On 18 December 2016, the bulk carrier Graig Rotterdam was discharging a deck cargo of packaged timber at anchor in Alexandria Port, Egypt. At 1109, the bosun, a Chinese national, fell overboard and into a barge that was secured alongside after the timber deck cargo stack on which he was standing partially collapsed. Although the ship’s crew provided first-aid following the accident, the bosun later died of his injuries.
Safety lessons
poor stevedoring practices probably contributed to the unsecured cargo stack collapsing, and no measures were in place to prevent the bosun from falling overboard as a result
with the deck cargo lashings removed, the cargo packages had insufficient racking strength to counter the effects of ship movement, cargo repositioning, dunnage displacement, barges securing to deck cargo stacks, and cargo discharge operations over a prolonged period
poor stevedoring practices that had previously been witnessed by the ship’s crew were not discussed and so were allowed to continue
Recommendations
Graig Ship Management Limited has been recommended (2017/149) to reinforce and, as appropriate, modify its Safety Management System with respect to the carriage of timber cargoes to ensure:
a lifeline or other means for attaching a safety harness is available to counter the risk of ship’s crew or shore stevedores falling from the top of a deck cargo stack or as a result of a deck cargo stack collapse
where possible, appoint a master or chief officer with experience of the cargo type being carried
ship’s crew proactively engage with shore stevedores for the purpose of maintaining a safe system of work during cargo operations
Norlat Shipping Limited AS has been recommended (2017/150) to ensure that all cargo information, as required by the International Maritime Organization’s Code of Safe Practice for Ships Carrying Timber Deck Cargoes, is provided to the master or his representative prior to loading cargo for all ships that it charters to carry timber deck cargo.
12-16 14:00
라싱 제거 후 바지선으로 양하 시작
크레인 조작 등 모든 양하는 육상 하역 작업자가 수행.
근거: 화물 양하
12-18 아침
1등항해사 브리핑 · 바지선은 갑판 화물 포장에 계류
근거: 사고
12-18 11:09
1번 해치 덮개 위 좌현 더미 일부 붕괴 — 갑판장이 화물과 함께 추락
약 20개 포장이 물과 좌현 선수 쪽 바지선으로 떨어짐. 1등항해사가 CCTV로 봄.
근거: 사고 · 화물 붕괴
11:09 직후
갑판장 무전 무응답 · 선장이 화물 작업 중지 명령
하역 작업자들이 3등항해사에게 갑판장이 떨어졌다고 알림.
근거: 사고
11:09 이후
선장 경보 — 선원들이 주변 수면 수색, 육상 지원 요청
근거: 사고
11:35
선원 10명이 바지선으로 옮겨 목재를 손으로 들어 갑판장 찾음
심폐소생술 후 소형선으로 육지 이송.
근거: 사고
13:30
선박 대리점이 갑판장 사망을 선장에게 알림
근거: 사고
② 등장 요소와 관계
점선 상자는 있었지만 쓰이지 않았거나 쓰였는지 모르는 것, 점선 화살표는 보고서가 추정한 관계입니다.
③ 원인 사슬
왼쪽에서 오른쪽으로, 무엇이 무엇으로 이어졌는지입니다. 상자(원인)는 보고서 근거 대목에서 가져왔고, 상자 사이 화살표는 보고서가 직접 적지 않은 경우 모델이 판단해 이은 것입니다.
보고서가 밝히지 못한 것
화물 더미가 무너진 정확한 경위
권고·조치
2017/149 Graig Ship Management: 목재 화물 SMS 보강 — 구명줄·하네스 연결 수단, 경험 있는 선장·1등항해사 임명, 하역 작업자와 선제 협의
2017/150 Norlat Shipping: 목재 갑판 화물 용선 시 TDC 규약이 요구하는 화물 정보를 적재 전 선장에게 제공
회사는 선단 회람, 위험성 평가에 '안전하지 않은 하역 작업' 추가, 2017 안전 중점을 '화물 작업'으로 지정.
