사고 경위, 조치 사항 및 이에 따른 권고를 포함한 해양사고 조사 보고서를 읽어 보십시오.Read our marine accident investigation report, which includes what happened, actions taken and subsequent recommendations:
2008년 8월 17일 늦은 저녁, 저녁 파티를 마친 승객 한 명이 여객선 Hurlingham호에서 웨스트민스터 부두(Westminster Pier)로 하선하려다 템스강(River Thames)에 떨어져 사망하였다.Late in the evening of 17 August 2008, a passenger fell into the River Thames and died as he was attempting to disembark from the passenger vessel Hurlingham onto Westminster Pier after an evening party.
안전 쟁점Safety Issues
선장은 면허가 있는 바(bar)의 운영과 파티 후 정리 등 다른 업무로 인해, 선박과 승객의 안전을 보장해야 하는 본연의 책임에서 주의가 흐트러졌다the skipper was distracted from his primary responsibilities of ensuring the safety of the vessel and passengers, by other duties concerning the running of the licensed bar and by tidying up after the party
선박이 충분히 고정되지 않았다the vessel was not adequately secured
항해사(mate)는 승객을 감독하고 돕는 자리를 떠나 보트의 위치를 옮기고 고정하러 갔다the mate had left his position, supervising and assisting passengers, to reposition, and secure the boat
선박의 안전관리체제가 부실하였다. 비상 훈련이 효과적이지 않았고, 위험성 평가에 결함이 있었으며, 계류와 승객 하선에 대한 절차가 미흡하였다the vessel’s safety management system was poor, with ineffective emergency drills, flawed risk assessments and inadequate procedures for mooring and passenger disembarkation
점선 상자는 있었지만 쓰이지 않았거나 쓰였는지 모르는 것, 점선 화살표는 보고서가 추정한 관계입니다.
③ 원인 사슬
왼쪽에서 오른쪽으로, 무엇이 무엇으로 이어졌는지입니다. 상자(원인)는 보고서 근거 대목에서 가져왔고, 상자 사이 화살표는 보고서가 직접 적지 않은 경우 모델이 판단해 이은 것입니다.
보고서가 밝히지 못한 것
권고·조치
MCA·LRS: 템스강 5등급 여객선에 안전 운항 체제가 갖춰졌는지 스스로 확인(안전 공지·긴급)
MCA: DSMC 준수 지침 개선, 검사 대상 선정 개선
LRS: 야간 자사 부두에서 승객 이동·통제 위험 평가
Hurlingham호 선주: 안전관리체제·승무원 행동·승객 접근 방식 세부 권고
선주는 조사 중 안전관리체제를 개선했고, PLA는 MCA·LRS·여객선협회와 템스강 여객선 운항 실무규약을 마련하였다.
권고Recommendations
사고 직후 발행한 안전 공보(PDF, 1,159KB)에서 우리는 MCA와 LRS에 템스강에서 운항하는 5급(Class V) 여객선이 안전한 운항을 보장하는 효과적인 체계를 갖추고 있는지 스스로 확인하도록 시급히 조치할 것을 권고하였다. 아울러 MCA에는 운항자가 DSMC를 준수하는 데 활용할 수 있는 지침을 개선하고, 이러한 선박의 운항에 대한 검사의 표적 선정을 개선할 것이 권고되었다. LRS에도 야간 부두에서 승객의 이동과 통제에 따른 위험을 평가할 것이 권고되었다. Hurlingham호의 선주에게는 안전관리체제의 측면, 승무원의 행동 및 승객 접근 방식에 관한 여러 세부 권고가 이루어졌다.In a safety bulletin (PDF, 1,159KB), issued shortly after the accident, WE recommended that the MCA and LRS took urgent action to satisfy themselves that Class V passenger vessels operating on the River Thames had effective systems in place to ensure their safe operation. In addition, the MCA has been recommended to improve the guidance available to operators for complying with the DSMC; and to improve the targeting of inspections on the operation of these vessels. LRS has also been recommended to assess the risks associated with the movement and control of passengers on its piers at night. A number of detailed recommendations have been made to the owners of Hurlingham on aspects of their safety management system, conduct of crew and arrangements for passenger access.
이 보고서는 2009년 6월 9일에 발간되었다.This report was published on 9 June 2009.
한국어는 모델 번역(검수 전)입니다. 표의 값은 흔한 말만 옮기고 나머지는 원문 그대로 둡니다.
본문
PDF 에서 뽑은 글 — 쪽 나눔·단 배치 때문에 줄 순서가 어긋난 곳이 있을 수 있습니다
[Synopsis]
한국어 번역 · 모델 · 검수 전
개요SYNOPSIS
Late in the evening of 17 August 2008, a fell into the River Thames and died as he was attempting to disembark from the passenger vessel Hurlingham onto Westminster after an evening party. Hurlingham was secured to Westminster pier using one at the bow, and the had left the wheelhouse unattended with the in while he attended to the bar account and tidied up after the party. The of the boat drifted away from the pier, and the moved from his on the pier, supervising the passengers disembarking, to manoeuvre the boat back alongside and attach two more lines. No gangway was used and passengers were allowed to continue disembarking unsupervised while the boat was put back into position. Shortly after the stern was brought back into the pier, a gap opened up between the front of the boat and pier at the point where passengers were disembarking. One passenger stepped forward and fell into the gap. Despite an extensive search, he could not be found and his body was recovered further downriver on 22 August 2008. A postmortem determined cause of death to be ‘ in the presence of alcohol intoxication’. The investigation found that: the skipper was distracted from his primary responsibilities of ensuring the safety of the vessel and passengers, by other duties concerning the of the licensed bar and by tidying up after the party; the vessel was not adequately secured; and the mate had left his position, supervising and assisting passengers, to reposition, and secure the boat. Also, the vessel’s was poor, with ineffective emergency drills, flawed and inadequate procedures for mooring and passenger disembarkation. The owners have, during the of the investigation, made a number of improvements to their safety management system. The (PLA), in partnership with the (MCA), London River Services (LRS) and the Passenger Boat Association, has developed a Code of Practice for Passenger Vessel Operations on the River Thames which provides detailed guidance to operators to supplement regulations in the Domestic Passenger Ships Safety Management Code (DSMC). In a safety bulletin, issued shortly after the accident, recommended that the MCA and LRS took urgent action to satisfy themselves that Class V passenger vessels operating on the River Thames had effective systems in place to ensure their safe operation. In addition, the MCA has been recommended to improve the guidance available to operators for complying with the DSMC; and to improve the targeting of inspections on the operation of these vessels. LRS has also been recommended to assess the risks associated with the movement and control of passengers on its piers at night. A number of detailed recommendations have been made to the owners of Hurlingham on aspects of their safety management system, conduct of and arrangements for passenger access.
한국어 번역 · 모델 · 검수 전
요약 2008년 8월 17일 늦은 저녁, 저녁 파티를 마친 뒤 여객선 Hurlingham호에서 웨스트민스터 부두(Westminster Pier)로 하선하려던 승객 한 명이 템스강(River Thames)에 빠져 사망하였다. Hurlingham호는 선수의 계류줄 한 가닥으로 웨스트민스터 부두에 고정되어 있었고, 선장은 바 계산을 처리하고 파티 뒤 정리를 하느라 기관을 전진 상태로 둔 채 조타실을 비워 두었다. 선박의 선미가 부두에서 멀어졌고, 항해사는 하선하는 승객을 감독하던 부두 위의 자리를 떠나 선박을 다시 붙이고 계류줄 두 가닥을 더 걸었다. 건널판(gangway)은 사용되지 않았고, 선박이 제 위치로 되돌려지는 동안 승객들은 감독 없이 계속 하선하도록 허용되었다. 선미가 부두에 다시 붙은 직후, 승객들이 하선하던 지점에서 선박 앞부분과 부두 사이에 틈이 벌어졌다. 승객 한 명이 앞으로 발을 디디다가 그 틈에 빠졌다. 대대적인 수색에도 그를 찾지 못하였으며, 그의 시신은 2008년 8월 22일 하류 쪽에서 수습되었다. 부검 결과 사인은 '알코올 중독 상태에서의 익사'로 판정되었다. 조사에서 다음이 밝혀졌다. 선장은 선박과 승객의 안전을 보장하는 본연의 책임에서, 면허를 받은 바의 운영과 파티 뒤 정리에 관한 다른 업무로 주의가 분산되었다. 선박은 적절히 고정되지 않았다. 항해사는 승객을 감독하고 도와주던 자리를 떠나 선박을 재배치하고 고정하였다. 또한 이 선박의 안전관리체제는 비상 훈련이 효과적이지 않고, 위험성 평가에 결함이 있었으며, 계류와 승객 하선 절차가 미흡하는 등 부실하였다. 선주는 조사 기간 중에 안전관리체제를 여러 가지로 개선하였다. 런던항만청(PLA)은 영국 해사연안경비청(MCA), 런던 리버 서비스(London River Services, LRS), 여객선협회(Passenger Boat Association)와 협력하여, 국내 여객선 안전관리 규약(DSMC)의 규정을 보완하는 상세한 지침을 운영자에게 제공하는 템스강 여객선 운항 실무규약을 마련하였다. 사고 직후 발행한 안전 공지에서 MAIB는 MCA와 LRS가 템스강에서 운항하는 5등급(Class V) 여객선에 안전한 운항을 보장하는 효과적인 체제가 갖추어져 있는지 스스로 확인하도록 긴급 조치를 취할 것을 권고하였다. 또한 MCA에는 운영자가 DSMC를 준수하는 데 이용할 수 있는 지침을 개선하고, 이 선박들의 운영에 대한 검사의 대상 선정을 개선하도록 권고하였다. LRS에도 야간에 자사 부두에서 승객의 이동과 통제에 따르는 위험을 평가하도록 권고하였다. Hurlingham호의 선주에게는 안전관리체제, 승무원의 행동, 승객 접근 방식에 관한 여러 세부 권고가 이루어졌다.
첨부 문서 2 HurlinghamReport.pdf
[HurlinghamReport.pdf]
Report on the investigation of the of a overboard from Hurlingham at Westminster , on the River Thames 17 August 2008 Carlton House Carlton Place Southampton United Kingdom Report No 12/2009 June 2009
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2005 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2005 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 13(9) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2005, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. Further printed copies can be obtained via our postal address, or alternatively by: Email: maib@dft.gsi.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 All reports can also be found on our website: www.maib.gov.uk
CONTENTS Page GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 - FACTUAL INFORMATION 2 1.1 of Hurlingham and accident 2 1.2 Narrative 3 1.2.1 Evening cruise 3 1.2.2 Return to Westminster Pier 6 1.2.3 Passenger disembarkation 7 1.3 Emergency response 8 1.3.1 Subsequent action 9 1.3.2 Accident reporting 9 1.4 The victim 10 1.5 10 1.6 Access arrangements 11 1.7 Passenger safety on the River Thames 12 1.8 Regulations 13 1.8.1 Domestic Safety Management Code 13 1.8.2 Safe Means of Access 14 1.9 14 1.9.1 Safety manager 14 1.9.2 Marine 15 1.9.3 and passenger access 16 1.9.4 16 1.9.5 Emergency drills 17 1.9.6 Audit and assessment 17 1.9.7 Implementation of the Domestic Safety Management Code 18 1.10 Pier operation and management 19 1.11 Single point mooring 20 1.12 Similar accidents 22 1.12.1 Findings from other investigations 22 SECTION 2 - ANALYSIS 23 2.1 Aim 23 2.2 The accident 23 2.3 Berthing and passenger disembarkation 23 2.3.1 Electing to use a single point mooring 23 2.3.2 Supervision of passengers disembarking 24 2.3.3 Crew’s actions 25 2.3.4 Emergency response 25 2.4 27
2.5 Mooring practice and passenger access 27 2.5.1 Lighting 27 2.5.2 Single point mooring 27 2.5.3 Snap back zones 28 2.5.4 Use of gangways 28 2.6 Effectiveness of safety management systems 28 2.6.1 Implementation of the DSM Code 28 2.6.2 Role of the safety manager 29 2.6.3 Crew knowledge and involvement 29 2.6.4 Audit 30 2.6.5 Operation of the licensed bar 30 SECTION 3 - CONCLUSIONS 31 3.1 Safety issues directly contributing to the accident which have resulted in recommendations 31 3.2 Other safety issues identified during the investigation also leading to recommendations 31 3.3 Safety issues identified during the investigation which have not resulted in recommendations but have been addressed 32 SECTION 4 - ACTION TAKEN 33 SECTION 5 - RECOMMENDATIONS 35
한국어 번역 · 모델 · 검수 전
2008년 8월 17일 템스강(River Thames) 웨스트민스터 부두(Westminster Pier)에서 Hurlingham호의 승객이 물에 빠져 상실된 사고 조사 보고서 영국 해양사고조사국(Marine Accident Investigation Branch) 칼턴 하우스 칼턴 플레이스 사우샘프턴 영국 보고서 번호 12/2009 2009년 6월 영국 상선(사고 보고 및 조사) 규칙 2005(The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2005) 제5조 발췌: "상선(사고 보고 및 조사) 규칙 2005에 따른 사고 조사의 유일한 목적은 사고의 원인과 상황을 확인하여 장래의 사고를 방지하는 것이다. 조사의 목적은 책임을 판정하는 것이 아니며, 그 목적을 달성하는 데 필요한 범위를 넘어 과실을 배분하는 것도 아니다." 참고 이 보고서는 소송을 염두에 두고 작성된 것이 아니며, 상선(사고 보고 및 조사) 규칙 2005 제13조(9)에 따라 책임이나 과실을 귀속하거나 배분하는 것을 목적 또는 목적 중 하나로 하는 모든 사법 절차에서 증거로 허용되지 아니한다. 추가 인쇄본은 우편 주소로, 또는 다음을 통해 구할 수 있다. 이메일: maib@dft.gsi.gov.uk 전화: 023 8039 5500 팩스: 023 8023 2459 모든 보고서는 웹사이트 www.maib.gov.uk에서도 볼 수 있다.
보고서 목차(쪽 번호는 원본 PDF 기준)
목차 쪽 약어 및 두문자어 해설 요약 1 1절 사실 정보 2 1.1 Hurlingham호 및 사고 세부 사항 2 1.2 경위 3 1.2.1 저녁 유람 3 1.2.2 웨스트민스터 부두로의 복귀 6 1.2.3 승객 하선 7 1.3 비상 대응 8 1.3.1 후속 조치 9 1.3.2 사고 보고 9 1.4 피해자 10 1.5 승무원 10 1.6 접근 방식 11 1.7 템스강의 승객 안전 12 1.8 규정 13 1.8.1 국내 안전관리 규약 13 1.8.2 안전한 접근 수단 14 1.9 안전관리체제 14 1.9.1 안전 관리자 14 1.9.2 해사 안전관리 매뉴얼 15 1.9.3 계류와 승객 접근 16 1.9.4 위험성 평가 16 1.9.5 비상 훈련 17 1.9.6 감사 및 평가 17 1.9.7 국내 안전관리 규약의 이행 18 1.10 부두 운영 및 관리 19 1.11 단일점 계류 20 1.12 유사 사고 22 1.12.1 다른 조사의 결과 22 2절 분석 23 2.1 목적 23 2.2 사고 23 2.3 접안과 승객 하선 23 2.3.1 단일점 계류의 선택 23 2.3.2 하선 승객의 감독 24 2.3.3 승무원의 행동 25 2.3.4 비상 대응 25 2.4 피로 27
2.5 계류 관행과 승객 접근 27 2.5.1 조명 27 2.5.2 단일점 계류 27 2.5.3 스냅백 구역 28 2.5.4 건널판의 사용 28 2.6 안전관리체제의 실효성 28 2.6.1 DSM 규약의 이행 28 2.6.2 안전 관리자의 역할 29 2.6.3 승무원의 지식과 참여 29 2.6.4 감사 30 2.6.5 면허 바의 운영 30 3절 결론 31 3.1 사고에 직접 기여하여 권고로 이어진 안전 쟁점 31 3.2 조사 중 확인되어 역시 권고로 이어진 기타 안전 쟁점 31 3.3 조사 중 확인되었으나 권고로 이어지지는 않고 조치가 이루어진 안전 쟁점 32 4절 조치 사항 33 5절 권고 35
약어·용어집GLOSSARY OF ABBREVIATIONS AND ACRONYMS BML
- Boat Masters Licence - Closed Circuit Television DSMC - Domestic Safety Management Code - Inshore Lifeboat - International Safety Management (Code) LRS - London River Services - Maritime and Coastguard Agency - Marine Guidance Notes - Man Overboard - Merchant Shipping Notice - Port of London Authority - Royal National Lifeboat Institution - Search and Rescue - International Convention on the Standards of Training, Certification and
개요SYNOPSIS
Late in the evening of 17 August 2008, a fell into the River Thames and died as he was attempting to disembark from the passenger vessel Hurlingham onto Westminster after an evening party. Hurlingham was secured to Westminster pier using one at the bow, and the had left the wheelhouse unattended with the in while he attended to the bar account and tidied up after the party. The of the boat drifted away from the pier, and the moved from his on the pier, supervising the passengers disembarking, to manoeuvre the boat back alongside and attach two more lines. No gangway was used and passengers were allowed to continue disembarking unsupervised while the boat was put back into
사실SECTION 1 - FACTUAL INFORMATION
1.1 OF HurlingHam AND ACCIDENT Vessel details Registered owner : Thames Cruises Ltd : London Flag : UK Type : Class V Vessel Built : 1915, Salter Brothers, Oxford : : 30.93m : 113.99 type : Gardner 6LX driving a fixed , four bladed through a gearbox Service : 9 knots Accident details Time and date : 2324, 17 August 2008 Location of incident : Westminster
분석SECTION 2 - ANALYSIS
2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 ThE ACCIDENT Hurlingham had been secured with a single line and the wheelhouse left unattended. With a single , the vessel was extremely vulnerable to movements caused by tidal movements or vessels, and with no-one in the wheelhouse, there was no way to make sure that the boat stayed in . It was highly likely that Hurlingham would away from the during the time needed for 121 to finish their drinks and leave the party. After the manoeuvred the of the boat back into the pier, the resulting contact caused the bow to move away. This opened up the gap between the boat and the pier at the point where passengers were disembarking. The was checking that the bar account had been signed and then became involved in tidying up. The
결론SECTION 3 - CONCLUSIONS
3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO ThE ACCIDENT WhICh hAVE RESULTED IN RECOMMENDATIONS • Hurlingham had been secured with a single line, with the left in and the wheelhouse unattended. In this condition, it was highly likely that it would away from the while the disembarked. [2.2] • The was distracted by other duties on the boat, and while the manoeuvred her back into , the boarding gates were left open and the passengers were allowed to continue disembarking across the gap between the boat and the pier, unsupervised. [2.2] • It is considered likely that the deceased passenger did not notice the gap that had been allowed to open up between Hurlingham and Westminster Pier. [2.2] • It is essential that skippers are able to supervise both passengers and to identify and minimise hazards as they appear, and to take preventative action in case of emergencies. This duty should be stated in company procedures and managers should check periodically to ensure that these are being complied with. [2.3.3] • Both the
조치 사항SECTION 4 - ACTION TAKEN
Thames Cruises Ltd: Has reviewed its health and safety system and taken the following actions: • Revised and updated the filing system on all its vessels, including a closed system to ensure that relevant sign to record that they have seen important documents. • Introduced a simplified filing system on board each vessel, instructed skippers on how documents are to be kept and included checks on the filing in periodic internal audits of each vessel. • Assessed the risks of catering staff loading equipment onto vessels and working on board, and introduced a system of reporting, training and supervision to minimise the risk of staff falling overboard. Catering staff are also required to while loading equipment. • Constructed boarding platforms at the company’s base at Lambeth to improve access to vessels. • An announcement is to be made to just before disembarkation, asking them to take additional care, and reminding crew of their obligations (reproduced at Annex E). • Issued an instruction to crew specifying detailed procedures for , boarding and disembarkation of passengers. Summaries of these procedures are included on each “party advice note” as a reminder. • Issued a personal copy of the Marine to all crew, in addition to those kept on board each vessel. • Revised the
권고SECTION 5 - RECOMMENDATIONS
The is recommended to: 2009/133 Improve the targeting of inspections on the operation of Class V vessels (particularly those working during the evening) to: • Verify compliance with the procedures specified in their DSMC. • Promote the adoption of procedures that reflect best practice, such as those described in the Code of Practice for Vessel Operations on the Thames 2009. 2009/134 Issue improved information to operators of Class III – VI (A) Domestic Passenger ships to guide them on the measures they should take to comply effectively with the Domestic Passenger Ships Safety Management Code. London River Services is recommended to: 2009/135 Assess the risks associated with the movement and control of passengers on its piers at night, to: • Clarify where the responsibility for passenger safety lies, and ensure that adequate control measures are in place to ensure passenger safety, particularly in emergency situations. • Ensure the lighting and marking arrangements of the edges make a distinct contrast with the surrounding water in all ambient light conditions. • Require all vessels using LRS piers to adhere to the Code of Practice for Passenger Vessel Operations on the Thames 2009. Thames Cruises Ltd is recommended to: 2009/136 Review and amend its , as necessary, to comply with the Code of Practice for Passenger Vessel Operations on the Thames 2009 and, specifically, to: • Implement a system to record accidents and near misses, identify the lessons to be learned, and review and update its
첨부 문서 3 Annexes
원문(영어)한국어 번역 · 모델 · 검수 전
Annex A Company Safety Memo
Annex B Standing Orders to Annex & Extract from Research Project 527Annex D Notice to regarding accident on board Royal PrincessAnnex ( Text of Thames Cruises disembarkation announcement“Announcement to be made just before going alongside the to disembark Can I have your attention please. We are just about to go alongside the pier to disembark. Please will you be extremely careful when you step from the vessel to the pier. Do not attempt to leave the vessel unless there is a on the exit gate, and you ensure that there is no gap between the vessel and the pier. Please make sure that you have taken all your belongings with you before you go ashore. And we ask you to leave the vessel and the surrounding area in a quiet and orderly fashion so as not to disturb the local residents On behalf of Thames Cruises I hope that you have enjoyed your cruise. Have a safe journey home, and we hope to see you again. THAMES CRUISES October 2008” [sic]
Annex ) Safety Bulletin 3/2008 SAFETY BULLETIN 3/2008 fatality during disembarkation from a Class V passenger vessel on the River Thames 17 August 2008 SAFETY BULLETIN 3/2008 This document, containing urgent safety recommendations, has been produced for marine safety purposes only, on the basis of information available to date. The Merchant Shipping (Accident Reporting and Investigation) Regulations 2005 provide for the to make recommendations at any time during the of an investigation if, in his opinion, it is necessary or desirable to do so. This Safety Bulletin is issued to ensure, through the relevant certification and licensing bodies, that Class V vessels on the River Thames are being operated to a standard which ensures the safety of their passengers and . Stephen Meyer Chief Inspector of Marine Accidents This bulletin is also available on our website: http://www.maib.gov.uk Press Enquiries: 020 7944 6433/3387; Out of hours: 020 7944 4292 Public Enquiries: 020 7944 3000BAckgrOUNd On 17 August 2008, a fell overboard from the Class V
Vessel management• All Class V vessels require a valid Domestic Safety Management (DSM) certificate and a Licence to operate from London piers. The initial investigation into this accident has highlighted a number of key areas where the requirements of the DSM certificate and Licence were not achieved. rEcOMMENdATION The and London river Services are recommended to: 2008/170 • Take urgent action to satisfy themselves that all companies operating licensed Class V passenger vessels on the River Thames have effective systems in place to ensure the safe operations of their vessels in accordance with the Domestic Safety Management Code and the LRS licence agreement. Issued September 2008
부록 A 회사 안전 메모부록 B 승무원 상시 지시
부록 C 연구 과제 527 발췌
부록 D Royal Princess호 선상 사고에 관한 승무원 공지 부록 E Thames Cruises 승객 하선 안내 방송문
"부두에 접안하여 하선하기 직전에 하는 안내 방송
주목해 주시기 바랍니다. 우리는 곧 하선을 위해 부두에 접안하려 합니다. 선박에서 부두로 발을 내디딜 때 각별히 조심해 주십시오. 출구 문에 승무원이 있지 않은 한 선박에서 내리려 하지 마시고, 선박과 부두 사이에 틈이 없는지 확인해 주십시오. 하선하시기 전에 소지품을 모두 챙기셨는지 확인해 주십시오. 그리고 인근 주민에게 방해가 되지 않도록 조용하고 질서 있게 선박과 그 주변 구역을 떠나 주시기 바랍니다. Thames Cruises를 대표하여 유람이 즐거우셨기를 바랍니다. 안전하게 귀가하시고, 다시 뵙기를 바랍니다. THAMES CRUISES 2008년 10월"[sic]
부록 F MAIB 안전 회보 3/2008
MAIB 안전 회보 3/2008
2008년 8월 17일 템스강에서 제5급 여객선의 승객 하선 중 발생한 승객 사망
MAIB 안전 회보 3/2008
긴급 안전 권고를 담은 이 문서는 현재까지 입수된 정보를 토대로 오로지 해사 안전 목적으로 작성되었다. 2005년 상선(사고 보고 및 조사) 규칙(Merchant Shipping (Accident Reporting and Investigation) Regulations 2005)은 해양사고 수석조사관이 필요하거나 바람직하다고 판단하는 경우 조사 진행 중 언제든지 권고할 수 있도록 규정한다. 이 안전 회보는 관련 증서 및 면허 발급 기관을 통해 템스강의 제5급 여객선이 승객과 승무원의 안전을 보장하는 수준으로 운영되고 있음을 확인하기 위해 발행된다.
