Source: Marine Accident Investigation Branch (GOV.UK). Contains public sector information licensed under the Open Government Licence v3.0. — PDF 에서 글을 뽑아 줄을 잇고 호칭 뒤의 인명을 가린 것으로, 원문과 다를 수 있습니다.
용어 밑줄은 영어 사전으로 붙입니다. 조문 연결·대목 나누기·원인 키워드는 국내 재결용 규칙이라 이 자료에는 적용되지 않습니다.
이 해양사고 조사 보고서에는 사고 경위, 조치 사항 및 이후의 권고가 담겨 있으니 읽어 보시기 바란다.Read our marine accident investigation report, which includes what happened, actions taken and subsequent recommendations:
2006년 8월 9일 2100 BST, 앤티가 바부다 선적 일반화물선 Thunder호가 모스틴항(port of Mostyn) 앞 와일드로드(Wild Road) 정박지에 닻을 내렸다. 수심 24m에서 앵커 체인 3섀클을 풀어 놓았다. 바람은 순간 29노트까지 불었고 조류는 2.5노트로 흐르고 있었다. 밤사이 선박은 닻이 끌려(주묘), 이튿날 이른 아침 썰물 끝 무렵에 좌초하였다.At 2100 BST on 9 August 2006, the Antigua and Barbuda registered general cargo vessel Thunder anchored in the Wild Road anchorage off the port of Mostyn. Three shackles of cable were veered in 24m of water. The wind was gusting to 29 knots and a tidal stream of 2.5 knots was running. Overnight the vessel dragged her anchor, and in the early morning of the following day, during the last of the ebb tide, she grounded.
안전 쟁점Safety Issues
선장은 적절한 해도가 선내에 없다는 것을 알고 있었다. 그는 모스틴 대리점과 화물 운영자에게 해도 공급을 요청하였으나, 항해 간행물 공급을 보장할 책임이 있는 회사 해사 감독(marine superintendent)에게는 이를 알리지 않았다the master was aware that an appropriate chart was not available on board. Although he had requested its supply from the Mostyn agent and the cargo operator, he did not notify the company marine superintendent, whose responsibility it was to ensure provision of nautical publications
모스틴 대리점은 진입 수로의 항로점(waypoint), 선호 정박지의 위치 및 도선사 승선 구역을 스스로 판단하여 선장에게 보냈다. 그는 그 정확성이나 신뢰성에 관해 항만장과 협의하지 않았다the Mostyn agent had taken it upon himself to send the waypoints for the approach channel, the position of a preferred anchorage and a pilot boarding area to the master. He had not consulted the harbourmaster about their accuracy or reliability
점선 상자는 있었지만 쓰이지 않았거나 쓰였는지 모르는 것, 점선 화살표는 보고서가 추정한 관계입니다.
③ 원인 사슬
왼쪽에서 오른쪽으로, 무엇이 무엇으로 이어졌는지입니다. 상자(원인)는 보고서 근거 대목에서 가져왔고, 상자 사이 화살표는 보고서가 직접 적지 않은 경우 모델이 판단해 이은 것입니다.
보고서가 밝히지 못한 것
권고·조치
모스틴항: 노스 라일 부표–항 권장 도선 서비스 복원, 포괄적 항만 항해계획 공표, 해도·간행물 수정
모스틴항: 해양사고 비상 대응 절차 검토
Reederei Erwin Strahlmann: SMS에 묘박 및 묘박 중 항해당직 지침 포함
MCA: 모스틴항 PMSC 검증 점검
교통부 장관: HRO 결정 때 모스틴 외측 수로 지위 명확화 고려
권고Recommendations
Port of Mostyn, Reederei Erwin Strahlmann, 영국 해사연안경비청 및 교통부 장관(Secretary of State of Transport)에 권고가 이루어졌다.Recommendations have been made to The Port of Mostyn, Reederei Erwin Strahlmann, The Maritime and Coastguard Agency and the Secretary of State of Transport.
이 보고서는 2007년 6월 12일에 발간되었다.This report was published on 12 June 2007.
한국어는 모델 번역(검수 전)입니다. 표의 값은 흔한 말만 옮기고 나머지는 원문 그대로 둡니다.
본문
PDF 에서 뽑은 글 — 쪽 나눔·단 배치 때문에 줄 순서가 어긋난 곳이 있을 수 있습니다
2006년 8월 9일 2100 BST에 앤티가 바부다(Antigua and Barbuda) 선적 일반 화물선 Thunder호가 모스틴항(Port of Mostyn) 앞의 와일드 로드(Wild Road) 묘박지에 닻을 내렸다. 수심 24m에 앵커 체인 3섀클(shackle)을 풀어 내렸다. 바람은 순간 29노트까지 불었고 조류는 2.5노트로 흐르고 있었다. 밤사이 선박은 닻이 끌렸고(dragged her anchor), 이튿날 이른 아침 낙조류가 끝날 무렵 좌초하였다. 선박은 적절한 항해용 해도 없이 모스틴 외측 수로(Mostyn Outer Channel)를 항행하였다. 선장은 선박의 모스틴 대리점이 이메일로 보내 준 GPS 경유점(waypoint) 세트와 ‘선호’ 묘박지의 위치를 이용하여 이를 해냈다. 선장은 선호 묘박지의 상세 정보를 제공한 대리점으로부터 받은 정보를 바탕으로, 모스틴 외측 수로 입구의 노스 라일(North Rhyl) 부표 가까이에 닻을 내리려던 당초 계획을 변경하였다. 밤사이 당직 항해사는 선장을 호출하지 않았다. 이튿날 0800에 선장이 선교에 도착했을 때 선박은 선호 묘박지의 남동쪽 2.5케이블(cable) 지점의 모래톱 위에 얹혀 있는 것을 발견하였다. 선박에 손상은 없었고 승조원 부상과 오염도 없었다. 선장은 선박이 좌초했다고 보고하지 않았다. 오전 중에 모스틴 항만장은 리버풀 해안경비대(Liverpool Coastguard)로부터 그의 관할 구역에 좌초한 선박이 있다는 보고를 받았다. 그는 선박자동식별장치(AIS)로 Thunder호의 위치를 확인하였고, 이 선박이 와일드 로드 묘박지에 있다고 만족하여 더 이상 조치하지 않았다. 다음 고조 때 선장은 선박을 모래톱에서 벗어나게 조종할 수 없었고, 우세한 바람과 조류로 선박은 더 안쪽 연안으로 끌려갔다. 선박은 이제 디강 관리청(Dee Conservancy)의 법정 항만당국(SHA) 구역 안에 있었고 소조기에 걸릴(neaped1) 위험에 놓여 있었다. 8월 10일 1625에 Thunder호는 디강 관리청 항만장에게 포인트 오브 에어(Point of Ayr) 앞에서 좌주(stranded)한 것으로 관측되었으며, 이것이 선박이 좌초했다는 최초의 공식 인지였다. 사고를 알게 된 모스틴 항만장은 Thunder호 선장과 통화하여 자정 직후의 다음 고조 때 모래톱에서 벗어나 조종하는 가장 효과적인 방법을 조언하였다. Thunder호는 8월 11일 0010에 자력으로 떠올랐다. 얕은 물에서 벗어나자 모스틴 도선사가 선박에 승선하여 선장에게 수로의 등(lights)과 표지를 숙지시켰다. 도선사는 선장에게 현지 해도를 제공하고 닻을 내릴 곳에 대해 조언하였다. 기상 악화로 도선사는 곧 선박을 떠났다.