본문
PDF 에서 뽑은 글 — 쪽 나눔·단 배치 때문에 줄 순서가 어긋난 곳이 있을 수 있습니다
On 18 December 2016, Graig Rotterdam (Figure 1) was cargo at in Alexandria , Egypt. At 1109 (UTC1+2), the bosun, Qin Zhigang, fell overboard and into a that was secured alongside after the timber stack on which he was standing partially collapsed. Although the ship’s provided first-aid following the accident, the bosun later died of his injuries. The investigation concluded that poor stevedoring practices probably contributed to the unsecured cargo stack collapsing and that no measures were in place to prevent the bosun from falling overboard. Graig Ship Management Limited has been recommended to take action designed to enhance safe working practices during the loading, carriage and of timber cargoes. The vessel’s , Norlat Shipping Limited AS, has been recommended to ensure masters are provided with the required information needed to safely transport timber deck cargo. 1 .
Figure 1: Graig Rotterdam원본 PDF 1쪽 (쪽 전체)제3자 저작물 · 내부 열람용copyright and you must; copyright material you will; copyright holders
FACTUAL INFORMATION
The Graig Rotterdam loaded a cargo of packaged sawn timber in the Finish ports of Rahja and Oulu for in Alexandria, Egypt. This was the first time a timber cargo had been carried on board the ship. A supercargo2, appointed by the , Norlat Shipping Limited AS, attended the ship, supervised the loading, and provided guidance to the on cargo loading and , and ship requirements. The was stacked four packages high on top of the covers and six high on . Following the supercargo’s instruction, the ship’s secured the deck cargo by means of top-over lashings3 using chains and turnbuckles supplied by the charterer (Figure 2). The ship’s crew constructed ladders at the forward and after ends of the deck cargo
Figure 2: Graig Rotterdam at sea with timber secured by top-over lashings원본 PDF 2쪽
Passage The weather on passage to Alexandria was good and the ship’s checked the lashings daily, tightening the turnbuckles as required. On 12 December, Graig Rotterdam arrived off Alexandria and was anchored in the outer , awaiting instructions. Cargo On 16 December, Graig Rotterdam was anchored in the inner anchorage in preparation for cargo discharge. The completed a checklist entitled ‘Timber Cargo Operations’ and attached to it a generic entitled ‘Loading and Un-loading of Timber Cargoes’. He then conducted a cargo operations briefing with the and crew. He also met with the stevedore foreman. They discussed the discharge plan but did not discuss safe systems of work. The ship’s crew removed the deck cargo lashings and, at 1400, cargo discharge commenced into barges secured alongside the anchored ship4. All aspects of the cargo discharge, including operation of the ship’s cranes, were carried out by stevedores as required by the
Graig Rotterdam Graig Rotterdam was a UK registered , built in China in 2012. The ship had a with five cargo holds and four cargo cranes. It was owned and managed by Graig Ship Management Limited, Cardiff. Graig Rotterdam traded worldwide, carrying a wide variety of bulk cargoes. The ship’s (CSM) detailed the requirements for the carriage of timber and timber cargoes. The ship was not fitted to accommodate uprights7 and did not carry lashings appropriate for timber . The CSM had been approved by the UK (MCA) in October 2012, and the timber deck cargo loaded on the ship at the time of the accident had been secured for passage in accordance with the CSM’s requirements. Graig Rotterdam had 20 crew, all Chinese nationals. All crew held the STCW8 certificates of competency required for their positions on board. They also met the Convention’s requirements concerning and rest. The was 36 years old and had been assigned to Graig Rotterdam since it was built, initially as
Figure 3: Cargo barges secured to packages원본 PDF 4쪽
ropes attached to The cargo Graig Rotterdam was carrying 45,775m3 of sawn timber in 12,479 individual packages, each package weighing approximately 2 tonnes. The timber was held together with metal bands and each package was pre-rigged with cargo slings before loading. The top and sides of each package were covered with a plastic protective coating. The cargo was destined for 24 cargo receivers in Alexandria. Each receiver’s packages were marked with identifying spray paint when loaded, with their stowage locations recorded on the supercargo’s cargo plan. During , packages were frequently repositioned to enable access to individual receivers’ packages. The cargo collapse Approximately 20 packages of timber fell from the side of the stack on top of number 1 . Some of the packages fell into the water and the remainder fell into the that was secured on Graig Rotterdam’s port side forward (Figure 4). The barge was unmanned at the time of the accident and already contained some packages. Company instructions Graig Ship Management Limited operated a (SMS) as required by the (ISM) Code.
