업계
CDI는 비영리 재단으로, 주요 목적 중 하나는 화학 산업의 해상 운송의 안전과 품질을 개선하는 것이다. 이의 핵심 요소는 선박 검사이다. CDI 선박검사보고서(SIR)는 안전 측면을 포함하여 선박과 그 운영에 대한 품질 평가를 제공한다. 이후 잠재적 용선자가 명목상의 요금을 내고 보고서를 볼 수 있다. 검사는 자격을 갖추고 승인된 독립 검사관이 수행하며 완료하는 데 최대 12시간이 걸릴 수 있다. 검사 요청은 선주 또는 관리자가 하며 최소 연 1회 이루어진다. Ennerdale호의 마지막 CDI 검사는 2006년 7월 21일자였다.
SIR 질문서는 포괄적이며 다음을 다룬다.
›규제 측면 - 법정(statutory)으로 표시
›업계 모범 실무 - 권장(recommended)으로 표시
›CDI 요건 - 바람직(desirable)으로 표시
SIR 질문 5.1.56~5.1.58은 시료 채취를 구체적으로 다루었다. 특히 5.1.57은 다음을 물었다.
5.1.57 시료 채취 장비를 연결하는 수단이 만족스러운 것으로 보이는가
CDI 검사관의 지침 노트는 이를 풀어서 (부록 F)에 있는 SIGTTO 권고 일부를 포함시켰다.
배관은 시료 실린더 무게 최대 3.5 kg을 견딜 수 있는 견고한 구조일 것. 시료 채취 연결부는 볼 밸브 두 개로 격리될 것. 스패너를 쓸 수 있도록 스텁 피스 연결부 주위에 최소 250mm의 여유가 있어야 한다
이 질문은 '권장'으로 분류되었으며 Ennerdale호의 마지막 CDI 검사에서 긍정으로 기재되었다.
1.10.3 OCIMF SIRE
OCIMF는 원유 및 석유 제품의 선적과 터미널에 이해관계가 있는 석유 회사들의 자발적 협회이다. 이 기구의 목적은 유조선과 터미널의 설계 및 운영 기준을 지속적으로 개선하도록 증진하는 것이다. 이를 뒷받침하기 위해 OCIMF는 선박검사보고 프로그램(SIRE)도 실시한다. 이 프로그램은 석유 산업의 열악한 품질의 해운에 대한 우려를 해소하기 위해 1993년에 시작되었다.
SIRE 검사는 CDI 검사와 달리 잠재적 용선자가 개시한다. 검사는 지정된 검사관이 실시하며 질문이 광범위하다. 검사 결과는 OCIMF 회원과 다른 기관이 잠재적 선박을 심사하는 데 도움이 되도록 명목상의 요금으로 이용할 수 있다. Ennerdale호의 직전 두 번의 SIRE 검사는 2006년 4월 23일과 10월 12일자였다. 둘 다 특별한 우려를 지적하지 않았다. 가스 운반선 화물 시료 채취와 관련된 SIRE 질문서의 관련 질문에는 다음이 포함되었다.
8.39액체와 증기 모두에 시료 채취 배관이 있으며 밸브와 캡이 갖추어져 있는가?
이 질문에는 추가 지침 노트가 딸려 있지 않았다.
1.10.4 터미널 검사
선박이 FMT와 같은 터미널에 도착할 때 심사 체계의 또 다른 요소가 발생한다. 선박이 기대되는 기준에 맞게 운영되는지 확인하기 위해 터미널 직원이 검사하는 경우가 흔하다. Ennerdale호는 FMT에 처음 도착했을 때 검사를 받았으며 적합한 것으로 판정되었다.
1.11 유사 사고
Coral Acropora호는 2004년 8월 10일 영국 런콘(Runcorn)에 접안해 있는 동안 염화비닐 단량체가 대량 방출되었다. 완전한 조사가 이루어졌고 MAIB가 보고서를 작성하였다. 가스 누출은 후부 화물 탱크에서 시료를 채취하는 동안 전부 화물 탱크가 과가압되어 일어났다. 화물은 Ennerdale호에서 사용된 방법과 비슷한 방식으로 시료를 얻기 위해 순환되었다. 그러나 화물 밸브가 관행적으로 열려 있어, 화물이 후부 탱크로 되돌아가지 않고 다른 화물 탱크로 이송되었다. 같은 시각에 육상 작업자들이 선박 직원의 감독 없이 매니폴드에서 작업을 시작하였다. 화물은 폐쇄 루프 시료 채취 체계를 사용해야 하는 것이었으나 Coral Acropora호의 후부 탱크에서는 폐쇄 루프 시료를 채취할 수단이 없었다. 터미널과 선박 운영자에게 권고가 이루어졌다. SIGTTO와 OCIMF에도, 화물 펌프를 사용해야 하는 시료 채취 작업과 관련하여 가스 운반선 점검표와 절차에 관한 당시의 지침과 권고를 검토하도록 권고가 이루어졌다. 절차와 점검표는 검토되었고 개정 사항이 2006년에 발간된 제5판 유조선 및 터미널 국제안전지침(ISGOTT)에 포함되었다.
원문 보기
1.1 OF ENNERDALE AND ACCIDENT Vessel details (Figure 1) Registered owner : Everjoy City Ltd, Hong Kong Manager : ICSM Pte Ltd Commercial Operator Petredec Services Asia : Hong Kong Flag : Hong Kong Type : Fully pressurised liquefied Built : 1997, Shin Kochi-Jyuko Co. Ltd, Japan : Nipon Kaiji Kyokai (NKK) : : 99.92 m : 4227 power and/or type : 3089 kW, Akasaka 6UEC37LA Service : 12 knots Other relevant info : Single fixed , no Accident details Time and date : 2142 17/10/2006 Location of incident : Alongside No. 2 , Fawley Marine Terminal Persons on board : 19 + 1 cargo Injuries/fatalities : 1, minor cold burn Outcome : 66 tonnes of lost to atmosphere
Please note the joining edges of this drawing show a degree of overlap
Figure 2
1.2 BACKGROUND 1.2.1 Ship description Ennerdale was built in 1997 as a chemical and gas carrier. She had operated under the managers, ICSM Pte Ltd, since March 2005, predominately transporting liquefied petroleum gas (LPG). ICSM Pte Ltd managed nine ships at the time of accident, the ships being a mixture of LPG, product and VLC carriers. Ennerdale was a fully pressurised gas tanker, and transported her cargo at ambient temperature in horizontal cylindrical pressure vessels rated for no greater than 18 bar gauge and at temperatures no lower than 0°C. Unlike semi pressurised or fully refrigerated gas carriers, her tanks were not heavily insulated and there was no cargo onboard. A cargo cooling facility was provided, but this was only used when carrying propylene oxide. Figure 2 shows the cargo containment layout. The two 2000m3 tanks were mirror images of each other and were loaded and discharged through either the or (Figure 3). If the cargo to be loaded was refrigerated, it could be directed through a heater to ensure the cargo temperature was above 0°C. Each tank had a vapour line to allow gas vapour to be returned ashore when loading and also to enable cargo vapour to be pressurised with the ship’s two compressors for its return to the tanks. Port cargo manifold Figure 3
At the tank domes, the loading lines were fitted with emergency shut down (ESD) valves immediately next to the tank, and then a manual screw down globe in series. On the line, a deep well was used to remove the cargo via an ESD valve, manual globe valve and non return valve (Figure 4) to the manifold. The cargo manifolds were fitted with ESD valves and manual globe valves. The vapour lines were also fitted with ESD valves and manual valves at the tank dome and manifold. The 10 ESD valves all operated on the same hydraulic system, closing automatically under spring pressure when the hydraulic pressure was removed. The sampling points used in this accident were situated beneath the manual globe valves on the discharge lines of the tanks (Figure 4). To obtain a representative sample, the cargo was circulated from the tank using the deep well pump, via the discharge line, and back into the tank, via the loading line. 1.2.2 Liquefied petroleum gasLPG comprises propane, butane and mixtures of the two. LPG is an important fuel that has a wide range of uses including power generation and other industrial purposes, such as metal cutting. LPG has been carried by sea since 1934, and significant quantities of LPG continue to be transported by sea. Propane, the gas carried in this case, has a boiling point at of -42°C and a vapour pressure at 37.8°C of 12.9 bars absolute. This requires the gas to be either refrigerated, pressurised or a combination of the two, to allow its transportation as a liquid. No 1 cargo discharge line Figure 4 Deep well pump ESD valve Screwed down globe valve NRV Motor controls
1.3 NARRATIVE (All times are BST, +1) 1.3.1 Events leading up to the cargo leak The gas carrier Ennerdale arrived, for her first ever visit, at Fawley Marine Terminal (FMT) on 7 October 2006. She loaded with liquefied propane and sailed for Portugal, where she unloaded in Leixoes and Lisbon before returning to the UK . She arrived at FMT at 2300 on 15 October, port side to on berth 2 (Chart 1). The intention was to load one more cargo of liquefied propane, destined for Portugal, before the ship entered for a scheduled survey and repair period. After completion of mooring, the terminal marine superintendent went aboard Ennerdale and the ship/ safety checklist was completed. A cargo surveyor, from Intertek Caleb-Brett, also went onboard the vessel to complete a residual cargo calculation with the , because, as usual, vapour from the previous cargo was still onboard. After that, the chief officer opened the ESD valve system and aligned the manual valves to permit . At 0006 on 16 October, liquefied propane began to flow into No. 1 and No. 2 cargo tanks. At 1830 on 17 October, with roughly 2 hours of loading remaining, cargo operations were stopped and the manual manifoldvalve was closed. A cargo surveyor came aboard to conduct a freeze test, which checked the water content of the cargo. He was shown to the sampling point for No. 1 (Figure 4), by the chief officer. The cargo surveyor then attached his freeze test equipment to the end of the elbow piece of the sampling point. The chief officer opened the necessary valves and started the deep well pump to circulate the cargo for 2-3 minutes until the cargo surveyor indicated he was content. The chief officer and cargo surveyor then moved to No. 2 cargo tank, which had an identical sampling arrangement, and repeated the process, with no apparent problems. After the cargo surveyor had confirmed the freeze test had been successful, cargo loading resumed. At 2100, the ship completed loading, having roughly 900 tonnes of liquefied propane in each tank. Both the liquid and vapour line manual manifold valves were closed, as well as the No. 1 and No. 2 manual loading valves. The cargo surveyor re-boarded the ship to obtain cargo samples and determine the cargo quantity onboard. He went straight to No.1 sampling point. The cargo surveyor could see the manual globe valve, to which the sampling point was attached, was screwed down and, therefore, shut. He also assumed that the ESD valve between the sampling point and the tank was closed. Happy that it was safe to continue, he found the appropriate screw adapter that would fit between the threaded elbow piece of the sampling arrangement and the sampling device (Figures 5 and 6). He attached the sampling device and tightened the connection by hand. The chief officer meanwhile had opened the manual cargo loadingvalve and, once the cargo surveyor was ready, the deep well pump of No. 1 tank was started. The chief officer then cracked open the discharge line manual valve and continued to open this valve slowly to start the cargo circulating. The cargo surveyor opened the sampling valve and the two valves on either end of the sampling device. He flushed the sampling device by filling and venting it to atmosphere three times before filling it. He closed the ship’s sampling valve and removed the sampling device. He fitted another sampling device and repeated the process, eventually taking four samples in total. The last sampling device was slightly
Chart 1 Fawley Marine Terminal Reproduced from Admiralty Chart 2036 by permission of the Controller of HMSO and the UK Hydrographic Office
Sampling bomb Figure 5 Thread adapter Figure 6
different as this was to be used for a copper corrosion test. Once the ship’s sampling valve had been closed for the last time, the chief officer closed the dischargevalve and stopped the deep well pump. He moved to close the manual loading valve. The cargo surveyor removed his equipment and started to walk aft along the flying to the sampling point for tank No. 2. The chief officer meanwhile noticed that some vapour was still emitting from the end of the sampling point, even though the capping plug had been inserted. He called the to bring a wrench and tighten the plug. This did not stop the vapour, so the chief officer told the to retrieve some PTFE tape from the to wrap around the screw thread of the plug to make it gas tight. When the cadet had returned, the chief officer left him and headed aft as he was conscious that the cargo surveyor was already making preparations at the sampling point for No. 2 tank. The cargo surveyor, happy again that the manual globe was closed and assuming the ESD valve was shut, reached down to grasp the sampling point with his right hand while holding a thread adapter in his left. Unlike No. 1 sampling point, he then had to rotate, by hand, the sampling valve towards him. The valve was rotated through no more than 90 degrees to enable him to attach the thread adapter. As the cargo surveyor rotated the valve, the valve and elbow piece came off in his hand, in one piece, and liquefied propane started to gush out of the threaded stud piece. The pressure in the line at the time was approximately 11 bar gauge. 1.3.2 Weather The weather conditions at the time of the accident consisted of a light south easterly, 8 knot breeze, and it was with occasional drizzle. 1.3.3 Emergency response A little after 2140, the chief officer saw a cloud of vapour and could hear a loud hissing noise as he was walking aft on the flying bridge. He ran to the sampling point for No. 2 cargo tank and asked the cargo surveyor what had happened. In reply, the cargo surveyor held out the gas sampling valve and said that the valve had come off. The chief officer ran back to the midships on the flying bridge and pressed the emergency shut down button (Figure 7) to activate an emergency shut down. The cargo surveyor attempted to refit the valve but was unsuccessful, dropping the valve on the in the vapour cloud in the process. The chief officer recovered the valve using his feet, as he could not see it, and then instructed his crew to get some rags as he intended to try and refit the valve himself. He believed now the ESD valve had been activated that it was only the pressure in the line causing the leak. The chief officer, using an equipment cover as a shield, tried to reconnect the valve but was forced back by the escaping gas. The of Ennerdale was on the bridge when he heard a hissing noise and then heard over the portable radios there had been a leak. He sounded the general alarm and made an announcement on the that there had been a cargo leak. The crew mustered, and an emergency team formed up preparing hoses and donning protective equipment. At 2150, the master also started the ship’s deck water spray system to dissipate the leaking gas. The chief officer arranged for the gas sampling valve to be given to the , so that the elbow piece could be removed from the of the valve. Having removed the elbow piece and, with the sampling valve open, it was hoped it could