분석
선장은 선박에 적절한 해도가 없다는 것을 알고 있었다. 모스틴 대리점과 화물 운영자에게 해도 공급을 요청하였으나, 항해 간행물 공급을 보장할 책임이 있는 회사의 해무 감독에게는 이를 알리지 않았다.
1 Neaped – 조석 간만의 차가 소조기를 향해 줄어들면서 고조 때에도 선박을 다시 띄울 만한 물이 충분하지 않은 것.
모스틴 대리점은 스스로 접근 수로의 경유점, 선호 묘박지의 위치, 도선사 승선 구역을 선장에게 보냈다. 대리점은 그 정확성이나 신뢰성에 대해 항만장과 협의하지 않았다. 모스틴항의 항만 항해계획(port passage plan)에는 외측 수로(Outer Channel)라고 알려진 구역이 포함되어 있는데, 이 구역은 현재 관할 항만당국(CHA)이나 법정 항만당국(SHA)에 속하지 않는다. 2001년 위험성 평가에서 이 접근 수로에 강제 도선이 필요하다고 확인되었으나 아직 시행되지 않았다. 이 항만은 CHA 구역 안에서 정보 제공만 하는 선박교통관제(VTS)를 운영하고 있으나, 대형 선박에게는 ‘사우스 호일(South Hoyle)’에서 ‘일방통행’ 수로인 외측 수로의 선박에 대해서는 통제나 감시 기능이 없다. 항만 항해계획은 외측 수로의 선박 운항 관리, 선박의 최소 선저 여유수심 규정, 와일드 로드 묘박지의 적합성 검토와 그 정보의 공표를 하지 못하였다. 위험성 평가와 트리니티 하우스(Trinity House)가 확인한 강제 도선 요건을 뒷받침하기 위해 모스틴 도크스 리미티드(Mostyn Docks Limited)는 2001년에 항만 개정 명령(HRO) 초안을 추진하였다. HRO에 대한 반대와 그에 따른 지연으로 최종 제출은 2003년에 이루어졌고, 환경청(EA)이 제출한 HRO 초안과 함께 2005년에 공개 심문이 열렸으나 그 결과는 아직 나오지 않았다.
권고
모스틴항에는 노스 라일 부표에서 항까지의 권장 도선 서비스를 복원하고, 포괄적인 항만 항해계획을 공표하며, 개정된 절차를 반영하도록 모든 해도와 수로 간행물이 수정되게 할 것을 권고하였다. 해양사고에 대한 비상 대응 절차를 검토하여 각 비상 상황에 필요한 조치가 확인되도록 하여야 한다. Reederei Erwin Strahlmann에는 안전관리체제(SMS)를 개정하여 선장을 위한 묘박 및 묘박 중 안전한 항해당직 유지에 관한 지침을 포함하도록 권고하였다. MCA에는 모스틴항에 대해 항만해사안전규약(PMSC) 검증 점검을 실시할 것을 권고하였다. 교통부 장관(Secretary of State for Transport)에게는 항만 개정 명령에 대한 결정을 검토할 때 모스틴 외측 수로의 지위를 명확히 할 필요성을 고려할 것을 권고하였다.
원문 보기
Narrative At 2100 BST on 9 August 2006, the Antigua and Barbuda registered general Thunder anchored in the Wild Road off the of Mostyn. Three shackles of cable were veered in 24m of water. The wind was gusting to 29 knots and a tidal stream of 2.5 knots was . Overnight the vessel dragged her , and in the early morning of the following day, during the last of the , she . The vessel had navigated the Mostyn Outer Channel without an appropriate navigational chart. The achieved this using a set of waypoints and the of a ‘preferred’ anchorage which had been sent to him in an email by the ship’s Mostyn agent. The master had changed his original plan of close to the North Rhyl
첨부 문서 2 ThunderReport.pdf
한국어 번역 · 모델 · 검수 전
디강 하구(Dee Estuary) 접근 수역에서 발생한 Thunder호 좌초(2006년 8월 10일) 조사 보고서 영국 해양사고조사국(Marine Accident Investigation Branch)
Carlton House, Carlton Place, Southampton, United Kingdom SO15 2DZ
보고서 번호 12/2007
2007년 6월
영국 상선(사고 보고 및 조사) 규칙 2005(The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2005) 제5조 발췌: “상선(사고 보고 및 조사) 규칙 2005에 따른 사고 조사의 유일한 목적은 원인과 경위를 밝혀 향후 사고를 예방하는 것이다. 조사의 목적은 책임을 판단하는 것이 아니며, 조사의 목적을 달성하는 데 필요한 경우를 제외하고는 과실을 배분하는 것도 아니다.”
참고
이 보고서는 소송을 염두에 두고 작성된 것이 아니며, 상선(사고 보고 및 조사) 규칙 2005 제13조 (9)항에 따라 책임이나 과실을 귀속시키거나 배분하는 것을 목적(또는 목적 중 하나)으로 하는 모든 사법 절차에서 증거로 인정될 수 없다.
인쇄본은 우편 주소로 추가로 구할 수 있으며, 다음 방법으로도 가능하다.
이메일
maib@dft.gsi.gov.uk
전화
023 8039 5500
팩스
023 8023 2459
모든 보고서는 우리 웹사이트 www.maib.gov.uk 에서도 볼 수 있다.