Figure 4: side cargo , immediately after cargo collapse원본 PDF 5쪽
The included a generic entitled ‘Loading and Un-loading of Timber Cargoes’. With regard to an identified hazard of timber not being stowed correctly, control measures included ‘Only experienced and qualified to work on board and Familiarisation training given prior to operations’ [sic]. The risk assessment identified neither the risk of falling from the top of a stack nor the risk of falling as a result of a deck cargo stack collapse during operations. The SMS Dry Cargo Operations Manual included the following: ‘6 Refer to Log & Timber Cargo Operations Checklist... …The carriage of logs and timber products presents unique risks, the importance of which must be appreciated by all crew… …A risk assessment for each type of cargo should be undertaken to identify hazards and ensure control measures… 6.2.4 Catwalks should be installed on top of deck cargo for safe access from to decks as per regulations… 6.3 As per company procedures, the Cargo Operations Briefing shall be used as an opportunity to highlight areas of personal safety and actions in the event of an emergency… 6.3.1 Although stevedore operations are largely controlled locally, the ship’s crew are reminded to remain vigilant to risk to personal safety… 6.3.3 …All crew are reminded of the duty to stop unsafe work. 6.3.5 To prevent personnel falling, particularly when the cargo is stowed to the full allowed width and height of the vessel, a safety harness can be used to sling the cargo. In any case, the cargo should be discharged from around the centerline… The dangers posed by these products cannot be overemphasised and we require that all personnel on-board are aware of the dangers and steps are in place to avoid any hazardous occurrences. 6.6
7.1Longitudinally stowed round wood, loose sawn wood and sawn wood packages with limited racking strength should be supported by uprights at least as high as the stow.’ With regard to cargo access while on passage, the Code states: ‘A.3.14 If there is no convenient passage on or below the of the ship, a sturdy catwalk with strong railings should be provided above the … 2.8.9 As an alternative [to a catwalk] a lifeline, preferably a , may be erected above the timber deck cargo such that a equipped with a fall protection system can hook onto it and work about the timber deck cargo. The lifeline should be: .1 erected about 2m above the timber deck cargo as near as practicable to the of the ship…’ With regard to cargo , the Code states: ‘A5.6 Personnel involved in the discharge process should be dressed with appropriate clothing, i.e., hardhats, proper footwear, gloves, etc., according to the ship’s and harbour requirements. A.5.7 While working on the cargo there should be provisions to attach a safety harness. A.5.9 Safe access should be available to the top of, and across the cargo stow.’
Health and safety of and stevedores (MGN) 492 (M+F), Health and Safety at Work: Protecting those not employed by the ship owner, which is published by the , states: ‘It is not only the employer who has a towards their workers under the Merchant Shipping and Vessels (Health and Safety at Work) Regulations 1997… Each employer has a duty of care both to workers and to others on board who are affected by their business. The Company has a duty to coordinate health and safety for all workers and others on board, by working with and sharing information with other employers, including contractors temporarily on board ship. Workers should take care for, and report any concerns about, the safety of contractors operations in the same way as they would for ship’s crew.’ Regulation 21(1) of The Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997 states: ‘It shall be the duty of every worker aboard a ship to which these Regulations apply a to take reasonable care for the health and safety of himself and of any other person aboard ship who may be affected by his acts or omissions’… Stevedoring practices The ’s (ILO) code of practice ‘Safety and health in ports’ (2005) contains advice on operations in . Section 2.1.4 states: ‘Contractors and labour or service providers should cooperate with port authorities and other bodies working in port areas to protect the safety and health of all persons who may be affected by their activities. In particular, they should ensure that: - all workers they employ or supply are appropriately trained and competent to perform the work they are required to do in
› (PPE) not being worn (Figure 7). • Cargo packages being dropped onto the or into the water (Figure 7). • Barges being secured to stacks (Figures 7, 8 and 9). • Smoking while on the deck cargo stacks. • Climbing and being lifted by crane from barges to the ship.