be replaced more easily. One of the emergency team, wearing and a chemical suit, tried to refit the valve once the elbow had been removed, but he was unable to do so as he found some ice had already accumulated on the threaded stud piece that projected from the underside of the globe valve. The sampling valve was handed back to another for safe keeping. It was now becoming increasingly obvious that the ESD valve was not holding and that No. 2 cargo tank was venting to atmosphere. The master notified the ship managers of the incident at 2200. As the incident developed, the company formed up their emergency management team at their offices to support the emergency response. Ashore, a member of FMT staff saw the incident unfold and raised the alarm. Cargo work was stopped, and at 2145 the emergency services and Southampton (VTS) were notified of the accident. As a precaution, VTS closed the port of Southampton at 2200. At 2220 Hampshire (HFRS) personnel arrived at FMT’s and took overall control of the accident site. At 2225, in response to the incident, Southampton harbourmaster activated SOLFIRE ‘B’. The marine response centre was set up at the at Southampton Docks. Representatives from the emergency services and FMT then reported to the marine response centre. FMT shore monitors and further -fighting hoses were employed to increase the water spray on to Ennerdale and disperse the gas cloud (Figure 8). One of the two tugs which were permanently based at FMT was also continuously employed spraying additional water. Just before midnight, HFRS ordered the evacuation of all non essential personnel from the ships moored at FMT. The master, chief engineer and second engineer remained onboard Ennerdale. Prior to the evacuation, the chief engineer and chief officer went to the cargo manifold and had started overboard the cargo that was in the lines. The pressure in the lines was slowly reducing when the chief officer was evacuated ashore with all the other crew. During the night, with consultation between HFRS, FMT, ship’s staff and the ship managers, different plans were considered and steps taken. Attempts were made to refit the valve, but the ice ball which had formed prevented this. There was an attempt to jack shut the actuator valve to try and close the ESD valve, as well as manually and closing it to try and get the valve to seat. Gas monitoring was regularly carried out by FMT staff. The water sprays were found to be fully effective in dissipating the leaking gas, and there was minimal danger of a flammable gas cloud forming. With the situation stabilised, at 0530 on 18 October the port of Southampton was reopened but with a 400m exclusion zone imposed around Ennerdale. Crews were permitted to return to their ships, and normal operations were resumed outside of the exclusion zone. A moored at FMT No. 1 berth was the only other ship unable to resume normal operations.
ESD button on flying bridge Figure 7 Water spray dispersion of LPG gas Figure 8
1.3.4 Main options for the LPG leak During the morning, the options for stopping the gas leak became clearer. Ship’s staff suggested pumping No. 1 cargo tank ashore and then transferring the contents of No. 2 tank into No. 1 tank. It was estimated this would take 12 hours. However, FMT staff considered this to be an option of last resort because there was no spare storage ashore to receive the cargo. Also, FMT staff were confident they could cure the leak in less than 12 hours. Ship’s staff also suggested that a thick piece of wood could be jacked up under the globe valve to try and temporarily seal the leak. FMT considered this to be impractical, due to the size of the ice ball and because of the risk of further damage to the pipework. This repair would also have been of a very temporary nature and would not have enabled the ship to sail to a dischargeport. The next plan, for which adapters and connectors were already being constructed throughout the night, was to fit a sea water hose to the No. 2 tank drain sump and then inject sea water into the tank. It was hoped that the water would then be pushed through the deep well pump and out of the tank through the leaking orifice. With water flowing through the leak, the ice ball could then be removed, and it would be possible to fit an open ball valve on to the stud piece with water at 11 bar still flowing through. Once fitted, the ball valve could then be shut. This option was not particularly favoured due to the unpredictability of the water flow, ice formation within the pipework and potential contamination problems. The last considered option was to hot-tap the pipework between the ESD and manual globe valve and then inject a compound into the pipework that would seal the leak. This work would be carried out by Furmanite, a sub contractor with whom Fawley refinery had a 24 hour -out contract. Although Furmanite had been employed regularly on the Fawley refinery site, they had never been used to fix a live leak onboard a tanker such as was the case onboard Ennerdale. At approximately 1000 on 18 October, the decision was made that the hot-tap injection method represented the best chance of sealing the leak. At 1340, preparations were complete and the contractors started to drill a into the of the globe valve. By 1425, the hot-tap was in place and they started injecting the sealing compound, which was delivered in 16 cc packets. It was initially estimated that 40-60 packets would be required. However, it was not until 93 packets had been inserted, at 0240 on 19 October, that the flow of cargo was sufficiently reduced to enable the ice ball to be removed and the leak capped. A new ½” ball valve, fitted with a thread adapter to screw on to the ⅜” stud piece, was fitted to close off the pipework (Figure 9). 1.3.5 Post accident action With Ennerdale gas tight, preparations were made to clear berth No. 2 at FMT. The manifold cargo hose was drained and the loading arm was disconnected. Tank quantities were measured and, from the ship’s figures, it was estimated that 66 tonnes of propane had been lost during the leak. The gave permission for the ship to sail to the Saltmead in the Solent. Ennerdale left the FMT berth at 0905, and by 1030 was at . Before she could leave the anchorage, the MCA stipulated the leak repair must be approved by class, the destination port must have agreed to receive the cargo, and the master must have had at least 6 hours rest.
Once written confirmation had arrived that the cargo would be received in Lisbon, and having obtained a condition of class from NKK, Ennerdale weighed anchor at 1814. The master confirmed to the MCA he had managed 5 hours rest. After some delays due to lack of tankage, Ennerdale unloaded her cargo in Lisbon before sailing for Vlissigen, Holland, for repairs. 1.4 CREW AND CARGO SURVEYOR All of the crew onboard Ennerdale were Filipinos who were employed through a company which was a subsidiary of the management company. The 51 year old master held a class II/2, with gas endorsement and had served as master on LPG carriers for 17 years. During this time, he had sailed on fully refrigerated and semi pressurised LPG tankers, but the majority of his time had been spent on fully pressurised gas carriers like Ennerdale. At the time of the accident, the master had served 5 months of his 6 month contract, his first onboard Ennerdale. The 33 year old chief officer obtained class II/3 in 1995 and served five contracts as 3/O on LPG carriers. He then served a further four contracts as 2/O before obtaining his class II/2, with gas endorsement and being promoted to chief officer 9 months prior to the accident. Ennerdale was his second contract as chief officer, and he had been onboard for half his 6 month contract. Although it was his first time onboard Ennerdale, he had previously served on a sister vessel as 3/O. No 2 sampling point repair Figure 9 Hot tap point for Furmanite injection
The 41 year old chief engineer had held his class III/2, with gas endorsement since September 2004, and had served two contracts as a chief engineer, both on LPG carriers. He had begun his career as a seagoing engineer in 1994. For the last 8 years he had sailed only on LPG tankers, predominately semi pressurised. At the time of the accident, the chief engineer had been onboard Ennerdale for 5 months of his 6 month contract. The 51 year old cargo surveyor had joined Intertek Caleb-Brett as a cargo surveyor in August 2006. He had undergone a company training programme since then to allow him to operate as a cargo sampler. Previously he had been in the Merchant Navy for 17 years, the last 5 years as a master on LPG carriers. He switched to a non maritime career in 1990, before his return as a cargo surveyor in August 2006. 1.5 CARGO SAMPLING 1.5.1 General Sampling of cargo is required to verify the quality of the product that has been transported. It is carried out regularly on departure and arrival at tanker terminals. At FMT, Intertek Caleb-Brett was contracted to collect samples on behalf of the terminal and the cargo charterers, both ashore and onboard ships. Once collected, the samples were taken to the laboratory at Fawley refinery for analysis. For a sample to be taken, it is necessary to breach the containment system of the cargo in a controlled and safe manner. In this case, an open-loop system of sampling was employed as a small release of LPG to the atmosphere was acceptable. For more hazardous products, a closed-loop sampling system is required such that any product released, that is not required as a sample, is returned to the tank. 1.5.2 Sampling arrangement on Ennerdale The original design intent (Annex A) for the drawing of liquid samples from the tanks of Ennerdale was via the sump drain (Figure 10), or by the use of the slip tubes (Figure 11). Samples of cargo vapour could be taken from the sampling valve on the tank dome. The sump drain was not a preferred sampling point as the bottom of the tank might well be contaminated, with water or previously carried cargoes. The slip tubes were installed as a back up system if the tank level float gauge failed. They consisted of two graduated tubes which penetrated the cargo tank, one in the lower half of the tank, the other into the upper half. An ullage measure of the tank contents could be taken by raising the tube out of the tank; opening the slip tube vent, releasing gas, lowering the slip tube until liquid was seen emitting from the vent instead of gas; this indicated the liquid level in the tank. The graduations on the slip tube could then be read to provide the ullage reading. When used for sampling, the slip tube would be positioned such that liquid would emit from the vent into a sample . During the last 10 years, changes to industry best practice have effectively stopped the regular use of slip tubes for sampling. There were many hazards inherent with this practice, including the fact it was not a closed loop sampling system. There was reliance on one small vent valve between the tank contents and the atmosphere. There have also been accidents where slip tubes have been ejected from tank domes under pressure, leaving an opening into the tank that was difficult to seal.
Slip tubes on tank dome Figure 11 Sump drain line Figure 10
Onboard Ennerdale, with slip tubes no longer an option and the tank sump drain unable to provide a good representative cargo sample, another method of obtaining samples was needed. On the bottom of all the screw down globe valves in series with the ESD valves, was a drain cock. The simple solution was then to adopt the drain cocks of the manual globe valves on the discharge lines (Figure 4), as open loop sampling points. The cargo could then be circulated using the deep well pumps to provide a good, representative, sample of the tank’s contents. 1.5.3 Sampling valve assembly examination Both sampling point assemblies were removed from the ship for detailed examination. A copy of the examination report is included at (Annex B). The drain point consisted of a flange, threaded stud piece, needle valve and elbow piece. A cap was also screwed into the end of the elbow piece when not in use. It was confirmed that all threads were compatible ⅜” BSP tapered threads. All threads were in good condition and showed no signs of damage. Fully tightened, the drain point should produce an adequate seal up to 18 bar gauge, the design limit for the cargo tank. However, no means of mechanically locking the threads was provided to prevent the assembly from unscrewing. It was also observed that there were several layers of paint on one of the valves, which would hamper seeing the depth of thread engagement. 1.5.4 Onboard sampling procedure The company’s gas carrier (SMS) manual included a section on cargo sampling (Annex C). It required that a competent officer accompanied the cargo surveyor at all times. The danger of accidentally loosening the sampling connection was also highlighted and preventative measures detailed. The crew was aware of the possibility of the sampling points unscrewing, and had tightened the assemblies in the past. Checks were made to ensure the sampling point fittings were tight as part of the shipboard procedures for securing for sea. 1.5.5 Cargo surveyor sampling procedure The sampling process adhered to by Intertek Caleb-Brett cargo surveyors followed the Gas Ship Measurement Guidelines, which were developed in 1998/99 for Exxon Chemical Europe Inc. ASTM D1265-97 was the specific standard employed for sampling LPG. To ensure that cargo surveyors were able to take samples of the various cargoes safely, they were trained and supervised internally until signed off as fit to sample a specific type of cargo. 1.6 EMERGENCY SHUT DOWN VALVES 1.6.1 General The ESD valve is intended to seal the cargo tank in an emergency. The IGC Code requires ESD valves to be capable of remote operation and that they close at a set steady rate to prevent damaging back pressure surges. 1.6.2 Ennerdale ESD valve description A drawing of the ESD valves fitted to Ennerdale is included at (Figure 12). As (Figure 2) indicates, there were 10 ESD valves on the cargo containment system, all of the same design, but three different sizes: 125mm nominal bore on the vapour lines; 150mm nominal bore on the loading and discharge lines; and 200mm nominal bore on the port and starboard liquid loading manifolds.