표지 사진 제공: ○○J. Allister 선장
목차
쪽
약어 및 두문자어 용어집
요약 1
1절 사실 정보 3
보고서 목차(쪽 번호는 원본 PDF 기준)
1.1 Thunder호 및 사고 제원 3
1.2 배경 4
1.3 환경 조건 4
1.3.1 기상 계 4
1.3.2 조석 4
1.4 경과 4
1.4.1 계획된 항해 4
1.4.2 사건 순서: 묘박 전 5
1.4.3 사건 순서: 묘박 후 7
1.4.4 지역 항만당국의 관여 8
1.4.5 사건 순서: 이초(離礁) 10
1.4.6 모스틴항(Port of Mostyn) 도착 후 조치 11
1.5 수로 간행물 11
1.5.1 BA 해도 1978 – Great Ormes Head에서 Liverpool까지(축척 1:75000) 11
1.5.2 BA 해도 1953 – 디강(River Dee) 접근 수역(축척 1:25000) 12
[ThunderReport.pdf]
Report on the investigation of the of mv Thunder at the approaches to the Dee Estuary 10 August 2006 Carlton House Carlton Place Southampton United Kingdom SO15 2DZ Report No 12/2007 June 2007
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2005 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2005 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 13(9) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2005, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. Further printed copies can be obtained via our postal address, or alternatively by: Email: maib@dft.gsi.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 All reports can also be found at our website: www.maib.gov.uk Front Cover photograph courtesy of Captain ○○J. Allister
CONTENTS Page GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 - FACTUAL INFORMATION 3 1.1 of Thunder and accident 3 1.2 Background 4 1.3 Environmental conditions 4 1.3.1 Weather system 4 1.3.2 Tides 4 1.4 Narrative 4 1.4.1 Planned 4 1.4.2 Sequence of events: pre- 5 1.4.3 Sequence of events: post-anchoring 7 1.4.4 Involvement of the local harbour authorities 8 1.4.5 Sequence of events:
약어·용어집GLOSSARY OF ABBREVIATIONS AND ACRONYMS AIS
한국어 번역 · 모델 · 검수 전
약어 및 두문자어 용어집
AIS - 선박자동식별장치(Automatic identification system)
BA - 영국 해군성 해도·수로서지(British Admiralty)
BMT - 영국 해사기술(British Maritime Technology)
BST - 영국 하계 표준시(British summer time)
CHA - 관할 항만당국(Competent harbour authority)
DfT - 영국 교통부(Department for Transport)
DPA - 육상 지정자(Designated person ashore)
ETA - 도착 예정 시각(Estimated time of arrival)
EA - 영국 환경청(Environment Agency)
GPS - 위성항법장치(Global positioning system)
ILO - 국제노동기구(International Labour Organisation)
ISM - 국제안전관리 코드(International Safety Management Code)
LLA - 지역 등대 당국(Local Lighthouse Authority)
LOA - 전장(Length Overall)
gt - 총톤수(gross tonnage)
HRO - 항만 개정 명령(Harbour Revision Order)
MAIB - 영국 해양사고조사국(Marine Accident Investigation Branch)
2006년 8월 9일 2100 BST에 앤티가 바부다(Antigua and Barbuda) 선적 일반 화물선 Thunder호가 모스틴항(Port of Mostyn) 앞의 와일드 로드(Wild Road) 묘박지에 닻을 내렸다. 수심 24m에 앵커 체인 3섀클(shackle)을 풀어 내렸다. 바람은 순간 29노트까지 불었고 조류는 2.5노트로 흐르고 있었다. 밤사이 선박은 닻이 끌렸고(dragged her anchor), 이튿날 이른 아침 낙조류가 끝날 무렵 좌초하였다. 선박은 적절한 항해용 해도 없이 모스틴 외측 수로(Mostyn Outer Channel)를 항행하였다. 선장은 선박의 모스틴 대리점이 이메일로 보내 준 GPS 경유점(waypoint) 세트와 ‘선호’ 묘박지의 위치를 이용하여 이를 해냈다. 선장은 선호 묘박지의 상세 정보를 제공한 대리점으로부터 받은 정보를 바탕으로, 모스틴 외측 수로 입구의 노스 라일(North Rhyl) 부표 가까이에 닻을 내리려던 당초 계획을 변경하였다. 밤사이 당직 항해사는 선장을 호출하지 않았다. 이튿날 0800에 선장이 선교에 도착했을 때 선박은 선호 묘박지의 남동쪽 2.5케이블(cable) 지점의 모래톱 위에 얹혀 있는 것을 발견하였다. 선박에 손상은 없었고 승조원 부상과 오염도 없었다. 선장은 선박이 좌초했다고 보고하지 않았다. 오전 중에 모스틴 항만장은 리버풀 해안경비대(Liverpool Coastguard)로부터 그의 관할 구역에 좌초한 선박이 있다는 보고를 받았다. 그는 선박자동식별장치(AIS)로 Thunder호의 위치를 확인하였고, 이 선박이 와일드 로드 묘박지에 있다고 만족하여 더 이상 조치하지 않았다. 다음 고조 때 선장은 선박을 모래톱에서 벗어나게 조종할 수 없었고, 우세한 바람과 조류로 선박은 더 안쪽 연안으로 끌려갔다. 선박은 이제 디강 관리청(Dee Conservancy)의 법정 항만당국(SHA) 구역 안에 있었고 소조기에 걸릴(neaped1) 위험에 놓여 있었다. 8월 10일 1625에 Thunder호는 디강 관리청 항만장에게 포인트 오브 에어(Point of Ayr) 앞에서 좌주(stranded)한 것으로 관측되었으며, 이것이 선박이 좌초했다는 최초의 공식 인지였다. 사고를 알게 된 모스틴 항만장은 Thunder호 선장과 통화하여 자정 직후의 다음 고조 때 모래톱에서 벗어나 조종하는 가장 효과적인 방법을 조언하였다. Thunder호는 8월 11일 0010에 자력으로 떠올랐다. 얕은 물에서 벗어나자 모스틴 도선사가 선박에 승선하여 선장에게 수로의 등(lights)과 표지를 숙지시켰다. 도선사는 선장에게 현지 해도를 제공하고 닻을 내릴 곳에 대해 조언하였다. 기상 악화로 도선사는 곧 선박을 떠났다.
분석
선장은 선박에 적절한 해도가 없다는 것을 알고 있었다. 모스틴 대리점과 화물 운영자에게 해도 공급을 요청하였으나, 항해 간행물 공급을 보장할 책임이 있는 회사의 해무 감독에게는 이를 알리지 않았다.
1 Neaped – 조석 간만의 차가 소조기를 향해 줄어들면서 고조 때에도 선박을 다시 띄울 만한 물이 충분하지 않은 것.
2.1목적 이 분석의 목적은 사고의 기여 원인과 상황을 규명하여, 앞으로 유사한 사고가 발생하지 않도록 권고하는 근거를 마련하는 것이다.
2.2피로 Thunder호의 승무 편성은 선교팀이 4시간 근무 8시간 휴식의 당직 방식으로 일할 수 있게 하였다. 휴식 시간은 휴식 및 초과근무 통합 양식에 기록되어 있었는데, 그 기록에 따르면 7월과 8월 동안 선교 당직 사관의 휴식 시간은 하루 14시간 이상이었다. 이 2개월 동안 네 차례는 휴식 시간이 하루 12시간으로 줄었다. Thunder호의 선교 당직 사관이 취한 휴식 시간은 STCW 및 ILO 요건을 웃돌았으므로, 피로는 2006년 8월 10일 좌주의 기여 요인으로 보지 않는다.