Figure 5: Knotted cargo slings원본 PDF 9쪽 (쪽 전체)Figure 6: Open shackles used as cargo hooks원본 PDF 9쪽Figure 7: Poor stevedoring practices secured to stack Stevedores standing at cargo edge No in use by stevedores Cargo dropped in water원본 PDF 10쪽Figure 8: rope attached to원본 PDF 10쪽
stack rope secured to dunnage and cargo sling To
ANALYSIS
Accident overview The bosun fell overboard and into a that was secured alongside, after the timber stack on which he was standing partially collapsed. At the time of the accident, cargo was being discharged from an adjacent stack into barges on the side of the ship. stevedores who were working in the vicinity were not available for interview. In the absence of witness evidence, it has not been possible to establish with certainty how the accident occurred. However, poor stevedoring practices probably contributed to the unsecured cargo stack collapsing, and no measures were in place to prevent the bosun falling overboard. Deck cargo arrangements The deck cargo had been secured for passage in accordance with the ship’s , which assumed the packages had sufficient racking strength so as not to require the use of uprights. Consequently, when all cargo lashings were removed prior to commencing cargo , nothing other than friction and the strength of the metal banded package was left to the timber deck cargo in place. While the of the deck cargo stow when secured with top-over lashings on passage was sufficient, the
Figure 9: Cargo 'bowing out' in part of vessel원본 PDF 11쪽
Cargo 'bowing out' Barges secured to stackUprights provide an additional means of timber packages with limited racking strength for passage, in accordance with the TDC Code. There is no evidence that the cargo packages carried on Graig Rotterdam had insufficient racking strength so as to require them to be supported by uprights while on passage. However, provision of uprights would have helped prevent a deck cargo stack from collapsing once the securing lashings had been removed in circumstances such as those faced by Graig Rotterdam in Alexandria , Egypt. There were two other ships packaged timber cargoes to the same terminal in Alexandria at the time of the accident. Both ships were fitted with uprights (Figure 10). The majority of the timber packages had protective plastic covers. High friction coatings can be incorporated into plastic covers and, although this makes the covering more expensive, it provides a means of improving the safe transport of these cargoes. Graig Rotterdam’s was not advised if the plastic covers incorporated any friction resistance prior to the cargo being loaded in Finland. Oversight and control of cargo The instructed that the cargo was to be discharged by
Figure 10: A vessel, with uprights, a timber at the same 원본 PDF 12쪽
from the identified risks. If the stevedore working practices do not change as a result, the should consider ceasing cargo operations and, in the case of unacceptable risks, should not hesitate to do so, as instructed in the company’s Dry Cargo Operations Manual. The method was random. Cargo packages were selected for discharge by the cargo receiver. Packages were often lifted and repositioned on board while searching for a cargo receiver’s individual package, prior to it being loaded onto the . Cargo packages were also witnessed being lifted from the barges and put back on board. A more uniform and disciplined discharge would have reduced the possibility of destabilising the cargo. Although the master’s concerns were eventually expressed by means of a letter of protest, they were not raised until after the accident. Graig Ship Management Limited’s SMS instructions drew attention to stevedore operations and the need for the ship’s to remain vigilant to risk to personal safety. However, they were silent on the need to proactively engage with stevedores for the purpose of maintaining and developing a safe system of work during cargo operations. While a supercargo had been appointed by the to supervise the loading of the timber cargo, a supercargo had not been appointed to supervise its discharge, and so a valuable point of liaison between the ship’s crew and the shore stevedores was unavailable. Safety on the
ACTION TAKEN
Graig Ship Management Limited has taken a number of actions, including the following: • A fleet circular has been distributed highlighting safety issues identified from its internal investigation of the accident, including a need to agree all tasks with the stevedore foreman before starting cargo operations. • The company’s generic entitled ‘Loading and Un-loading of Timber Cargoes’ has been amended to include a hazard of unsafe stevedore working, with a control measure requiring the to cease operations immediately and to notify the company and . • A company safety focus for 2017 has been designated ‘cargo operations’.