ESD valve drawing Figure 12
A single hydraulic system supplied all 10 ESD valve actuators which, when the valves needed to be opened, pushed the valve spindles down into the valve body. In this design of valve, the spindle was not attached to the valve disc as it had first to contact with a valve on the centre of the valve disc (Figure 13). The pilotvalve assembly allowed the initial pressure differential either side of the valve disc to be reduced. This enabled the valve disc to be opened with less force and, therefore, required a smaller hydraulic actuator. When a shut down was carried out, the correct closure rate for the ESD valve was determined by the rate of relief of the hydraulic oil pressure and the force of the two springs in the system; one in the actuator, the other below the valve disc. The closure rate for the ESD valves was tested and logged by ship’s crew regularly. Only a sample of ESD valves was timed on each occasion. Although the last logged ESD test on Ennerdale recorded 28 seconds on 12 October 2006, it is unclear which ESD valve was tested. This test and the previous ESD valve tests, all recorded acceptable closure times (Annex D). The timing of the ESD closure was one of the items required in the terminal ship/shore safety checklists, as the terminal staff wanted to ensure their pipework systems were protected from any back pressure surge. 1.6.3 Valve manufacturer The ESD valves on Ennerdale were manufactured by Nakakita Seisakusho Co Ltd. This type of valve has been in construction since 1979 and was still available in 2006. Over 800 ESD valves of this type and varying sizes have been produced. A basic ‘Instruction Booklet’ and ‘Check and Maintenance Manual’ (Annex E) were produced by the manufacturers for this type of valve, but no copies of these documents were found onboard Ennerdale. ESD valve disc with pilotvalve Figure 13
1.6.4 Examination of the faulty ESD valve Once in dry dock, all the ESD valves onboard Ennerdale were removed and examined. No problems were found except with the ESD valve on the No. 2 discharge line. It was found to be jammed open, and obviously accounted for why the ESD valve had not contained the leak (Figures 14 & 15). The bottom of the valve, which contained the valve disc and spring assembly, was removed (Figure 16). It was discovered that a small burr in the valve guide was preventing the valve disc from rising, under the force of the spring, on to the valve seat (Figures 17 & 18). The burr was adjacent to one of two tack welds that held the guide in position in the bottom of the valve body. No 2 ESD valve viewed from pressure side Figure 14 Inside No 2 ESD valve- seat at top and valve disc at bottom Figure 15 Valvebottom assembly Figure 16
Burr on valve guide Figure 17 Scoring damage on valve disc body Figure 18
1.7 IGC CODE The purpose of the IGC Code is to provide an international standard for the safe transportation by sea of bulk liquefied gases and certain other substances. The 1993 edition of the IGC Code applied to gas carriers constructed after 1 October 1994, which included Ennerdale. A supplement to the IGC Code has been published since 1994, but this entered into force on 1 July 1998, after Ennerdale was constructed. The predecessor to the IGC Code was the Gas Carrier Code, whose requirements applied to vessels with build contracts placed after 1976, or delivered after 1980. The IGC Code details numerous requirements including , ship arrangement, cargo containment, pressure piping systems and fire protection. societies assess vessels against the requirements of the IGC Code and any additional class rules they may have for gas carriers. The IGC Code has several specific requirements for ESD valves detailed in section 5.6: The following extracts applied to Ennerdale: 5.6.1 Every cargo piping system and cargo tank should be provided with the following valves, as applicable: ... .2 For cargo tanks with a MARVS exceeding 0.7 bar gauge, all liquid and vapour connections, except safety relief valves and liquid level gauging devices, should be equipped with a manually operated stop valve and a remotely controlled emergency shut down valve. These valves should be located as close to the tank as practicable… 5.6.4 The control system for all required emergency shut down valves should be so arranged that all such valves may be operated by single controls situated in at least two remote locations on the ship. One of these locations should be the control position required by 13.1.3 or cargo control room. The control system should also be provided with fusible elements designed to melt at temperatures between 98°C and 104°C which will cause the emergency shut down valves to close in the event of a fire. Locations for such fusible elements should include the tank domes and loading stations. Emergency shutdown valves should be of the fail-closed (closed on of power) type and be capable of local manual closing operation. Emergency shutdown valves in liquid piping should fully close under all service conditions with 30 s of actuation. Information about the closing time of the valves and their operating characteristics should be available on board and the closing times should be verifiable and reproducible. Such valves should close smoothly. The requirements for ESD valves under the Gas Carrier Code did not differ significantly from the above. These were the regulations that were applicable in 1979 when the Nakakita Seisakusho Co Ltd first manufactured the type of ESD valve fitted to Ennerdale. 1.8 The International Association of Classification Societies (IACS) also holds unified interpretations of the IGC Code, approved by (International Maritime Organization), to ensure areas of ambiguity in the code are covered consistently by the various classification societies. At the time of the accident, there were no IACS interpretations relevant to ESD valve requirements or cargo sampling.
IACS also holds unified requirements (UR) which represent a minimum standard for IACS members to adopt into their rules. Of particular interest was the requirement found in UR Z16, ‘Periodic Surveys of Cargo Installations on ships carrying liquefied gas in bulk’, which states under the Special Survey requirements for Piping Systems: 2.3.1 The cargo, liquid nitrogen and process piping systems, including valves, actuators, compensators etc. are to be opened for examination as deemed necessary. Insulation is to be removed as deemed necessary to ascertain the condition of the pipes. If the visual examination raises doubt as to the integrity of the pipelines, a pressure test at 1,25 times the MARVS for the pipeline is to be carried out. After reassembly the complete piping systems are to be tested for leaks. 1.9 INDUSTRY GUIDANCE 1.9.1 SIGTTO The Society of International Gas Tanker and Terminal Operators (SIGTTO), was created in 1979 to promote high standards and industry best practice worldwide, to maintain confidence in the safety of the liquefied gas industries. In 1982, SIGTTO was granted observer status at IMO, recognising its position as an impartial expert organisation, advising on safety matters. SIGTTO has produced many publications providing guidelines to the industry and it maintains a library of information on the organisation’s website. In 1989, SIGTTO published a report of a working group on liquefied gas sampling procedures (a copy is included at Annex F). The key recommendation made was that a standardized sampling connection fitting should be adopted. Further recommendations were made for consideration and application as operational circumstances permitted, these included: sample containers, closed loop sampling and sampling procedures. The following extract applied specifically to the sample arrangement: Pipework or tubing up to the sampling connection should be robust enough to withstand marine service and up to 3.5 kg weight of an attached sample . The sampling connection should be isolated by two standard ball valves fitted at least one metre apart as a precaution against hydrate formation at the primary valve. The sampling connection locked so that it cannot be unscrewed by the normal action of making and breaking connections…. With regard to sampling, there was also one HS&E bulletin, 07/2004, published by , which highlighted the dangers of over filling sampling devices. 1.9.2 The International Chamber of Shipping (ICS) has published a tanker safety guide for liquefied gas carriers, which provided best practice guidance and included a section on cargo sampling, an extract of which is included below: The responsible officer should be present when any cargo sampling is carried out. He should be fully conversant with all aspects of the ship’s sampling system including the operational characteristics of all valves. He should clearly recognise that the responsibility rests entirely with him for ensuring that sampling operations are conducted in a safe and efficient manner which will preclude any escape of cargo liquid or vapours to the atmosphere beyond that required by the sampling process, whoever is performing the actual sampling operation.
The responsible officer should satisfy himself that the sampling equipment is compatible with the ship’s sampling points before starting any sampling operations. 1.10 SHIP INSPECTIONS 1.10.1 Background The tanker industry is exposed to scrutiny beyond classification surveys and flag administration inspections. Industry bodies conduct further inspections to provide a measure of vessel material and operational quality. Inspections are conducted by Chemical Distribution Industry (CDI), the (OCIMF) and by the LPG terminals themselves. 1.10.2 Chemical Distribution Industry CDI is a non profit-making foundation, one of whose main aims is to improve the safety and quality of marine transportation in the chemical industry. A key element of this is the inspection of ships. The CDI (SIR) provides a quality assessment of a ship and its operation, including safety aspects. Potential charterers can then view the reports for a nominal fee. The inspections are conducted by qualified and approved independent inspectors and can take up to 12 hours to complete. The request for an inspection is initiated by a ship owner or manager, at least once a year. Ennerdale’s last CDI inspection was dated 21 July 06. The SIR questionnaire is comprehensive, covering: • regulatory aspects- highlighted as statutory, • industrial best practice- highlighted as recommended • CDI requirements- highlighted as desirable. SIR questions 5.1.56- 5.1.58 dealt specifically with sampling. In particular 5.1.57 asked whether: 5.1.57 Means for the connection of sampling equipment appears to be satisfactory The CDI inspector’s guidance notes expanded on this, incorporating some of the SIGTTO recommendations at (Annex F): Pipework to be of robust construction to withstand up to 3.5 kg weight of a sample cylinder. The sampling connection isolated by two ball valves. There should be a clearance of at least 250mm around the stub piece connection to allow spanner access This question was categorised as ‘recommended’, and was completed in the affirmative at the last Ennerdale CDI inspection. 1.10.3 OCIMFSIREOCIMF is a voluntary association of oil companies having an interest in the shipment and terminals of crude oil and oil products. The purpose of this organisation is to promote continuous improvement in standards of design and operation of oil tankers and terminals. In support of this, OCIMF also conducts a Ship Inspection Report Programme (SIRE). This programme was launched in 1993 to address concerns over poor quality shipping in the oil industry.
SIRE inspections, unlike CDI inspections, are initiated by potential charterers. Inspections are carried out by appointed inspectors and the questioning is extensive. The results of the inspections are available to OCIMF members and other organisations, for a nominal charge, to assist in their vetting of potential shipping. Ennerdale’s previous two SIRE inspections were dated 23 April and 12 October 2006. Neither highlighted any particular concerns. Pertinent questions in the SIRE questionnaire relevant to gas carrier cargo sampling included: 8.39 Are sample lines provided for both liquid and vapour and are they valved and capped? There were no further guidance notes associated with this question. 1.10.4 Terminal inspection A further element to the vetting system occurs when a ship arrives at a terminal, such as FMT. There is often an inspection by terminal staff to ensure the vessel operates to the standards expected. Ennerdale was inspected on her first arrival at FMT, and was found acceptable. 1.11 SIMILAR ACCIDENTS Coral Acropora had a major release of vinyl chloride monomer on 10 August 2004 while alongside at Runcorn, UK. A full investigation was conducted and a report produced by the . The gas leak was caused by over pressurizing the forward cargo tank while taking samples from the aft tank. The cargo was circulated to obtain a sample in a similar fashion to the method employed on Ennerdale. However, cargo valves had been, routinely, left open causing the cargo to be transferred into the other cargo tank rather than back into the aft tank. At the same time shore side workers had started work at the manifold without any supervision from ship’s staff. Although the cargo required a closed loop sampling system to be employed, there was no means of taking closed loop samples from the aft tank of Coral Acropora. Recommendations were made to the terminal and ship operators. A recommendation was also made to SIGTTO and OCIMF to review the then current guidelines and recommendations concerning gas carrier checklists and procedures, with respect to sample operations requiring the use of cargo pumps. The procedures and checklists were reviewed and amendments were included in the fifth edition of the International Safety Guide for Oil Tankers and Terminals (ISGOTT), published in 2006.
화물 검수원은 화물 시료를 자주 채취하지만 자신들이 접하는 수많은 서로 다른 화물 체계의 세부 사항에는 익숙하지 않다. 이 때문에 화물 검수원은 자신이나 선박을 위험에 빠뜨리지 않도록 선원 한 명이 면밀히 감독할 필요가 있다.