스티븐 마이어(Stephen Meyer)
해양사고 수석조사관
이 회보는 우리 웹사이트에서도 볼 수 있다. http://www.maib.gov.uk
언론 문의
020 7944 6433/3387; 업무 시간 외: 020 7944 4292
일반 문의
020 7944 3000
배경
2008년 8월 17일, 템스강 웨스트민스터 부두에서 제5급 여객선 Hurlingham호에서 하선하려던 승객이 물에 빠졌다. 강에서 광범위한 수색이 이루어졌음에도 불구하고 승객의 시신은 닷새 뒤에야 강에서 수습되었다. 템스강을 운항하며 그레이터 런던(Greater London)의 부두를 이용하는 제5급 여객선의 안전한 운영은 영국 국내 안전관리 규약(UK Domestic Safety Management Code)의 요건과 런던 리버 서비스 유한회사(London River Services Ltd)가 발급한 면허 협약을 준수할 필요에 의해 규율된다.
1995 (as amended) TfL - Transport for London
-
Very High Frequency
-
Vessel Traffic Services
Times: All times in this report are local (
+ 1) unless otherwise stated
Hurlingham
한국어 번역 · 모델 · 검수 전
약어 및 두문자어 해설 BML - 보트선장 면허(Boat Masters Licence) CCTV - 폐쇄회로 텔레비전(Closed Circuit Television) DSMC - 국내 안전관리 규약(Domestic Safety Management Code) ILB - 연안 구명정(Inshore Lifeboat) ISM - 국제안전관리(International Safety Management) 코드 LRS - 런던 리버 서비스(London River Services) MCA - 영국 해사연안경비청(Maritime and Coastguard Agency) MGN - 해사지침 고시(Marine Guidance Notes) MOB - 사람이 물에 빠짐(Man Overboard) MSN - 상선 고시(Merchant Shipping Notice) PLA - 런던항만청(Port of London Authority) RNLI - 영국 왕립구명정협회(Royal National Lifeboat Institution) SAR - 수색구조(Search and Rescue) STCW - 선원의 훈련·자격증명 및 당직근무의 기준에 관한 국제협약 1995(개정본)(International Convention on the Standards of Training, Certification and Watchkeeping 1995 (as amended)) TfL - 런던 교통공사(Transport for London) VHF - 초단파(Very High Frequency) VTS - 선박교통관제(Vessel Traffic Services) 시각: 달리 명시하지 않는 한 이 보고서의 모든 시각은 현지 시각(UTC + 1)이다
Hurlingham
position
. Shortly after the
stern
was brought back into the
pier
, a gap opened up between the front of the boat and
pier
at the point where
passengers
were disembarking. One
passenger
stepped forward and fell into the gap. Despite an extensive search, he could not be found and his body was recovered further downriver on 22 August 2008. A postmortem determined cause of death to be ‘
in the presence of alcohol intoxication’. The investigation found that: the
skipper
was distracted from his primary responsibilities of ensuring the safety of the vessel and
passengers
, by other duties concerning the
of the licensed bar and by tidying up after the party; the vessel was not adequately secured; and the
mate
had left his
position
, supervising and assisting
passengers
, to reposition, and secure the boat. Also, the vessel’s
was poor, with ineffective emergency drills, flawed
and inadequate procedures for
mooring
and
passenger
disembarkation. The owners have, during the
of the investigation, made a number of improvements to their
safety management system
. The
(
PLA
), in partnership with the
(
MCA
), London River Services (LRS) and the
Passenger
Boat Association, has developed a Code of Practice for
Passenger
Vessel Operations on the River Thames which provides detailed guidance to operators to supplement regulations in the Domestic
Passenger
Ships Safety Management Code (DSMC). In a safety bulletin, issued shortly after the accident,
recommended that the
MCA
and LRS took urgent action to satisfy themselves that Class V
passenger
vessels operating on the River Thames had effective systems in place to ensure their safe operation. In addition, the
MCA
has been recommended to improve the guidance available to operators for complying with the DSMC; and to improve the targeting of inspections on the operation of these vessels. LRS has also been recommended to assess the risks associated with the movement and control of
passengers
on its piers at night. A number of detailed recommendations have been made to the owners of Hurlingham on aspects of their
safety management system
, conduct of
and arrangements for
passenger
access.
한국어 번역 · 모델 · 검수 전
요약 2008년 8월 17일 늦은 저녁, 저녁 파티를 마친 뒤 여객선 Hurlingham호에서 웨스트민스터 부두(Westminster Pier)로 하선하려던 승객 한 명이 템스강(River Thames)에 빠져 사망하였다. Hurlingham호는 선수의 계류줄 한 가닥으로 웨스트민스터 부두에 고정되어 있었고, 선장은 바 계산을 처리하고 파티 뒤 정리를 하느라 기관을 전진 상태로 둔 채 조타실을 비워 두었다. 선박의 선미가 부두에서 멀어졌고, 항해사는 하선하는 승객을 감독하던 부두 위의 자리를 떠나 선박을 다시 붙이고 계류줄 두 가닥을 더 걸었다. 건널판(gangway)은 사용되지 않았고, 선박이 제 위치로 되돌려지는 동안 승객들은 감독 없이 계속 하선하도록 허용되었다. 선미가 부두에 다시 붙은 직후, 승객들이 하선하던 지점에서 선박 앞부분과 부두 사이에 틈이 벌어졌다. 승객 한 명이 앞으로 발을 디디다가 그 틈에 빠졌다. 대대적인 수색에도 그를 찾지 못하였으며, 그의 시신은 2008년 8월 22일 하류 쪽에서 수습되었다. 부검 결과 사인은 '알코올 중독 상태에서의 익사'로 판정되었다. 조사에서 다음이 밝혀졌다. 선장은 선박과 승객의 안전을 보장하는 본연의 책임에서, 면허를 받은 바의 운영과 파티 뒤 정리에 관한 다른 업무로 주의가 분산되었다. 선박은 적절히 고정되지 않았다. 항해사는 승객을 감독하고 도와주던 자리를 떠나 선박을 재배치하고 고정하였다. 또한 이 선박의 안전관리체제는 비상 훈련이 효과적이지 않고, 위험성 평가에 결함이 있었으며, 계류와 승객 하선 절차가 미흡하는 등 부실하였다. 선주는 조사 기간 중에 안전관리체제를 여러 가지로 개선하였다. 런던항만청(PLA)은 영국 해사연안경비청(MCA), 런던 리버 서비스(London River Services, LRS), 여객선협회(Passenger Boat Association)와 협력하여, 국내 여객선 안전관리 규약(DSMC)의 규정을 보완하는 상세한 지침을 운영자에게 제공하는 템스강 여객선 운항 실무규약을 마련하였다. 사고 직후 발행한 안전 공지에서 MAIB는 MCA와 LRS가 템스강에서 운항하는 5등급(Class V) 여객선에 안전한 운항을 보장하는 효과적인 체제가 갖추어져 있는지 스스로 확인하도록 긴급 조치를 취할 것을 권고하였다. 또한 MCA에는 운영자가 DSMC를 준수하는 데 이용할 수 있는 지침을 개선하고, 이 선박들의 운영에 대한 검사의 대상 선정을 개선하도록 권고하였다. LRS에도 야간에 자사 부두에서 승객의 이동과 통제에 따르는 위험을 평가하도록 권고하였다. Hurlingham호의 선주에게는 안전관리체제, 승무원의 행동, 승객 접근 방식에 관한 여러 세부 권고가 이루어졌다.
, River Thames, London Persons on board : 127 comprising: 2 marine
, 2 bar staff, 1 caterer, 1 DJ and 121
passengers
Injuries/fatalities : One
passenger
died after falling overboard Damage : None
1.2 NARRATIVE 1.2.1 Evening cruise Thames Cruises Ltd operates five vessels and specialises in providing boats for
by companies and groups. Hurlingham had been booked by a local company for its annual staff party, to cruise on a circular route from Westminster
Pier
to Greenwich (Figure 1), with a licensed bar, buffet and disco. The boat was kept at Lambeth
Pier
. On 17 August 2008, the
arrived at about 1600 to prepare the boat for the party. As it was a Sunday, the company’s office was closed. He checked the overall condition of the boat, cleaned the public areas and worked through the pre-sailing, safety and
engine
checks. The
had been working on another of Thames Cruises’ boats from 0800 that morning. He arrived at Lambeth
Pier
at 1800 and boarded Hurlingham at 1815. The two bar staff and the caterer arrived and, at 1855, Hurlingham left Lambeth
Pier
for the short journey to Westminster
Pier
. The
skipper
brought Hurlingham alongside Westminster
Pier
(Figures 2a and b) and, due to the effect of turbulence from Westminster
, he asked the
mate
to secure it with head and midships lines. The
skipper
left the
propeller
engaged in
and the
engine
at idle to put some tension on the
and draw the boat into the
pier
. The layout of the boat and height of the
pier
made it preferable for
passengers
to embark using the forward entrances. These were on the turn of the bow, and it was normal practice for the boat to
at a slight angle against the
pier
and for
passengers
to step directly from the
pier
onto the boat. A gangway was not routinely used, and none was used throughout that night. The party organiser boarded to meet the
skipper
and
mate
, and shortly afterwards
passengers
started to embark. The
skipper
and
mate
stood at the entrance gate and the
skipper
used a hand counter to record the number of
passengers
boarding. At 1927, Hurlingham left Westminster
Pier
and sailed upriver towards Lambeth
Bridge
. The boat then turned and headed downriver to Tower
Pier
to pick up some more
passengers
. Although a standard safety announcement was made during this period, not all the
passengers
heard it due to the background noise from the party. River traffic at Tower
Pier
was heavy, and the only
berth
available to Hurlingham was the one set aside for the regular commuter service. The
skipper
brought Hurlingham alongside at this
berth
and the
mate
secured the boat with a single headline. The boat was head into the ebbing tide and the effect of this, the wind blowing onto the
berth
, and the
engine
running
astern
, was sufficient to
her close against the
pier
. The
skipper
,
mate
and party organiser waited at the
pier
gate for the remainder of the
passengers
, but it was reported that they were going to arrive later than expected. The
skipper
was concerned that Hurlingham might obstruct the commuter service, and told the party organiser that he
Figure 1 Chartlet of the River Thames from Lambeth
Pier
to Tower
Bridge
Reproduced from Admiralty Chart BA 3319 by permission of the Controller of HMSO and the UK Hydrographic Office Lambeth
Pier
Westminster
Pier
Tower
Pier
Greenwich
Figure 2a Figure 2b Westminster
Pier
, viewed from the river Details of Westminster
Pier
wanted to stand off the
pier
, stemming the tide to wait for the
passengers
to arrive. The conditions of the bar licence required the bar to be closed while the boat was alongside the
pier
, so standing off in mid stream also allowed staff to continue serving drinks. The party organiser had pre-paid for drinks at the bar; at about 2100 the initial £1250 float had been used up, and a further £1000 was provided. By 2115 the remainder of the
passengers
had arrived and the cruise got
. A total of 121
passengers
and 6
crew
were on board. The party was good humoured, and none of the
passengers
or
crew
reported any unruly or foolish behaviour. There was a company policy not to serve alcohol to
passengers
who were considered to have had too much to drink, and the bar staff did not report being unduly concerned by the state of any of the
passengers
that they saw ordering drinks. 1.2.2 Return to Westminster
Pier
The
skipper
and
mate
took it in turns to take the wheel during the cruise, and on the return leg the
mate
passed control back to the
skipper
at Tower
Bridge
. As Hurlingham approached Westminster
pier
the tide was on the last of the ebb and there was very little stream flowing. However, the
skipper
expected the
to start soon and turned Hurlingham to head downriver and into the expected tide, berthing
side to in the centre part of Westminster
Pier
. The
mate
went to the forward open part of the
, opened the boarding gate in the boat’s
port
and prepared a headline. At 2316:30, he stepped onto the
pier
and secured the
mooring line
, as a
, leading from a cleat forward of the gate on the boat, to a
on the
pier
which was also forward of a gate in the
pier
’s guardrail. The
mate
then opened the gate on the
pier
and, 20 seconds later, the caterer and two
passengers
followed him onto the
pier
. Once the
head line
was secured, the
skipper
put the
to draw the boat up against the
pier
. He had not given the
mate
any specific instructions on how he wanted to moor the vessel, assuming that the
mate
would know what to do. The
skipper
looked down from the wheelhouse and saw the
mate
near the gate on the
pier
, and
passengers
on the forward
deck
preparing to disembark. The
passengers
partially obscured his view so that he could only see the forward
mooring line
. However, he assumed that the boat was adequately secured, and did not think it necessary to check the
arrangements. With the
engine
still
running
at low power
astern
, the
skipper
then left the wheelhouse to go down to the
area, where he met the bar staff and checked whether the party organisers had signed to accept the bar account. One of the organisers came over, signed the account and thanked the
skipper
for the cruise. The
skipper
then went aft and up to the top
deck
to check that none of the safety equipment had been damaged. Finding it all in order, he began tidying up chairs and glasses.
1.2.3
Passenger
disembarkation Westminster
Pier
is fitted with a number of Closed Circuit Television (
) cameras, two of which recorded the accident. The recordings from these were studied to determine how the
passenger
fell overboard. All the times referred to are from the
CCTV
recording system. The
mate
had a brief conversation with the caterer and then moved to stand near the
pier
gate. At 2318:00 he re-boarded the vessel and moved two rubbish bags, that he thought were in the way of
passengers
, onto the edge of the
pier
. He stayed near the
pier
gate briefly, then went back on board Hurlingham. Very few
passengers
had left the boat at this stage, and the
mate
returned to the
pier
and leant on the
pier
guardrails just upriver of the gate
, facing the boat and periodically drinking from a
. At 2320:40 Hurlingham’s
started to
out into the river. The reason for this is not known, but as the wind was very light, it is most likely that it was either due to the effects of other vessels moving on the river, or turbulence from the changing tidal stream. Seventeen
passengers
disembarked across the widening gap, before the
mate
re-boarded at 2321:40. The
mate
went up to the wheelhouse and attempted to stop the swing. He then went back to the side of the boat to prepare a second
mooring
rope, attached to a cleat immediately aft of the disembarkation gate. The
mate
then made two further visits to the wheelhouse, using the controls to try and move the
stern
of the boat back alongside, and returning to the
pier
to attach the second
mooring
rope, and a third
. However, it was not until 2323:20 that Hurlingham’s
stern
started to swing back towards the
pier
, the angle between the vessel and the
pier
having reached a maximum of approximately 40º. Both the gates on the
pier
and boat had been left open throughout, and by the time the
mate
returned to the
pier
at 2324:08 and secured the third and final, midships
mooring line
, a further 48
passengers
had disembarked and 4 had re-boarded. At this time, the effect of the
stern
swinging into the
pier
caused the bow to move away to the limit of the forward
mooring
lines. A gap between Hurlingham’s
deck
and the
pier
opened up and
passengers
were seen having to make long strides to
cross
the gap. The
mate
went back up to the wheelhouse to take the
engine
. One
passenger
, Mr ○○, moved towards the gate on Hurlingham. At 2324:48 he took one step forwards and fell into the gap that had opened up between the boat and the
pier
. The
passenger
immediately behind him shouted in alarm, and another
passenger
of Mr ○○ heard a splash as he entered the water. A few seconds later, Hurlingham reached the limit of the forward
mooring
ropes and moved back up against the
pier
.
Passengers
crowded around the immediate area at the front of the boat and on the
pier
, searching for Mr ○○, but were unable to see him. The
mate
was in the
wheelhouse and realised that something had happened. He became aware, from the shouts, that a
passenger
had fallen into the river, and he came down to the
deck
to look himself. He could not see anyone in the water and returned to the wheelhouse to
for help, using the
radio to contact London
(
VTS
). London
also heard the transmission and activated
(
SAR
) plans. 1.3 EMERGENCY RESPONSE The
skipper
had been at the aft end of Hurlingham tidying up after the party, and became aware that the
stern
had drifted away from the
pier
when he felt the
engine
movements that were being used to bring the vessel back alongside. He heard shouts coming from the front of the boat and moved forward to find out what was going on. He was met by the
mate
, who told him that one of the
passengers
had fallen into the river. The
skipper
moved towards the wheelhouse to
call
for assistance, but stopped when the
mate
told him that the emergency services were already on their way. By 2325:44, one
passenger
had climbed over Hurlingham’s
bulwark
and was standing on the outboard part of the
deck
in an attempt to get a better view of the water. Other
passengers
were crowding round the forward part of the boat and the
pier
immediately opposite, searching for the
. One
passenger
was on the outboard part of the
pier
, outside the guardrail, walking up and down as he spoke on his mobile telephone. A
was taken from the
side of Hurlingham, and
passengers
lowered the light over the edge to help with the search. No-one reported seeing any sign of Mr ○○. An ‘E’ Class
(
ILB
) from the
Tower station was on exercise, and once tasked by the
coastguard
it diverted to Westminster
Pier
. The
skipper
saw it approaching and decided that he should move Hurlingham off the
pier
to allow the
ILB
to search more effectively. He let go the
mooring
lines that were secured
amidships
and just aft of the gate, and told the
mate
to standby to release the forward
mooring line
. The
skipper
went to the wheelhouse and began to move the boat
astern
. The
mate
let the last line go, and at 2328:25 Hurlingham began to move off the
berth
. The boarding gate was shut, but one
passenger
remained standing outside the boat’s
bulwark
. Hurlingham turned and started to search upriver. The
lifebuoy
had been put into the water and the increasing
flood tide
had swept it upriver, past Westminster
Bridge
. The
skipper
manoeuvred the boat to recover it and to search for the missing
passenger
. Launches from the Police, and
and Rescue Services joined the search, but Mr ○○ could not be found. A police helicopter using a night vision camera later searched the area, but nothing was seen and the
coastguard
terminated the
search and rescue
operation at 0047.
1.3.1 Subsequent action Hurlingham returned to Westminster
Pier
and the
skipper
began his own search around the inboard parts of the
pier
(Figure 3). He met up with the
ILB
crew
, who confirmed that they had not been able to find the missing
passenger
on either side of the
pier
. Police
breathalysed the
skipper
and a negative result was recorded. The
mate
was not breathalysed. 1.3.2 Accident reporting After the incident, the
crew
discussed what had happened. Some
passengers
had told the
crew
that Mr ○○ might have gone home, and in the confusion it was not clear to them that he had actually been lost overboard. Nothing had been found during the extensive search, and the
crew
hoped that the reports of his
were mistaken. Neither the
skipper
nor the
mate
reported the incident or their concerns to Thames Cruises, and the company was still unaware of the accident when contacted by the
the following day. The
loss
of Mr ○○ could only be confirmed by a very small number of
passengers
who were eye-witnesses, and following careful study of the
CCTV
images. Figure 3 Westminster
Pier
viewed from the river bank
1.4 ThE VICTIM Mr ○○ was aged 32, and he was an employee of the company chartering the boat for the party. He had been at a festival during the afternoon before the party and was considered by friends and colleagues, who were with him during the evening, to be enjoying the party and showing the effects of alcohol consumption. His body was recovered downriver, at Embankment
Pier
on 22 August 2008. The postmortem examination reported that there was little evidence of any natural diseases and, specifically, no crush injuries. Toxicological analysis found evidence of alcohol consumption equivalent to more than 3.5 times the drink drive limit. The cause of death was recorded as “
in the presence of alcohol intoxication” [sic]. 1.5
CREW
Hurlingham’s
skipper
and
mate
held the appropriate Boatmasters licences (
) with local knowledge endorsements to allow either of them to command the vessel. Both men had previously been licensed by the
(
PLA
) as Watermen and Lightermen, and each had been automatically awarded the
BML
in January 2007 when the new, national, Boatmasters scheme entered into force. The
skipper
was aged 60 and had spent his entire working life on the River Thames. He had worked for Thames Cruises (and its predecessors) for 23 years, the last 15 of which as the regular
skipper
of Hurlingham. As the company’s trade had changed, he had worked less for Thames Cruises and was in regular employment with a lighterage company. His work on Hurlingham was seasonal and predominantly during the evenings. In agreement with the directors of Thames Cruises, he was the Designated Premises Supervisor for the purposes of the bar alcohol licence. He managed the bar, employed the bar staff and also had a financial interest, taking a share of the profits to supplement his
as
skipper
. The
mate
was aged 23, and had completed his Waterman’s apprenticeship before the
BML
came into force. He had worked on a number of commuter and pleasure boats on the river. He was self-employed and offered himself on a freelance basis to several different companies, either as
mate
or
skipper
. Although he was a Personal Licence Holder under the licensing regulations, as a casual employee, he did not have a financial interest in the bar. One of the two bar staff was designated as a competent crewman to assist in an emergency. The
skipper
had shown him the location of the lifesaving and
appliances, and had explained how to use them. His understanding of the role was to react to, and assist other
crew
in an emergency. His instructions in the event of a
Man Overboard
were to keep a
, standby with a lifebelt, and keep other
passengers
calm.