2.3항해 계획 2.3.1 해도 요건 Thunder호를 모스틴항(Port of Mostyn)으로 돌리라는 지시 변경이 접수되었을 때, 선장과 항해사는 회사 SMS의 항해 계획 지침에 따라 행동하였다. 필요한 항로 해도와 간행물이 갖추어져 있는지 확인하였고, BA 해도 1953이 없다는 점이 파악되었다. 회사의 SMS는 항해 계획과 입항 중 해도 입수에 관해서는 다루고 있었다. 그러나 항해 중 지시가 변경되는 경우에 따라야 할 절차나, 항해 간행물이 필요할 때 이를 입수하는 절차는 선장에게 제공하지 않았다. 선장은 선박의 화물 운영자와 모스틴의 상업 대리점에 두 차례에 걸쳐 연락하여 부족한 해도의 공급을 확보하려고 즉시 조치를 취하였다. 그러나 결정적으로, 선박에 필요한 모든 항해 간행물이 완비되도록 할 궁극적 책임이 있는 선주의 해무 감독에게는 알리지 않았다. 그 결과 선주는 선장의 어려움을 알지 못하였고, 따라서 선장이 필요로 한 도움을 줄 수 없었다. 선장은 BA 해도 1953을 입수한 상태에서만 다음을 할 수 있었을 것이다. 디 하구(Dee Estuary) 접근로에 대한 완전한 항해 평가, 가장 안전한 묘박지에 대한 충분한 정보에 근거한 결정, 그리고 필요하다고 판단되는 경우 모스틴 외측 수로(Mostyn Outer Channel)를 지나 와일드 로드(Wild Road) 묘박지까지 Thunder호를 안전하게 항해시키는 것이다. 2.3.2 항로 계획 모스틴 입항에 결정적인 해도를 갖고 있지 않다는 점을 우려하면서도, 선장과 항해사는 축척이 더 작은 BA 해도 1978과 영국 해군성 항로지(Admiralty Sailing Directions)를 참고하여 계속 계획을 세웠다. 항로지의 최신 정정 사항이 선내에 있었지만 참조되지 않았다. 그 결과 선장은 모스틴 도선사가 이제 노스 릴 등부표(North Rhyl Light buoy)의 동남동 7케이블 지점이 아니라 디 부표(Dee buoy)에서 승선한다고 안내한 항로지 정정 사항을 알지 못하였다.
선장이 BA 해도 1953을 갖고 있었더라면 디 부표 가까이에 표시된 유일한 도선사 기호를 알아보았을 것이다. 선장은 BA 해도 1978에서 모스틴 외측 수로 주변의 천수 구역을 확인한 터라, 입수 가능한 가장 큰 축척의 해도나 현지 도선사의 도움 없이 Thunder호를 외측 수로를 따라 항해시킬 생각이 없었다. 더구나 경험상, 필요하면 노스 릴 부표 가까이에 투묘함으로써 선박이 당장의 항해 위험과 풍하 해안으로부터 벗어날 수 있다고 알고 있었다. 2.3.3 의사 결정 과정 선장은 모스틴 대리점이 보낸 전자우편 때문에 혼란을 겪었다. 그 전자우편에는 일련의 변침점(waypoint), '선호 묘박지', 그리고 도선사 승선 지점이 디 부표라는 선언이 들어 있었다. 선장은 그 정보를 해사 배경을 가진 선임 전문가가 보냈거나 승인한 것이라고 믿었다. 이것이 마지막 순간에 입항 계획을 바꾸게 한 단일 요인으로서 가장 중요한 것이었다. 선장은 제공된 변침점을 이용해 모스틴 외측 수로를 항해하고, '선호 묘박지'에 투묘하여 필요에 따라 도선사를 승선시킬 준비를 하기로 결정하였다. 이 결정은 대리점이 전달한 정보와, 어느 정도는 선박이 적재를 위한 유효한 준비 완료 통지서를 제출할 수 있도록 정확한 위치에 있어야 한다는 상업적 압박으로 인지한 것에 직접 영향을 받았다. 와일드 로드 안쪽 묘박지로 가기로 결정한 뒤, 선장은 적절한 항해 해도 없이, 도선사의 도움 없이, 위험한 수로를 지나 장기 투묘에 부적합한 묘박지까지 선박을 항해시켰다. 기상 상태는 나빴고, 해가 저물고 있었으며, 조류는 세지고 있었다. 이 행동은 양호한 항해 및 선박 운용 관행에 어긋났고, 잠재적으로 위험하였으며, 선박과 선원에게 훨씬 더 큰 결과를 가져올 수 있었다. 선장이 VHF 무선으로 항에 여러 차례 연락을 시도하였으나, 항은 무선 청취 당직을 계속 유지하고 있지 않았다. 외측 수로에 선박 교통 감시 또는 보고 체계가 운영되고 있었더라면, 선장은 자신의 이동 계획에 관해 조언을 제공하고 받을 수 있었을 것이다.
결론SECTION 3 - CONCLUSIONS
한국어 번역 · 모델 · 검수 전
3절 결론
3.1사고에 직접 기여하였고 권고로 이어진 안전 쟁점 1. 적절한 해도 없이 모스틴 외측 수로(Mostyn Outer Channel)를 항해한 행위는 양호한 항해 및 선박 운용 관행에 어긋났고, 위험하였으며, 궁극적으로 선박과 선원에게 훨씬 더 큰 결과를 가져올 수 있었다. [2.3.3] 2. 선장은 투묘 원리를 근본적으로 오해하고 있었다. 기상, 조석, 수심, 항해 위험과의 근접성을 감안할 때, 신출한 닻줄의 길이는 선박을 위치에 안전하게 붙들어 두기에 불충분하였다. [2.4.2] 3. 모스틴 외측 수로에 강제 도선이 마련될 때까지, 모스틴 부두 유한회사(Mostyn Docks Limited)는 노스 릴 부표(North Rhyl buoy)에서의 권장 도선 서비스를 복원해야 한다. [2.5] 4. 와일드 로드(Wild Road) 묘박지의 적합성과 이용, 그리고 깊은 흘수 선박을 위한 대안적 방안의 존재 여부에 관해 항해자에게 더 포괄적인 안내를 제공하도록 항만 항해 계획과 항로지를 수정해야 한다. [2.6.1] 5. 모스틴 외측 수로의 지위가 해결되어야 한다. [2.9.3]
3.2조사 중 식별된, 역시 권고로 이어진 기타 안전 쟁점 6. 선장은 모스틴 도선사가 디 부표(Dee buoy)에서 선박에 승선한다고 안내한 항로지 정정 사항을 알지 못하였다. [2.3.2] 7. GPS 주묘 경보가 장착되어 있었으나 그 사용은 고려된 선택지가 아니었다. [2.4.3] 8. 항해사는 선박이 좌주한 것이 분명해졌을 때 선장을 호출하지 않았다. [2.4.3] 9. 선장은 좌주를 국가 또는 지역 당국 어느 쪽에도 보고하지 않았다. [2.4.3] 10. 선박 보고 체계가 갖추어져 있었더라면 Thunder호 선장이 항과 교신하고 지시와 조언을 받을 수 있었을 것이다. [2.6.2] 11. 항만 항해 계획은 CHA 구역에 접근하거나 그 안을 항해할 때 수용할 수 있다고 여기는 최소 UKC를 정해야 한다. [2.6.3]