이 사고에서 평소의 절차에 익숙해 보이던 화물 검수원은 일등항해사로부터 시료 채취 지점만 안내받았고, 시료 채취 장치를 연결하는 데 필요한 나사 어댑터를 장착하는 작업에 착수하였다. 두 사람 사이에 유용한 정보 교환이 이루어지기는커녕, 둘 다 화물 체계의 상태와 앞으로 일어날 일에 대해 가정을 하였다. 화물 검수원은 자신과 화물 사이에 실제보다 더 많은 밸브 격리가 있다고 믿었다. 이는 수동 글로브 밸브가 닫혀 있고 시료 콕이 닫혀 있는 것을 볼 수 있었으며, ESD 밸브도 닫혀 있다고 믿었기 때문이다. 실제로는 시료 채취 지점이 밸브의 압력 쪽에 있었고(그림 19) ESD 밸브는 열려 있었으므로, 그와 화물 사이의 유일한 방벽은 시료 콕의 작은 니들 밸브뿐이었다. 한편 일등항해사는 그것이 통상의 관행이었으므로 화물 검수원이 이러한 밸브 상태에서 시료 채취 장비를 연결하는 것에 만족하였다.
수동 글로브 밸브 도면 그림 19 압력
1번 탱크에서 시료를 채취하는 데 문제가 없었으므로 화물 검수원은 선미 쪽 2번 탱크로 이동하였다. 이때 일등항해사는 1번 탱크를 폐쇄하고 있었으므로 화물 검수원을 감독하고 있지 않았다. 화물 검수원은 전과 마찬가지로 시료 채취 장비를 연결해도 안전하다고 믿었으며, 반대되는 지시가 없었으므로 계속 연결하였다. 그러나 2번 시료 채취 지점의 경우 시료 채취 장치를 연결하려면 엘보 부품을 자기 쪽으로 돌려야 했다. 화물 검수원은 시료 채취 지점을 자기 쪽으로 돌려도 안전하리라는 마지막 잘못된 가정을 하였다. 그때 일등항해사는 그 자리에 없었다.
Ennerdale호에서 시료가 채취된 방식은 매우 허술하였고, 이와 같은 일상 작업에서 흔히 나타나는 안일함의 수준을 보여 주었다. 화물 시료를 채취하려면 화물 격납 체계를 통제되고 안전한 방식으로 열어야 하였다. 화물 검수원과 일등항해사 모두 시료 채취 장치에 내재한 위험을 간과한 것으로 보인다. 화물 검수원은 적절한 지시나 브리핑을 받지 못하였고, 일등항해사는 화물 검수원이 자기가 무엇을 하는지 알고 있다고 가정하였는데, 외부인이 승선해 있을 때는 위험할 수 있는 가정이다.
2.4.2 제공된 지침
선박 SMS 매뉴얼의 화물 시료 채취 부분(부록 C)은 화물 검수원이 승선해 있는 동안 항상 동행이 있어야 함을 강조한다. ICS 유조선 안전 지침서 - 액화가스(ICS Tanker Safety Guide - Liquefied Gas)는 더 간결하며 화물 시료 채취에 관한 추가 지침을 제공한다. 4.18절은 다음과 같이 규정한다.
책임 사관은 화물 시료 채취가 이루어질 때 입회하여야 한다. 그는 모든 밸브의 작동 특성을 포함하여 선박의 시료 채취 체계의 모든 측면을 충분히 숙지하고 있어야 한다. 그는 실제 시료 채취 작업을 누가 수행하든, 시료 채취 작업이 시료 채취 과정에 필요한 것을 넘어 화물 액체나 증기가 대기로 유출되는 것을 막는 안전하고 효율적인 방식으로 이루어지도록 하는 책임이 전적으로 자신에게 있음을 분명히 인식하여야 한다.
책임 사관은 어떠한 시료 채취 작업을 시작하기 전에도 시료 채취 장비가 선박의 시료 채취 지점과 호환되는지 스스로 확인하여야 한다.
이 경우 화물 검수원은 면밀히 감독받지 못하였다. 그러나 일등항해사가 2번 시료 채취 지점에 있었다면 화물 검수원이 시료 채취 지점을 돌리는 것을 막았을지는 결코 확실하지 않은데, 이러한 부속이 과거에 조여진 적이 있다는 증거가 있었기 때문이다. 이 관행은 시료 채취 연결부가 우연히 느슨해질 위험을 강조한 선박의 SMS 매뉴얼에 어긋나는 것이었다. 이를 막기 위해 매뉴얼은 '고무 개스킷 한 토막과 결박용 와이어(seizing wire)'를 사용하여 부속을 임시로 고정하도록 요구한다.
앞 문단들에서 보았듯이 선박 직원에게 시료 채취 절차에 관한 정보가 일부 제공되었으나 결코 포괄적이지 않았고 해석의 여지가 있었다. 선원들이 LPG 화물 시료를 채취할 때 취해야 할 올바른 절차를 알 수 있도록 더 명확한 지침이 필요하다. 화물 검수원이 해야 할 일과 해서는 안 될 일을 분명히 하도록 이들에게도 브리핑이 이루어져야 한다. 화물 검수원에게도 화물 시료 채취의 선박별 안전 측면에 관한 더 나은 지침이 제공되어야 한다. Intertek Caleb-Brett가 제공한 지침과 ASTM 표준은 일반적인 성격이며 좋은 시료를 얻는 데 더 치중한다. 화물 검수원이 자신의 가정에 근거하여 시료 채취 작업을 하지 않도록 이들에게 명확한 지시가 제공되어야 한다.
2.5 물리적 시료 채취 장치
2.5.1 설계
Ennerdale호의 화물 시료 채취 수단은 현재의 관리 회사 아래에서 운항하기 이전, 선박의 수명 중에 발전해 온 것이었다. 액체 시료를 채취하는 세 가지 수단 중에서 양하 배관 수동 글로브 밸브의 배수 지점이 대표성 있는 양질의 화물 시료를 채취하기에 가장 안전하고 간단한 것으로 보였다. 그러나 배수 지점은 정기적인 시료 채취 지점으로 의도된 적이 없었다. 이는 글로브 밸브와 ESD 밸브 사이 배관 구간을 배수하는 수단을 제공하기 위해서만 있었다. 배수 콕이 시료를 얻는 '일반적인' 방법이 된 시점에 대한 기록도, 선박의 이전 관리 회사가 이 변경을 뒷받침하는 위험성 평가를 하였는지에 대한 기록도 없었다. 현재 시행 중인 SMS에는 변경 관리에 관한 지침이 포함되어 있으며, 이는 화물 시료 채취 수단의 변경을 부각했을 것이다.
실제 배수 지점의 도면은 발견되지 않았는데, 이는 수동 글로브 밸브의 배수 지점이 조선소가 공급한 품목이었음을 시사한다. 이것이 부속이 미터법 표준이 아닌 이유일 수 있다. 배수 지점으로서 밸브 구성은 구성 부품이 나사로 결합된 상태로 있는 한 설계 압력을 견디기에 적절하였다. 고정 장치가 없어 조립체는 진동이나 인적 오류로 풀리기 쉬웠다.
사고 이후 FMT 직원과 Intertek Caleb Brett 화물 검수원은 FMT를 방문하는 여러 선박이 사용하는 시료 채취 지점을 조사하였다. Ennerdale호처럼 글로브 밸브의 배수 콕에서 시료를 채취하는 사례는 발견되지 않았다. 이는 이러한 구성이 비교적 드문 것임을 시사할 수 있으나, 선원들은 자기 선박의 시료 채취 장치에 특별히 이상한 점이 있다고 생각하지 않았다.
2.5.2 규제 요건
IGC 코드 5장 '공정 압력 용기와 액체, 증기 및 압력 배관'에는 다음의 관련 발췌 두 가지가 있다.
5.2.1.6 액체가 가득 찬 상태로 격리될 수 있는 모든 배관이나 구성품에는 릴리프 밸브를 갖추어야 한다.
5.4.2플랜지 없이 배관 길이를 직접 연결하는 다음의 방식을 고려할 수 있다. ...
.3 주관청이 인정하는 나사식 커플링은 외경 25 mm 이하의 부속 배관과 계측 배관에만 사용하여야 한다
이러한 규정은 수동 글로브 밸브에 배수 밸브를 설치하는 요건과, 배수 지점 조립체의 외경이 25 mm 미만이었으므로 나사 연결이 허용된 이유를 설명한다. IGC 코드에는 화물 시료 채취에 대한 명시적 요건이 없다. IGC 코드와 자체 선급 규칙에 비추어 Ennerdale호를 평가할 책임이 있던 선급 NKK는 배수 지점 구성이 만족스럽다고 판단하였다. NKK는 시료 채취 장치를 별도로 검사하거나 승인하지 않았다. 그러나 다른 선급은 배관 계통이 독성 또는 인화성 물질을 운반하는 경우 나사산 이음을 허용하지 않는다.
시료 채취 장치에 대한 명확한 규제 요건이 없으면 서로 다른 다양한 기준이 나타날 여지가 있으며, 그중 일부는 Ennerdale호에 설치된 것만큼 위험할 수 있다. IACS 통일 해석은 일관된 기준을 적용하는 수단을 제공한다. 그러나 시료 채취는 현재 해석이 다루는 분야에 속하지 않는다.
시료 채취 밸브와 ESD 밸브의 형태로 두 개의 밸브 격리가 있었으므로 더 높은 수준의 시료 채취 지점은 불필요하다는 주장이 있을 수 있다. 또한 ESD 밸브의 고장을 예견하기를 기대하는 것은 무리라고 주장할 수 있다. 그러나 ESD 밸브가 올바르게 작동하여 화물을 차단했더라도 화물 배관의 상당한 양의 화물은 여전히 방출되었을 것이다. 운송된 화물에 따라서는 그래도 중상이 발생했을 수 있다.
2.5.3 업계 모범 실무
규제 외에도 석유, 가스 및 화학 산업에는 상당한 양의 지침이 있다. 불행히도 시료 채취는 깊이 다루어지는 분야가 아니며 여러 면에서 간과되어 온 것으로 보인다. 핵심적인 예외는 시료 채취 장치를 포함한 여러 권고를 한 SIGTTO 작업반의 액화가스 시료 채취 절차 보고서(부록 F)였다. 이 권고는 CDI 검사 질문서에 포함되었으나, Ennerdale호의 경우 설치된 장치는 SIGTTO 권고를 전혀 충족하지 못하였음에도 마지막 CDI 검사에서 만족스러운 것으로 표시되었다. 이 선박이 받은 어떤 검사에서도 시료 채취 장치가 위험하다는 점이 알아차려지지 않았다.
SIGTTO 작업반이 한 권고를 업계가 어느 정도 채택하였는지는 불분명하나, 1989년에 발간된 것을 고려하면 LPG 시료 채취 장치에 관한 조언을 다시 살펴보고 그에 따라 CDI 및 SIRE 검사를 개정하는 것이 신중할 수 있다. 실제로 시료 채취에 관한 정보가 분명히 부족하다는 점에 비추어, 업계는 안전하지 않은 관행을 피하도록 하는 추가적인 일반 지침의 혜택을 볼 수 있을 것이다.
2.6 비상 차단 밸브
2.6.1 설계
ESD 밸브에 대한 IGC 코드의 기본 요건 중 하나는 페일 클로즈드(fail closed)여야 한다는 것이다. 따라서 밸브를 여는 데 가해지는 힘은 반대 방향의 힘에 맞서 작용해야 하며, 동력이 상실되면 그 반대 힘이 밸브를 닫는다. Ennerdale호에 설치된 JIS 20 K ESD 밸브는 스프링을 사용하여 밸브 디스크를 밸브 시트에 밀착시킨다. 일단 닫히면 배관 내 압력도 밸브 디스크를 시트에 밀착시킨다. 두 번째 중요한 요건은 밸브가 너무 빠르게 닫히지 않아야 한다는 것이다. JIS 20 K는 유압 작동기 조립체 안의 또 다른 스프링으로 이를 달성하며, 이 스프링은 유압이 제거되었을 때 밸브 스핀들이 후퇴하는 속도를 제어한다. 따라서 JIS 20 K는 IGC 코드의 이 두 요건을 충족하는 것으로 보인다.