RECOMMENDATIONS
Graig Ship Management Limited is recommended to: 2017/149 Reinforce and, as appropriate, modify its with respect to the carriage of timber cargoes to ensure: • A lifeline or other means for attaching a safety harness is available to counter the risk of ship’s or stevedores falling from the top of a stack or as a result of a deck cargo stack collapse. • Where possible, appoint a or with experience of the cargo type being carried. • Ship’s crew proactively engage with shore stevedores for the purpose of maintaining a safe system of work during cargo operations. Norlat Shipping Limited AS is recommended to: 2017/150 Ensure that all cargo information, as required by the Code of Safe Practice for Ships Carrying Timber Cargoes, is provided to the master or his representative prior to loading cargo for all ships that it charters to carry timber deck cargo. Safety recommendations shall in no case create a presumption of blame or liabilitySHIP Name Graig Rotterdam Flag UK
of departure Not applicable Port of arrival Not applicable Type of International Cargo information Packaged sawn timber 20
INFORMATION
Date and time 18 December 2016, 1109 (+2) Type of or incident Very Serious Marine Casualty Location of incident Alexandria , Egypt Place on board Main , port side forward Injuries/fatalities One fatality Damage/environmental impact Minor damage to ship structure Ship operation Cargo segment At External & internal environment Sea state: smooth, moderate breeze Persons on board 33
stack to afford access between the
and the
. Access forward was only possible by walking on top of the
deck cargo
. 2 The supercargo was a Russian national who had been employed by the
charterer
since 1995. He had worked as a supercargo since 2011 and had previously served as
on ships exclusively carrying sawn timber cargo. 3 A top-over
lashing
is a frictional method of
lashing
that applies vertical pressure, increasing the friction force between the outer stows of
deck cargo
and the ship’s
deck
/
. Chains are secured to eyes on each side of the
deck
and passed over the top of the longitudinally stowed cargo. The chains are then joined using turnbuckles that can be tightened as required.
. Cargo
discharge
was scheduled to last 15 days and continued on 17 December. The accident On the morning of 18 December, the
chief officer
carried out a cargo operations briefing with the third
officer
(3/O), the bosun and two other duty
crew
. He also met with the stevedore foreman and discussed the cargo
discharge
plan for the day and how much cargo had already been discharged. Two barges were located on Graig Rotterdam’s
side, and one
was positioned on its
side forward. The barges were secured with
ropes attached to the
deck cargo
packages (Figure 3).
Deck cargo
was being discharged from the stacks on top of numbers 2 and 3
covers into the two barges located on the ship’s
starboard
side using two of the ship’s cranes. At 1109, the
chief officer
, who was in the cargo office, saw on a CCTV5 monitor a partial cargo collapse from the
port
side of the ship. He called the bosun several times on his radio to enquire what had happened. There was no response. He then called the 3/O and instructed him to go on
deck
and to see what had happened. The
, who had heard the radio calls, went to the
and ordered cargo operations to stop. The stevedores informed the 3/O that the bosun had been standing on top of the
deck cargo
stack that had collapsed, and that he had fallen with the cargo. The 3/O relayed this message to the
master
and
chief officer
by radio. The
master
alerted the
crew
, who began a search of the water around the ship, and requested
shore
assistance. At 1135, 10 of the ship’s
crew
transferred to the
barge
that was secured on the
port
side. They manually lifted timber that had fallen into the
barge
during the cargo collapse until they located the bosun. CPR6 was commenced and the bosun was placed in a stretcher before being transferred ashore by
. At 1330, the ship’s agent advised the
master
that the bosun had died. 4 It was the usual practice in Alexandria for ships carrying timber cargo to
discharge
their cargo into barges, and for the barges to transport the cargo to the quay. 5 Closed circuit television camera. Graig Rotterdam had two
cameras: one monitoring the
port
side of the ship and the other monitoring the
starboard
side. 6 Cardio-Pulmonary Resuscitation.
prior to being promoted to
master
in December 2012. He had no previous experience of carrying timber
deck cargo
. The
chief officer
was 35 years old. He had been employed by Graig Ship Management Limited since 2012 and this was his first contract as
chief officer
. It was his first contract on Graig Rotterdam although he had sailed on its
, Graig Cardiff. The
chief officer
, who also had no previous experience of carrying timber
deck cargo
, was supervising cargo
operations from the cargo office at the time of the accident. The bosun, Qin Zhigang, was 46 years old. It was his first contract with Graig Ship Management Limited and his first trip on Graig Rotterdam. He had joined the ship on 19 October 2016. At the time of the accident, he was conducting security rounds and monitoring operations for any damage caused to the ship. He was wearing a boiler suit, safety boots and a safety helmet. 7 Uprights are vertical supports, normally made of
, placed in sockets or secured to the
deck
,
or
of a ship at the side of a
deck cargo
stack used to contain and secure the stack. On smaller ships, uprights can be made from timber. 8
.
and
crew
on board vessels carrying timber cargoes shall be selected where possible in accordance with the Company’s recruitment and selection criteria to ensure suitably experienced
crew
are employed onboard.’ [sic] The
SMS
checklist entitled ‘Timber Cargo Operations’ was completed by the
and verified by the
prior to cargo
discharge
operations commencing in Alexandria. The checklist made no reference to accessing the timber
deck cargo
stacks or cargo
lashings, but it did refer to completing a
risk assessment
, for which guidance was provided elsewhere in the
SMS
. The
chief officer
attached a copy of the generic
risk assessment
entitled ‘Loading and Un-loading of Timber Cargoes’ to the checklist, but a further
risk assessment
was not completed.