12. 항만장이 선박이 와일드 로드 묘박지에 있는 상황을 확실히 파악했더라면 비상 대응이 훨씬 일찍 시작될 수 있었을 것이고, 선박 이초를 돕기 위한 고조 시간대가 한 번 더 있었을 것이다. [2.7.2] 13. 독립적인 외부 감사는 모스틴에서 아직 실시된 적이 없지만, 그러한 절차라면 SMS를 상세히 검토하고 의무 보유자에게 SMS가 견고하고 효과적이며 항의 현재와 장래의 필요를 충족하고 있다는 확신을 줄 수 있을 것이다. [2.8] 구체적으로 다음과 같다. i. 대리점 담당자의 업무, 책임, 권한은 모스틴 해사 서비스(Mostyn Maritime Services)의 운영 절차에 분명히 규정되어야 한다. [2.7.1] ii. 적절한 자격을 갖춘 사람을 항의 부항만장 직위에 채용하면 항만장이 SMS 안의 의무를 이행할 수 있을 것이다. [2.7.3]
3.3조사 중 식별되어 권고로는 이어지지 않았으나 조치가 이루어진 안전 쟁점 14. 회사의 SMS는 선장에게 항해 중 지시가 변경되는 경우에 따라야 할 절차나, 필요할 때 항해 간행물을 입수하는 절차를 제공하지 않았다. [2.3.1] 15. 선장은 선박에 필요한 모든 항해 간행물이 완비되도록 할 궁극적 책임이 있는 선주의 해무 감독에게 알리지 않았다. [2.3.1] 16. 선장은 변침점(waypoint) 정보를 해사 배경을 가진 선임 전문가가 보냈거나 승인한 것이라고 믿었다. 이것이 마지막 순간에 입항 계획을 바꾸게 한 단일 요인으로서 가장 중요한 것이었다. [2.3.3] 17. 사용 중이던 해도의 축척으로는 닻이 끌리기 시작했을 때 당직자에게 충분히 이른 경고를 주지 못하였다. [2.4.1]
원문 보기
3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT WHICH HAVE RESULTED IN RECOMMENDATIONS 1. The action of navigating the Mostyn Outer Channel without an appropriate chart was contrary to good
조치 사항SECTION 4 - ACTION TAKEN
한국어 번역 · 모델 · 검수 전
4절 조치 사항
4.1레데라이 에르빈 슈트라만(Reederei Erwin Strahlmann) 2006년 8월 10일 좌주 이후 선박 소유주는 자사 SMS 절차를 수정하여 발행하였다. 항해 계획 절차는 이제 다음과 같이 지시한다. o 대리점이 필요한 해도를 제공할 수 없는 경우, 회사 항해 감독관(Nautical Inspector)에게 즉시 통보해야 한다. o 지시 변경으로 해도를 구할 수 없는 경우, 항해 감독관에게 즉시 연락해야 한다. 항해 감독관이 적절한 조치를 취한다. o 변침점에 관한 조언을 얻으려고 항만 대리점에 연락해서는 안 된다. 선박의 안전에 대한 궁극적 책임은 회사와 선장에게 있다.
4.2모스틴항 모스틴항의 의무 보유자이자 소유주는 대리점 담당자와 항만장에게 다음 내용의 회람을 발행하였다. o 투묘하려는 선박의 선장은 노스 릴 부표에서 투묘해야 한다. o 선박은 지시를 받기 위해 VHF 무선 14번 및 16번 채널을 청취해야 한다. o 선장이 추가 항해 정보를 요청하면 항만장에게 문의하도록 안내해야 한다.
원문 보기
4.1 REEDEREI ERWIN STRAHLMANN Subsequent to the on 10 August 2006, the vessel’s owners have issued an amendment to their procedures. The procedure now instructs that: o If the agent is not able to provide the charts required, then the company Nautical Inspector is to be informed immediately. o In the case where charts are not available due to change of orders, the Nautical Inspector is to be contacted immediately. The Nautical Inspector will make appropriate arrangements. o The agent is not to be contacted for advice regarding waypoints. The company and are ultimately responsible for the safety of the ship. 4.2 THE PORT OF MOSTYN The duty holder and owner of the
권고SECTION 5 - RECOMMENDATIONS
한국어 번역 · 모델 · 검수 전
5절 권고 레데라이 에르빈 슈트라만(Reederei Erwin Strahlmann)에 다음을 권고한다. 2007/141 선장이 다음과 같이 하도록 SMS를 개정할 것. • 국가 및 지역 규정에 따라 사고를 보고할 의무를 인지한다. • STCW가 정한 투묘 중 안전한 항해 당직 유지에 관한 지시를 따르고 이해한다. • 투묘의 기본 원리를 이해한다. 모스틴항 유한회사(The Port of Mostyn Ltd)에 다음을 권고한다. 다음을 달성하기 위한 조치를 취할 것. 2007/142 • 노스 릴 부표에서의 권장 도선 서비스를 복원하고, 해당하는 모든 해도와 수로 간행물이 그에 맞게 정정되도록 할 것. • 수로를 이용하고 모스틴 접근로에서 투묘하는 선박의 선장에게 포괄적인 안내를 제공하도록 항만 항해 계획을 수정할 것. • 해양사고에 대한 비상 대응 절차를 검토하여, 각 비상 상황에 필요한 조치가 식별되고 항만·항 직원이 그 요건을 교육받아 숙지하도록 할 것. 영국 해사연안경비청(MCA)에 다음을 권고한다. 2007/143 모스틴항에 대한 PMSC 검증 점검을 실시할 것. 이 점검은 최소한 항을 입출항하는 선박의 항해 안전, 항만 항해 계획, 해양사고에 대한 비상 대응 절차를 포함해야 한다. 운수부 장관(Secretary of State for Transport)에게 다음을 권고한다. 2007/144 환경청(Environment Agency)과 모스틴 부두 유한회사가 제출한 항만개정명령에 대한 결정을 검토할 때, 책임 당국이 수로의 항해 안전을 확보하는 데 필요한 권한을 갖도록 모스틴 외측 수로의 지위를 명확히 할 필요성을 고려할 것. 영국 해양사고조사국 2007년 6월 안전 권고는 어떠한 경우에도 과실이나 책임이 있다는 추정을 낳지 않는다.