1.6 ACCESS ARRANGEMENTS During the investigation, Hurlingham was brought alongside Westminster
Pier
to examine
passenger
access (Figure 4). It was found that by bringing the boat into the
pier
at a shallow angle, the
at the forward boarding gate could be brought up against the
pier
, without leaving a gap. Hurlingham’s
deck
was lower than the
pier
, requiring
passengers
to step up a distance of between 17 and 23cm depending on the number of people on board. The
fore
deck
disembarkation area was lit by background light from the
accommodation
of Hurlingham and from overhead lights on Westminster
Pier
. The combination provided general lighting but, on the evening of the accident, the immediate area of the gates on the boat and
pier
would have been in shadow (Figure 5). The
deck edge
of Hurlingham was painted white, and the
material at the edge of the
pier
was black. Figure 4 Possible means of access from Hurlingham to Westminster
Pier
Hurlingham also had midships doors on either side of the main
deck
accommodation
, near the aft end of the bar where stairs
led
to the upper and lower decks. These doors were on the straight sided part of the hull, which would have been parallel to the
pier
had the boat been secured alongside in the conventional way. However, the
deck
sheer meant that these doors were lower than the forward boarding gates, such that the step needed to get up onto Westminster
Pier
would have been much greater. The
accommodation
area doors also opened inwards to about 90º, but then became jammed by the camber of the
deck
. This made this part of the boat extremely congested when the doors were opened with
passengers
on board and, although they were available as emergency exits, the
accommodation
doors were considered to be too awkward to use routinely. 1.7
PASSENGER
SAFETY ON ThE RIVER ThAMES Current regulations and operational practices for
passenger
vessels on the River Thames are heavily influenced by the
in 1989 between the
passenger
vessel Marchioness and the
Bowbelle, which resulted in the deaths of 51 people. A number of investigations were made into the circumstances of the accident of which, for the purpose of this report, the most significant are the Thames Safety Inquiry (2000) and the Formal Investigation (2001), both by General arrangements on Westminster
Pier
Figure 5
Lord Justice Clarke. These reports made a number of recommendations, which have since been implemented. Of relevance to this accident are the following recommendations from the Formal Investigation report: • Recommendation 11: “We recommend that the consultation process relating to the introduction of the Safety Management Code for Domestic
Passenger
Ships be completed with the minimum of delay and the Code introduced as soon as possible.”1 • Recommendation 14: “We recommend that all owners and operators of Class V
passenger
vessels should consider the training requirements for their crews, particularly in relation to emergency training and that consideration be given to extending the ‘Crowd Management and
Passenger
Safety’ training requirements in STCW95, Section A-V/22 to all persons working on Class V vessels, not only on the Thames but also nationally.”3 • Recommendation 17: “We remind shipowners and operators of the importance of keeping accurate contemporaneous records and of the importance of ensuring that their standing orders include instructions to that effect and that such instructions should be monitored closely.”4 1.8 REGULATIONS 1.8.1 Domestic Safety Management Code The Safety Management Code for Domestic
Passenger
Ships of Classes III – VI(A) came into effect on 1 November 2001. Often referred to as the Domestic Safety Management Code (DSMC), it was intended to establish a common standard for the safe operation of
passenger
ships operating in the UK. It was adapted from the
(
ISM
) Code for large, seagoing ships and simplified to make it more manageable for small companies and owner operators. The aim of the Code is to foster a culture of safety management and, specifically, it requires operators to develop and implement safe practices and procedures for: • health and safety protection; • ensuring the safe operation of ships in compliance with the relevant rules; 1 Recommendation 11: Statutory Instrument 2001:3209 ‘The Merchant Shipping (Domestic
Passenger
Ships) (Safety Management Code) Regulations 2001 refers. 2 International Convention on the Standards of Training, Certification and
for Seafarers 1995. 3 Recommendation 14: Marine Guidance Notes (
) 203,
Crew
Training for Personnel Serving on Domestic
Passenger
Vessels and
MGN
290, Local
Passenger
Vessels:
refers. 4 Recommendation 17:
MGN
158, Safety Management Code For Domestic
Passenger
Ships of Classes III-VI(A) refers.
• lines of communication between personnel, ashore and afloat; • reporting accidents; and • responding to emergency situations. These must be written and may be presented in a checklist format. The Code also requires that personnel receive training appropriate to the tasks they are expected to undertake, and that they have an understanding of the relevant regulations. Guidance on how to comply with the Code states that each employee should have ‘familiarisation training and proper instruction in onboard procedures … including
mooring
and unmooring.’ 1.8.2 Safe Means of Access The Merchant Shipping (Means of Access) Regulations 1988 set out the duties of the employer and the vessel’s
, who must ensure that there is a safe means of access between the ship and any quay,
or similar structure. Any access equipment and the immediate approaches to it must be adequately illuminated. Although the regulations require any ship over 30 metres
to carry a gangway, and the regulations comment in detail about other access equipment, there is no explicit requirement for a gangway to be used. 1.9
The introduction of the DSMC was a major change and Thames Cruises, like many other operators on the River Thames, sought assistance from consultants to produce the necessary paperwork needed to comply with the Code. A Marine
was produced, and copies of it were put on board each of the company’s five boats. 1.9.1 Safety manager Soon after the Code came into effect, a safety manager joined the company on a part-time basis to manage the paperwork and act as the
, providing the communications link between the crews and management. The safety manager was responsible for the ‘monitoring of vessel safety’ [sic], by providing and communicating guidance, policies and procedures to all other staff. This included ensuring compliance with regulations, maintaining the marine
safety management system
as well as accident reporting and investigation. Although the safety manager described attempts to get
crew
involved in the
safety management system
, at the time of the accident, it was evident from descriptions of the role that it had reduced to producing enough paperwork to satisfy the regulations.
1.9.2 Marine
Safety Management Manual
Crew
were required to sign the Marine
Safety Management Manual
to record that they had read and understood it. The manual found on board Hurlingham at the beginning of the investigation had been signed by the managing director on 21 November 2007, but there were no signatures on the appropriate page for
crew
. Although other
crew
had signed manuals on other Thames Cruises’ vessels, the safety manager reported that it was difficult to ensure the signature pages were kept up to date. This was emphasised in a company “safety memo” dated 23 August 2007 (Annex A). The manual included the statutory sections on: • Health and Safety Policy • Responsibilities of personnel • Policies and procedures • Emergency plans and procedures • Accident reporting The Health and Safety Policy Statement specified that the company would ‘establish and maintain a proactive health and safety culture by: Keeping the workplace safe and ensure that access and egress are safe and without risk Maintaining agreed safety standards by monitoring performance’ The manual noted that its method of accounting for
passengers
, by using a manual ‘clicker’ on arrival on board, complied with
1794, Counting and Registration of Persons on Board. It did not, however, give any instructions for counting
passengers
leaving the boat or, as required by the regulations, maintaining a
running
total of those left on board. There were several references to the consumption of alcohol, both by
crew
and
passengers
. A very clear policy prohibited
crew
from consuming alcohol both at any time up to 8 hours before and during their period of duty.
Crew
were required to
a uniform, during which time they were not permitted to enter any licensed premises. Sales of alcohol were not permitted to anyone under 18, or to any
passengers
who made a nuisance of themselves or were aggressive due to the affects of alcohol.
Opening
the bar and serving of alcohol were at the
skipper
’s discretion. The Emergency plans took the form of laminated checklists, and were kept readily to hand in the wheelhouse. They included a plan for reacting to a
Man Overboard
(
MOB
), but this was presumed to be in mid-stream. There was no guidance provided to cater for someone falling overboard while the vessel was alongside or close to a
pier
.
1.9.3
Mooring
and
passenger
access The Marine and Safety Manual did not contain any specific procedures for
mooring
and
passenger
access, other than a generic statement: ‘The company should establish and manage procedures that facilitate safe access/egress of all their vessels by: •
• Reviewing
risk assessment
after incident or
• Ensure staff carry out working procedures correctly • Keeping staff updated on the relevant regulations’ [sic] The managing director and safety
officer
both considered the management of safe access and egress to be a very basic element of a Waterman’s professional knowledge, and something that should not need to be stated in detail in the manual. They expected that crews would embark and disembark
passengers
using the forward boarding gates on either the
port
or
starboard
sides, and the boat should be moored using three ropes, one on each side of the boarding gate and a third,
amidships
. However, a notice to
crew
dated 6 May 2004 and a standing order to
crew
dated 26 February 2007 (both reproduced at Annex B), were found on board, which gave conflicting instructions. The first required
crew
to use a head and a
stern
rope to secure the vessel, the second simply stated that the vessel should be ‘moored tight alongside’ [sic]. The number of ropes to be used was only specified in the second instruction, on occasions when the boat was moored outboard of another boat. In this case, two ropes were to be used, one positioned on either side of the access gate in the
bulwark
. Despite these instructions, the
skipper
reported that his preference was to use three ropes in the way described by the managing director and safety
officer
. The
mate
also used this method to secure Hurlingham after the
stern
drifted away just before the accident. It was Thames Cruises’ company policy that at least one member of
crew
would stay in the
of the boarding gate, counting
passengers
on and supervising, or assisting their departure. Statements to this effect were found in several documents on board Hurlingham, the earliest dated 1989 and the latest, a loose memo reinforcing the requirement, dated July 2006. A further memo found in the company’s office, dated 26 February 2007 (Annex B), advised
crew
to ‘
the exit gate’. Supervising
passengers
disembarking was also a condition of the Premises Licence, issued by Westminster City Council. Both the
skipper
and the
mate
were aware of these requirements. 1.9.4
Risk assessments
The Marine and Safety Manual stated that it was the
skipper
’s duty to complete and update
risk assessments
, and a comprehensive set was kept in a folder on board Hurlingham. However, the
risk assessments
had all been completed
without the
crew
’s involvement. The
skipper
reported that he had not seen the
risk assessments
before, and was unable to explain what information the form contained or how the process worked. The manual also stated that the
mate
was responsible for monitoring and implementing the control measures identified by the
risk assessments
. While the
mate
understood the process, he was not familiar with the requirements for Hurlingham. The consultant who originally set up the
safety management system
in 2001 had produced a
risk assessment
for ‘falling overboard’. The safety manager had signed the form, but the spaces on the form for the risk assessor and
skipper
were all blank. The control measures to prevent someone from falling overboard included: • Establish a safe system of work for
mooring
/ departure • Establish a procedure for person overboard • Ensure adequate lighting is provided While there was a procedure for responding to an
MOB
in the middle of the river, there were none covering
mooring
and departure operations. There was no lighting of the forward boarding gates on Hurlingham, other than background light from the
accommodation
, and the company accepted that illumination of the embarkation area would be mostly provided by the lighting on the
pier
. 1.9.5 Emergency drills The DSMC requires procedures for potential emergencies to be exercised and recorded. The safety manager was responsible for advising when emergency exercises were held and assisting in
running
them. A timetable, covering the period from December 2002 to March 2007, had been produced for a range of different exercises, and a new schedule was issued in January 2008. The most recent record for an emergency drill, involving the
skipper
, was in July 2007. The safety manager acknowledged that it was extremely difficult to get the
crew
to do effective emergency drills. This was made harder by the irregular working pattern of evening parties and use of casual
crew
. The safety manager and managing director reported that they had identified the problem and were considering additional measures to conduct emergency drills more frequently. 1.9.6 Audit and assessment The
issued Hurlingham’s combined
Passenger
Certificate and Domestic
on 13 February 2004. The certificate was valid until 11 January 2009, and stated that it had to be endorsed annually at the Mid Term Safety Management Audit which was to be held between 13 May and 13 August. The annual hull inspection and survey had both been completed in
January 2008, but the Mid Term Audit had not been done since October 2007. The previous Mid Term Audit in 2006 also occurred in October, and it was only in 2005 that the Mid Term Audit was held within the prescribed period, on 10 August. The aim of the Mid Term Audit is for
MCA
surveyors to see the vessel’s
safety management system
in action, and it is meant to occur during the part of the season when the vessel is most likely to be operating. There is no requirement for the
crew
to be present at the Mid Term Audit and, in practise, the safety manager and managing director normally hosted the audit. The DSMC requires operators to conduct a formal review of their system every 3 years. Thames Cruises had not done this, preferring a continuous and more informal process. The safety manager and managing director reported that they had regular contact, during which they discussed matters relating to regulatory compliance and safety. Similarly, both men were often present when crews arrived to prepare their boats for evening functions. Paperwork was updated either by
it directly to the
skipper
, or by putting it in the boat concerned. The regular
skipper
would then put it in the file kept on the boat. On Hurlingham, there were a number of folders and a ‘portable metal home file’, containing numerous loose sheets of paper, variously dated from 1989 and, at the time of the accident, in no clear order. Although both the safety manager and managing director made regular inspections of the material state of the boat and its safety equipment, their only contact with the
crew
was while they were preparing the boat for departure. It was unusual for either of them to audit the operation of the boats, or pay an unscheduled visit to a boat to see for themselves how the
crew
performed away from the company’s base at Lambeth
Pier
. 1.9.7 Implementation of the Domestic Safety Management Code Inspection of the DSMC on Hurlingham identified that there were no procedures for
mooring
, a lack of emergency drills, ineffective
risk assessments
, muddled paperwork records and an incomplete description of the
passenger
accounting system. Most of these shortcomings would have been present at previous Mid Term Audits held in 2005, 2006 and 2007. In 2005, the
MCA
commissioned Research Project 527, an independent assessment of the DSMC as part of the Formal Safety Assessment on Domestic
Passenger
Vessel Safety Standards. The results from the assessment were reported to be: Compliance with the requirements of the DSMC was found to be good. However, there were concerns in the following areas: • Health and Safety Protection Policy • Procedures to Ensure Safe Operation
• Communication • Accident and Incident Reporting • Procedures for Responding to Emergency Situations • Training In particular, (the project) found that in most cases the
Safety Management System
was viewed as an exercise in compliance with regulations, rather than being integrated into, and therefore informing company safety systems.” The areas of concern identified in the results section of the report, form a substantial part of the DSMC. The
MCA
responded, reporting that it was reassured by the level of compliance and believed that the integration of safety management systems into the day to day
running
of
passenger
vessels would come in time. The report (Annex C) made eight recommendations, two of which are considered to be particularly relevant to this accident. These, and the responses from the
MCA
, are summarised below: • The second recommendation suggested that
MCA
audits should assist operators to determine where gaps in Health and Safety Protection Policy existed and help them to develop objectives and targets for improvements. The
MCA
acknowledged this, and reported that training in
risk assessment
and safety management was included in the syllabus for the national Boatmaster’s Licence. Neither the
skipper
nor
mate
were required to do any such training as BMLs were automatically awarded to licensed Watermen and Lightermen in January 2007, when the Boatmasters Scheme came into force. • Recommendation five suggested that checklist systems should be expanded to include the management system items which will regularly check the status of the Domestic
Safety Management System
as a means for companies to carry out an internal audit. The
MCA
reported that it did not consider it appropriate for them to develop standard checklists and that this issue should be a matter for operators. Guidance on compliance with the DSMC has not been updated since it was introduced in 2001 as
MGN
158. 1.10
PIER
OPERATION AND MANAGEMENT Westminster
Pier
is owned and operated by London River Services (LRS), part of Transport for London (TfL). LRS issues licences to all boat operators who use its piers for commercial purposes to ensure an appropriate level of safety is maintained.
One of the clauses of the licence states: Each approved vessel is at all times adequately fendered and secured when stationary alongside a
Pier
with a view to maintaining the safety of
passengers
, the approved vessel and the
Pier
. Without prejudice to the foregoing, when vessels are berthed or moored at any
Pier
, they must: a) have their
mooring
adjusted from time to time to allow for the rise and fall of the tide5 and to provide for the safety of persons lawfully embarking and disembarking. LRS began its own investigation immediately after the accident. No defects were found with the
pier
’s lighting, guardrail or safety equipment. The
pier
was fitted with chains at the
, and ladders to assist anyone in the water to support themselves and climb out. Westminster
Pier
is fitted with a substantial, black coloured,
fender
(Figure 2). The lights are fitted above the central part of the
pier
and provide a level of illumination typical of street lighting at a public facility. A substantial guardrail is fitted around the edge of the
pontoon
and inevitably casts a shadow over the outboard edge of the
pontoon
. The shadow is reduced when the gate is opened, but increases if
passengers
congregate at the guardrail. LRS provides caretaker staff on Westminster
Pier
from 0700 to 1900. Their role is to monitor usage and the material state of the
pier
. Companies using the
pier
are expected to provide their own staff to assist and supervise their own
passengers
. At the time of this accident, there were no LRS staff on Westminster
Pier
. 1.11 SINGLE POINT
MOORING
Any vessel alongside a
pier
will move in a combination of four principal ways: surging forwards and backwards along its longitudinal length, laterally sideways, yawing about a vertical axis and lastly,
and
with the motion of waves or wash from other vessels. Conventional
mooring
practice uses several ropes (Figure 6) to resist the longitudinal, sideways and yawing movement. 5 Westminster
Pier
is floating and its
remains constant throughout the
. Conventional arrangement of
mooring
lines Figure 6 Back spring
Fore
spring
Stern
rope Aft breast rope
For’d breast rope
These ropes can, to some extent, also limit vertical motion from waves and
. Equally, as the vessel is restrained by ropes leading in different directions it can only move a limited amount, and there is generally no need to use
engine
power to keep it in
position
. Some piers and jetties, particularly in the south-west of the UK have very restricted access and, in practice, only part of the vessel can lie alongside the embarkation point. In these circumstances, operators use a single
mooring line
to
hold
the vessel into the
pier
, and the
engine
and rudder to keep the boat in
position
. This practice has also been adopted on the River Thames, for several reasons: • By allowing some boats to overhang the ends of the piers, more boats can use the
pier
at the same time. • It is quicker and easier for boats operating with two crewmen to moor with a single line. • Using the current and
engine
power to tension the single line causes the boat to lie snugly against the
pier
, reducing the amount of movement caused by the effects of waves and
passing
vessels. Vessels from a number of other companies on the River Thames were observed
mooring
with a single line during this investigation. Single point mooring6 requires the
engine
power and or current to apply a force against a
mooring
rope to
hold
the boat stationary. If done successfully, the forces can be used to
hold
the boat tightly against a
pier
, so that waves and
wake
cause relatively little movement. However, it is a dynamic situation that must be kept in equilibrium all the time. Any changes, or application of additional forces could upset the balance and cause the boat to move off the
pier
or
jetty
. There are no regulations specifying how many
mooring
lines should be used to secure a vessel alongside her
berth
. However, following a fatal accident7 on the River Thames when a
mooring
bollard
became detached, the
MCA
advised operators8 to assess the risks of
mooring
with a single line and to take action to minimise the risks involved. 6 Colloquially known as ‘steaming on a spring’. 7 Failure of a
mooring
bollard
from the Class V
passenger
vessel Star Clipper resulting in a fatal accident at St Katharine’s
Equipment and Techniques, January 2005.
1.12 SIMILAR ACCIDENTS
MAIB
records between 2000 and 2008 were analysed to determine how many incidents involving
passengers
falling overboard from Class V
passenger
vessels on the River Thames have been reported. The following 12 cases were identified: • Three cases involving a
passenger
becoming injured after falling in a gap between the boat and the
pier
, and being trapped. Only one of these
passengers
fell into the water. • Three cases where a
passenger
slipped and injured themselves while boarding or disembarking a vessel, but did not become trapped or fall overboard. • Two cases involving the failure of a
mooring line
while ‘steaming on a spring’. One of these caused fatal injuries to a passenger7, the other caused damage to the boat. • Two cases where
passengers
attempted to climb over guardrails or jump across the gap between the boat and
pier
to board or disembark. • One case where a gangway became detached and
passengers
fell into the gap between the boat and the
pier
. • One case where two
passengers
fell overboard after emergency doors opened accidentally. Despite explicit requirements in the Merchant Shipping (Accident Reporting and Investigation) Regulations and DSMC, it is likely that not all accidents of this type are reported. A notice to
crew
(Annex D) was found on board Hurlingham which described a similar accident in summer 2001 on board Royal Princess, belonging to Thames Cruises. This accident was not reported to
MAIB
. Other accidents involving other operators became apparent during the investigation, suggesting that the frequency of such events is much greater than statistics indicate. 1.12.1 Findings from other investigations The Formal Investigation into the
collision
between Marchioness and Bowbelle, found that shortcomings in the management of the vessel and the crews’ commercial interest in the bar were
. It was reported that the managers had no proper system for ensuring that written instructions were regularly given to, and retained by their crews and that, at best, such instructions were put into a cardboard box. One of the crewmen on board Marchioness had spent much of his time tidying up glasses rather than assisting with the
of the vessel, and the report noted that it was, in principle, undesirable for the
skipper
and
mate
to have a financial interest in the bar. However, it was concluded that this arrangement was not impossible, provided that a proper system of safe
navigation
was instituted.