그러나 MAIB 조사 중에 분명해진 것은, 운영자와 많은 평가자가 JIS 20 K ESD 밸브 설계가 밸브 위치의 확실한 표시를 제공하지 않는다는 것을 알지 못하였다는 점이다. 작동기 스핀들과 밸브 스템 사이의 연결부가 밸브가 열려 있는지 닫혀 있는지를 나타내는 지시기로 사용되었다(그림 20). 이 표시 방식이 밸브가 열려 있을 때만 확실히 보여 줄 수 있고 닫혀 있을 때는 그렇지 않다는 사실이 간과되었다. JIS 20 K 설계의 이 근본적인 누락은, 현행 시험 체제에서는 밸브가 닫혀 있다는 것에 대한 어떠한 확신도 가질 수 없었으므로 이 밸브가 ESD 밸브로 기능하는 능력을 해쳤다.
IGC 코드는 ESD 밸브에 밸브 위치의 확실한 표시를 요구하지 않는다. 그러나 밸브가 현장에서 수동으로 닫힐 수 있을 것은 요구한다. JIS 20 K ESD 밸브는 건조 시 선급에 의해 ESD 요건을 충족하는 것으로 승인되었다(부록 A). 밸브의 현장 수동 폐쇄는 작동기로 가는 유압 배관을 분리하여 현장에서 유압을 제거할 수 있다는 것을 근거로 해석되었던 것으로 짐작된다. 밸브 상부의 스템은 렌치로 조여 내릴 수 있으나 이는 밸브를 여는 방향으로만 밀 수 있고 닫는 데에는 쓸 수 없었다. 밸브 위치를 표시할 필요성이나 밸브를 수동으로 닫는 기능에 대해 모호함이 없도록 ESD 밸브에 대한 IGC 코드 요건의 일관된 해석이 필요하다.
ESD 밸브 위치 지시기 그림 20
2.6.2 시험 및 정비
Ennerdale호의 ESD 밸브 중 일부는 폐쇄 속도가 만족스러운지 확인하기 위해 화물 적재 및 양하 전에 정기적으로 시험되었다. 불행히도 이 시험은 유압 작동기가 열린 위치에서 닫힌 위치로 이동하는 데 걸리는 시간에 대한 확정적인 척도만 제공하고 있었다. ESD 밸브의 설계에 대한 충분한 이해가 없어, 이 밸브들이 올바르게 작동하고 있다는 잘못된 믿음이 생겼다.
화물 배관 구간의 시험은 선박의 압축기로 계통을 가압한 뒤 압력이 유지되는지 감시하는 방식으로 이루어졌다. 이 시험은 ESD 밸브 앞의 수동 밸브를 여는 것만으로 대부분의 ESD 밸브에 확대할 수 있었다. 선박 일지에는 2006년 8월 18일에 탱크 적재 배관 ESD 밸브에 대해 이러한 시험이 이루어진 것으로 기록되어 있다(부록 D). 압력 시험이 2006년 7월 31일과 2006년 8월에 두 차례 화물 매니폴드 밸브에 대해서도 이루어진 것으로 기록되어 있다. 이 시험이 ESD 밸브의 시험을 포함하였는지는 일지에서 불분명하다. 또한 선박의 SMS나 계획정비시스템(PMS) 어디에도 ESD 압력 시험을 하라는 지정된 요건이 없었다.
그러나 양하 배관의 ESD 밸브 두 개에는 배관에 역지 밸브가 있어 화물 배관을 가압하는 것만으로는 시험할 수 없다. 이 ESD 밸브를 시험하는 한 가지 가능한 접근은 탱크에 화물이 있을 때일 것인데, 탱크가 증기로 가득 차 있을 때 선박의 압축기로 탱크를 가압하는 것은 실행 불가능하기 때문이다. 다른 방법으로, 화물을 양하하는 동안 ESD 밸브를 실제로 작동시켜 올바르게 작동하는지 확인할 수 있다. 이 두 시험 방법 모두 화물이 선내에 있거나 양하 중이어야 하며, 불행하게도 이는 밸브 문제가 발견되더라도 상황을 바로잡기 위해 무엇이든 하기 전에 먼저 화물을 양하해야 한다는 뜻이다.
제조업체가 작성한 사용 설명서는 ESD 밸브의 설치, 정비 및 재조립에 관한 일부 정보를 제공하였다. 그러나 점검 및 정비 매뉴얼에는 점검 항목과 권장 주기의 간단한 목록과 '문제 해결(trouble shooting)' 안내가 들어 있었다(부록 E). 밸브 분해 정비를 위한 기본 점검 지점은 제공되었으나 권장 주기는 없었다. 또한 확실한 밸브 표시가 없다는 점에 비추어, 밸브가 올바르게 작동하는지 확인하기 위해 사용 중에 얼마나 자주, 어떤 수단으로 시험해야 하는지를 매뉴얼은 제시하지 않았다.
IGC 코드는 주로 설계 표준이지만 18장은 일부 운영 요건을 상세히 규정하며, 특히 다음과 같다.
18.7 계통 및 제어
화물 이송에 관여하는 화물 비상 차단 및 경보 계통은 화물 취급 작업이 시작되기 전에 시험하고 점검하여야 한다. 필수적인 화물 취급 제어장치도 이송 작업 전에 시험하고 점검하여야 한다.
ESD 밸브의 폐쇄 속도 시험은 이 요건을 적용하는 한 예이다. 그러나 ESD 밸브 기능의 안전상 중대한 성격을 감안하면, ESD 밸브의 정기 압력 시험과 내부 검사에 대한 명확한 규제 요건은 없는 것으로 보인다. 1.8절에서 보았듯이 정기 검사 시 ESO 밸브의 내부 검사는 전적으로 입회하는 검사관의 재량에 달려 있다.
2번 양하 배관의 ESD 밸브가 얼마나 오랫동안 열린 채 걸려 있었는지는 알아낼 수 없었다. 버는 밸브가 만들어질 때부터 있었거나 과거에 운송한 화물에서 생긴 오염으로 인해 생긴 것이다. NNK는 Ennerdale호의 ESD 밸브가 시험되거나 내부 검사 또는 분해 정비를 받았다는 기록을 찾을 수 없었다. ESD 밸브를 정기적으로 내부 검사하거나 압력 시험하도록 하는 요건이 없다는 점은, ESD 밸브가 선박 안전 체계의 근본적인 부분이므로 우려스럽다. 선급마다 정기적인 검사나 시험에 대한 개별 요건이 있을 수 있으나 일관된 접근은 없다.
ESD 밸브가 의도한 역할을 다하도록 하려면 두 단계에서 정기적으로 시험되어야 한다. 첫째, 선박 운영자는 자기 선박의 ESD 밸브가 올바르게 작동함을 확인해야 하며, 이 요건을 포함하도록 업계 지침이 검토되고 개정되어야 한다. 둘째, 선급은 화물 격납 체계가 목적에 적합하다는 검증의 일환으로 ESD 밸브의 압력 시험 및/또는 내부 검사에 대한 정기 요건을 포함하여야 한다. 이렇게 하면 ESD 체계에 대한 완전한 신뢰를 유지할 수 있다.
2.7 누출 이후의 조치
누출이 발생한 뒤 매우 빠르게 경보가 울렸고 비상 계획이 신속히 실행되었다. 총원 경보가 울렸고 화물 누출에 대처하기 위해 비상팀이 집결하였다. Ennerdale호 선장이 SMS 비상 절차 매뉴얼의 점검 목록을 실제로 사용하지는 않았으나 필요한 기본 조치는 모두 이행되었으며, 이는 승무원 훈련의 이점을 보여 준다. 물분무와 추가 호스는 새어 나오는 가스를 분산시키고 인화성 가스 구름의 생성을 막는 데 좋은 효과를 거두었다.
ESD 밸브가 닫히지 못하는 상황은 선박 직원이 고려하지 않았고 선박의 SMS에도 포함되어 있지 않았다. 누출을 막을 수 없고 선원들의 능력을 넘어선다는 것이 분명해지자 사고 관리는 다소 혼란스러워졌다. 선원들은 실제로 누가 책임자인지 확신하지 못하였다. 선박 관리 회사 ICSM Pte Ltd는 IMT Ltd 및 지역 긴급 구조 기관과 긴밀히 협력하던 FMT와 연락하고 있었다. ICSM Pte Ltd는 선박과도 연락하고 있었다. 그러자 선박이 선박 관리자와 계속 협의해야 하는 필요 때문에 결정이 지연된 것으로 보였다.
FMT는 세계의 많은 터미널에 비해 기술적으로 앞선 터미널이며 Ennerdale호의 누출을 막는 문제에 기여할 전문 지식과 경험이 많았다. 사고 관리 중에 선박 직원은 자신들이 의사 결정 과정에 완전히 참여하지 못한다고 느꼈다. 동시에 FMT 직원은 선박 직원에게서 완전한 협조를 받지 못한다고 생각하였다. Ennerdale호에서 일어난 LPG 누출 같은 실제 비상 상황을 훈련하거나 모의하는 것은 거의 불가능할 것이며, 실제로는 서로 다른 기관 간 연락에 어려움이 생길 수 있다. 명확한 지휘 계통을 수립하고 비상 시 무슨 일이 일어날지에 관한 기본 정보를 제공하면 비상 상황에 효과적으로 대처할 수 있다. 그러나 궁극적으로 비상 대응의 결과는 성공적이었으며, 의사소통의 어려움이 누출을 막는 데 큰 정도로 지연을 초래하였을 가능성은 낮다.
원문 보기
2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 THE ACCIDENT The initial leak of gas was caused by the cargo unscrewing the gas sampling , by roughly ¼ of a turn, while he aligned the connection with his equipment. The sampling valve fell off in the cargo surveyor’s hand, breaching the cargo containment system and LPG was released to the atmosphere. The sample point in use had been originally fitted as a drain cock for the manual globe valve. When other fixed methods of sampling on board became unacceptable industrial practice, the drain cock was used instead, as it provided an easy and effective means of taking cargo samples. Although the emergency shut down system was activated, it failed to contain the leak as the ESD valve in the cargo line, from which the sample was being taken, failed to close. The ESD valve was later found to be jammed open. How long this valve was in this state is unknown. Due to the nature of the leak, the ship’s were unable to secure the leak themselves and assistance from FMT was provided. The leak took 29 hours to seal. 2.3 Fatigue is not considered to be a in this accident. The was well rested, and the cargo surveyor had come on duty only 3 hours before taking his samples on Ennerdale. 2.4 SAMPLING PROCEDURES 2.4.1 Relationship between ship’s staff and cargo surveyor Cargo surveyors, although frequently taking cargo samples, will not be familiar with the details of the numerous different cargo systems that they encounter. For this reason, cargo surveyors need to be closely supervised by a member of the ship’s crew to ensure they are not endangering themselves or the ship. In this accident, the cargo surveyor, who appeared to be conversant with the normal routine, was simply shown the sampling point by the chief officer and he set to work attaching the necessary thread adapter to connect the sampling device. Rather than having a useful exchange of information between the two men, both made assumptions about the state of the cargo system and what was going to happen. The cargo surveyor believed he had a greater degree of valve separation between himself and the cargo than he actually had. This was because he could see the manual globe valve was shut, the sample cock was closed, and he believed the ESD valve was also shut. In reality, the sample point was on the pressure side of the valve (Figure 19), and the ESD valve was open, meaning the only barrier between him and the cargo was the small needle valve on the sampling cock. The chief officer meanwhile was content for the cargo surveyor to attach the sampling equipment in this valve state, as it was normal practice.