원문 보기
Reederei Erwin Strahlmann is recommended to: 2007/141 Revise its to ensure that masters: • Are aware of their obligation to report an accident in accordance with national and local regulations. • Follow and understand the instructions for keeping a safe at , provided in . • Understand the fundamental principles of . The of Mostyn Ltd is recommended to: Take action to achieve the following: 2007/142 • Reinstate the recommended
첨부 문서 3 Annexes (스캔본 · 글자 인식)
한국어 번역 · 모델 · 검수 전
부록 A 8월 8일 1420 BST 에코십(Echoship)에 보낸 전자우편 <----- 원본 메시지 -- 보낸 사람: 선장 mvThunder ‹master.mvthunder@telaurus. net> 받는 사람: chartering@echoship.dk ‹chartering@echoship.dk>; 수신: 08-08-2006 15:20:29 제목: [HJ] new voy > ‹new voy> > gå aftrn > > 15.30부터 리버풀(Bar) 도선사까지 거리 290,6 nm > 바(Bar) 도선사 도착 예정 09.08/20.00 lt › 날씨: 서풍 또는 남서풍 4 - 5, 북풍 또는 북서풍으로 순전 > 모스틴 접근을 위한 해도 1953이 없음, 그 때문에 > 레인스 부두(Raynes Jetty) 항해 때처럼 바 도선사 위치에서 도선사가 필요함. > rgds › cpt.a.kobuszynski > > 부록 B 8월 8일 1542 BST 모스틴항(Port of Mostyn) 대리점에 보낸 전자우편 보낸 사람: 보낸 날짜: 받는 사람: 제목: chartering@echoship.dk 2006년 8월 8일 16:42 agency@portofmostyn.com Fw: new voy 발신: ECHOSHIP APS, SVENDBORG, DENMARK TEL +45 6221 5666 - TLX 58185 - FAX +45 6321 7700 EMAIL: chartering@echoship.dk WEBSITE : WWW.ECHOSHIP.DK ======= =======• 참조: 060808-HJ6169 안녕하세요 모스틴 귀하의 내역서에 따른 DA(입항 대리점 경비) 자금은 내일 아침 이체될 예정입니다. m Thunder호 선장 드림 :- 부록 C 8월 8일 1658 BST 모스틴항 대리점에 보낸 전자우편 보낸 사람: 받는 사람: 보낸 날짜: 제목: "Master mvThunder" <Master.mvThunder@telaurus.net> <agency@portofmostyn.com> 2006년 8월 8일 17:58 eta gd aftm eta Bar(Liverpool) 도선사 09.08/20.00 It wp 모스틴 접근 해도가 없으니 바에서 도선사를 요청해 주십시오. 최대 흘수 2,65m 선박 휴대전화 +49 171 6044794 다음 해도를 요청해 주십시오: 180 1953 2214 그리고 항행통보 No.31 및 최신분 그리고 최신 I.S.P.S. 폐기물 통보서와 선원 명부 직전 기항지 뉴포트(Newport)의 대리점 전화 +44 117 982 5836 Denholm Barwil 로 전화해 주십시오 rgds cpt.a.kobuszynski 부록 D 8월 8일 1748 BST 에코십에 보낸 전자우편 ‹-- 원본 메시지 --> 받는 사람: ‹chanering i schoshio dIP: 수신: 08-08-2006 17:48:33 제목: [HU] RE: new voy > ‹RE: new voy> > - > 안녕하세요. - 첨부된 Daypoin Pite 노스 릴 부표(North Rhyl Buoy)에서 디 부표(Dee Buoy)까지... > 안부를 전하며 > 대리점 > MMS A 선장 M V_ 에게 전달해 주십시오 도선사 승선 지점은 디 부표입니다. 53'21.8 N 03'18.8 W 노스 릴 부표에서 디 부표까지의 GPS 변침점: 53'23.00 N 03'34.60 W (노스 릴 부표) 53'21.70 N 03'31.35 W 53 21.25 N 03 24.60 W 4) 5) 6) 53'21.35 N 03'24.00 W 53°21.90 N 03/22.00 W 53'21.90 N 03'18.60 W 선호 묘박지는 와일드 로드(Wild Road) 묘박지 53'21.75 N 03'18.80 W 도선사 승선 전에 도선사 지시를 받기 위해 VHF 14번 채널 청취 당직을 유지해 주십시오. regards HJ 2006-08-10 부록 E 8월 9일 0710 BST 모스틴항 대리점에 보낸 전자우편 보낸 사람: 보낸 날짜: 받는 사람: 제목: Master mvThunder (Master.mvThunder@telaurus.net) 2006년 8월 9일 08:10 agency@portofmostyn.com eta gd ming 나의 eta 모스틴 도선사 09.08/21.00 lt wp 접근 변침점을 받았음 도선사와 협의해 주십시오: 오늘 또는 내일 중 고조 전 몇 시에 선박에 승선하는지 h.w. eta 21.00 lt 어두워지기 시작해 부표가 보이지 않게 됨 나의 최대 흘수는 2,65m 이며 해도상 통과해야 하는 수심은 2, 0m 또는 1,7m 로 보임 투묘해야 한다면 노스 릴 부표(Nort Rhyl buoy) 서쪽 1,5 nm 에 투묘할 것임 해도에 관한 요청 전자우편 두 통을 받으셨는지 확인해 주십시오 rgds cpt.a.kobuszynski 부록 F 8월 9일과 10일 사이 Thunder호의 위치를 나타낸 BA 해도 1953 영국 왕립출판청(HMSO) 관리관 및 영국 수로국의 허가를 받아 영국 해군성 해도 1953에서 복제함
1 - 8월 9일 최초 투묘 위치(선교) 2 - 좌현 닻이 첫 번째로 끌린 뒤 8월 10일 오전 위치 3 - 좌현 닻이 두 번째로 끌린 뒤 8월 10일 오후 위치 E BAN K Salisbury Middle Wild Road Mostyn Deep a 수심과 부표 NEL MOSTYN ENGLAND AND WALES APPROACHES TO THE RIVER DEE (잉글랜드 및 웨일스 디강 접근로)