IMO
Code of Safe Practice for Ships Carrying Timber
Cargoes The provisions contained in the
IMO
Code of Safe Practice for Ships Carrying Timber
Deck
Cargoes (TDC Code) 2011 are recommended for all vessels of 24m or more in length, engaged in the carriage of timber
deck
cargoes. The supercargo, who supervised the loading in Finland, provided a copy of the Code to the
chief officer
as Graig Rotterdam had not previously carried a timber cargo. The purpose of
the Code is to ensure that timber cargoes are loaded, stowed and secured to prevent, as far as practicable, throughout the , damage or hazard to the ship and persons on board as well as of cargo overboard. The Code states the following information as applicable for each parcel of cargo should be provided by the and collected by the or his representative: • ‘total amount of cargo intended as ; • typical dimensions of the cargo; • number of bundles; • density of the cargo; • stowage factor of the cargo; • racking strength for packaged cargo; • type of cover of packages and whether non-slip type; • relevant coefficients of friction including covers of sawn packages if applicable.’ With regard to cargo for passage, the Code states: ‘2.10.12 Uprights should be fitted when required by this Code and as prescribed in the ship’s in accordance with the nature, height or character of the timber deck cargo.
port
areas; - all such persons are appropriately supervised; - all plant and equipment that they supply or use is of sound
and properly maintained in a safe condition; - they supply such information as is necessary to others who may be affected by their activities; - they cooperate with the
port
authority, other employers and any other relevant bodies.’ Cargo
operations ceased following the accident until the arrival of
inspectors and representatives of Graig Ship Management Limited. Once approval had been granted to re-commence cargo
discharge
, the following poor stevedoring practices were observed, many of which were later raised by the
in a letter of protest addressed to all involved parties: • Knotted cargo slings (Figure 5) and open shackles being used as hooks (Figure 6) to lift cargo. • Walking on the edge of
stacks (Figure 7).
stability
of the stow once the lashings had been removed was insufficient to counter the effects of ship movement, cargo repositioning, dunnage displacement, barges
securing
to
deck cargo
stacks, and cargo
discharge
operations over a prolonged period. In this regard, there was evidence that the cargo was ‘bowing out’ after the
securing
lashings had been removed, particularly in the
part of the vessel (Figure 9). The rigidity of timber packages is of great importance for the
stability
of the
deck cargo
and the racking strength of the timber packages should be taken into consideration when
securing
systems are designed. Graig Rotterdam’s
was not advised of the cargo package racking strength prior to the cargo being loaded in Finland.
stevedores, yet this did not absolve the ship’s management from its
towards the health and safety of both the ship’s
and the
shore
stevedores throughout the cargo
discharge
. While the
met with the stevedore foreman on the day of the accident, poor stevedoring practices that had previously been witnessed by the ship’s
crew
were not discussed and so were allowed to continue.