Manual globe valve drawing Figure 19 Pressure
With no problems encountered with taking samples from No. 1 tank, the cargo surveyor moved aft to No. 2 tank. The chief officer was then not supervising the cargo surveyor as he was No. 1 tank. The cargo surveyor believed, as before, he was safe to connect his sampling equipment and, since he had no instructions to the contrary, continued to do so. However, in the case of No. 2 sampling point he needed to turn the elbow piece towards him to allow the sampling device to be connected. The cargo surveyor made his final flawed assumption that it would be safe to turn the sampling point towards him. The chief officer was not present at that time. The manner in which samples were taken onboard Ennerdale was very casual and demonstrated a level of complacency often shown in routine operations such as this. Taking samples of the cargo required the cargo containment system to be breached in a controlled and safe manner. Both the cargo surveyor and chief officer appear to have overlooked the inherent dangers of the sampling arrangement. The cargo surveyor was not provided with adequate instructions or a briefing, and the chief officer assumed that the cargo surveyor knew what he was doing, a potentially dangerous assumption when a stranger is onboard. 2.4.2 Guidance provided The section on cargo sampling in the ship’s manual, Annex C, highlights the need for cargo surveyors to always be accompanied, while onboard. The Safety Guide - Liquefied Gas is more succinct and provides further guidance on cargo sampling. Section 4.18 states: The responsible should be present when any cargo sampling is carried out. He should be fully conversant with all aspects of the ship’s sampling system including the operational characteristics of all valves. He should clearly recognise that the responsibility rests entirely with him for ensuring that sampling operations are conducted in a safe and efficient manner which will preclude any escape of cargo liquid or vapours to the atmosphere beyond that required by the sampling process, whoever is performing the actual sampling operation. The responsible officer should satisfy himself that the sampling equipment is compatible with the ship’s sampling points before starting any sampling operations. The cargo surveyor was not supervised closely in this case. However, it is by no means certain if the chief officer had been present at No. 2 sampling point whether he would have stopped the cargo surveyor from the sampling point, as there was evidence that these fittings had been tightened in the past. This practice was in contravention of the ship’s SMS manual which highlighted the hazard of accidentally loosening the sampling connection. In order to prevent this, the manual requires temporary securing of the fitting using ‘a length of rubber gasket and wire’. As shown in the preceding paragraphs, although there was some information on sampling procedures provided to ship’s staff, it was by no means comprehensive and it was open to interpretation. Clearer guidance is required to ensure ship crews are aware of the proper steps to be taken when obtaining LPG cargo samples. Cargo surveyors must also be briefed to clarify what they should and should not do. Cargo surveyors must also be provided with better guidance on ship specific safety aspects of taking cargo samples. The guidance and ASTM standard provided by Intertek Caleb-Brett are generic in nature and more concerned with obtaining a good sample. Clear instructions need to be provided to the cargo surveyors to ensure they are not conducting sampling operations based on their own assumptions.
2.5 PHYSICAL SAMPLING ARRANGEMENTS 2.5.1 Design The means of taking cargo samples onboard Ennerdale had evolved during the vessel’s life, prior to operating under the current managers. Of the three means of taking liquid samples, the drain point on the manual globe valve on the discharge line appeared the safest and simplest for taking a good representative cargo sample. However, the drain point was never intended as a regular sampling point. It was only present to provide a means of draining the section of pipework between the globe valve and the ESD valve. There was no record of when the drain cock became the ‘normal’ method of drawing samples, nor whether any was carried out in support of the change by the previous managers of the vessel. The SMS now in place includes instructions on the management of change, which would have highlighted the of the means of cargo sampling. No drawings for the actual drain point were found, suggesting the drain points on the manual globe valves were a shipyard supplied item. This may account for the non metric standard of the fittings. As a drain point, the valve arrangement was adequate to withstand the design pressure, as long as the component pieces remained screwed together. The lack of a securing arrangement left the assembly liable to become unscrewed through vibration or human error. Since the accident, FMT staff and the Intertek Caleb Brett cargo surveyors have studied the sampling points in use by the various ships visiting FMT. No examples of sampling from the drain cock of globe valves, as on Ennerdale have been found. This might indicate this arrangement was relatively unusual, although the ship’s crew did not believe there was anything particularly strange about the sampling arrangement on their vessel. 2.5.2 Regulatory requirements Chapter 5 of the IGC Code ‘Process pressure vessels and liquid, vapour and pressure piping’, contains the following two pertinent extracts: 5.2.1.6 All pipelines or components which may be isolated in a liquid-full condition should be provided with relief valves. 5.4.2 The following direct connection of pipe lengths, without flanges, may be considered: ... .3 Screwed couplings acceptable to the Administration should only be used for accessory lines and instrumentation lines with external diameters of 25 mm or less These regulations account for the requirement for drain valves to be fitted on the manual globe valves, and also why connections were permitted, since the drain point assembly was less than 25 mm external diameter. The IGC Code contains no explicit requirements for cargo sampling. NKK, the responsible for assessing Ennerdale against the IGC Code and their own rules was content that the drain point arrangement was satisfactory. NKK did not examine or approve the sampling arrangement in isolation. However, other classification societies do not permit screw thread joints when piping systems convey toxic or flammable substances.
With no clear regulatory requirement for sampling arrangements, there is the opportunity for a wide range of differing standards to emerge, some potentially as dangerous as that fitted to Ennerdale. The unified interpretations provide a mechanism for applying a consistent standard. However, sampling is not currently one of the areas covered under the interpretations. It might be suggested that a higher standard of sampling points is unnecessary, since two valve separation was present in the form of the sampling valve and the ESD valve. Also, it could be argued that it was unreasonable to expect the failure of the ESD to be foreseen. However, even if the ESD valve had functioned correctly and shut off the cargo, a significant quantity of cargo from the cargo lines would still have been released. Depending on the cargo carried, serious injuries might still have resulted. 2.5.3 Industry best practice In addition to regulation, there is a significant amount of guidance available to the oil, gas and chemical industries. Unfortunately, sampling is not an area that is covered in great depth and, in many ways, appears to have been overlooked. The key exception to this was the SIGTTO working group report on liquefied gas sampling procedures (Annex F), which made several recommendations including sampling arrangements. This recommendation was included in the CDI inspection questionnaire but, in the case of Ennerdale, the arrangement fitted was marked as satisfactory at the last CDI inspection even though it in no way met the SIGTTO recommendations. The sampling arrangement was not noticed as being hazardous during any of the inspections to which the ship was subjected. It is unclear how far the recommendations made by the SIGTTO working group have been adopted by the industry but, considering it was published in 1989, it may be prudent to revisit the advice on sampling arrangements for LPG and amend CDI and inspections accordingly. Indeed, given the apparent lack of information on sampling, the industry could benefit from further general guidance to ensure unsafe practices are avoided. 2.6 EMERGENCY SHUT DOWN VALVES 2.6.1 Design One of the fundamental requirements from the IGC Code for ESD valves is that they fail closed. Therefore, the force applied to open the valve must act against an opposing force, which, if power is lost, closes the valve. The JIS 20 K ESD valves fitted to Ennerdale employ a spring to force the valve disc against the valve seat. Once closed, the pressure in the line will also force the valve disc on to its seat. The second important requirement is that the valve does not close too quickly. The JIS 20 K achieves this by another spring in the hydraulic actuator assembly, which controls the rate at which the valve spindle retreats once the hydraulic pressure is removed. The JIS 20 K would, therefore, appear to meet these two requirements of the IGC Code. However, what became clear during ’s investigation was that the operators, and many assessors, did not realise that the JIS 20 K ESD valve design does not provide a positive indication of the valve’s . The joint between the actuator spindle and the valve was used as an indicator of whether the valve was open or shut (Figure 20). The fact that this indication method could only positively show when the valve was open, not shut, was overlooked. This fundamental omission in the design of the JIS 20 K compromised the ability of this valve to act as an ESD valve, since no confidence could ever be placed in the valve being shut under the current testing regime.
The IGC Code does not require ESD valves to have positive indication of the valveposition. It does, however, require the valve to be capable of local manual closure. The JIS 20 K ESD valve was approved by class at build as meeting ESD requirements (Annex A). It is assumed local manual closure of the valve was interpreted on the basis that the hydraulic pressure could be removed locally by disconnecting the hydraulic pipe to the actuator. The stem on top of the valve can be screwed down using a wrench, but this could only be used to push the valve open, not closed. A consistent interpretation of the IGC Code requirements for ESD valves is required to ensure there is no ambiguity about the need for the valveposition to be indicated, or the ability to manually close the valve. ESD valveposition indicator Figure 20
2.6.2 Testing and maintenance A sample of the ESD valves onboard Ennerdale, was regularly tested before loading and cargo to ensure the closure rate was satisfactory. Unfortunately, this test was only providing a definitive measure of how long it took for the hydraulic actuator to move from the open to the closed position. The lack of a full appreciation of the design of the ESD valveled to a false belief that these valves were functioning correctly. Testing of sections of cargo lines was carried out by pressurising the system with the ship’s compressors and then monitoring if the pressure was held. This testing could be extended to most of the ESD valves, simply by the manual valve of the ESD valve. The ship’s log appears to record such a test on the tank loading line ESD valves, which occurred on 18 August 2006 (Annex D). Pressure tests were also recorded as having been conducted on the cargo valves on 31 July 2006 and twice in August 2006. Whether these tests included testing the ESD valves, is unclear from the log. There was also no specified requirement to conduct ESD pressure testing in either the ship’s SMS or (PMS). However, the two ESD valves on the discharge lines have a non-return valve in the line, which prevents testing by merely pressurising the cargo lines. One possible approach to testing these ESD valves would be when the tanks contain cargo, since pressurising the tanks when they were full of vapour, using the ship’s compressors, would be unfeasible. Alternatively, the ESD valve could actually be operated while unloading cargo, to check it works correctly. Both these methods of testing require cargo to be either onboard or unloading, which, unfortunately, means if a valve problem is discovered the cargo has still to be unloaded before anything can be done to rectify the situation. The instruction manual produced by the manufacturers provided some information on installing, servicing and reassembly of the ESD valves. The check and maintenance manual, however, included a brief of checks and their suggested intervals, as well as a ‘trouble shooting’ guide (Annex E). Although basic check points for overhauling the valve were provided, there was no suggested periodicity. Also, in light of the fact there was no positive valve indication, the manual did not suggest how often, and by what means, the valve should be tested in service to ensure it functioned correctly. The IGC Code is primarily a design standard, however, section 18 does detail some operating requirements, in particular: 18.7 Systems and controls Cargo emergency shutdown and alarm systems involved in cargo should be tested and checked before operations begin. Essential cargo handling controls should also be tested and checked prior to transfer operations. The testing of the closure rates of the ESD valves is one example of applying this requirement. However, given the critical safety nature of the function of ESD valves, there appears to be no clear regulatory requirement for the periodic pressure testing and internal inspection of ESD valves. As shown in section 1.8, any internal inspection of ESO valves at periodic surveys is entirely at the discretion of the attending surveyor.
How long the ESD valve on No. 2 discharge line had been jammed open was impossible to determine. The burr was either present when the valve was constructed, or it had been caused by contamination from cargo that had been carried in the past. NNK could find no record of the ESD valves on Ennerdale ever being tested, internally inspected or overhauled. The lack of a requirement to regularly internally inspect and/or pressure test ESD valves is of concern, since the ESD valve is a fundamental part of the vessel’s safety system. The different classification societies might have individual requirements for inspection or testing at periodic intervals, but there is no consistent approach. To ensure ESD valves fulfil the role for which they are intended, they must be regularly tested, at two levels. Firstly, ship operators must ensure that the ESD valves onboard their vessels function correctly, and industry guidance should be reviewed and amended to include this requirement. Secondly, classification societies should include a periodic requirement for pressure testing and/or internal inspection of ESD valves, as part of the verification that the cargo containment system is fit for purpose. In this manner, full confidence can be maintained in the ESD system. 2.7 ACTIONS FOLLOWING THE LEAK The alarm was raised very quickly after the leak occurred, and emergency plans were put into action swiftly. The general alarm was sounded and an emergency team mustered, to tackle the cargo leak. Although the of Ennerdale did not actually employ the check-off list in the SMS Emergency Procedures Manual, all the necessary basic actions were carried out, demonstrating the benefit of crew drills. The water sprays and additional hoses were used to good effect to disperse the leaking gas and prevent the creation of a flammable gas cloud. The scenario of the ESD valve failing to close had not been considered by ship’s staff nor included in the ship’s SMS. Once it became clear that the leak could not be contained and was beyond the capability of the ship’s crew, the management of the incident became slightly confused. The ship’s crew was unsure who was actually in charge. The ship management company ICSM Pte Ltd was liaising with IMT Ltd and with FMT, who worked closely with the local emergency services. ICSM Pte Ltd was also in contact with the ship. Decisions then appeared to be hampered by the need for the ship to continuously consult with the ship managers. FMT is a technologically advanced terminal compared with many around the world, and had a lot of expertise and experience to contribute to the problem of securing the leak on Ennerdale. During the management of the incident, ship’s staff felt they were not fully integrated in the decision making process. At the same time, FMT staff believed they were not receiving full co-operation from ship’s staff. It will rarely be possible to drill or simulate a real emergency such as the LPG leak onboard Ennerdale and, in reality, difficulties in liaison between different authorities might occur. Establishing clear lines of authority, and providing basic information on what will happen in an emergency will ensure an emergency is tackled effectively. However, ultimately, the outcome of the emergency response was a success, and the difficulties in communications are unlikely to have delayed the securing of the leak to any significant degree.