부록 G 레데라이 에르빈 슈트라만(Reederei Erwin Strahlmann)의 SMS에 담긴 좌초 절차 충돌 / 좌주 / 좌초 Reederei Erwin Strahlmann Allee 14 D-25709 Marne 상황 사고 충돌 좌주 / 좌초 지원 상황과 선내 조치 조치 선교 경보 기관 항해 지휘 집합 통신 신호 통신 신호 연기, 화재 응급 처치 선박 확보 측심 배관, 전기 회로 좌초 누수 책임 당직 사관 당직자 당직 사관 기관장 당직 사관 선장 전원 일등항해사 선장 당직 사관 선장 당직 사관 소화반 구조반 지원반 기관사, 유능 갑판원 기관사 선장 일등항해사 선장 기관사 지원반 내용 주기관: 긴급 정지. 수동 조타로 전환한다. 갑판 조명을 켠다. 수밀 격벽, 문, 창을 닫는다. 선장에게 보고한다. 총원 경보를 울린다(타이폰 / 경보 벨: • • • -). 선내 방송으로 경보를 알린다. 발전기 2대를 기동하고, 빌지 및 밸러스트 배수 장치를 준비한다. 주기관을 조종 가능 상태로 대기시킨다. 무선항법 장비(GPS, 레이더 등)로 위치를 확인한다. 갑판 일지에 기재한다. 선교에 도착하면 지휘를 인수한다. 상황을 평가한다. 승무원에게 지시를 내린다. 집합 장소에 모인다. 점호를 실시한다. 실종자 수색을 시작한다. 지시를 내린다(집합표). 휴대용 무선기를 나누어 준다. 다른 선박과 연락을 취한다. 즉각 조치에 합의한다. 상대방과 다음 정보를 주고받는다. 선박 제원, 선주 주소와 연락 번호, P&I 클럽, 화물 종류. 본사의 비상 대응팀(ERT)에 보고한다(Li-001). VHF 16번 채널로 다른 선박에 알린다(SECURITE). 해안 무선국에 알린다. 시각 및 음향 신호: 주간: 흑구 2개. 야간: 전주등 홍색 2개, 선박이 아직 전진 중이면 현등과 선미등도. 안개: 음향 신호 - •• ; 최소 2분 간격 본사의 비상 대응팀(ERT)에 보고한다(Li-001). VHF 16번 채널로 다른 선박에 알린다(SECURITE). 해안 무선국에 알린다. 시각 및 음향 신호: 주간: 흑구 3개. 야간: 전주등 홍색 2개, 선수·선미에 백색 전주등. 안개: 종 ***- •** ; 최소 1분 간격 NP-001 참조 해당되는 경우 부상자를 돌본다 - NP-004 참조 수밀 상태를 점검하고 완결한다. 모든 탱크, 빌지, 화물창, 코퍼댐을 계속 측심한다. 수위와 그 변화를 기록하고 선교에 보고한다. 모든 도관, 유압 배관, 전선의 손상이나 누출을 점검한다. 침수될 회로는 화재나 정전을 피하도록 차단한다. 선박이 더 해안 쪽으로 밀려가지 않도록 밸러스트 탱크에 물을 채운다. 닻을 내린다. 조석을 계산한다. 다음 고조 때 이초할 계획을 세운다. 선박 주변의 가용 수심을 확인한다. 저질(암초, 모래)을 조사한다. 조석 상태를 기록한다. 부력을 계산한다. 빌지 펌프를 가동한다. 외부에서 방수포/충돌 매트로 누수를 막는다. 내부에서 누수를 막는다 IP-005 개정 6 01.08.2004 쪽 1 / 4 상황 지원 (계속) 선박 침몰 위험 비상 종료 NP-005 조치 환경 기상 이초 손상 평가 타 측의 지원 경하 선내 잔류 평가 구명설비 퇴선 통신 문서화 책임 보고 브리핑 충돌 / 좌주 / 좌초 Reederei Erwin Strahlmann Allee 14 D-25709 Marne 책임 일등항해사, 기관장 선장 선장 선장, 일등항해사, 기관장 선장 선장 전원 선장, 기관장, 일등항해사 지원반 전원 선장 일등항해사, 기관장 선장 선장 선장, 기관장, 일등항해사 전원 내용 화물에서 나온 물질, 연료, 윤활유 등의 유출로 인한 환경 위험을 점검·차단한다. (SOPEP, NP-008) 기상 예보를 입수하고 기상 변화를 확인하며 육상 기상국 또는 회사에 연락한다. 시기(고조)를 계산한다. 트림을 바꾸도록 밸러스트 물을 배출한다. 기관을 조작한다. 선박의 손상(예: 기관, 프로펠러, 방향타, 선체)을 평가한다. 사진과 영상을 촬영한다. 사고 각 단계에서의 선박 위치를 약도로 그린다. 누수를 찾는다. 선박의 복원성을 점검한다. 다른 선박 / 예인선에 지원을 요청할 필요가 있는지 검토한다. 대기 중인 선박과 연락을 유지한다. 실제 위험이 없으면 선박을 풀어 준다. 필요하면, 그리고 ERT의 확인이 있으면 지원을 수락한다. 경하(적하 경감)가 필요한지 검토한다. 대리점을 통해 라이터/부선을 주문한다. 가능한 한 오래 선내에 머문다 - 선박이 보트보다 더 나은 대피처를 제공한다. 침몰 위험이 있을 때에만 퇴선한다. 상황을 평가하고 복원성을 점검하여 결정을 내린다. 선장의 명령에 따라 구명설비를 준비한다(NP-002). NP-002 - 퇴선 참조. ERT에 보고한다. 상황(위치, 침로, 속력 등)과 취한 조치를 가능한 한 정확히 기록한다. 갑판 일지와 기관 일지에 기재한다. 사건 경과를 재구성하는 데 필요한 모든 정보, 증거, 자료를 수집한다. 사건 경과, 신호, 조타 침로와 속력, 충돌 관련 선박의 위치 / 각도에 관한 자료, 표시·인지한 신호, 게양·취명·판독한 신호, 기상, 시정, 레이더 화면 / 플롯 자료, 흘수. 다른 선박, 선주, 증인(가능하면 다른 선박의 증인)의 인적 사항에 관한 모든 정보를 수집한다. 발신·수신한 모든 통신문을 수집한다. 상대 선박에 서면으로 책임을 묻고, 책임을 인정하지 않으며, 어떤 약속도 하지 않고, 아무것도 합의하지 않는다! 책임을 부인한다. 우리 측이 비난받는 경우 "수령 확인용으로만(For receipt only)" 도장을 사용한다. 무엇이, 언제, 어떻게 일어났고 어떤 조치를 취했는지 보고서를 작성한다. 첨부: 일지 발췌, 사진(있는 경우), 인명 피해와 선박 및 화물 손상에 대한 설명, 침로 기록계(있는 경우), 타각 기록계(있는 경우), 기관 조종 자료 인쇄물(시각 대조). 부적합 보고서(Fo-004) 작성을 잊지 않는다. 상황을 논의하고 개선안을 제시한다. 개인을 비난하지 않는다. 개정 6 01 08 2004 쪽 2 / 4
부록 H STCW 규약 A-VIII/2절 제3부-1