Shore
stevedore co-operation with other parties is promoted in the
’s code of practice ‘Safety and health in ports’. What constitutes a reasonable level of care required to be performed by the
crew
of a UK registered ship may differ significantly from that exercised by
shore
stevedores in a non-UK
port
. In such circumstances, as in the case of Graig Rotterdam and Alexandria
Port
, it may be difficult for the ship’s management to establish an agreed working practice with the
shore
stevedores that reflects as high a level of safety as it would wish. However, it should not prevent the
master
from attempting to reduce risks to as low as reasonably practicable by expressing his concerns both directly to the
shore
stevedores and in the form of a letter of protest to the
. It should also not prevent him from isolating the ship’s
crew
Graig Ship Management Limited’s
SMS
entitled ‘Loading and Un-loading of Timber Cargoes’ identified neither the risk of falling from the top of a
deck cargo
stack nor the risk of falling as a result of a
deck cargo
stack collapse. The
SMS
checklist entitled ‘Timber Cargo Operations’ made no reference to accessing timber
deck cargo
stacks or cargo
lashings. However, an
SMS
instruction required catwalks to be installed on top of
deck cargo
for safe access from the
to the
while the ship was on passage. Although the ship’s
crew
constructed
ladders to access the top of the
deck cargo
from both the
accommodation
superstructure
and the
forecastle
, a catwalk was not constructed and, contrary to the provisions of the TDC Code, no alternative to a catwalk, such as a lifeline, was provided. A further
SMS
instruction required personnel to
a safety harness when slinging cargo and that cargo should be discharged from around the
. However, without provision of a lifeline, there were no readily available means for attaching a safety harness, contrary to TDC Code advice. Furthermore, the
SMS
instruction took no account of the fact that
deck cargo
would inevitably be discharged from locations other than those close to the ship’s
centreline
. The design of the ship was such that the
crew
had to pass over the top of the
deck cargo
frequently when the vessel was at
sea
, and both the
crew
and stevedores had to access the top of the
deck cargo
stacks during cargo
discharge
operations. Without edge protection or any means of fall arrest, the risk of falling from the top of a
deck cargo
stack, or as a result of a
deck cargo
stack collapse, was significant. While the risk was recognised in the TDC Code and the
SMS
Dry Cargo Operations Manual, the ship’s
crew
did not consider the level of risk while on passage to be sufficient to warrant installation of a catwalk or for safety harnesses to be worn. Further, the risk of falling during cargo
discharge
operations did not feature in the generic
risk assessment
, and it was not identified and addressed in either a
risk assessment
or at the cargo operations briefing conducted by the
. A
to these omissions is likely to have been both the
master
’s and
chief officer
’s lack of previous experience of carrying timber
deck cargo
, despite this being a stated aspiration in Graig Ship Management Limited’s
SMS
Dry Cargo Operations Manual, and a stated requirement in its generic
risk assessment
entitled ‘Loading and Un-loading of Timber Cargoes’. While the ship’s
crew
were not actively engaged in the cargo
discharge
, they frequently accessed the cargo stacks. The bosun’s role on
at the time of the
deck cargo
stack collapse was to carry out security rounds and to monitor operations for any damage caused to the ship. He played no part in the
actual cargo . While the ship’s were equipped with and wore , the PPE provided no defence in the event of a fall from height or collapse of the stack. The bosun perceived little risk from accessing the cargo stack. Had the actual level of risk been recognised, a safer means of conducting his task could have been considered. CONCLUSIONS • It has not been possible to establish with certainty how the accident occurred. However, poor stevedoring practices probably contributed to the unsecured cargo stack collapsing, and no measures were in place to prevent the bosun from falling overboard as a result. • With the lashings removed, the cargo packages stowed on had insufficient to counter the effects of ship movement, cargo repositioning, dunnage displacement, barges to deck cargo stacks, and cargo discharge operations over a prolonged period. • The use of uprights would have helped prevent a deck cargo stack from collapsing once the securing lashings had been removed. • Prior to loading, the was not advised of either the deck cargo package racking strength or the frictional resistance of its plastic covering. Such information would have enabled him to make a more informed assessment of the deck cargo stack’s stability and security. • Poor stevedoring practices that had previously been witnessed by the ship’s crew were not discussed with the stevedores’ foreman and so were allowed to continue. Graig Ship Management Limited’s instructions were silent on the need to proactively engage with stevedores for the purpose of maintaining a safe system of work during cargo operations. • A supercargo had not been appointed to supervise the cargo discharge operation, and so a valuable point of liaison between the ship’s crew and the shore stevedores was unavailable. • Without the provision of a lifeline, there were no readily available means for attaching a safety harness. Without edge protection or any means of fall arrest, the risk of falling from the top of a deck cargo stack, or as a result of a deck cargo stack collapse, was significant. • The ship’s crew did not consider the level of risk while on passage to warrant the need for a catwalk to be installed or for safety harnesses to be worn. This lack of recognition extended to the increased risk of falling during cargo discharge operations. A to these omissions is likely to have been both the master’s and ’s lack of previous experience of carrying timber deck cargo, despite this being a stated aspiration in the company’s SMS.
GL
number/
numbers 9602186 Type
Registered owner Graig Rotterdam Shipping Limited Manager(s) Graig Ship Management Limited Year of build 2012