3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT WHICH HAVE RESULTED IN RECOMMENDATIONS 1. The ESD
on the
line of No. 2
was jammed open, compromising the ship’s emergency cargo shut down system. [2.2] 2. The IGC code permits unsecured
fittings. [2.5.2] 3. There was no clear regulatory requirement for sampling arrangements. [2.5.2] 4. No concerns about the sampling point arrangement had been raised during any of the numerous recent ship surveys by class and other inspection authorities. [2.5.3] 5. There is a general lack of guidance on cargo sampling in the industry. [2.5.3] 6. The definition of ‘local manual closing’ would appear to need clarification given the ESD valves onboard Ennerdale were approved by class. [2.6.2] 7. There was no clear regulatory requirement or industry requirement for ESD valves to be regularly pressure tested or inspected to ensure the
valve
was functioning correctly. [2.6.2] 3.2 SAFETY ISSUES IDENTIFIED DURING THE INVESTIGATION WHICH HAVE NOT RESULTED IN RECOMMENDATIONS BUT HAVE BEEN ADDRESSED (SEE SECTION 4) 1. The sampling
valve
was able to be unscrewed by hand and came apart after roughly a quarter of a turn. [2.2] 2. The briefing and supervision of the cargo
did not provide an adequate means for ensuring cargo sampling could take place safely. [2.4.1] 3. The cargo
surveyor
was attaching his equipment assuming he had at least two
valve
separation from the cargo pressure, which was incorrect. [2.4.1] 4. The
screw
fitting of the sampling point was not secured as required in the ship’s
, and the fact that it had become unscrewed went unnoticed. [2.4.2] 5. The use of the globe
valve
drain as a regular sampling point had evolved and the dangers of this practice had not been fully appreciated. [2.5.1] 6. The operators and many assessors did not realise that the JIS 20 K ESD
valve
design does not provide a positive indication of the
valve
’s
. [2.6.1] 7. Although cargo lines and some valves were pressure tested, the ESD valves on the
discharge
line were not tested to ensure they were closing. [2.6.2] 8. Liaison between ship’s staff and the marine terminal were not ideal, but the difficulties in communications are unlikely to have delayed the
of the leak to any significant degree. [2.7]
단일 밸브 고장이 체계의 가스 기밀 건전성을 위태롭게 하지 않도록 화물 체계에 대한 위험성 평가를 실시하라는 요건.
›육상 비상 대응과의 조정이 포함되도록 훈련 시나리오를 개정하자는 제안.
4.2 INTERTEK CALEB-BRETT
FMT의 Intertek Caleb-Brett는 직원에게 다음을 지시하였다.
›화물 검수원이 입회한 상태에서 선박 직원이 시료 채취 장비를 연결하도록 할 것.
›가스 시료를 채취할 때 화학 보호복을 착용할 것.
4.3 SIGTTO
SIGTTO는 다음을 하였다.
›이번 사고에서 확인된 형식의 ESD 밸브의 내재적 약점에 관한 안전 경보를 발간하고 그 작동 건전성을 점검할 필요성을 강조하였다.
›회원들에게 LPG 시료 채취에 관해 SIGTTO가 이미 제공한 지침을 상기시켰다.
›지역 회의에서 이번 사고에서 얻은 교훈을 발표하고 논의하였다.
›2008년에 완료될 예정인 LPG 교육 지침(LPG Training Guidelines)의 개발에 착수하였다. 올바른 LPG 시료 채취 절차에 대한 지식이 기초 지식 부분에 포함될 것이다.
4.4 OCIMF
OCIMF는 다음을 하였다.
›다음 개정 때 가스 운반선에 대한 SIRE 선박 제원 질문서 8절의 문구가 SIGTTO의 '액화가스 시료 채취 절차에 관한 작업반 보고서(Report of a Working Group on Liquefied Gas Sampling Procedures)'에 담긴 권고를 반영하도록 개정하는 절차에 착수하였다.
›이번 사고에 관한 정보 고시가 SIRE 검사 그룹에 발행되었으며 세부 사항은 다가오는 SIRE 검사 그룹 회의에서 논의될 것이다.
원문 보기
4.1 ICSM PTE LTD The ship managers, ICSM Pte Ltd, conducted their own investigation after the accident and have taken steps to prevent a reoccurrence. Onboard Ennerdale the following modifications have taken place: • The manual globe drain cocks on Ennerdale have been replaced with flanged ball valves to prevent them from being unscrewed, and the drain cocks will no longer be used for cargo sampling. • A dedicated closed loop sampling system has been fitted, in , after the NRV on the line, with two valves between the cargo line and the sampling point (Figure 21). • Ship procedures have been amended to ensure the ESD valves, including those in the discharge line, are pressure tested monthly. • The ESD valves will also be removed, pressure tested, and overhauled where required at every period. A company Safety Bulletin has also been issued which contains: • Re-emphasis that ship’s staff are responsible for the safety of cargo operations and, where contractors need to be involved, they must be closely supervised. • Instructions to vessels to check sampling connections and secure any fittings, pending permanent design modifications. Modified No. 2 sampling point Figure 21
• Instructions to all gas carriers in the fleet to put in place an in service ESD valve testing regime. • A requirement to conduct a on cargo systems to ensure single valve failure does not jeopardise the gas tight integrity of the system. • Suggested amendments to drill scenarios to ensure coordination with shore based emergency response has been included. 4.2 INTERTEK CALEB-BRETT Intertek Caleb-Brett at FMT has instructed its staff to: • Employ ship’s staff to connect the sampling equipment with the cargo in attendance. • a chemical suit when sampling gases. 4.3 SIGTTO SIGTTO has: • Published a safety alert on the inherent weaknesses of the type of ESD valve identified in this accident, highlighting the need to check their operational integrity. • Reminded its members of the guidance already available from SIGTTO for sampling. • Presented and discussed the lessons learnt from this accident at regional meetings. • Commenced development of LPG Training Guidelines, which are scheduled to be complete in 2008. Knowledge of correct LPG sampling procedures will be included in the underpinning knowledge section. 4.4 OCIMF has: • Initiated the process to amend the wording in Vessel Questionnaire Section 8 for gas carriers to observe recommendations contained in SIGTTO’s “Report of a Working Group on Liquefied Gas Sampling Procedures” at its next revision. • An information notice has been issued to the SIRE inspection group regarding this incident and the details will be discussed at the forthcoming SIRE inspection group meetings.
on the development of unified requirements (URs) on sampling arrangements for liquefied gas carriers. The standards should, as a minimum, address the relevant shortfalls identified in this investigation, especially with regard to the provision of two
separation from the cargo system and the avoidance of
couplings. 2007/151 Take forward a proposal to
IACS
regarding the operation and design of ESD valves which: • Stipulates a requirement for ESD valves to be tested and inspected during class surveys to verify effective closure. • Ensures that the IGC Code requirement for local manual closure means the ESD
valve
can be positively closed by hand. • Requires arrangements for the indication of the status of ESD valves to accurately mimic whether the
valve
is open or closed.
May 2007 Safety recommendations shall in no case create a presumption of blame or liability
one (1) and
cargo tank
two (2), were supplied to MSI-DSL for investigation purposes . The
valve
assemblies were invo lved in a inci dent aboard MT Ennerdale where it is understood by MSI-DSL that during a routine gas sampling exercise the
valve
from
cargo tank
two (2) became detached from the
assembly.
Figure 1: Typical Assembly원본 PDF 6쪽
10 Cambridge Road, Granby Industrial Estate, Weymouth, Dorset DT4 9XA telephone: +44 (0) 1305 760111 fax: +44 (0) 1305 760222 e-mail: Weymouth@msi-dsl.com website: www.msi-dsl.comA subsidiary of MS INTERNATIONAL plc Certificate Number FM 32073 Registered in England No. 954839
2.0 Inspection
2.1 Assembly One
On receipt at MSI-DSL the assembly wa s visually inspected. The connecting threads appear in good condition and show no signs of deformation / corrosion. The male thread engages six (6) full threads when hand tight and has not bottomed out on the valve, allowing adequate threads for final wrenching.
Figure 2: Male Thread Tank 1 Figure 3: Female Thread Tank 1원본 PDF 7쪽
2.2 Assembly Two
On receipt at MSI-DSL the assembly wa s visually inspected. The connecting threads appear in relatively good condition and show no signs of deformation / corrosion. The male thread engages fully within the valve body and bo ttoms out when only hand tight thus leaving no allowance for wrenching other than that gained when applying PTFE tape. Despite this the assembly can be tightened and should produce an adequate se al at the pres sures required (believed to be 18 bar).
Figure 4: Male Thread Tank 2 Figure 5: Female Thread Tank 2원본 PDF 7쪽
10 Cambridge Road, Granby Industrial Estate, Weymouth, Dorset DT4 9XA telephone: +44 (0) 1305 760111 fax: +44 (0) 1305 760222 e-mail: Weymouth@msi-dsl.com website: www.msi-dsl.comA subsidiary of MS INTERNATIONAL plc Certificate Number FM 32073 Registered in England No. 954839
2.3The threads were then measured and confirmed as R3/8 (3/8 BSP external taper thread) and Rc 3/8 (3/8” BSP internal taper thread) in accordance with;
›BS 21:1985 “Pipe threads for tubes and fittings wh ere pressure-tight joints are made on the threads (metric dimensions)”.
In accordance with BS 21:1985 a 3/8 BSP male thread should have 7.5 useful threads of which 2.75 threads are for fitting. Therefore the minimum engagement should be approximately 4.75 threads.
2.4BS 21:1985 states that “This British Standard specifies requirements for the following pipe threads. a) Jointing threads, which are pipe threads for joints made pressure-tight by the mating of the threads and are taper external, taper internal or parallel internal threads.”
2.5It should be noted that it is common practice to apply a jointing medium to the threads before assembly to ensure that a pressure-tight joint is made and to prevent galling of the threads.
2.6All threads are full form and show no signs of damage indicating failure of the threads. There also appears to be no evidence of the threads being modified by filing or rethreading.
2.7It should be noted that assembly one (1 ) was heavily coated in paint. This gives the impression that the male thread is engaged deeper in the valve body than it actually is. Valve two (2) had had its paint removed prior to receipt at MSI-DSL.
Figure 6: Female Thread Tank 1원본 PDF 8쪽
10 Cambridge Road, Granby Industrial Estate, Weymouth, Dorset DT4 9XA telephone: +44 (0) 1305 760111 fax: +44 (0) 1305 760222 e-mail: Weymouth@msi-dsl.com website: www.msi-dsl.comA subsidiary of MS INTERNATIONAL plc Certificate Number FM 32073 Registered in England No. 95483910 Cambridge Road, Granby Industrial Estate, Weymouth, Dorset DT4 9XA telephone: +44 (0) 1305 760111 fax: +44 (0) 1305 760222 e-mail: Weymouth@msi-dsl.com website: www.msi-dsl.comA subsidiary of MS INTERNATIONAL plc Certificate Number FM 32073 Registered in England No. 954839
3.0 Conclusions
3.1Given the above evidence and that the method used for attachment is a well known industry standard MSI-DSL postulate that the cause of the failure can be attributed to either;
›The rotation of the ( i.e. unscrewing of the valve due to vibration / operation of the valve) whilst in situ.
Or
›Incorrect assembly, i.e. not tightened fully.
3.2The subtle difference between the two male threads could be attributed to different manufactures however both thread forms conform to the British Standard and are therefore compatible with the female threads of the bodies.
4.0 Recommendations
4.1MSI-DSL recommends that consideration be given to replacing the tapere d threads with parallel threads using either o-ring or bonded seals. This would simplify both assembly and subsequent inspection.
4.2Consideration should also be given to the prov ision of a mechanical locking device to prevent rotation of the assembly. This could be in the fo rm of, but not limited to, a right angled bracket attached to the bolts or locking wire to prevent the rotation of the body.
4.3Painting of the assembly should be av oided as it prevents thorough inspection during routine maintenance.
If you require any further information please do not hesitate to .