한국어 번역 · 모델 · 검수 전
1절 사실 정보
1.1Hurlingham호 및 사고 세부 사항 선박 세부 사항 등록 선주: Thames Cruises Ltd 등록항: 런던 기국: 영국 종류: 5등급(Class V) 여객선 건조: 1915년, 옥스퍼드(Oxford)의 솔터 브라더스(Salter Brothers) 구조: 강 전장: 30.93m 총톤수: 113.99 기관 종류: 역회전 기어박스를 통해 고정 피치 4엽 프로펠러를 구동하는 가드너(Gardner) 6LX 상용 속력: 9노트 사고 세부 사항 일시: 2008년 8월 17일 2324 사고 장소: 런던 템스강(River Thames) 웨스트민스터 부두(Westminster Pier) 승선 인원: 127명(해상 승무원 2명, 바 직원 2명, 케이터링 담당 1명, DJ 1명, 승객 121명) 부상/사망: 승객 1명이 바다에 빠진 뒤 사망 손상: 없음
1.2경위 1.2.1 저녁 유람 Thames Cruises Ltd는 선박 5척을 운영하며 기업과 단체에 선박을 전세로 제공하는 일을 전문으로 한다. Hurlingham호는 지역 기업이 연례 직원 파티를 위해 예약하였으며, 면허를 받은 바와 뷔페, 디스코를 갖추고 웨스트민스터 부두에서 그리니치(Greenwich)까지 순환 경로로 유람할 예정이었다(그림 1). 이 선박은 램버스 부두(Lambeth Pier)에 계류되어 있었다. 2008년 8월 17일 선장은 파티를 위한 선박 준비를 위해 약 1600에 도착하였다. 일요일이었으므로 회사 사무실은 닫혀 있었다. 그는 선박의 전반적인 상태를 점검하고 공용 구역을 청소했으며 출항 전, 안전, 기관 점검을 차례로 하였다. 항해사는 그날 오전 0800부터 Thames Cruises의 다른 선박에서 일하고 있었다. 그는 1800에 램버스 부두에 도착하여 1815에 Hurlingham호에 승선하였다. 바 직원 두 명과 케이터링 담당자가 도착하였고, 1855에 Hurlingham호는 웨스트민스터 부두까지의 짧은 항해를 위해 램버스 부두를 떠났다. 선장은 Hurlingham호를 웨스트민스터 부두에 접안시켰고(그림 2a 및 b), 웨스트민스터 다리(Westminster Bridge)의 난류 영향 때문에 항해사에게 선수줄과 선체 중앙줄로 고정하도록 요청하였다. 선장은 계류줄에 약간 장력을 걸어 선박을 부두 쪽으로 끌어당기도록 프로펠러를 후진 기어에 넣고 기관을 공회전 상태로 두었다. 선박의 배치와 부두의 높이 때문에 승객은 전방 출입구를 이용해 승선하는 것이 바람직하였다. 이 출입구는 선수 굽은 부분에 있었으며, 선박이 부두에 약간 비스듬히 접안하고 승객이 부두에서 선박으로 직접 발을 디디는 것이 일반적인 관행이었다. 건널판은 일상적으로 사용되지 않았고 그날 밤에도 내내 사용되지 않았다. 파티 주최자가 선장과 항해사를 만나러 승선했고, 이후 곧 승객들이 승선하기 시작하였다. 선장과 항해사는 출입문에 서 있었고 선장은 수동 계수기로 승선 인원을 기록하였다. 1927에 Hurlingham호는 웨스트민스터 부두를 떠나 램버스 다리(Lambeth Bridge) 쪽으로 강 상류로 항행하였다. 이후 선박은 선회하여 승객을 더 태우기 위해 타워 부두(Tower Pier)로 강 하류를 향해 나아갔다. 이 시간 중에 표준 안전 방송이 있었으나 파티의 배경 소음 때문에 모든 승객이 들은 것은 아니었다. 타워 부두의 강 교통은 혼잡하였고, Hurlingham호가 이용할 수 있는 유일한 계류 자리는 정기 통근 운항용으로 비워 둔 자리였다. 선장은 이 계류 자리에 Hurlingham호를 접안시켰고 항해사는 선수줄 한 가닥으로 선박을 고정하였다. 선박은 낙조류를 선수에 받고 있었으며, 이것과 계류 자리 쪽으로 부는 바람, 후진 중인 기관의 효과가 어우러져 선박을 부두에 가깝게 붙여 두기에 충분하였다. 선장, 항해사, 파티 주최자는 나머지 승객을 기다리며 부두 출입문에서 대기하였으나, 승객들이 예상보다 늦게 도착할 것이라는 보고가 있었다. 선장은 Hurlingham호가 통근 운항을 방해할 수 있다고 우려하여 파티 주최자에게 그가그림 1 램버스 부두에서 타워 브리지까지의 템스강 해도 조각 영국 해군성 해도 BA 3319를 HMSO 관리관과 영국 수로국(UK Hydrographic Office)의 허가를 받아 전재함 램버스 부두 웨스트민스터 부두 타워 부두 그리니치 그림 2a 그림 2b 강에서 본 웨스트민스터 부두 웨스트민스터 부두의 세부 모습 부두에서 떨어져 조류를 맞받으며(stemming the tide) 승객들이 도착하기를 기다리고 싶다고 말하였다. 바 면허 조건상 선박이 부두에 접안해 있는 동안에는 바를 닫아야 했으므로 강 한가운데에서 대기하면 직원이 계속 음료를 제공할 수도 있었다. 파티 주최자는 바에서 음료를 선불하였으며, 약 2100에 처음 준비금 1,250파운드가 소진되어 1,000파운드가 추가로 제공되었다. 2115에 나머지 승객이 도착하여 유람이 시작되었다. 승객 121명과 승무원 6명이 승선하였다. 파티는 유쾌한 분위기였고 승객이나 승무원 누구도 난폭하거나 어리석은 행동을 보고하지 않았다. 회사 방침은 과음했다고 여겨지는 승객에게 술을 제공하지 않는 것이었으며, 바 직원은 음료를 주문하는 승객 중 누구의 상태도 지나치게 우려하지는 않았다고 보고하였다. 1.2.2 웨스트민스터 부두로의 복귀 선장과 항해사는 유람 중에 번갈아 조타하였으며, 귀항 구간에서는 항해사가 타워 브리지(Tower Bridge)에서 선장에게 조종을 다시 넘겼다. Hurlingham호가 웨스트민스터 부두에 접근할 때 조류는 낙조류의 막바지였고 흐름은 거의 없었다. 그러나 선장은 곧 창조류가 시작될 것으로 예상하고 Hurlingham호를 하류 쪽으로 돌려 예상되는 조류를 맞받으며 웨스트민스터 부두 중앙 부분에 좌현을 대고 접안하였다. 항해사는 갑판 전방의 개방된 부분으로 가서 선박 좌현 불워크(bulwark)의 승선 출입문을 열고 선수줄을 준비하였다. 2316:30에 그는 부두로 발을 내디뎌, 선박의 출입문 앞쪽에 있는 클리트에서 부두의 난간 출입문 앞쪽에 있는 볼라드로 이어지는 계류줄을 선수줄로 고정하였다. 그다음 항해사는 부두의 출입문을 열었고 20초 뒤 케이터링 담당자와 승객 두 명이 그를 따라 부두로 건너갔다. 선수줄이 고정되자 선장은 기관을 후진에 넣어 선박을 부두에 붙도록 끌어당겼다. 그는 항해사가 무엇을 해야 하는지 알 것이라고 가정하여 선박을 어떻게 계류할지에 대해 항해사에게 구체적인 지시를 하지 않았다. 선장은 조타실에서 내려다보다가 항해사가 부두의 출입문 근처에 있고 승객들이 하선을 준비하며 전방 갑판에 있는 것을 보았다. 승객들이 그의 시야를 일부 가려서 그는 선수 계류줄만 볼 수 있었다. 그러나 그는 선박이 적절히 고정되었다고 가정하고 계류 상태를 점검할 필요가 있다고 생각하지 않았다. 기관을 여전히 낮은 출력으로 후진시킨 채, 선장은 조타실을 떠나 선실 구역으로 내려가 바 직원을 만나 파티 주최자들이 바 계산서를 승인하는 서명을 했는지 확인하였다. 주최자 중 한 명이 와서 계산서에 서명하고 선장에게 유람에 대해 감사하였다. 이후 선장은 선미로 가서 상부 갑판으로 올라가 안전 장비가 손상되지 않았는지 점검하였다. 모두 이상이 없는 것을 확인한 뒤 그는 의자와 유리잔을 정리하기 시작하였다.
1.2.3승객 하선 웨스트민스터 부두에는 여러 대의 폐쇄회로 텔레비전(CCTV) 카메라가 설치되어 있으며 그중 두 대가 사고를 녹화하였다. 승객이 어떻게 바다에 빠졌는지 판단하기 위해 이 녹화본을 분석하였다. 언급되는 모든 시각은 CCTV 녹화 시스템에서 가져온 것이다. 항해사는 케이터링 담당자와 짧게 대화한 뒤 부두 출입문 근처에 서 있는 곳으로 이동하였다. 2318:00에 그는 다시 선박에 승선하여 승객에게 방해가 된다고 생각한 쓰레기 봉투 두 개를 부두 가장자리로 옮겼다. 그는 잠시 부두 출입문 근처에 머물다가 다시 Hurlingham호에 승선하였다. 이 시점에는 선박에서 내린 승객이 매우 적었으며, 항해사는 부두로 돌아와 출입문 개구부 바로 상류 쪽의 부두 난간에 기대어 선박을 마주 보고, 때때로 용기에 든 것을 마셨다. 2320:40에 Hurlingham호의 선미가 강 쪽으로 밀려나기 시작하였다. 그 이유는 알려지지 않았으나, 바람이 매우 약했으므로 강에서 이동하는 다른 선박의 영향이나 조류 변화에 따른 난류 때문일 가능성이 가장 크다. 항해사가 2321:40에 다시 승선하기 전까지 승객 열일곱 명이 벌어지는 틈을 건너 하선하였다. 항해사는 조타실로 올라가 선회를 멈추려고 하였다. 그런 뒤 하선 출입문 바로 뒤쪽 클리트에 연결할 두 번째 계류줄을 준비하러 선측으로 되돌아갔다. 이후 항해사는 조타실을 두 번 더 오가며 조종 장치로 선박의 선미를 다시 붙이려 하였고, 부두로 돌아가 두 번째 계류줄과 선체 중앙의 세 번째 줄을 걸었다. 그러나 선박과 부두 사이의 각도가 최대 약 40º에 이른 뒤인 2323:20이 되어서야 Hurlingham호의 선미가 부두 쪽으로 다시 선회하기 시작하였다. 부두와 선박의 출입문은 내내 열려 있었으며, 항해사가 2324:08에 부두로 돌아가 세 번째이자 마지막인 선체 중앙 계류줄을 고정할 무렵에는 승객이 48명 더 하선하였고 4명이 다시 승선하였다. 이때 선미가 부두 쪽으로 선회한 영향으로 선수가 전방 계류줄의 한계까지 멀어졌다. Hurlingham호의 갑판과 부두 사이에 틈이 벌어졌고 승객들이 틈을 건너기 위해 성큼 걸어야 하는 모습이 관찰되었다. 항해사는 기관을 중립으로 하기 위해 조타실로 다시 올라갔다. 승객 한 명인 ○○ 씨가 Hurlingham호의 출입문 쪽으로 이동하였다. 2324:48에 그는 한 걸음 앞으로 내디뎠다가 선박과 부두 사이에 벌어진 틈으로 떨어졌다. 바로 뒤에 있던 승객이 놀라 소리를 질렀고, ○○ 씨 앞에 있던 다른 승객은 그가 물에 들어갈 때 물 튀는 소리를 들었다. 몇 초 뒤 Hurlingham호는 전방 계류줄의 한계에 이르러 부두에 다시 붙었다. 승객들이 선박 앞쪽의 바로 그 부근과 부두에 몰려들어 ○○ 씨를 찾았으나 그를 볼 수 없었다. 항해사는조타실 안에서 무슨 일이 일어났음을 알아차렸다. 그는 외침 소리로 승객 한 명이 강에 빠졌음을 알게 되었고, 직접 살펴보려고 전방 갑판으로 내려왔다. 그는 물속에서 아무도 볼 수 없었고 조타실로 돌아가 도움을 요청하였으며, VHF 무선기로 런던 선박교통관제(VTS)에 연락하였다. 런던 해안경비대도 이 송신을 들었고 수색구조(SAR) 계획을 가동하였다.
1.3비상 대응 선장은 파티 뒤 정리를 하느라 Hurlingham호의 선미 쪽에 있었으며, 선박을 다시 붙이기 위해 사용되던 기관의 움직임을 느끼고서 선미가 부두에서 멀어졌음을 알게 되었다. 그는 선박 앞쪽에서 나는 외침 소리를 듣고 무슨 일인지 알아보려고 앞으로 이동하였다. 그를 맞이한 항해사가 승객 한 명이 강에 빠졌다고 말하였다. 선장은 도움을 요청하려고 조타실 쪽으로 움직였으나, 항해사가 구조 기관이 이미 오고 있다고 말하자 멈추었다. 2325:44까지 승객 한 명이 물을 더 잘 보려고 Hurlingham호의 불워크를 넘어가 갑판 바깥쪽 부분에 서 있었다. 다른 승객들은 선박 앞쪽과 바로 맞은편의 부두에 몰려 물에 빠진 사람을 찾았다. 승객 한 명은 부두 난간 바깥쪽, 부두의 바깥 부분에서 휴대전화로 통화하며 오락가락 걷고 있었다. 구명부환이 Hurlingham호 우현에서 꺼내졌고, 승객들이 수색을 돕기 위해 그 등을 가장자리 너머로 내렸다. ○○ 씨의 흔적을 보았다고 보고한 사람은 없었다. 영국 왕립구명정협회(RNLI) 타워(Tower) 구명정 기지의 'E'급 연안 구명정(ILB)이 훈련 중이었는데, 해안경비대의 임무 지시를 받자 웨스트민스터 부두로 항로를 바꾸었다. 선장은 구명정이 접근하는 것을 보고 ILB가 더 효과적으로 수색할 수 있도록 Hurlingham호를 부두에서 떼어 내야 한다고 판단하였다. 그는 선체 중앙과 출입문 바로 뒤쪽에 고정된 계류줄을 풀고, 항해사에게 전방 계류줄을 풀 수 있도록 대기하라고 말하였다. 선장은 조타실로 가서 선박을 후진시키기 시작하였다. 항해사가 마지막 줄을 풀었고, 2328:25에 Hurlingham호는 계류 자리에서 떨어지기 시작하였다. 승선 출입문은 닫혀 있었으나 승객 한 명은 선박의 불워크 바깥쪽에 계속 서 있었다. Hurlingham호는 선회하여 강 상류 쪽을 수색하기 시작하였다. 구명부환은 물에 던져졌고 거세지는 창조류가 이를 웨스트민스터 다리를 지나 상류로 휩쓸어 갔다. 선장은 이를 회수하고 실종된 승객을 수색하기 위해 선박을 조종하였다. 경찰, 소방구조대의 단정이 수색에 합류하였으나 ○○ 씨를 찾지 못하였다. 이후 경찰 헬리콥터가 야간 투시 카메라로 이 해역을 수색하였으나 아무것도 보이지 않았고, 해안경비대는 0047에 수색구조 작전을 종료하였다.
1.3.1후속 조치 Hurlingham호는 웨스트민스터 부두로 돌아왔고 선장은 부두의 안쪽 부분 주변에서 자체 수색을 시작하였다(그림 3). 그는 ILB 승조원들을 만났고, 그들은 부두의 양쪽 어디에서도 실종된 승객을 찾지 못하였음을 확인해 주었다. 경찰관들이 선장에게 음주 측정을 하였고 음성 결과가 기록되었다. 항해사에게는 음주 측정을 하지 않았다. 1.3.2 사고 보고 사고 후 승무원들은 무슨 일이 있었는지 논의하였다. 일부 승객이 승무원들에게 ○○ 씨가 집에 갔을 수도 있다고 말하였고, 혼란 속에서 승무원들에게는 그가 실제로 바다에 빠져 사라졌는지가 분명하지 않았다. 대대적인 수색에서 아무것도 발견되지 않았고, 승무원들은 그가 사라졌다는 보고가 잘못된 것이기를 바랐다. 선장도 항해사도 이 사건이나 자신들의 우려를 Thames Cruises에 보고하지 않았으며, 다음 날 MAIB가 연락했을 때까지도 회사는 사고를 알지 못하였다. ○○ 씨의 상실은 눈으로 본 극소수의 승객에 의해서만, 그리고 CCTV 영상을 면밀히 살핀 뒤에야 확인될 수 있었다. 그림 3 강둑에서 본 웨스트민스터 부두
1.4피해자 ○○ 씨는 32세였으며, 파티를 위해 선박을 전세한 회사의 직원이었다. 그는 파티 전날 오후에 축제에 가 있었으며, 저녁에 그와 함께 있던 친구와 동료들은 그가 파티를 즐기고 있었고 음주의 영향을 보이고 있었다고 생각하였다. 그의 시신은 2008년 8월 22일 하류의 임뱅크먼트 부두(Embankment Pier)에서 수습되었다. 부검 결과 자연 발생 질환의 증거는 거의 없었고, 특히 압궤 손상은 없었다. 독성학 분석에서 음주 운전 한계의 3.5배를 넘는 수준에 해당하는 음주의 증거가 확인되었다. 사인은 "알코올 중독 상태에서의 익사"로 기록되었다 [sic].
1.5승무원 Hurlingham호의 선장과 항해사는 각각 이 선박을 지휘할 수 있도록 지역 지식 보증(local knowledge endorsement)이 있는 적절한 보트선장 면허(BML)를 보유하였다. 두 사람은 이전에 런던항만청(PLA)으로부터 워터맨 및 라이터맨(Watermen and Lightermen)으로서 면허를 받았으며, 새로운 전국 보트선장 제도가 시행된 2007년 1월에 각자 자동으로 BML을 받았다. 선장은 60세였고 평생의 직장 생활을 템스강에서 보냈다. 그는 Thames Cruises(및 그 전신)에서 23년간 일했으며 그중 최근 15년은 Hurlingham호의 정규 선장이었다. 회사의 사업이 바뀌면서 그는 Thames Cruises에서의 일을 줄였고 부선(lighterage) 회사에 정규 취업해 있었다. Hurlingham호에서의 그의 일은 계절적이었고 주로 저녁 시간이었다. 그는 Thames Cruises 이사들과의 합의에 따라 바 주류 면허 목적상의 지정 영업장 관리자(Designated Premises Supervisor)였다. 그는 바를 관리하고 바 직원을 고용했으며, 선장으로서의 임금을 보충하기 위해 이익의 일부를 가져가는 재정적 이해관계도 있었다. 항해사는 23세였고 BML이 시행되기 전에 워터맨 견습 과정을 마쳤다. 그는 강에서 여러 통근선과 유람선에서 일했다. 그는 자영업자로서 항해사 또는 선장으로 여러 회사에 프리랜서로 일하였다. 그는 면허 규정상의 개인 면허 보유자(Personal Licence Holder)였지만, 임시 고용자였으므로 바에 재정적 이해관계는 없었다. 바 직원 두 명 중 한 명은 비상시에 돕는 적격한 승조원으로 지정되었다. 선장은 그에게 인명구조 및 소방 설비의 위치를 보여 주고 사용법을 설명하였다. 그가 이해한 역할은 비상시에 대응하고 다른 승무원을 돕는 것이었다. 사람이 물에 빠지는 경우 그의 지시 사항은 경계를 하고, 구명대(lifebelt)를 들고 대기하며, 다른 승객을 진정시키는 것이었다.
1.6접근 방식 조사 중 승객 접근을 살펴보기 위해 Hurlingham호를 웨스트민스터 부두에 접안시켰다(그림 4). 선박을 부두에 얕은 각도로 접근시키면 전방 승선 출입문의 갑판 가장자리를 틈 없이 부두에 붙일 수 있음이 확인되었다. Hurlingham호의 갑판은 부두보다 낮아서 승객은 승선 인원에 따라 17~23cm의 높이만큼 올라서야 하였다. 전방 갑판 하선 구역은 Hurlingham호 선실의 배경 조명과 웨스트민스터 부두의 머리 위 조명으로 비추어졌다. 이 조합은 전반적인 조명을 제공하였으나, 사고 당일 저녁에는 선박과 부두의 출입문 바로 부근이 그늘졌을 것이다(그림 5). Hurlingham호의 갑판 가장자리는 흰색으로 칠해져 있었고 부두 가장자리의 방현재는 검은색이었다. 그림 4 Hurlingham호에서 웨스트민스터 부두로 접근하는 가능한 방법Hurlingham호에는 주 갑판 선실 양쪽에도 선체 중앙의 문이 있었는데, 이는 상층과 하층으로 이어지는 계단이 있는 바의 후미 근처였다. 이 문들은 선체의 직선 구간에 있어서, 선박이 통상적인 방식으로 나란히 계류되었다면 부두와 평행했을 것이다. 그러나 갑판의 현호(sheer) 때문에 이 문들은 전방 승선 출입문보다 낮았고, 웨스트민스터 부두로 올라가기 위해 필요한 높이는 훨씬 컸을 것이다. 선실 구역의 문은 또한 약 90º까지 안쪽으로 열렸으나 갑판의 캠버(camber) 때문에 걸렸다. 이 때문에 승객이 승선한 상태에서 문을 열면 선박의 이 부분이 극도로 혼잡해졌으며, 비상 출구로 이용할 수는 있었으나 선실 구역의 문은 일상적으로 사용하기에는 지나치게 불편하다고 여겨졌다.