Yours faithfully
Richard Hanney Justin Waller Senior Engineer (Diving and Pressure Systems) Engineering ManagerAnnex C Sampling section from ship’s systemDate: 11 Jan 2005 Rev: 1 Ch: 5 Gas Carrier Manual Chapter 5 Page: extract of manual 5.3.11 Sampling Sampling of cargo is rout inely carried out by terminal representative prior commencement of . Sampling is carried out for two basic reasons: To establish safe conditions before cargo . To establish that the ca rgo is within commercially agreed specification at the various points of cargo transfer. This could be a hazardous situati on as the terminal representative or will not generally be familiar with the layout of the shipboard piping. Hence a competent thoroughly fam iliar with the pipeline layout of the vessel must always accompany the terminal representative. It is generally accepted that sampling wil l always be associated with certain amount of disposal of vapour to the atmosphere for sample point purging and ullaging. The following safeguards should be followed: In all cases venting, purgi ng or ullaging of sample containers must be carried out in a safe area with due regard to prevailing wind and weather conditions. When the sample being taken might hav e irritant hazard in addition to flammable hazards, then means should be provided to absorb or disperse the material in a safe area. For example in the case of ammonia, a hose could be provided to carry the vapour to a water surface or spray area. When the sample might have toxic rate s for instance VCM or butadiene then means should be provided to avoid releas e of the material to the atmosphere. In this case a closed loop system ma y be provided or obtained by connectingDate: 11 Jan 2005 Rev: 1 Ch: 5 Gas Carrier Manual Chapter 5 Page: extract of manual outlet of the sampli ng to a vapour sample connection point or vent system. Certain cargoes are required to be carried under a nitrogen pad (propylene oxide, ethylene oxide or mixtures of them); product samp les are therefore drawn only from the tank or liquid space. The vapour space is sampled to ensure adequate nitrogen content. The other hazard associated with sampli ng is accidental loosening of the sampling connection. This would not normally occur at the designated sampling points as safeguards have been incorporated at the design stage. However, from time to time, sampling is done from screwed down connections on the cargo piping. This is done particularly from a partly empty tank. In order to guard against this the flanged ar ea of such connections should be temporarily secured with a length of rubber gasket and wire. Do not attempt to secure these by a tack weld . The heat of the welding will definitely damage any Teflon seating in way of these connections and destroy their gas tight integrity. A peculiar problem is associated with bottom sampling. This must always be done from the designated samp ling point. Do not try to draw a sample from the sump drains. The content of the sump drain is never a representative sample of the cargo. It contains trac es of many previous cargoes and water. In order to obtain a repr esentative sample the entir e length of the drain lines must be adequately vented. This problem can easily be avoided by drawing sample from the designated sampling poi nts. Cargoes have in the past been rejected because of this.
Annex D Ship’s ESD test log and relevant extracts of Annex E Check and maintenance manual for JIS 20 K ESD Annex F Report of a working group on liquefied gas sampling procedures, published by SIGTTO in 1989REPORT OF A WORKING GROUP ON LIQUEFIED GAS SAMPLING PROCEDURES NOTICE OF TERMS OF USE While the advice given in this document has been developed using the best information currently available, it is intended purely as guidance to be used at the owner’s own risk. No responsibility is accepted by the Society of International and Terminal Operators Ltd, or by any person, firm, corporation or organisation who or which has been in any way concerned with the furnishing of information or data, the compilation, publication or authorised translation, for the accuracy of any information or advice given herein or for any omission herefrom or for any consequences whatsoever resulting directly or indirectly from the compliance with or adoption of guidance contained herein even if caused by a failure to exercise reasonable care.
REPORT OF A WORKING GROUP ON LIQUEFIED GAS SAMPLING PROCEDURESSOCIETY OF INTERNATIONAL AND TERMINAL OPERATIONS LTD WORKING GROUP ON LIQUEFIED GAS SAMPLING EQUIPMENT AND PROCEDURES TERMS OF REFERENCE 1 The Working Group shall be called "The SIGTTO Working Group on Liquefied Gas Sampling Equipment and Procedures" and shall consist of representation from terminals, gas carriers and other organisations as many be considered appropriate. The Working Group shall elect its Chairman from its nominated participants and may co-opt additional participation as may be found desirable. 2 The Task of the Working Group shall be to develop a proposal and budget for a project defining with particularity the present problems and potential consequences involved in the taking of cargo samples from the tanks of liquefied gas carriers. The Group shall recommend short-term improvements and give long term criteria, all with the objective of minimising the potential risks involved in the cargo sampling of liquefied gas cargoes. The Working Group shall address the requirements for the standardisation of sampling equipment and the training of terminal, gas carrier and other personnel involved with sampling to a suitable minimum level. 3 The Working Group shall report to the SIGTTO General Purposes Committee to which Minutes of the Working Group meetings will be made available and to which the project proposal and budget will be submitted for approval. 4 The Working Group will complete its task as expeditiously as possible, conducting its affairs by correspondence as far as is efficient and practical. It will aim to submit a draft project proposal for approval by 1st May 1986. 5 The SIGTTO London Liaison Office will act as Secretariat to the Working Group and under the guidance of the Chairman will convene meetings as may be considered necessary. 6 If required by the SIGTTO General Purposes Committee the Working Group will extend its remit to include such requirements.
Gas Sampling Procedures REPORT OF A WORKING GROUP ON LIQUEFIED GAS SAMPLING PROCEDURES Summary The Working Group first met on the 18th April 1986 and adopted the Terms of Reference, which are attached as Appendix I, and elected Capt. ○○ as Chairman of the Group. Project proposals were approved by the General Purposes Committee and a survey was carried out obtaining data from some forty seven (47) tankers and operating experience through Working Group members of four (4) major terminal operators. It was soon apparent to the Group that both ship and independent internal sampling procedures are about to be generally covered by the relevant section of Safety Guide (Liquefied Gas) on the one hand and by International Standard 4257 (Liquefied Petroleum Gases - Methods of co-opted membership of the committee on this subject. The Group has therefore sought and enjoyed close co-operation through direct participation of ICS representatives and with ISO activities through Secretariat co-opted membership of the BSI working committee on this subject. It is agreed that provided internal sampling procedures on both ship and shore are carried out by trained personnel familiar with the environment and possessing fully compatible equipment for the task in hand, the risks are minimal. However, it was borne out by the survey that the risk of an incident is much greater when personnel are attempting to draw samples from areas unfamiliar to them, particularly if they attempt to use mis-matched connections. The requirements for shore representatives to draw samples from ship tanks is the most obvious and frequent example of this situation. In confirmation of this point, a member has advised of an incident occurring as recently as January 1988 in which a technician completely unscrewed a one inch ball from a pressurised tank of LPG. He had mistakenly identified the valve as the sampling point; fortunately the LPG release was rapidly contained. The Working Group are unanimous therefore in stating that the adoption of Recommendation 1 for a standardised connection is the best improvement (available in the short term) to minimise the potential risks involved in the sampling of liquefied gas cargoes. Recommended 1 for a standardised connection is the best improvement (available in the short term) to minimise the potential risks involved in the sampling of liquefied gas cargoes. Recommendations 2-5 are made for consideration and application as operational circumstances and procedures permit. Recommendations 1 Standard for sampling connection fittings It is recommended that ships tank sample access point should terminate in a G ½ female parallel threaded connector in accordance with ISO 228/1. The sampling equipment should terminate in a corresponding male connector*. An illustrative sketch is attached. *This recommendatory note has also been incorporated into ISO/DIS 4257Gas Sampling Procedures Pipework or tubing up to the sampling connection should be robust enough to withstand marine service and up to 3.5 kg weight of an attached sample . The sampling connection should be isolated by two standard ball valves fitted at least one metre apart as a precaution against hydrate formation at the primary . The sampling connection locked so that it cannot be unscrewed by the normal action of making and breaking connections. There should be a clear space of radius 250 mm around the stub piece sampling connection to allow spanner access to the connection nuts and fitting of the sample cylinder. When not is use the stub piece should be fitted with a screwed plug incorporating a soft washer to protect the sealing face. The connection should be clearly labelled as to its origin, ie tank designation nd top, middle or source. In fully refrigerated ships where it is necessary to use a to obtain a sample, a standard connection point (as above) should be fitted on the pumpdischarge line. 2 The provision of closed loop sampling facilities Sample containers should be constructed to a recognised standard and of metal suitable for the gas to be handled. The Working Group are unanimous in recommending the following design features: (a) In all cases venting, purging or ullaging of sample containers must be carried out in a safe area with due regard to prevailing wind and weather condition. (b) When the sample being taken might have irritant hazards in addition to flammable hazards, then means should be provided to absorb or disperse the material in a safe area, e.g. in the case of ammonia, a hose could be used to carry the vapour to a water surface or spray area. (c) When the sample might have toxic risks, e.g. VCM, butadiene, then means should be provided to avoid release of the material to atmosphere, e.g. a closed loop system may be provided, or obtained by connecting the outlet
3.4A connecting T-piece with bleed and suitable swivel should be attached to the sample inlet valve ending in a male connection stub with parallel thread G ½ to 228/1; this for presentation to ships corresponding female sampling connector point. In connecting to the ship’s sample point the required pressure seal is made by a metal or bonded washer fitted to the male connection, which seals against the surface surrounding the threads of the female . NB The seal is NOT made on the thread. 4 The procedures involved in taking samples 4.1 In all cases, guidance given in the redraft of ISO 4257 should be observed with reference to protective clothing, gloves, goggles and . This is standard guidance (as originally contained in BS 3195) 4.2 As laid down under Chapter 18.1 of the IGC Code, it is imperative that all concerned are properly informed of the nature of the crgo being handled and the precautions to be observed. This should include a full description of the physicl and chemical properties, countermeasures against accidental personal contact, and other emergency procedures. This information should be available and promulgated in the form of industry Data Sheets, such as “HAZCHEM” or “TREM” cards from terminal, or as included in the appendix to the publication “ Safety Guide (Liquefied Gas)”, etc. 4.3 A responsible should be present when any sample is being drawn from ship’s tanks by a terminal representative or third party inspector. The officer should be fully conversant with all aspects of the ships sampling system including the operational characteristics of all valves. He should clearly recognise that his duty is to ensure that sampling is authorised and carried out in a safe manner, regardless of who is actually performing the sampling operation. 4.4 When drawing liquid samples it is imperative that sufficient ullage or vapour space is left in the sample to allow for liquid expansion due to the temperature increasing to ambient. Proper ullage will be confirmed if the sample container is held upright after filling (ie ullage tube at the top) and the top valve opened until only vapour (rather than liquid) is emitted. 5 Principles involved in the basic need to obtain samples It was agreed that sampling was carried out for two basic reasons: (i) To establish safe conditions prior to cargo . (ii) To establish that the cargo is within commercially agreed specifications at the various points of custody transfer. As such, it was felt that variations on sampling requirements resulted from prevailing production specifications and customer’s requirements. It was therefore agreed that the Working Group could only usefully advise on methods, procedures and standard for connections. The principles of sampling, the level and number of samples required and receiving tank condition stipulations were felt to be commercial matters for the contracting parties to agree upon. Nevertheless, it was also agreed that where the producer and buyer had agreed upon sampling requirements, specifications and appointed surveyors, etc, there was often lack of information provided to the carrier of the cargo. For example, many consignments of were carried as fuel Gas Sampling Procedures gas and provided that calorific value was maintained, there was no specific sensitivity to many impurities. Another consignment of LPG may be destined for cavern storage and therefore have a receiver’s specification for maximum methanol content to protect underground permafrost or water table conditions. It is obviously in the interest of all parties, therefore, that conditions andsensitivities, as well as the general description and hazards of the cargo, are made know to those responsible for storage, or carriage. It is the absence of such information exchange and cooperation that leads to each of the parties requiring their own samples, which is clearly an unnecessary increase of potentially hazardous activities. The necessity for sampling should always be minimised by cooperation resulting in the analysis of an agreed representative sample being accepted by all interested parties. In terminal loading systems, the use of automatic sampling devices may further reduce the requirements for manually drawn samples. Conclusion The Working Group believe that they have developed recommendations on all that can be practically and effectively accomplished in the short to medium term. They therefore submit their report for approval and, if agree, that the Recommendations be circulated to the Members. The Working Group members would be pleased to consider further studies as an when the GPC believes it would be beneficial to re-open longer term issues.
valve
to a vapour sample connection point or vent system. (d) Certain cargoes are required to be carried under a nitrogen pad (propylene oxide, ethylene oxide or mixtures of them), product samples are therefore only drawn from the tank
bottom
or liquid space. The vapour space is sampled to ensure adequate nitrogen content. Further advice is available from the
Gas Codes and the data sheets referred to in para. 4.2 below. 3 The standard/type of containers used to obtain and transport samples Sample containers should be constructed to a recognised standard and of metal suitable for the gas to be handled. The Working Group are unanimous in recommending the following design features: 3.1 Containers should be fitted with inlet and outlet valves to permit “throughflow” purging with suitable inert gas prior to use. (Helium was recognised as being most suitable for use with gas chromatography analysis but with due regard to the high cot of helium, the use of nitrogen is also recognised as an accepted industry practice). 3.2 Containers should be fitted with an internal ullage tube to ensure that a safe working ullage could always be established for the particular liquefied gas being sampled. 3.3 A bursting disc suitably rated for protection of the sample
cylinder
should be fitted at the ullage tube end of the
cylinder
. This may be incorporated into the
valve