1.7템스강의 승객 안전 템스강 여객선에 대한 현행 규정과 운영 관행은 1989년 여객선 Marchioness호와 준설선 Bowbelle호의 충돌로부터 큰 영향을 받았으며, 이 충돌로 51명이 사망하였다. 이 사고의 상황에 대해 여러 조사가 이루어졌고, 이 보고서의 목적상 가장 중요한 것은 모두 웨스트민스터 부두의 일반 배치 그림 5클라크 항소법원 판사(Lord Justice Clarke)가 수행한 템스 안전 조사(2000)와 공식 조사(2001)이다. 이 보고서들은 여러 권고를 하였으며 그 후 이행되었다. 이 사고와 관련 있는 공식 조사 보고서의 권고는 다음과 같다. • 권고 11: "국내 여객선 안전관리 규약 도입에 관한 협의 절차를 최소한의 지체로 마무리하고 가능한 한 빨리 규약을 도입할 것을 권고한다."(주 1) • 권고 14: "5등급 여객선의 모든 선주와 운영자가 승무원 교육 요건, 특히 비상 교육과 관련한 요건을 고려하고, STCW95 A-V/2절(주 2)의 '군중 관리 및 승객 안전' 교육 요건을 템스강뿐 아니라 전국적으로 5등급 선박에서 일하는 모든 사람에게 확대하는 것을 검토할 것을 권고한다."(주 3) • 권고 17: "선주와 운영자에게 정확한 동시 기록을 유지하는 것의 중요성과, 상시 지시에 그러한 취지의 지시를 포함하고 그러한 지시를 면밀히 감시하는 것의 중요성을 상기시킨다."(주 4)
1.8규정 1.8.1 국내 안전관리 규약 3~6(A)등급 국내 여객선 안전관리 규약은 2001년 11월 1일 발효되었다. 흔히 국내 안전관리 규약(DSMC)이라 불리며, 영국에서 운항하는 여객선의 안전한 운영에 대한 공통 기준을 정하려는 것이었다. 이는 대형 외항선을 위한 국제안전관리(ISM) 코드를 개작하여 소규모 회사와 선주 운영자가 더 쉽게 다룰 수 있도록 단순화한 것이다. 이 규약의 목적은 안전관리 문화를 조성하는 것이며, 특히 운영자가 다음을 위한 안전한 관행과 절차를 개발하고 이행하도록 요구한다. • 보건 및 안전 보호 • 관련 규칙에 따른 선박의 안전한 운항 보장 1 권고 11: 법정 문서(Statutory Instrument) 2001:3209 '상선(국내 여객선)(안전관리 규약) 규칙 2001'을 참조한다. 2 선원의 훈련·자격증명 및 당직근무의 기준에 관한 국제협약 1995. 3 권고 14: 해사지침 고시(MGN) 203, 국내 여객선에 근무하는 인원의 승무원 교육, 및 MGN 290, 지역 여객선: 승무원 배치를 참조한다. 4 권고 17: MGN 158, 3~6(A)등급 국내 여객선 안전관리 규약을 참조한다.
›육상과 선상 인원 사이의 연락 체계, • 사고 보고, 그리고 • 비상상황 대응.
이러한 사항은 문서로 작성되어야 하며 점검표 형식으로 제시될 수 있다. 이 규약은 또한 인원이 맡게 될 업무에 적합한 훈련을 받고 관련 규정을 이해하도록 요구한다. 규약 준수 방법에 관한 지침은 각 종사자가 '계선 및 이계를 포함하여 … 선내 절차에 대한 숙지 훈련과 적절한 지도'를 받아야 한다고 명시하고 있다.
1.8.2 안전한 승하선 수단
1988년 상선(승하선 수단) 규칙(Merchant Shipping (Means of Access) Regulations 1988)은 고용주와 선박의 선장의 의무를 규정하고 있으며, 이들은 선박과 부두, 부선(pontoon) 또는 이와 유사한 구조물 사이에 안전한 승하선 수단이 확보되도록 하여야 한다. 모든 승하선 장비와 그에 이르는 바로 앞 접근로는 충분히 조명되어야 한다. 이 규칙은 등록 길이 30미터를 넘는 모든 선박에 현문 사다리(gangway)를 비치하도록 요구하고 다른 승하선 장비에 대해서도 상세히 언급하고 있으나, 현문 사다리를 반드시 사용하도록 하는 명시적 요건은 없다.
1.9 안전관리체제
DSMC의 도입은 큰 변화였으며, 템스강(River Thames)의 다른 많은 운영사와 마찬가지로 Thames Cruises도 이 규약을 준수하는 데 필요한 문서를 작성하기 위해 컨설턴트의 도움을 받았다. 해사 안전관리 매뉴얼(Marine Safety Management Manual)이 작성되었으며, 그 사본이 이 회사의 보트 5척 모두에 비치되었다.
1.9.1 안전관리자
이 규약이 시행된 직후, 안전관리자 한 명이 문서 업무를 관리하고 육상 지정자(Designated Person Ashore)로서 승무원과 경영진 사이의 연락 창구 역할을 하기 위해 시간제로 회사에 합류하였다. 안전관리자는 다른 모든 직원에게 지침, 정책 및 절차를 제공하고 전달함으로써 '선박 안전의 감시'[sic]를 책임졌다. 여기에는 규정 준수 확보, 해사 안전관리체제의 유지, 그리고 사고 보고 및 조사가 포함되었다. 안전관리자는 승무원을 안전관리체제에 참여시키려는 시도를 설명하였으나, 사고 당시 그 역할에 대한 설명으로 보건대 이 역할은 규정을 충족할 만큼의 문서를 만들어 내는 것으로 축소되어 있었음이 분명하였다.
1.9.2 해사 안전관리 매뉴얼
승무원은 해사 안전관리 매뉴얼을 읽고 이해하였음을 기록하기 위해 이에 서명하도록 되어 있었다. 조사 초기에 Hurlingham호에서 발견된 매뉴얼에는 2007년 11월 21일 자로 대표이사가 서명하였으나, 승무원용 해당 페이지에는 서명이 없었다. 다른 승무원들은 Thames Cruises의 다른 선박에 있는 매뉴얼에 서명하였으나, 안전관리자는 서명 페이지를 최신 상태로 유지하기가 어렵다고 진술하였다. 이는 2007년 8월 23일 자 회사 '안전 메모'(부록 A)에서도 강조되었다. 이 매뉴얼에는 다음의 법정 항목이 포함되어 있었다.
›보건 및 안전 방침
›인원의 책임
›방침 및 절차
›비상 계획 및 절차
›사고 보고
보건 및 안전 방침 선언문은 회사가 다음을 통해 '적극적인 보건 및 안전 문화를 정립하고 유지할 것'이라고 명시하였다. 작업장을 안전하게 유지하고 승하선이 안전하며 위험이 없도록 보장한다. 성과를 점검함으로써 합의된 안전 기준을 유지한다.
매뉴얼은 승선 시 수동 '계수기(clicker)'를 사용하여 승객 수를 파악하는 방식이 MSN 1794, 승선 인원의 계수 및 등록(Counting and Registration of Persons on Board)에 부합한다고 기재하였다. 그러나 매뉴얼은 하선하는 승객을 계수하는 방법이나, 규정이 요구하는 바와 같이 선내에 남은 인원의 누계를 유지하는 방법에 관한 지침은 전혀 제시하지 않았다.
승무원과 승객 모두의 음주에 관한 언급이 여러 군데 있었다. 매우 명확한 방침이 승무원의 음주를 근무 시작 전 8시간까지의 어느 때든, 그리고 근무 중에 금지하고 있었다. 승무원은 제복을 착용하여야 했으며, 그동안에는 주류 판매 허가 시설에 출입할 수 없었다. 18세 미만의 사람이나 음주의 영향으로 소란을 피우거나 공격적인 승객에게는 주류 판매가 허용되지 않았다. 바(bar)의 개장과 주류 제공은 선장의 재량이었다.
비상 계획은 코팅한 점검표 형태였고 조타실에 즉시 쓸 수 있도록 비치되어 있었다. 여기에는 사람이 물에 빠짐(MOB)에 대응하는 계획이 포함되어 있었으나, 이는 강 한가운데에서의 상황을 전제로 한 것이었다. 선박이 부두에 접안해 있거나 부두 가까이 있을 때 사람이 물에 빠지는 경우를 다루는 지침은 제공되어 있지 않았다.
1.9.3 계선 및 승객 승하선
해사 안전 매뉴얼(Marine and Safety Manual)에는 다음과 같은 일반적인 문구를 제외하고는 계선 및 승객 승하선에 관한 구체적인 절차가 들어 있지 않았다. '회사는 다음을 통해 모든 선박에 대한 안전한 승하선을 가능하게 하는 절차를 수립하고 관리하여야 한다. • 위험성 평가 • 사고 또는 아차사고 이후 위험성 평가 재검토 • 직원이 작업 절차를 올바르게 수행하도록 보장 • 직원에게 관련 규정을 지속적으로 숙지시킴'[sic]
대표이사와 안전책임자는 모두 안전한 승하선의 관리가 워터맨(Waterman)의 전문 지식에서 매우 기본적인 요소이며 매뉴얼에 상세히 기술할 필요가 없는 사항이라고 보았다. 이들은 승무원이 좌현 또는 우현의 앞쪽 승선문(boarding gate)을 이용하여 승객을 승하선시키고, 보트는 승선문 양쪽에 하나씩과 선체 중앙부에 하나, 총 세 가닥의 로프를 사용하여 계류할 것으로 기대하였다. 그러나 선내에서 2004년 5월 6일 자 승무원 공지와 2007년 2월 26일 자 승무원 상시 지시(둘 다 부록 B에 수록)가 발견되었는데, 이들은 상충하는 지시를 담고 있었다. 첫 번째는 승무원이 선수 로프와 선미 로프를 사용하여 선박을 고정하도록 요구하였고, 두 번째는 단지 선박을 '부두에 바짝 계류'[sic]하도록만 명시하였다. 사용할 로프의 수는 두 번째 지시에서만, 그것도 다른 보트의 바깥쪽에 계류하는 경우에 대해서만 명시되어 있었다. 이 경우에는 불워크(bulwark)의 승하선문 양쪽에 하나씩 두 가닥의 로프를 사용하도록 되어 있었다. 이러한 지시에도 불구하고, 선장은 대표이사와 안전책임자가 설명한 방식대로 세 가닥의 로프를 사용하는 것을 선호한다고 진술하였다. 항해사(mate)도 사고 직전 선미가 떠밀려 나간 뒤 Hurlingham호를 고정할 때 이 방식을 사용하였다.
승무원 중 최소 한 명이 승선문 위치에 머물면서 승객의 승선을 계수하고 감독하거나 하선을 도와야 한다는 것이 Thames Cruises의 회사 방침이었다. 이러한 취지의 문구가 Hurlingham호에 있던 여러 문서에서 발견되었는데, 가장 오래된 것은 1989년 자이고 가장 최근 것은 2006년 7월 자로 이 요건을 거듭 강조하는 낱장 메모였다. 회사 사무실에서 발견된 2007년 2월 26일 자 또 다른 메모(부록 B)는 승무원에게 '출구 문 옆에 서 있을' 것을 권고하였다. 승객의 하선을 감독하는 것은 웨스트민스터 시의회(Westminster City Council)가 발급한 영업장 허가(Premises Licence)의 조건이기도 하였다. 선장과 항해사 모두 이러한 요건을 알고 있었다.
1.9.4 위험성 평가
해사 안전 매뉴얼은 위험성 평가를 완료하고 갱신하는 것이 선장의 의무라고 명시하였으며, Hurlingham호의 폴더에 포괄적인 평가 일체가 보관되어 있었다. 그러나 위험성 평가는 모두 승무원의 참여 없이 작성된 것이었다. 선장은 이전에 위험성 평가를 본 적이 없다고 진술하였으며, 그 서식에 어떤 정보가 들어 있는지 또는 절차가 어떻게 운영되는지 설명하지 못하였다. 매뉴얼은 또한 항해사가 위험성 평가에서 식별된 통제 조치를 감시하고 이행할 책임이 있다고 명시하였다. 항해사는 그 절차를 이해하고 있었으나, Hurlingham호에 대한 요건에는 익숙하지 않았다.
2001년에 안전관리체제를 처음 구축한 컨설턴트는 '해상 추락(falling overboard)'에 대한 위험성 평가를 작성하였다. 안전관리자가 그 서식에 서명하였으나, 서식의 위험성 평가자 및 선장 란은 모두 비어 있었다. 사람이 물에 빠지는 것을 방지하기 위한 통제 조치에는 다음이 포함되어 있었다.
›계선/출항에 대한 안전 작업 체계를 수립한다
›사람이 물에 빠졌을 때의 절차를 수립한다
›충분한 조명이 제공되도록 한다
강 한가운데에서 MOB에 대응하는 절차는 있었으나, 계선 및 출항 작업을 다루는 절차는 없었다. Hurlingham호의 앞쪽 승선문에는 거주구역에서 나오는 배경 조명 외에는 조명이 없었으며, 회사는 승선 구역의 조명이 대부분 부두의 조명에 의해 제공될 것이라고 인정하였다.
1.9.5 비상 훈련
DSMC는 잠재적 비상상황에 대한 절차를 훈련하고 기록하도록 요구한다. 안전관리자는 비상 훈련이 실시되는 시기를 조언하고 훈련 진행을 보조할 책임이 있었다. 2002년 12월부터 2007년 3월까지의 기간에 대해 다양한 훈련의 일정표가 작성되어 있었고, 2008년 1월에 새 일정이 발행되었다. 선장이 참여한 가장 최근의 비상 훈련 기록은 2007년 7월의 것이었다. 안전관리자는 승무원이 효과적인 비상 훈련을 하도록 하는 것이 극히 어려웠다고 인정하였다. 이는 저녁 파티라는 불규칙한 근무 형태와 임시 승무원의 활용으로 인해 더 어려워졌다. 안전관리자와 대표이사는 이 문제를 인식하고 있었으며 비상 훈련을 더 자주 실시하기 위한 추가 조치를 검토하고 있었다고 진술하였다.
1.9.6 심사 및 평가
MCA는 2004년 2월 13일에 Hurlingham호의 여객 증서 및 국내 안전관리증서(Domestic Safety Management Certificate)를 통합하여 발급하였다. 이 증서는 2009년 1월 11일까지 유효하였으며, 5월 13일부터 8월 13일 사이에 실시되는 중간 안전관리 심사(Mid Term Safety Management Audit)에서 매년 확인을 받아야 한다고 명시하고 있었다. 연례 선체 검사 및 검열은 둘 다 완료된 것은 2008년 1월이었으나, 중간 심사(Mid Term Audit)는 2007년 10월 이후 실시되지 않았다. 2006년의 이전 중간 심사도 10월에 이루어졌으며, 중간 심사가 규정된 기간 내인 8월 10일에 실시된 것은 2005년뿐이었다. 중간 심사의 목적은 MCA 검사관이 해당 선박의 안전관리체제가 실제로 작동하는 모습을 확인하는 것이며, 선박이 가장 활발히 운항할 가능성이 높은 시즌 중에 이루어지도록 되어 있다. 중간 심사에 승무원이 참석해야 한다는 요건은 없으며, 실제로는 안전관리자와 대표이사가 보통 심사를 맞이하였다.
DSMC는 운영자가 3년마다 체제에 대한 공식 검토를 실시하도록 요구한다. Thames Cruises는 이를 실시하지 않았으며, 지속적이고 보다 비공식적인 과정을 선호하였다. 안전관리자와 대표이사는 정기적으로 접촉하였으며 그때 규정 준수 및 안전에 관한 사항을 논의하였다고 진술하였다. 마찬가지로 두 사람 모두 승무원이 저녁 행사를 위해 보트를 준비하러 도착할 때 자주 그 자리에 있었다. 문서는 선장에게 직접 전달하거나 해당 보트에 넣어 두는 방식으로 갱신되었다. 그러면 고정 선장이 이를 보트에 비치된 파일철에 넣었다. Hurlingham호에는 여러 개의 폴더와 '휴대용 금속 가정용 파일 상자'가 있었는데, 여기에는 1989년부터 다양한 날짜가 적힌 수많은 낱장 문서가 들어 있었으며 사고 당시에는 뚜렷한 순서 없이 놓여 있었다. 안전관리자와 대표이사는 모두 보트의 물적 상태와 안전장비를 정기적으로 점검하였으나, 승무원과의 접촉은 보트의 출항을 준비하는 동안뿐이었다. 두 사람 중 누군가가 보트의 운영 상황을 심사하거나, 예고 없이 보트를 방문하여 램버스 부두(Lambeth Pier)에 있는 회사 기지에서 떨어진 곳에서 승무원이 어떻게 업무를 수행하는지 직접 확인하는 일은 드물었다.
1.9.7 국내 안전관리 규약(Domestic Safety Management Code)의 이행
Hurlingham호에서 DSMC를 점검한 결과, 계선 절차가 없었고, 비상 훈련이 부족했으며, 위험성 평가가 효과적이지 않았고, 문서 기록이 뒤죽박죽이었으며, 승객 수 파악 체계에 대한 설명이 불완전하였음이 확인되었다. 이러한 결함의 대부분은 2005년, 2006년, 2007년에 실시된 이전 중간 심사 때에도 존재하였을 것이다.
2005년에 MCA는 국내 여객선 안전 기준에 대한 공식 안전성 평가(Formal Safety Assessment)의 일환으로 DSMC에 대한 독립적 평가인 연구 과제 527(Research Project 527)을 의뢰하였다. 평가 결과는 다음과 같이 보고되었다.
DSMC 요건의 준수 상태는 양호한 것으로 나타났다. 그러나 다음 분야에서 우려가 있었다.
›보건 및 안전 보호 방침
›안전 운항을 보장하는 절차
›의사소통
›사고 및 사건 보고
›비상상황 대응 절차
›훈련
특히 (해당 과제는) 대부분의 경우 안전관리체제가 회사의 안전 체계에 통합되어 이를 뒷받침하는 것이 아니라 규정 준수를 위한 형식적 절차로 여겨지고 있음을 발견하였다."
보고서의 결과 부분에서 지적된 우려 분야는 DSMC의 상당 부분을 이룬다. MCA는 준수 수준에 안심하고 있으며 안전관리체제를 여객선의 일상 운영에 통합하는 것은 시간이 지나면 이루어질 것으로 믿는다고 회신하였다.
이 보고서(부록 C)는 여덟 가지 권고를 제시하였으며, 그중 두 가지가 이 사고와 특히 관련이 있는 것으로 판단된다. 이들과 이에 대한 MCA의 회신을 아래에 요약한다.
›두 번째 권고는 MCA의 심사가 운영자가 보건 및 안전 보호 방침에서 부족한 부분이 어디인지 파악하도록 돕고 개선을 위한 목표와 지표를 수립하도록 도와야 한다고 제안하였다. MCA는 이를 인정하였으며 위험성 평가 및 안전관리에 관한 훈련이 국가 보트선장 면허(Boatmaster's Licence)의 교육과정에 포함되어 있다고 회신하였다. 그러나 선장과 항해사 어느 쪽도 이러한 훈련을 받을 필요가 없었는데, 보트선장 제도(Boatmasters Scheme)가 시행된 2007년 1월에 면허를 가진 워터맨(Watermen) 및 라이터맨(Lightermen)에게 BML이 자동으로 부여되었기 때문이다.
›다섯 번째 권고는 점검표 체계를 확대하여 국내 안전관리체제의 상태를 정기적으로 점검하는 관리체제 항목을 포함시켜 회사가 내부 심사를 수행하는 수단으로 삼도록 해야 한다고 제안하였다. MCA는 표준 점검표를 개발하는 것이 자신들에게 적절하다고 보지 않으며 이 문제는 운영자의 사안이어야 한다고 회신하였다.
DSMC 준수에 관한 지침은 2001년에 MGN 158로 도입된 이후 갱신되지 않았다.
1.10 부두 운영 및 관리
웨스트민스터 부두(Westminster Pier)는 런던교통공사(Transport for London, TfL)의 일부인 런던 리버 서비스(London River Services, LRS)가 소유하고 운영한다. LRS는 상업적 목적으로 자사 부두를 이용하는 모든 보트 운영자에게 면허를 발급하여 적절한 수준의 안전이 유지되도록 한다.
면허의 조항 중 하나는 다음과 같다. 승인된 각 선박은 승객, 승인된 선박 및 부두의 안전을 유지하기 위하여, 부두에 정박하여 있는 동안 항상 방현재가 적절히 설치되고 고정되어 있어야 한다. 앞의 내용을 침해하지 않는 범위에서, 선박이 어느 부두에 접안하거나 계류할 때에는 다음을 갖추어야 한다. a) 조수의 오르내림5을 고려하고 합법적으로 승하선하는 사람의 안전을 도모할 수 있도록 계류 상태를 수시로 조정한다.
LRS는 사고 직후 자체 조사를 시작하였다. 부두의 조명, 난간 또는 안전장비에서 결함은 발견되지 않았다. 부두에는 수면 높이에 사슬이 설치되어 있었고, 물에 빠진 사람이 몸을 지탱하고 올라올 수 있도록 돕는 사다리가 있었다. 웨스트민스터 부두에는 크고 검은색인 방현재(fender)가 설치되어 있다(그림 2). 조명은 부두 중앙부 위쪽에 설치되어 있으며 공공시설에서 일반적인 가로등 수준의 조도를 제공한다. 부선(pontoon)의 가장자리를 따라 튼튼한 난간이 설치되어 있어 부선 바깥쪽 가장자리에 불가피하게 그림자가 드리워진다. 문이 열리면 그림자는 줄어들지만 승객이 난간 가까이 모여들면 그림자가 늘어난다. LRS는 웨스트민스터 부두에 0700부터 1900까지 관리 직원을 배치한다. 이들의 역할은 이용 현황과 부두의 물적 상태를 감시하는 것이다. 부두를 이용하는 회사는 자기 승객을 돕고 감독할 자체 직원을 제공하도록 되어 있다. 이 사고 당시 웨스트민스터 부두에는 LRS 직원이 없었다.
1.11단일점 계류(Single Point Mooring)
부두에 접안한 모든 선박은 크게 네 가지 방식이 결합된 형태로 움직인다. 즉, 선체의 세로 방향으로 앞뒤로 움직이는 서지(surging), 옆으로 움직이는 횡방향 운동, 수직축을 중심으로 선수가 좌우로 흔들리는 요잉(yawing), 그리고 마지막으로 파도 또는 다른 선박이 일으키는 항적에 따른 피칭(pitching) 및 롤링(rolling)이다. 통상적인 계선 방식은 세로, 옆, 요잉 운동에 저항하기 위해 여러 가닥의 로프를 사용한다(그림 6).
5 웨스트민스터 부두는 부유식이며 조수 간만의 전 범위에 걸쳐 건현이 일정하게 유지된다.
통상적인 계선줄 배치
그림 6원본 PDF 26쪽
후방 스프링(Back spring)
전방 스프링(Fore spring)
선미 로프(Stern rope)
후방 브레스트 로프(Aft breast rope)
선수 로프(Head rope)
전방 브레스트 로프(For'd breast rope)
이러한 로프는 어느 정도까지는 파도와 항적에 의한 수직 운동도 제한할 수 있다. 마찬가지로, 선박이 서로 다른 방향으로 뻗은 로프에 의해 구속되므로 움직일 수 있는 폭이 제한되며, 일반적으로 위치를 유지하기 위해 기관 동력을 사용할 필요가 없다.
일부 부두와 잔교, 특히 영국 남서부의 부두와 잔교는 접근이 매우 제한되어 있어 실제로는 선박의 일부만 승선 지점에 접안할 수 있다. 이러한 상황에서 운영자는 선박을 부두에 붙들어 두기 위해 계선줄을 하나만 사용하고 보트의 위치를 유지하기 위해 기관과 타를 사용한다. 이러한 관행은 여러 이유로 템스강에서도 채택되었다.
›일부 보트가 부두의 끝을 넘어 걸쳐 있게 함으로써 더 많은 보트가 동시에 부두를 이용할 수 있다.
›승무원 두 명으로 운항하는 보트가 한 가닥의 줄로 계류하는 것이 더 빠르고 쉽다.
›조류와 기관 동력을 이용하여 한 가닥의 줄에 장력을 걸면 보트가 부두에 바짝 붙어 있게 되어, 파도와 지나가는 선박의 영향으로 인한 움직임이 줄어든다.
이 조사 중에 템스강의 다른 여러 회사 소속 선박이 한 가닥의 줄로 계류하는 것이 관찰되었다.
단일점 계류6는 보트를 정지 상태로 유지하기 위해 계선줄에 맞서 기관 동력 및/또는 조류로 힘을 가해야 한다. 이를 성공적으로 수행하면 그 힘으로 보트를 부두에 단단히 붙여, 파도와 항적이 상대적으로 적은 움직임만 일으키도록 할 수 있다. 그러나 이는 항상 평형 상태로 유지되어야 하는 동적인 상황이다. 어떠한 변화나 추가적인 힘이 가해지면 균형이 깨져 보트가 부두나 잔교에서 떨어져 나갈 수 있다.
선박을 접안 장소에 고정하는 데 계선줄을 몇 가닥 사용해야 하는지 명시한 규정은 없다. 그러나 계선주(bollard)가 떨어져 나간 템스강에서의 치명적 사고7 이후, MCA는 운영자에게 한 가닥의 줄로 계류하는 것의 위험을 평가하고 관련된 위험을 최소화할 조치를 취하도록 권고하였다8.
6 구어로 '스프링에 걸고 전진(steaming on a spring)'이라고 한다.
7 2004년 5월 2일 영국 런던 템스강의 세인트 캐서린 부두(St Katharine's Pier)에서 제5급(Class V) 여객선 Star Clipper호의 계선주가 파손되어 발생한 치명적 사고. http://www.maib.gov.uk/publications/investigation_reports/2005/star_clipper.cfm 8 MCA 안전 경보 – 기술 제2호, 신속 계선 장비 및 기법(Quick Mooring Equipment and Techniques), 2005년 1월.
1.12 유사 사고
2000년부터 2008년까지의 MAIB 기록을 분석하여 템스강의 제5급 여객선에서 승객이 물에 빠진 사건이 몇 건 보고되었는지 확인하였다. 다음의 12건이 확인되었다.
›승객이 보트와 부두 사이의 틈에 빠져 끼이면서 부상을 입은 3건. 이 승객들 중 물에 빠진 사람은 1명뿐이었다.
›승객이 선박에 승선하거나 하선하는 중에 미끄러져 부상을 입었으나 끼이거나 물에 빠지지는 않은 3건.
›'스프링에 걸고 전진' 중 계선줄이 끊어진 2건. 그중 하나는 승객에게 치명적 부상을 입혔고7 다른 하나는 보트에 손상을 입혔다.
›승객이 승하선하기 위해 난간을 넘거나 보트와 부두 사이의 틈을 뛰어넘으려 한 2건.
›현문 사다리가 떨어져 나가 승객이 보트와 부두 사이의 틈으로 떨어진 1건.
›비상문이 뜻하지 않게 열린 뒤 승객 두 명이 물에 빠진 1건.
상선(사고 보고 및 조사) 규칙(Merchant Shipping (Accident Reporting and Investigation) Regulations)과 DSMC에 명시적 요건이 있음에도 불구하고, 이러한 유형의 사고가 모두 보고되지는 않는 것으로 보인다. Hurlingham호에서는 Thames Cruises 소속 Royal Princess호에서 2001년 여름에 발생한 유사한 사고를 기술한 승무원 공지(부록 D)가 발견되었다. 이 사고는 MAIB에 보고되지 않았다. 조사 중에 다른 운영자와 관련된 다른 사고들도 드러났으며, 이는 이러한 사건의 빈도가 통계가 나타내는 것보다 훨씬 더 높음을 시사한다.
1.12.1 다른 조사의 결과
Marchioness호와 Bowbelle호 사이의 충돌에 대한 공식 조사(Formal Investigation)는 선박 관리상의 결함과 승무원이 바(bar)에 갖고 있던 상업적 이해관계가 기여 요인이었음을 밝혀냈다. 관리자들은 서면 지시가 정기적으로 승무원에게 주어지고 그들에 의해 보관되도록 하는 적절한 체계를 갖추고 있지 않았으며, 기껏해야 그러한 지시가 종이 상자에 넣어졌다고 보고되었다. Marchioness호의 승무원 중 한 명은 선박의 항해를 돕기보다는 유리잔을 정리하는 데 대부분의 시간을 보냈으며, 보고서는 선장과 항해사가 바에 금전적 이해관계를 갖는 것은 원칙적으로 바람직하지 않다고 지적하였다. 그러나 적절한 안전 항해 체계가 마련된다면 이러한 방식이 불가능하지는 않다고 결론지었다.
mate
went to the wheelhouse to move the boat back into
position
, and no-one else was assigned to assist or supervise
passengers
. Both gates were left open, and
passengers
were allowed to continue disembarking. The evening cruise was intended to be a party and Mr ○○, like many other
passengers
, was under the influence of alcohol. As no gangway was used, the safety of the
depended on there being little or no gap between the boat and the
pier
. Study of the
images shows him take a normal step and fall into the water. It is thought unlikely, considering his last movements, that he saw that there was a gap between the boat and the
pier
. Although it was August, the water would have felt cold and caused Mr ○○ body some shock. The postmortem noted that he did not have any crush injuries, and it is likely that once he entered the water, he was unable to get back to the surface as the gap between Hurlingham and the
pier
would have been very narrow. 2.3 BERThING AND
PASSENGER
DISEMBARKATION 2.3.1 Electing to use a single point
mooring
In a conventional
mooring
with multiple lines, there is generally no need to leave the
. The
skipper
had considered that, in this case, the
propeller
would help draw the boat into the
pier
to reduce the amount of movement from the waves or
passing
vessels. Despite his reported preference to secure the boat with three
mooring
lines, the
skipper
told the
mate
to use two lines at Westminster
Pier
earlier in the evening, and only one line was used at
Tower
Pier
. Other vessels were observed using a single line to moor during the investigation, and it is evident that this practice was used on Hurlingham. At the end of the cruise, only one line was used and, whether or not he intended to use more lines, the
skipper
did not check to confirm the
mooring
arrangements. Thames Cruises had issued several different instructions on
mooring
which, viewed collectively, and compared with the managers’ and safety
’ expectations, gave a confused view of what was required. None of these instructions had been incorporated into the Marine
. Both the
skipper
and
mate
knew that there was a possibility that the boat could
drift
away from the
pier
if it was secured with only one line. Managers were also aware of this risk. Although it was the
mate
who secured the boat, both the
skipper
, through direct supervision, and managers, via company procedures, also had a responsibility to ensure that the requirements to secure the boat properly were clear and that they were being followed. There was ample opportunity to secure the boat with additional
mooring
lines, and using only a single point
mooring
when disembarking 121
passengers
, after a party, was inappropriate. 2.3.2 Supervision of
passengers
disembarking For the first few minutes after Hurlingham moored alongside Westminster
Pier
, the
mate
stayed on the
pier
, near the gate. After chatting with the caterer, and moving some bags of rubbish, he leant on the rail. He made no attempt to guide the few
passengers
that disembarked and could be seen drinking from some form of drinks
. Although the
mate
reported that he would not have had an alcoholic drink, this can not be confirmed, because he was not breathalysed. The
mate
remained in this
position
as the
stern
drifted away from the
pier
. Seventeen
passengers
crossed the widening gap before he took action and re-boarded the boat. Despite the increasing hazard, he did not close either the gate on the
pier
or the boat to stop
passengers
. During his attempts to bring the boat back alongside, 48
passengers
disembarked and 4 re-boarded. The gap was substantial and it is interesting that none of these people thought to wait until the boat was properly secured. It must be remembered that they were leaving a party where, on average, the bill for drinks was nearly £20 per person; it is likely that the judgment of many was affected by consumption of alcohol. It is therefore essential that the measures described in the conditions for the Premises Licence – that
passengers
must be supervised while disembarking the vessel – are observed. Although repositioning and
the boat were positive actions, the
passengers
should have been prevented from leaving the boat while this was being done. A safer procedure would have been to close the boarding gates,
the
skipper
to assist and perhaps even use bar staff to keep
passengers
clear of the forward
until the boat was re-secured. The use of portable radios or other means of communication between the
would have helped them to respond more effectively. 2.3.3
Crew
’s actions The
skipper
had left the wheelhouse because of his commercial interest in the bar, his desire to check the safety equipment, and to begin tidying up after the party. There was no obligation for him to do any of these tasks immediately, but it was part of his normal practice to ensure that the party finished as quickly and effectively as possible. The change in
noise prompted him to stop tidying at the rear part of the boat, and he realised that the
stern
had drifted away from the
pier
. Although he came forward to find out what was happening, a hazardous situation had already developed, and he was not in an appropriate
position
to take the proper action. The
skipper
did not appreciate the risks of leaving the wheelhouse unmanned with the
engine
left in
, he was not in a
position
to supervise the
crew
, and could not be contacted easily. It is essential that skippers are able to supervise both
passengers
and
crew
to identify and minimise hazards as they appear, and to take preventative action in case of emergencies. This duty should be stated in company procedures, and managers should check periodically to ensure that these are being complied with. The
mate
had the same qualification as the
skipper
. Despite the poor instructions for
mooring
, he also found it acceptable to moor Hurlingham with a single line, leaving the
propeller
turning
and the wheelhouse unattended. He was already paying little attention to the
passengers
before the
stern
drifted away. With the
skipper
elsewhere, he decided to move the boat himself without seeking assistance, and without preventing
passengers
from disembarking while he repositioned the vessel. Both the
skipper
and
mate
showed very little appreciation of the potential consequences of their actions. 2.3.4 Emergency response The
mate
had left the
pier
and was in the wheelhouse when he became aware that someone had gone into the water. He called the emergency services quickly, but
passengers
crowded around the front of the boat making it difficult for him to see what was happening or to respond effectively. He became isolated because other
crew
were not informed and, as his uniform did not stand out,
passengers
were not able to identify him easily. Both the gates on the boat and
pier
remained open and
passengers
were able to move freely. Although it was good thinking on the part of
passengers
to use the light from a
to help with the search, some put themselves in additional danger by walking outside the guardrails in their well-intentioned
attempts to search for Mr ○○. If other
crew
had been told about the emergency, they could have helped move
passengers
, many of whom would have been under the influence of alcohol, to a safer place. It is not the primary responsibility of LRS staff to assist and supervise
passengers
, but they are present during the day to act as caretakers and help with the general
of the
pier
. In an emergency, either they, or employees from the boat operator would be extremely helpful in controlling
passengers
on the
pier
and supporting the
crew
. As no-one was supervising
passengers
disembarking, there was no way to immediately identify and assist the
. The area where the man entered the water was difficult to see, and by the time
crew
responded access was obstructed by
passengers
. The
skipper
saw the
approach and decided to move Hurlingham off the
. His reaction was instinctive to give the
ILB
space to search, but it created additional risks, both to the man in the water and the remaining
passengers
. The tide was now
and it was likely that the
MOB
would be swept up river towards and past Hurlingham’s
propeller
. No-one was looking out aft, and by
off the
berth
the boat could have run over the top of him. There were no warnings that the boat was leaving the
berth
, and the
crew
had no idea how many
passengers
were left on board. As Hurlingham pulled away, one
passenger
was still standing outside the
, and he could easily have lost his balance and fallen in. Several
passengers
later commented that they would have jumped into the water if they had seen Mr ○○, a brave but extremely dangerous action. The strength of the tidal stream was growing and with no additional
, they too would probably have become casualties. The immediate reactions put
passengers
and the man in the water in greater danger. In an emergency, all
crew
must be involved immediately and respond in a way that minimises the danger to
passengers
and has the best chance of recovering the situation. To achieve this, the
crew
must be in control, and emergency procedures have to be relevant, pre-planned and, most importantly, rehearsed to make sure that everyone knows what to do, and to test that the procedure is likely to work. There was no record of how many people had disembarked from Hurlingham because it was assumed that
passengers
did not need to be counted off at the end of a
. However, this accident demonstrates that if
passengers
are not counted as they leave, there is no way to corroborate if someone is missing. Although this is not required by the regulations, it offers a more positive way of supervising
passengers
and ensuring that
crew
are paying proper attention. The
crew
allowed themselves to believe that the reported
of Mr ○○ was a mistake, and decided that they would not report the incident to Thames Cruises until the following day despite the attendance of the emergency services and the extensive search.
2.4
The
mate
had started work at 0800 in the morning, and had undertaken a cruise from 1100 until 1210, and again from 1450 until 1800 before starting work on Hurlingham. Although his working time complied with the regulations contained in The
MSN
1778(M), it is considered likely that after a long day, once the
passengers
started disembarking, the
mate
’s concentration waned. The
skipper
had recently returned from holiday. He commenced work on Hurlingham that day at 1600. He is not considered to have been unduly affected by
fatigue
. 2.5
MOORING
PRACTICE AND
PASSENGER
ACCESS 2.5.1 Lighting Although the central part of Westminster
Pier
was adequately lit, the
position
of the lights and guardrail meant that the edge of the
would have been in shadow. The only lighting from Hurlingham was from the
area. The edge of the
deck
was painted white, but there would not have been much contrast between the edge of the
pier
’s
fender
and the water. It might not have been obvious, particularly to a person under the influence of alcohol, that there was a gap, and given the way Mr ○○ stepped off Hurlingham, it is unlikely that he saw that a gap existed. Improvements to lighting and a change in the colour of the
fender
material, to give a greater contrast between the edge of the
pier
and the water, could improve safety of
passengers
. 2.5.2 Single point
mooring
The perceived advantages for
passenger
boats to moor with a single rope are clear, because of access limitations at a
berth
, time or limited manpower. The forces set up by using
engine
power against line tension can also damp the boat’s movement in the water, making it easier for
passengers
to board and disembark. However, it is a dynamic system dependent on two, single points of failure; the
mooring
rope and the
engine
. For a single point
mooring
to be used safely, it is vital that the
mooring
system (rope, bollards, cleats etc) is sufficiently strong and that the boat’s
engine
and rudder are controlled at all times. Failure of any of these elements will inevitably cause some form of hazard to
passengers
, which must be immediately controlled. While a single point
mooring
may at times be appropriate it can, by definition, never be as reliable as a conventional
mooring
using multiple ropes. Where a single point
mooring
is used, additional measures should be taken to mitigate the inherent hazards. These will include: •
Engine
and rudder under control at all times • Access points manned •
Passenger
movements controlled and allowed only when the vessel is considered to be securely moored alongside.
• Communications between personnel at the
engine
controls and the access point •
Mooring
equipment of adequate strength, and maintained in good condition Where large numbers of
passengers
need to be embarked or disembarked, a conventional
mooring
, using multiple ropes, is more appropriate than a single point
mooring
. 2.5.3 Snap back zones On Hurlingham, and several other boats seen during this investigation, the
mooring
ropes were secured at points which were very close to
passenger
access areas. Such
mooring
ropes are relatively short, and on regular services become worn in the same place each day. If a rope should part, it is likely that the free ends will snap back, striking
passengers
boarding or disembarking. Most vessels can be moored in several different ways, and operators should satisfy themselves that moorings are arranged so that their
passengers
would be adequately protected if any part of the
mooring
system failed. 2.5.4 Use of gangways Very few operators on the River Thames use gangways, despite the requirement in the Means of Access Regulations for all vessels over 30m in length to carry one. Many boats can
berth
close up to a
pier
and have a suitable
to match the height of the
pier
. However, a properly designed and used gangway can increase safe operating margins by covering gaps as the boat moves relative to the
pier
and providing a safe walkway across a hazardous area. Hurlingham had midships doors, which could have been used for
passenger
access. However, they were too low and did not open fully. A proper assessment of
mooring
and
passenger
access, and study of previous incidents, should have identified that by using the forward boarding gate an increased risk of a
passenger
falling into the gap between the boat and the
pier
existed. An option for reducing this risk could have been to modify the midships doors, moving them to a better
position
, making them open fully and even fitting an integral gangway to lead up onto the
pier
. Such an arrangement could also have kept
passengers
clear of
mooring
lines. 2.6 EFFECTIVENESS OF SAFETY MANAGEMENT SYSTEMS 2.6.1 Implementation of the DSM Code Although the DSMC is intended to foster a culture of safety management, it is possible to produce all the paperwork needed to show compliance with the regulations without making the shift in attitude that the Code was intended to achieve. This is demonstrated by Thames Cruises, which produced sufficient paperwork to satisfy surveyors over a 7-year period, but employed
crew
that
had not done sufficient effective emergency drills, knew nothing of the
and had not signed to record that they had read the safety manual. Nothing in the DSMC prevented or detected these shortcomings. Comparison of this incident with the findings of the
’s Research Project 527 indicates that further practical guidance to owners is needed on how to fully implement the DSMC. This should include the provision of specific training in
risk assessment
and safety management for those who have been automatically awarded BMLs as a consequence of their previous professional qualifications, and detailed advice to operators on conducting internal audits. 2.6.2 Role of the safety manager The safety manager’s job had been diminished over time to ‘looking after the paperwork’, and practical efforts to improve safety in the past had almost been abandoned. Although a new schedule for emergency drills had been published in January 2008, the last recorded drill involving the
skipper
, was in July 2007. Neither of the
crew
had done any recent training or exercises to help them prepare for this emergency. At the time of the accident, the safety manager worked 1 day per week for Thames Cruises, and was typically only present in normal office hours. As the crews mostly worked during the evening, his contact with them was minimal, hence there was almost no opportunity for him to explain or discuss regulations and procedures. Consequently, from the crews’ perspective, the safety manager had become increasingly irrelevant and his influence on working practices was negligible. 2.6.3
Crew
knowledge and involvement Although crews arriving to prepare a boat for an evening function would have had some contact with the managing director, they would often arrive to find papers left inside the boat for them to read. These were then kept in a file on board. It was evident that there was little order to the filing, and certainly no incentive for the
crew
to search through the papers in order to keep themselves up to date. It is concerning that this situation is so similar to that reported by Lord Justice Clarke in the Formal Investigation report into the
between Marchioness and Bowbelle. The
skipper
had not been involved in compiling the
risk assessments
; he could not explain how the process worked and did not know what control measures had been identified to reduce the risks. The
mate
understood how to carry out a
risk assessment
, but although the Marine Safety Manual stated that he was responsible for enforcing the control measures, in the case of
MOB
the description was too vague to be of any help to him. The
risk assessment
was flawed, offering the statement, ‘Establish a safe system of work for
mooring
/ departure’ as a means of preventing an
MOB
. Although managers had an expectation of what this “safe system” should be, it was not included in the Marine
Safety Management Manual
, and loose instructions on
mooring
were contradictory. Other control measures were incomplete; there was no emergency procedure for a person overboard while the vessel was alongside and Hurlingham was reliant on background light from the
pier
and its
accommodation
area to illuminate the access areas. 2.6.4 Audit The DSMC requires that boat operators monitor the effectiveness of their procedures and formally review them every 3 years. The managing director and safety manager reported that they did this as part of routine daily business. While this may be so, they had limited contact with their crews and it was rare for either of them to witness the actual operation of the boat away from Lambeth
Pier
, and especially at the end of the night when
passengers
were disembarking. Consequently, they could not see how effective their procedures were, or even if crews were using the procedures at all. LRS conducted an annual audit to satisfy themselves that the boats licensed by them to use their piers were safe. This focussed on the material state of the boat and its safety equipment, and there was little opportunity for LRS staff to review the operation of boats and control of
passengers
. Even if they had done so, with no formal
mooring
procedures, there was nothing for them to judge the operating standards against. The last two Mid Term Audits conducted by the
MCA
were done outside the period stated on the combined
Passenger
and DSMC certificate. The audits were done in October, at the end of the peak season, making it less likely that the boat would have been in normal operation. Like any audit, the Mid Term Audit can only make an assessment based on the sample visit, and conducting the audit outside of the boat’s main operating season must reduce its effectiveness. While the
MCA
conducts spot checks on the operating standards of vessels on the River Thames, this is now constrained to during normal
, and the evening ‘party boats’ are not normally seen. Mid Term Audits on Hurlingham, conducted over several years, were not able to detect any of the shortcomings identified by this accident. 2.6.5 Operation of the licensed bar It was reported in the Formal Investigation into the
collision
between Marchioness and Bowbelle that
crew
became distracted by their involvement in
running
the bar. It was, however, concluded that it should not be impossible for the
skipper
to have a financial interest in the bar. However, during this accident, the
skipper
also became distracted, firstly by the bar account and secondly by tidying up after the party. This must have been at least partly motivated by his commercial interest. The potential for distraction will always exist in these circumstances and must be avoided.
한국어 번역 · 모델 · 검수 전
2절 분석
2.1 목적
이 분석의 목적은 사고의 기여 원인과 상황을 규명하여, 향후 유사한 사고의 발생을 방지하기 위한 권고의 근거를 마련하는 것이다.
2.2 사고
Hurlingham호는 한 가닥의 줄로 고정되어 있었고 조타실은 무인 상태로 방치되어 있었다. 계선줄이 한 가닥뿐이어서 선박은 조수의 움직임이나 지나가는 선박에 의한 움직임에 극히 취약하였으며, 조타실에 아무도 없었으므로 보트가 제 위치에 머물도록 확인할 방법이 없었다. 승객 121명이 음료를 다 마시고 파티를 마치고 떠나는 데 필요한 시간 동안 Hurlingham호가 부두에서 떠밀려 나갈 가능성은 매우 높았다. 항해사가 보트의 선미를 다시 부두 쪽으로 조종해 붙인 뒤, 그 결과로 생긴 접촉이 선수를 부두에서 멀어지게 하였다. 이로 인해 승객이 하선하고 있던 지점에서 보트와 부두 사이의 틈이 벌어졌다. 선장은 바 계산서에 서명이 되었는지 확인하고 있었고 이어서 정리 작업에 관여하게 되었다. 항해사는 보트를 제 위치로 되돌리기 위해 조타실로 갔으며, 승객을 돕거나 감독하도록 배정된 사람은 달리 없었다. 양쪽 문이 모두 열려 있었고 승객들은 계속 하선하도록 허용되었다. 이 저녁 유람은 파티로 기획된 것이었고, ○○ 씨는 다른 많은 승객과 마찬가지로 술에 취한 상태였다. 현문 사다리가 사용되지 않았으므로 계선의 안전은 보트와 부두 사이에 틈이 거의 또는 전혀 없는 데 달려 있었다. CCTV 영상을 검토하면 그가 평범한 걸음을 내디뎌 물에 빠지는 모습이 확인된다. 그의 마지막 움직임을 고려할 때, 그가 보트와 부두 사이에 틈이 있음을 보았을 가능성은 낮은 것으로 생각된다. 8월이었음에도 물은 차갑게 느껴졌을 것이며 ○○ 씨의 몸에 어느 정도 충격을 주었을 것이다. 부검에서는 그에게 압궤 손상이 없었다고 기록되었으며, Hurlingham호와 부두 사이의 틈이 매우 좁았을 것이므로 일단 물에 빠진 뒤에는 수면으로 되돌아오지 못하였을 가능성이 높다.
2.3 접안 및 승객 하선
2.3.1 단일점 계류의 선택
여러 가닥의 줄을 사용하는 통상적인 계선에서는 일반적으로 프로펠러를 계속 회전시켜 둘 필요가 없다. 선장은 이 경우 프로펠러가 보트를 부두 쪽으로 끌어당겨 파도나 지나가는 선박으로 인한 움직임을 줄여 줄 것으로 생각하였다. 선장은 세 가닥의 계선줄로 보트를 고정하는 것을 선호한다고 진술하였음에도, 저녁 이른 시간에 웨스트민스터 부두에서는 항해사에게 두 가닥을 사용하라고 지시하였고, 타워 부두(Tower Pier)에서는 한 가닥만 사용되었다. 조사 중에 다른 선박들이 한 가닥의 줄로 계류하는 것이 관찰되었으며, Hurlingham호에서도 이러한 관행이 사용되었음이 분명하다. 유람이 끝났을 때 줄은 한 가닥만 사용되었고, 선장은 더 많은 줄을 사용할 의도가 있었는지와 관계없이 계선 상태를 확인하지 않았다.
Thames Cruises는 계선에 관해 서로 다른 여러 지시를 내려 왔는데, 이를 종합하여 보고 관리자와 안전책임자의 기대와 비교하면 요구 사항이 무엇인지 혼란스러운 인상을 주었다. 이 지시들 중 어느 것도 해사 안전관리 매뉴얼에 반영되어 있지 않았다. 선장과 항해사 모두 한 가닥의 줄로만 고정하면 보트가 부두에서 떠밀려 나갈 수 있다는 가능성을 알고 있었다. 관리자들도 이 위험을 알고 있었다. 보트를 고정한 것은 항해사였으나, 보트를 적절히 고정하기 위한 요건이 명확하고 그것이 지켜지고 있는지 확인할 책임은 선장(직접 감독을 통해)과 관리자(회사 절차를 통해) 모두에게 있었다. 추가 계선줄로 보트를 고정할 기회는 충분하였으며, 파티 후에 승객 121명을 하선시키면서 단일점 계류만을 사용한 것은 부적절하였다.
2.3.2 승객 하선 감독
Hurlingham호가 웨스트민스터 부두에 접안한 후 처음 몇 분 동안 항해사는 문 근처의 부두 위에 있었다. 케이터링 담당자와 이야기를 나누고 쓰레기 봉투 몇 개를 옮긴 뒤 그는 난간에 기대었다. 하선하는 소수의 승객을 안내하려는 시도를 하지 않았으며, 그는 어떤 종류의 음료 용기로 마시고 있는 모습이 관찰되었다. 항해사는 알코올 음료를 마시지 않았을 것이라고 진술하였으나, 음주 측정을 하지 않았으므로 이는 확인할 수 없다. 선미가 부두에서 떠밀려 나가는 동안에도 항해사는 이 자세로 남아 있었다. 그가 조치를 취하고 보트에 다시 올라타기까지 승객 17명이 벌어지는 틈을 건너갔다. 위험이 커지고 있었음에도 그는 승객을 막기 위해 부두 쪽 문이나 보트 쪽 문 어느 것도 닫지 않았다. 그가 보트를 다시 부두에 붙이려고 시도하는 동안 48명의 승객이 하선하고 4명이 다시 승선하였다. 틈은 상당하였으며, 이 사람들 중 누구도 보트가 제대로 고정될 때까지 기다릴 생각을 하지 않았다는 점은 흥미롭다. 이들이 평균적으로 1인당 음료 대금이 거의 20파운드에 달하는 파티에서 나오는 길이었음을 기억하여야 하며, 많은 사람의 판단이 알코올 섭취로 영향을 받았을 가능성이 높다. 따라서 영업장 허가의 조건에 기술된 조치, 즉 승객이 선박에서 하선하는 동안 감독되어야 한다는 조치가 준수되는 것이 필수적이다. 보트를 재배치하고 고정한 것은 긍정적인 조치였으나, 그 작업이 이루어지는 동안 승객이 보트를 떠나지 못하도록 막았어야 했다. 더 안전한 절차는 승선문을 닫고, 선장을 불러 도움을 받으며, 필요하다면 바 직원까지 동원하여 보트가 다시 고정될 때까지 승객이 앞쪽 갑판에 접근하지 못하도록 하는 것이었을 것이다. 휴대용 무전기나 승무원 사이의 다른 통신 수단을 사용하였다면 승무원이 더 효과적으로 대응하는 데 도움이 되었을 것이다.
2.3.3 승무원의 행동
선장은 바에 대한 상업적 이해관계, 안전장비를 점검하려는 의도, 그리고 파티 후 정리를 시작하려는 이유로 조타실을 떠났다. 이러한 작업 중 어느 것도 즉시 수행할 의무는 없었으나, 파티가 가능한 한 빠르고 효과적으로 끝나도록 하는 것은 그의 통상적인 관행의 일부였다. 기관 소음의 변화에 그는 보트 뒤쪽에서의 정리를 멈추었고 선미가 부두에서 떠밀려 나갔음을 알아차렸다. 무슨 일이 일어나고 있는지 알아보려고 앞쪽으로 왔으나, 이미 위험한 상황이 전개되어 있었고 그는 적절한 조치를 취하기에 알맞은 위치에 있지 않았다. 선장은 기관을 기어에 넣어 둔 채 조타실을 무인 상태로 두는 것의 위험을 인식하지 못하였고, 승무원을 감독할 수 있는 위치에 있지 않았으며, 쉽게 연락이 닿을 수도 없었다. 선장이 승객과 승무원을 모두 감독하여 위험이 나타나는 대로 파악하고 최소화하며 비상상황에 대비한 예방 조치를 취할 수 있어야 하는 것은 필수적이다. 이 의무는 회사 절차에 명시되어야 하며, 관리자는 이것이 준수되고 있는지 주기적으로 확인하여야 한다.
항해사는 선장과 같은 자격을 가지고 있었다. 계선에 관한 지시가 부실하였음에도, 그 역시 한 가닥의 줄로 Hurlingham호를 계류하고 프로펠러를 회전시킨 채 조타실을 무인으로 두는 것을 받아들일 만하다고 여겼다. 선미가 떠밀려 나가기 전부터 그는 이미 승객에게 거의 주의를 기울이지 않고 있었다. 선장이 다른 곳에 있는 상태에서 그는 도움을 구하지 않고, 또 선박을 재배치하는 동안 승객의 하선을 막지 않은 채 직접 보트를 움직이기로 결정하였다. 선장과 항해사 모두 자신들의 행동이 초래할 수 있는 결과에 대해 거의 인식하지 못하였다.
2.3.4 비상 대응
항해사는 누군가가 물에 빠졌음을 알게 되었을 때 부두를 떠나 조타실에 있었다. 그는 신속히 비상 대응기관에 연락하였으나, 승객들이 보트 앞쪽에 몰려들어 무슨 일이 일어나고 있는지 보거나 효과적으로 대응하기가 어려웠다. 다른 승무원들에게 알려지지 않았으므로 그는 고립되었고, 그의 복장이 눈에 띄지 않았기 때문에 승객들이 그를 쉽게 알아볼 수 없었다. 보트와 부두의 문이 모두 열려 있었으며 승객들은 자유롭게 움직일 수 있었다. 승객들이 구명부환(lifebuoy)의 불빛을 수색에 활용한 것은 좋은 생각이었으나, 일부는 ○○ 씨를 찾으려는 선의의 시도로 난간 바깥쪽을 걸어 다니며 스스로를 추가적인 위험에 빠뜨렸다. 다른 승무원들에게 비상상황이 알려졌다면, 그들이 많은 수가 술에 취해 있었을 승객들을 더 안전한 곳으로 이동시키는 것을 도울 수 있었을 것이다. 승객을 돕고 감독하는 것은 LRS 직원의 주된 책임이 아니지만, 이들은 낮 동안 관리인으로서 부두의 전반적인 운영을 돕기 위해 상주한다. 비상상황에서는 이들 또는 보트 운영자의 직원이 부두 위 승객을 통제하고 승무원을 지원하는 데 매우 큰 도움이 되었을 것이다. 하선하는 승객을 감독하는 사람이 없었으므로 MOB를 즉시 파악하고 도울 방법이 없었다. 그 남성이 물에 빠진 구역은 보기 어려운 곳이었으며, 승무원이 대응할 무렵에는 승객들 때문에 접근이 막혀 있었다.
선장은 연안 구명정(ILB)이 접근하는 것을 보고 Hurlingham호를 접안 위치에서 이동시키기로 결정하였다. ILB가 수색할 공간을 내주려는 것은 본능적인 반응이었으나, 이는 물에 빠진 남성과 남아 있던 승객 모두에게 추가적인 위험을 만들어 냈다. 이때 조류는 창조(flooding) 중이었으며, MOB가 상류 쪽으로 쓸려 Hurlingham호의 프로펠러 쪽으로, 그리고 그것을 지나쳐 갔을 가능성이 높았다. 후방을 경계하는 사람은 아무도 없었으며, 후진으로 접안 위치에서 벗어나면 보트가 그를 타고 넘어갈 수도 있었다. 보트가 접안 위치를 떠난다는 경고는 없었고, 승무원은 몇 명의 승객이 선내에 남아 있는지 알지 못하였다. Hurlingham호가 멀어질 때 승객 한 명이 여전히 불워크 바깥쪽에 서 있었으며, 그는 쉽게 균형을 잃고 물에 빠질 수 있었다. 여러 승객은 나중에 ○○ 씨를 보았다면 물속으로 뛰어들었을 것이라고 언급하였는데, 이는 용감하지만 극히 위험한 행동이다. 조류의 세기는 커지고 있었고 추가적인 부력이 없었으므로 이들 역시 사상자가 되었을 가능성이 높다. 즉각적인 반응들이 승객과 물에 빠진 남성을 더 큰 위험에 처하게 하였다. 비상상황에서는 모든 승무원이 즉시 참여하여 승객에 대한 위험을 최소화하고 상황을 수습할 최선의 가능성을 가진 방식으로 대응하여야 한다. 이를 달성하려면 승무원이 상황을 통제하여야 하고, 비상 절차는 현실에 부합하고 사전에 계획되며 무엇보다 모든 사람이 무엇을 해야 하는지 알도록 그리고 절차가 실제로 작동할 가능성이 있는지 시험하도록 훈련되어야 한다.
Hurlingham호에서 몇 명이 하선하였는지에 대한 기록은 없었는데, 이는 항해가 끝날 때 승객을 하선 계수할 필요가 없다고 여겨졌기 때문이다. 그러나 이 사고는 승객이 떠날 때 계수하지 않으면 누군가가 사라졌는지 확인할 방법이 없음을 보여 준다. 이는 규정이 요구하는 사항은 아니지만, 승객을 감독하고 승무원이 적절한 주의를 기울이도록 하는 더 확실한 방법이 된다.
승무원들은 ○○ 씨가 사라졌다는 신고가 착오라고 스스로 믿도록 방치하였으며, 비상 대응기관이 출동하고 광범위한 수색이 이루어졌음에도 이튿날까지 Thames Cruises에 사건을 보고하지 않기로 결정하였다.
2.4 피로
항해사는 아침 0800에 근무를 시작하였으며, Hurlingham호에서 근무를 시작하기 전에 1100부터 1210까지, 그리고 다시 1450부터 1800까지 유람을 수행하였다. 그의 근무 시간은 상선 고시 MSN 1778(M)에 담긴 규정을 준수하였으나, 긴 하루를 보낸 뒤 승객이 하선하기 시작했을 때 항해사의 집중력이 떨어졌을 가능성이 높은 것으로 판단된다. 선장은 최근 휴가에서 복귀한 상태였다. 그는 그날 1600에 Hurlingham호에서 근무를 시작하였다. 그는 피로의 지나친 영향을 받지 않은 것으로 판단된다.
2.5 계선 관행 및 승객 승하선
2.5.1 조명
웨스트민스터 부두의 중앙부는 적절히 조명되어 있었으나, 조명과 난간의 위치 때문에 방현재의 가장자리는 그림자 속에 있었을 것이다. Hurlingham호에서 나오는 유일한 조명은 거주구역에서 나오는 것이었다. 갑판 가장자리는 흰색으로 칠해져 있었으나, 부두 방현재의 가장자리와 물 사이에는 대비가 크지 않았을 것이다. 특히 술에 취한 사람에게는 틈이 있다는 것이 분명하지 않았을 수 있으며, ○○ 씨가 Hurlingham호에서 발을 내디딘 방식으로 보아 그가 틈이 있음을 보았을 가능성은 낮다. 조명을 개선하고 방현재 재료의 색을 바꾸어 부두 가장자리와 물 사이의 대비를 더 크게 하면 승객의 안전을 높일 수 있을 것이다.
2.5.2 단일점 계류
여객선이 한 가닥의 로프로 계류하는 것의 이점은, 접안 장소의 접근 제약, 시간 또는 한정된 인력 때문에 명백하다. 줄의 장력에 맞서 기관 동력을 사용함으로써 생기는 힘은 물속에서 보트의 움직임을 줄여 주기도 하여, 승객이 승하선하기가 더 쉬워진다. 그러나 이는 두 개의 단일 고장점, 즉 계선줄과 기관에 의존하는 동적 체계이다. 단일점 계류를 안전하게 사용하려면 계선 체계(로프, 계선주, 클리트 등)가 충분히 튼튼하고 보트의 기관과 타가 항상 통제되고 있는 것이 필수적이다. 이러한 요소 중 어느 하나라도 고장 나면 승객에게 어떤 형태로든 위험이 불가피하게 발생하며, 이는 즉시 통제되어야 한다. 단일점 계류가 때로는 적절할 수 있지만, 정의상 여러 가닥의 로프를 사용하는 통상적인 계선만큼 신뢰할 수는 결코 없다. 단일점 계류를 사용하는 경우에는 그에 내재한 위험을 줄이기 위한 추가 조치를 취하여야 한다. 여기에는 다음이 포함된다.
›기관과 타를 항상 통제할 것
›승하선 지점에 인원을 배치할 것
›승객의 이동을 통제하고, 선박이 부두에 안전하게 계류되었다고 판단될 때에만 허용할 것
›기관 조종 위치의 인원과 승하선 지점 사이의 통신
›충분한 강도를 갖추고 양호한 상태로 정비된 계선 장비
다수의 승객이 승선하거나 하선하여야 하는 경우에는 단일점 계류보다 여러 가닥의 로프를 사용하는 통상적인 계선이 더 적절하다.
2.5.3스냅백 구역(Snap back zones)
Hurlingham호와 이 조사 중에 본 다른 여러 보트에서는 계선줄이 승객 승하선 구역에 매우 가까운 지점에 고정되어 있었다. 이러한 계선줄은 비교적 짧고, 정기 운항에서는 매일 같은 곳이 마모된다. 줄이 끊어지면 자유단이 튕겨 되돌아와 승선하거나 하선하는 승객을 때릴 가능성이 높다. 대부분의 선박은 여러 가지 방식으로 계류할 수 있으며, 운영자는 계선 체계의 어느 부분이 파손되더라도 승객이 충분히 보호되도록 계선이 배치되어 있음을 스스로 확인하여야 한다.
2.5.4 현문 사다리 사용
승하선 수단 규칙(Means of Access Regulations)이 길이 30m를 넘는 모든 선박에 현문 사다리를 비치하도록 요구하고 있음에도 템스강에서 현문 사다리를 사용하는 운영자는 매우 적다. 많은 보트는 부두에 가깝게 접안할 수 있으며 부두 높이에 맞는 적절한 건현을 갖추고 있다. 그러나 적절하게 설계되고 사용되는 현문 사다리는 보트가 부두에 대해 상대적으로 움직일 때 틈을 덮어 주고 위험한 구역을 가로지르는 안전한 통로를 제공함으로써 안전 운항의 여유를 높일 수 있다. Hurlingham호에는 승객 승하선에 사용할 수 있었던 선체 중앙부의 문이 있었다. 그러나 이 문들은 너무 낮았고 완전히 열리지 않았다. 계선과 승객 승하선에 대한 적절한 평가와 이전 사건에 대한 검토가 이루어졌다면, 앞쪽 승선문을 사용함으로써 승객이 보트와 부두 사이의 틈으로 떨어질 위험이 커진다는 점이 파악되었을 것이다. 이 위험을 줄이는 한 가지 방안은 선체 중앙부의 문을 개조하여 더 나은 위치로 옮기고, 완전히 열리도록 하며, 부두로 이어지는 일체형 현문 사다리를 설치하는 것이었을 수 있다. 이러한 배치는 승객이 계선줄에 가까이 가지 않도록 하는 데에도 도움이 되었을 것이다.
2.6 안전관리체제의 효과성
2.6.1 DSM 규약의 이행
DSMC는 안전관리 문화를 조성하려는 것이지만, 규약이 이루고자 한 태도의 전환 없이도 규정 준수를 보여 주는 데 필요한 문서를 모두 작성하는 것이 가능하다. 이는 Thames Cruises가 보여 준다. 이 회사는 7년 동안 검사관을 만족시킬 만큼의 문서를 작성하였으나, 효과적인 비상 훈련을 충분히 하지 않았고, 위험성 평가에 대해 아무것도 알지 못하였으며, 안전 매뉴얼을 읽었음을 기록하는 서명을 하지 않은 승무원을 고용하였다. DSMC의 어떤 규정도 이러한 결함을 방지하거나 발견하지 못하였다. 이 사건을 MCA의 연구 과제 527의 결과와 비교하면, DSMC를 완전히 이행하는 방법에 관하여 선주에게 추가적인 실무 지침이 필요함을 알 수 있다. 여기에는 이전의 직업 자격으로 인해 BML을 자동으로 부여받은 사람들을 위한 위험성 평가 및 안전관리 분야의 구체적인 훈련 제공과, 운영자에 대한 내부 심사 실시에 관한 상세한 조언이 포함되어야 한다.
2.6.2 안전관리자의 역할
안전관리자의 직무는 시간이 지나면서 '문서 관리'로 축소되었고, 과거의 안전을 개선하기 위한 실질적인 노력은 거의 포기되어 있었다. 2008년 1월에 비상 훈련의 새 일정이 발행되었으나, 선장이 참여한 마지막 기록된 훈련은 2007년 7월의 것이었다. 승무원 두 사람 모두 이 비상상황에 대비하는 데 도움이 되는 최근의 훈련이나 연습을 받은 적이 없었다. 사고 당시 안전관리자는 Thames Cruises에서 주 1일 근무하였으며 통상 정규 사무 시간에만 있었다. 승무원이 대부분 저녁에 근무하였으므로 그와의 접촉은 최소한이었고, 따라서 그가 규정과 절차를 설명하거나 논의할 기회는 거의 없었다. 그 결과 승무원들의 관점에서 안전관리자는 점점 더 무관한 존재가 되었으며 작업 관행에 대한 그의 영향력은 미미하였다.
2.6.3 승무원의 지식 및 참여
저녁 행사를 위해 보트를 준비하러 도착한 승무원들은 대표이사와 어느 정도 접촉하였겠지만, 보트 안에 읽어 보라고 남겨진 서류가 있는 것을 발견하는 경우가 많았다. 이 서류들은 이후 선내 파일철에 보관되었다. 서류 정리에 거의 질서가 없었고, 승무원이 스스로를 최신 상태로 유지하기 위해 서류를 뒤져 볼 유인이 분명히 없었음이 드러났다. 이러한 상황이 Marchioness호와 Bowbelle호 사이의 충돌에 대한 공식 조사 보고서에서 클라크 판사(Lord Justice Clarke)가 보고한 것과 매우 유사하다는 점은 우려스럽다.
선장은 위험성 평가를 작성하는 데 관여한 적이 없었으며, 그 절차가 어떻게 작동하는지 설명하지 못하였고 위험을 줄이기 위해 어떤 통제 조치가 식별되었는지도 알지 못하였다. 항해사는 위험성 평가를 수행하는 방법을 이해하고 있었으나, 해사 안전 매뉴얼은 그가 통제 조치를 시행할 책임이 있다고 명시하고 있음에도 MOB의 경우에는 그 서술이 너무 모호하여 그에게 도움이 되지 않았다. 위험성 평가에는 결함이 있었는데, MOB를 방지하는 수단으로 '계선/출항에 대한 안전 작업 체계를 수립한다'라는 문구를 제시하였다. 관리자들은 이 '안전한 체계'가 무엇이어야 하는지에 대한 기대를 갖고 있었으나 그것은 해사 안전관리 매뉴얼에 포함되어 있지 않았고, 계선에 관한 낱장 지시는 서로 모순되었다. 다른 통제 조치들은 불완전하였다. 선박이 부두에 접안해 있는 동안 사람이 물에 빠졌을 때의 비상 절차가 없었으며, Hurlingham호는 승하선 구역을 밝히는 데 부두와 거주구역에서 나오는 배경 조명에 의존하고 있었다.
2.6.4 심사
DSMC는 보트 운영자가 절차의 효과성을 감시하고 3년마다 이를 공식 검토하도록 요구한다. 대표이사와 안전관리자는 이를 일상 업무의 일환으로 수행하였다고 진술하였다. 그러할 수는 있으나, 이들은 승무원과의 접촉이 제한적이었고 둘 중 누구도 램버스 부두에서 떨어진 곳에서, 특히 밤이 끝나고 승객이 하선하는 시점에 보트가 실제로 운영되는 모습을 목격하는 일은 드물었다. 그 결과 이들은 자신들의 절차가 얼마나 효과적인지, 또는 승무원이 그 절차를 사용하고 있는지조차 알 수 없었다.
LRS는 자신들의 부두를 사용하도록 면허를 발급한 보트가 안전한지 스스로 확인하기 위해 연례 심사를 실시하였다. 이 심사는 보트와 안전장비의 물적 상태에 중점을 두었으며, LRS 직원이 보트의 운영과 승객 통제를 검토할 기회는 거의 없었다. 설령 검토하였더라도, 공식적인 계선 절차가 없었으므로 운영 수준을 판단할 기준이 없었다.
MCA가 실시한 마지막 두 차례의 중간 심사는 통합 여객 및 DSMC 증서에 명시된 기간 밖에 이루어졌다. 심사는 성수기가 끝나는 10월에 실시되어 보트가 정상적으로 운항 중이었을 가능성이 낮았다. 모든 심사와 마찬가지로, 중간 심사는 표본 방문에 기초한 평가만 할 수 있으며, 보트의 주 운항 시즌 밖에 심사를 실시하는 것은 그 효과를 떨어뜨릴 수밖에 없다. MCA는 템스강의 선박 운영 수준에 대해 불시 점검을 실시하나, 이것은 현재 정상 근무 시간 동안으로 제한되어 있어 저녁의 '파티 보트'는 보통 점검 대상이 되지 않는다. 수년에 걸쳐 실시된 Hurlingham호에 대한 중간 심사는 이 사고로 드러난 결함 중 어느 것도 발견하지 못하였다.
2.6.5 면허 바의 운영
Marchioness호와 Bowbelle호 사이의 충돌에 대한 공식 조사에서 승무원이 바 운영에 관여하여 주의가 흐트러졌다고 보고되었다. 그러나 선장이 바에 금전적 이해관계를 갖는 것이 불가능해서는 안 된다고 결론지어졌다. 그런데 이 사고에서 선장도 처음에는 바 계산서에, 그다음에는 파티 후 정리에 주의가 흐트러졌다. 이것은 적어도 부분적으로는 그의 상업적 이해관계에 의해 동기가 부여된 것이었을 것이다. 이러한 상황에서는 주의가 흐트러질 가능성이 항상 존재하며 이는 피하여야 한다.
skipper
and
mate
showed very little appreciation of the potential consequences of their actions. [2.3.3] • The
mate
had started work at 0800 that morning on another of Thames Cruises’ vessels. Although his working time complied with the regulations, it is likely that at the end of the evening his concentration waned due to the effects of
. [2.4] • Improvements to lighting, and greater contrast between the colour of the
material and water below would assist
passengers
determine whether a gap between the vessel and
pier
exists. [2.5.1] 3.2 OThER SAFETY ISSUES IDENTIFIED DURING ThE INVESTIGATION ALSO LEADING TO RECOMMENDATIONS •
Passengers
were exposed to unnecessary additional risks because the
crew
were unable to command or control the immediate response to the emergency, and there were no
pier
staff present to assist. [2.3.4] • Where single point moorings are used, additional measures should be taken to mitigate the inherent hazards. [2.5.2] • Operators should ensure that
passengers
will be adequately protected if a
parts while
passengers
are boarding or disembarking. [2.5.3]
• Using a properly designed and constructed gangway can increase safe operating margins by covering gaps between a boat and a
pier
and providing a safe walkway across a hazardous area. [2.5.4] • Although Thames Cruises was found to be compliant with the DSMC, the accident demonstrates several shortcomings which the Code neither prevented nor detected. Further guidance to owners is needed on how to implement the Code in practice [2.6.1] • The
crew
had a poor understanding of the
, and were not involved in it enough to make the system work properly. [2.6.3] • Audits of Hurlingham did not detect how the vessel was operated in practice. [2.6.4] • The potential for a
to be distracted from his primary duties by commercial interests must be avoided. [2.6.5] 3.3 SAFETY ISSUES IDENTIFIED DURING ThE INVESTIGATION WhICh hAVE NOT RESULTED IN RECOMMENDATIONS BUT hAVE BEEN ADDRESSED • There was ample opportunity to secure the boat with additional
lines. Using a single point
mooring
, while disembarking 121
passengers
, was inappropriate. [2.3.1] •
Passengers
under the influence of alcohol are less able to look after themselves, making it essential that the conditions specified in Premises Licences, for
passengers
to be supervised while boarding and disembarking, are followed. [2.3.2] • Although not required by the regulations, counting
passengers
as they leave the vessel at the end of the
offers a more positive way of supervising
passengers
during disembarkation and ensuring that
crew
are paying proper attention. [2.3.4]
한국어 번역 · 모델 · 검수 전
3절 결론
3.1 사고에 직접 기여하여 권고로 이어진 안전 쟁점
›Hurlingham호는 한 가닥의 줄로 고정되어 있었고, 기관은 기어에 넣어진 채였으며 조타실은 무인 상태였다. 이러한 상태에서는 승객이 하선하는 동안 부두에서 떠밀려 나갈 가능성이 매우 높았다. [2.2]
›선장은 보트의 다른 업무로 주의가 흐트러져 있었고, 항해사가 보트를 제 위치로 되돌리는 동안 승선문이 열려 있었으며 승객들은 감독 없이 보트와 부두 사이의 틈을 건너 계속 하선하도록 허용되었다. [2.2]
›사망한 승객은 Hurlingham호와 웨스트민스터 부두 사이에 벌어지도록 방치된 틈을 알아차리지 못한 것으로 판단된다. [2.2]
›선장이 승객과 승무원을 모두 감독하여 위험이 나타나는 대로 파악하고 최소화하며 비상상황에 대비한 예방 조치를 취할 수 있어야 하는 것은 필수적이다. 이 의무는 회사 절차에 명시되어야 하며 관리자는 이것이 준수되고 있는지 주기적으로 확인하여야 한다. [2.3.3]
›선장과 항해사 모두 자신들의 행동이 초래할 수 있는 결과에 대해 거의 인식하지 못하였다. [2.3.3]
›항해사는 그날 아침 0800에 Thames Cruises의 다른 선박에서 근무를 시작하였다. 그의 근무 시간은 규정을 준수하였으나, 저녁이 끝날 무렵 피로의 영향으로 집중력이 떨어졌을 가능성이 높다. [2.4]
›조명을 개선하고 방현재 재료의 색과 그 아래 물의 색 사이의 대비를 더 크게 하면 승객이 선박과 부두 사이에 틈이 있는지 판단하는 데 도움이 될 것이다. [2.5.1]
3.2 조사 중에 확인되어 마찬가지로 권고로 이어진 그 밖의 안전 쟁점
›승무원이 비상상황에 대한 즉각적인 대응을 지휘하거나 통제할 수 없었고 도울 부두 직원도 없었기 때문에 승객들은 불필요한 추가 위험에 노출되었다. [2.3.4]
›단일점 계류를 사용하는 경우에는 그에 내재한 위험을 줄이기 위한 추가 조치를 취하여야 한다. [2.5.2]
›운영자는 승객이 승선하거나 하선하는 동안 계선줄이 끊어지더라도 승객이 충분히 보호되도록 하여야 한다. [2.5.3]
›적절히 설계되고 제작된 현문 사다리를 사용하면 보트와 부두 사이의 틈을 덮고 위험한 구역을 가로지르는 안전한 통로를 제공함으로써 안전 운항의 여유를 높일 수 있다. [2.5.4]
›Thames Cruises는 DSMC를 준수하는 것으로 확인되었으나, 이 사고는 규약이 방지하지도 발견하지도 못한 여러 결함을 보여 준다. 규약을 실제로 이행하는 방법에 관하여 선주에게 추가적인 지침이 필요하다. [2.6.1]
›승무원은 안전관리체제에 대한 이해가 부족하였고, 체제가 제대로 작동하도록 할 만큼 이에 충분히 참여하지 않았다. [2.6.3]
›Hurlingham호에 대한 심사는 선박이 실제로 어떻게 운영되는지를 발견하지 못하였다. [2.6.4]
›선장이 상업적 이해관계로 인해 본연의 직무에서 주의가 흐트러질 가능성은 피하여야 한다. [2.6.5]
3.3 조사 중에 확인되었으며 권고로 이어지지는 않았으나 이미 해결된 안전 쟁점
›추가 계선줄로 보트를 고정할 기회는 충분하였다. 승객 121명이 하선하는 동안 단일점 계류를 사용한 것은 부적절하였다. [2.3.1]
›술에 취한 승객은 스스로를 돌볼 능력이 떨어지므로, 승객이 승선하고 하선하는 동안 감독되어야 한다는 영업장 허가에 명시된 조건이 준수되는 것이 필수적이다. [2.3.2]
›규정이 요구하는 것은 아니지만, 항해가 끝날 때 승객이 선박을 떠나면서 계수하는 것은 하선 중 승객을 감독하고 승무원이 적절한 주의를 기울이도록 하는 더 확실한 방법이 된다. [2.3.4]
for
passenger
access and personnel falling overboard. • Arranged training courses for all
crew
in first-aid, crowd control and anger management. • Arranged training courses for all
crew
in the operation of the company’s
. • Intends to increase the amount of time the safety manager works for Thames Cruises. • Arranged formal meetings between
crew
representatives and the safety manager to discuss the operation of the
safety management system
and training drills. • Fitted additional lighting to all five vessels owned by Thames Cruises to illuminate
passenger
access areas.
• The managing director and safety manager will conduct random checks on vessel operations,
crew
performance and
mooring
procedures, particularly at night, and will record their observations.
: • Prior to this accident, the
PLA
had begun developing a Code of Practice for
Passenger
Vessel Operations on the Thames. Development continued throughout this investigation, in co-operation with the
,
Passenger
Boat Association, London River Services and Police marine units. The Code of Practice was published in May 2009, in time for the main operating season. London River Services: • Conducted its own investigation of the accident, which confirmed that the lighting, guardrails and safety equipment on Westminster
Pier
were all working as designed. • Wrote to all vessel operators licensed to use LRS piers, reminding them of the need to moor safely, and that licences could be suspended if vessels were seen to be operating unsafely. • Has begun trials of markings to improve the contrast between the edge of the
pier
and the water.
: • Issued a Safety Bulletin (3/2008, reproduced at Annex F) in September 2008, identifying the safety issues of
mooring
,
passenger
control and vessel management. The Safety Bulletin made a joint recommendation9 to the
Maritime and Coastguard Agency
and London River Services to satisfy themselves that companies operating Class V
passenger
vessels had effective systems in place to ensure the safe operation of their vessels. 9 Recommendation 2008/170 to the
Maritime and Coastguard Agency
and London River Services are recommended to: Take urgent action to satisfy themselves that all companies operating licensed Class V
passenger
vessels on the River Thames have effective systems in place to ensure the safe operation of their vessels in accordance with the Domestic Safety Management Code and the LRS licence agreement.
한국어 번역 · 모델 · 검수 전
4절 조치 사항
Thames Cruises Ltd:
보건 및 안전 체제를 검토하고 다음 조치를 취하였다.
›모든 선박의 문서 보관 체계를 개정하고 갱신하였으며, 관련 승무원이 중요한 문서를 보았음을 기록하는 서명을 하도록 보장하는 폐쇄형 체계를 포함하였다.
›각 선박에 간소화된 문서 보관 체계를 도입하고, 선장에게 문서를 보관하는 방법을 지시하였으며, 각 선박에 대한 정기 내부 심사에 문서 보관 점검을 포함시켰다.
›케이터링 직원이 장비를 선박에 싣고 선내에서 일하는 것에 따른 위험을 평가하고, 직원이 물에 빠질 위험을 최소화하기 위한 보고, 훈련 및 감독 체계를 도입하였다. 케이터링 직원은 장비를 싣는 동안 구명조끼를 착용하도록 요구된다.
›선박 승하선을 개선하기 위해 램버스 부두의 회사 기지에 승선용 플랫폼을 설치하였다.
›하선 직전에 승객에게 각별히 주의해 줄 것을 요청하고 승무원에게 그들의 의무를 상기시키는 안내 방송을 하기로 하였다(부록 E에 수록).
›승무원에게 계선, 승객 승선 및 하선에 관한 상세한 절차를 명시한 지시를 발령하였다. 이 절차의 요약은 상기용으로 각 '파티 안내 메모(party advice note)'에 포함되어 있다.
›각 선박에 비치된 것과 별도로 모든 승무원에게 해사 안전관리 매뉴얼의 개인용 사본을 지급하였다.
›승객 승하선 및 인원의 해상 추락에 대한 위험성 평가를 개정하였다.
›모든 승무원을 위한 응급처치, 군중 통제 및 분노 관리 교육과정을 마련하였다.
›모든 승무원을 위한 회사 안전관리체제 운영 교육과정을 마련하였다.
›안전관리자가 Thames Cruises에서 근무하는 시간을 늘릴 계획이다.
›안전관리체제의 운영과 훈련 연습을 논의하기 위해 승무원 대표와 안전관리자 사이의 공식 회의를 마련하였다.
›Thames Cruises가 소유한 5척 모두에 승객 승하선 구역을 밝히는 추가 조명을 설치하였다.
›대표이사와 안전관리자는 특히 야간에 선박 운영, 승무원의 업무 수행 및 계선 절차에 대하여 무작위 점검을 실시하고 관찰 결과를 기록할 것이다.
런던항만청(Port of London Authority):
›이 사고 이전에 PLA는 템스강 여객선 운영을 위한 실무 규약(Code of Practice for Passenger Vessel Operations on the Thames)의 개발을 시작하였다. 개발은 MCA, 여객선협회(Passenger Boat Association), 런던 리버 서비스 및 경찰 해상 부서와의 협력하에 이 조사 전체에 걸쳐 계속되었다. 이 실무 규약은 주요 운항 시즌에 맞추어 2009년 5월에 발간되었다.
런던 리버 서비스(London River Services):
›사고에 대한 자체 조사를 실시하였으며, 이를 통해 웨스트민스터 부두의 조명, 난간 및 안전장비가 모두 설계대로 작동하고 있음을 확인하였다.
›LRS 부두를 사용하도록 면허를 받은 모든 선박 운영자에게 안전하게 계류할 필요성을 상기시키고, 선박이 안전하지 않게 운영되는 것이 목격되면 면허가 정지될 수 있음을 알리는 서한을 보냈다.
›부두 가장자리와 물 사이의 대비를 개선하기 위한 표시의 시험을 시작하였다.
영국 해양사고조사국(Marine Accident Investigation Branch):
›2008년 9월에 계선, 승객 통제 및 선박 관리의 안전 쟁점을 확인하는 안전 회보(Safety Bulletin) 3/2008(부록 F에 수록)을 발행하였다. 이 안전 회보는 제5급 여객선을 운영하는 회사들이 선박의 안전 운항을 보장하는 효과적인 체제를 갖추고 있음을 스스로 확인하도록 영국 해사연안경비청과 런던 리버 서비스에 공동 권고9를 하였다.
9 권고 2008/170 영국 해사연안경비청과 런던 리버 서비스에 권고한다. 국내 안전관리 규약 및 LRS 면허 협약에 따라, 템스강에서 면허를 받은 제5급 여객선을 운영하는 모든 회사가 선박의 안전 운항을 보장하는 효과적인 체제를 갖추고 있음을 스스로 확인하기 위한 긴급 조치를 취할 것.
and emergency procedures. • Conduct effective emergency training drills to practice responding to the range of hazards identified in its
risk assessments
of vessel operations. • Introduce employment procedures to ensure, as far as possible, that
are working in accordance with the regulations for
and rest.
• Provide masters with clear guidance on the conduct of operations and, specifically, the requirement to ensure the wheelhouse is manned at all times when the vessel’s
is in
. • Introduce procedures to ensure that marine crews are not distracted by commercial activities, including responsibility for the bar, which could detract from the performance of their primary duties. 2009/137 Review the
passenger
access arrangements on all its vessels to ensure that: •
Passengers
are protected in the event that a
or other part of the
system fails. • Access points are positioned appropriately to minimise the risk of a
passenger
falling overboard while embarking or disembarking, and that gangways are used where necessary.
June 2009 Safety recommendations shall in no case create a presumption of blame or liability
한국어 번역 · 모델 · 검수 전
5절 권고
영국 해사연안경비청에 다음을 권고한다.
2009/133 제5급 선박(특히 저녁에 운항하는 선박)의 운영에 대한 점검의 대상 선정을 개선하여 다음을 수행할 것.
›각 선박의 DSMC에 명시된 절차의 준수를 확인할 것.
›2009년 템스강 여객선 운영 실무 규약(Code of Practice for Passenger Vessel Operations on the Thames 2009)에 기술된 것과 같은 모범 실무를 반영한 절차의 채택을 장려할 것.
2009/134 제3~6(A)급 국내 여객선 운영자에게 국내 여객선 안전관리 규약(Domestic Passenger Ships Safety Management Code)을 효과적으로 준수하기 위해 취해야 할 조치를 안내하는 개선된 정보를 제공할 것.
런던 리버 서비스에 다음을 권고한다.
2009/135 야간 부두에서의 승객 이동 및 통제와 관련된 위험성을 평가하여 다음을 수행할 것.
›승객 안전에 대한 책임이 어디에 있는지 명확히 하고, 특히 비상상황에서 승객 안전을 보장하기 위한 적절한 통제 조치가 마련되도록 할 것.
›부두 가장자리의 조명 및 표시 방식이 모든 주변 조도 조건에서 주위의 물과 뚜렷한 대비를 이루도록 할 것.
›LRS 부두를 이용하는 모든 선박에 2009년 템스강 여객선 운영 실무 규약을 준수하도록 요구할 것.
Thames Cruises Ltd에 다음을 권고한다.
2009/136 2009년 템스강 여객선 운영 실무 규약을 준수하도록 필요에 따라 안전관리체제를 검토하고 수정하며, 특히 다음을 수행할 것.
›사고와 아차사고를 기록하고, 얻어야 할 교훈을 파악하며, 위험성 평가와 비상 절차를 검토하고 갱신하는 체계를 시행할 것.
›선박 운영에 대한 위험성 평가에서 식별된 다양한 위험에 대한 대응을 연습하는 효과적인 비상 훈련을 실시할 것.
›가능한 한 승무원이 근로 및 휴식 시간에 관한 규정에 따라 근무하도록 보장하는 고용 절차를 도입할 것.
›선장에게 운영 수행에 관한 명확한 지침을 제공하고, 특히 선박의 기관이 기어에 들어가 있을 때에는 항상 조타실에 인원이 배치되도록 하는 요건을 제시할 것.
›해상 승무원이 본연의 직무 수행에 지장을 줄 수 있는 바 운영 책임을 비롯한 상업 활동으로 인해 주의가 흐트러지지 않도록 하는 절차를 도입할 것.
2009/137 모든 선박의 승객 승하선 방식을 검토하여 다음을 보장할 것.
›계선줄이나 계선 체계의 다른 부분이 파손되는 경우에 승객이 보호될 것.
›승하선 지점이 승객이 승선하거나 하선하는 동안 물에 빠질 위험을 최소화하도록 적절히 배치되고, 필요한 경우 현문 사다리가 사용될 것.
영국 해양사고조사국
2009년 6월
안전 권고는 어떤 경우에도 과실이나 책임에 대한 추정을 만들어 내지 않는다.
passenger
vessel Hurlingham when attempting to disembark the vessel at Westminster
on the River Thames. Despite an extensive search of the river, the
passenger
’s body was not recovered from the river until five days later. The safe operation of Class V
passenger
vessels operating on the River Thames and utilising piers in Greater London is governed by the need to comply with the requirements of the UK Domestic Safety Management Code and also a licence agreement issued by London River Services Ltd. ISSUE Preliminary findings of the
’s investigation into the causes and circumstances of this accident have raised concerns over the safe operation of Class V
passenger
vessels operating on the River Thames. The main areas of concern are as follows: Vessel
• Strong anecdotal evidence suggests that, notwithstanding general advice to the contrary, the practice of using a single
and
power to
a boat alongside is widespread on the River Thames. While this may be adequate in some circumstances it is not appropriate when disembarking large numbers of
passengers
.
Passenger
control• Like many other Class V
passenger
vessels on the River Thames, Hurlingham operates as a venue for social occasions and the bar is a prominent feature of the boat. In these circumstances it is likely that
passengers
’ judgment and spatial awareness may be impaired due to the effects of alcohol. It is therefore vital that robust procedures are observed to ensure the supervision, control and safety of
passengers
especially during embarkation / disembarkation.
쟁점
이 사고의 원인과 상황에 대한 MAIB 조사의 예비 결과는 템스강을 운항하는 제5급 여객선의 안전한 운영에 대한 우려를 불러일으켰다. 주요 우려 분야는 다음과 같다.
선박 계선
›반대되는 일반적 조언에도 불구하고, 한 가닥의 계선줄과 기관 동력으로 보트를 부두에 붙여 두는 관행이 템스강에서 널리 퍼져 있다는 강한 일화적 증거가 있다. 이는 일부 상황에서는 충분할 수 있으나, 다수의 승객을 하선시킬 때에는 적절하지 않다.
승객 통제
›템스강의 다른 많은 제5급 여객선과 마찬가지로 Hurlingham호는 사교 행사의 장소로 운영되며 바가 보트의 두드러진 특징이다. 이러한 상황에서는 알코올의 영향으로 승객의 판단력과 공간 인지 능력이 저하되었을 가능성이 높다. 따라서 특히 승선/하선 중 승객의 감독, 통제 및 안전을 보장하는 견실한 절차가 준수되는 것이 필수적이다.
선박 관리
›모든 제5급 여객선은 유효한 국내 안전관리(DSM) 증서와 런던 부두에서 운항하기 위한 면허를 필요로 한다. 이 사고에 대한 초기 조사는 DSM 증서와 면허의 요건이 달성되지 않은 여러 핵심 분야를 부각시켰다.
권고
영국 해사연안경비청과 런던 리버 서비스에 다음을 권고한다.
2008/170
›국내 안전관리 규약 및 LRS 면허 협약에 따라, 템스강에서 면허를 받은 제5급 여객선을 운영하는 모든 회사가 선박의 안전 운항을 보장하는 효과적인 체제를 갖추고 있음을 스스로 확인하기 위한 긴급 조치를 취할 것.