A-VIII/2절 제3부-1 투묘 중인 선박 선장이 필요하다고 판단하면 투묘 중에도 연속적인 항해 당직을 유지하여야 한다. 투묘 중 항해 당직 책임 사관은 다음을 하여야 한다. 1 가능한 한 빨리 선박의 위치를 정하여 적절한 해도에 기입한다. .2 상황이 허락할 때, 고정된 항로표지 또는 쉽게 식별되는 육상 물표의 방위를 측정하여 선박이 안전하게 투묘 상태를 유지하고 있는지 충분히 자주 확인한다. .3 적절한 경계가 유지되도록 한다. .4 선박의 순시가 주기적으로 이루어지도록 한다. 5 기상 및 조석 상태와 해상 상태를 관찰한다. 6 선박의 닻이 끌리면 선장에게 보고하고 필요한 모든 조치를 취한다. .7 주기관과 그 밖의 기계의 준비 상태가 선장의 지시에 따르도록 한다. 8 시정이 나빠지면 선장에게 보고한다. 9 선박이 적절한 등화와 형상물을 표시하고 모든 적용 규정에 따라 적절한 음향 신호를 하도록 한다. .10 선박에 의한 오염으로부터 환경을 보호하는 조치를 취하고 적용되는 오염 규정을 준수한다. VIII STCW 규약 STCW 규약 - 159 부록 I 현행 SHA 및 CHA 한계 Re Codie or no any the hydrographic once WGS84 위치 제안된 귄트 이 모르(Gwynt y Mor) 풍력 발전단지 모스틴 부두 유한회사(Mostyn Docks Ltd)가 관할 항만당국(CHA, 즉 도선 당국)으로서 갖는 현행 관할 한계. 현행 모스틴 항 디 보전구역 당국(Dee Conservancy Authority, DCA)의 현행 관할 한계 APPROACHES TO THE RIVER DEE (디강 접근로)
부록 J 모스틴 및 디 보전구역 기록에서 뽑은 모스틴의 사고·사건 일람표 일자 2001년 12월 18일 2001년 12월 29일 2002년 8월 2003년 4월 23일 2003년 6월 14일 2003년 7월 11일 2003년 8월 8일 2003년 9월 9일 2003년 11월 5일 2004년 5월 6일 선박 European Envoy호 European Seafarer호 유러피언 엔보이호 Jan Rasmus호 Frisium호 European Ambassador호 Forth Guardsman호 어선 LN 170 유러피언 앰배서더호 Afon Dyfrdwy호 사건 유형 좌주 및 좌초 좌주 접촉 좌주 및 좌초 위험 사건 주장 접촉 과속 좌초 좌초 사건 내용 모스틴 접근로에서. 선장(도선 면제 증명서 소지자)이 조류에 대응하지 못함. 모스틴 접근로에서. 미들 패치 스핏(Middle Patch Spit) 부표 손상. 모스틴항의 버그 뱅크(Bug Bank)에서. 화물 때문에 조타실에서의 전방 시야가 가려짐. 모스틴에 접근하는 중. 노스 이스트 모스틴(North East Mostyn) 부표 손상. 모스틴 수로 안에서 다른 선박이 과속하여 장비가 손상되었다고 주장함. 강풍 조건에서 출항을 시도하다가 모스틴항의 버그 뱅크에서. 플린트 뱅크(Flint Bank)에서 MAIB 보고 주체 디 보전구역(Dee Conservancy)이 보고함. 기록 없음 기록 없음 기록 없음 기록 없음 기록 없음 항만당국이 보고함 기록 없음 해안경비대가 보고함. 디 보전구역이 보고함.
부록 K 1949년 해안보호법 동의서
DTLR 교통 지방정부 지역부 J P 오툴(O'Toole) 씨 상무이사 모스틴항 유한회사(The Port of Mostyn Limited) Mostyn Holywell Flintshire CH8 9HE 토니 스프링소프(TONY SPRINGTHORPE) 항만국 교통·지방정부·지역부(DEPARTMENT FOR TRANSPORT, LOCAL GOVERNMENT AND THE REGIONS) ZONE 2/31 GREAT MINSTER HOUSE 76 MARSHAM STREET LONDON SWIP 4DR 직통전화: 020 7944 5106 팩스: 020 7944 2188 GTN 코드: 3533 5106 전자우편: anthony.springthorpe@dtlr.gsi.gov.uk 웹사이트: www.dtlr.gov.uk 당방 참조: MNA 151/1837/2 귀방 참조: JPO'T/LS 2001년 9월 4일 N.. - Foole 귀하 1949년 해안보호법: 동의 번호 70078 모스틴 외측 수로(Mostyn Outer Channel)에 퍼치 파일 및 항해 부표 16개 설치 2001년 4월 23일자 귀하의 신청서와 2001년 5월 1일자 귀하의 서한으로 수정된 내용을 참조합니다. 본인은 국무장관의 지시에 따라, 1988년 상선법(Merchant Shipping Act) 36조로 개정된 1949년 해안보호법 34조의 목적에 한하여, 첨부된 해안 계획 번호 70078에 나타난 바와 같이 모스틴항 유한회사가 북웨일스 모스틴 외측 수로의 평균 대조 만조 수위 이하에 있는 해안 일부에 퍼치 파일 1개와 항해 부표 16개(이하 '공사')를 설치하는 데 대한 동의로서 이 서한을 발행합니다. 이 동의는 아래에 제시된 조건 1-11과 이 서한에 첨부된 부록 A1. MWP1의 표준 조건을 따른다는 전제로 부여됩니다. 이 동의는 귀하의 동의 신청서와 지정된 해안 계획에 기술된 공사에만 해당합니다. 귀하나 공사의 전부 또는 일부를 수행하도록 계약한 시공자는 당 부처의 추가 서면 동의 없이는 평균 대조 만조 수위 이하의 해안 어느 부분에도, 영구적이든 일시적이든, 다른 공사를 시공하거나 다른 물체나 자재를 두어서는 안 됩니다. 위의 일반성을 해치지 않는 범위에서, 위와 같은 사전 서면 동의 없이는 공사로 가는 둑길이나 그 밖의 임시 접근 수단, 임시 부표나 계류물을 설치할 수 없습니다. 귀사는 해안 소유자의 허가를 포함하여 공사를 수행하는 데 필요한 그 밖의 허가와 권한을 확보하였는지 스스로 확인해야 합니다. 모스틴항 유한회사는 전체 하구와 그 접근로에 대한 해결책을 제공하는 항만개정명령(Harbour Revision Order)이 추진될 때까지 비법정 방식으로 선박 이동을 통제하고 난파물 표지·제거 책임을 지는 조치를 마련하여야 합니다. 2. 신청이 이루어진 때로부터 2년 이내에 항만개정명령이 확보되지 않으면, 교통·지방정부·지역부(DTLR)가 전체 상황을 검토합니다. INVESTOR IN PEOPLE 1183702 doc 3. 모스틴항 유한회사는 수로 운영을 위해 마련된 체계에 대한 독립적인 안전 평가를 의뢰하여야 하며, 그 권고에 따라 가능한 한 빨리 조치하여야 합니다. 4. 모스틴항 유한회사는 접근 수로에 대한 정기 측량을 실시하여야 하며, 필요에 따라 유지 준설을 실시하여야 합니다. 5. 모스틴항 유한회사는 수로 안에서 또는 수로 이용으로 인해 발생하는 모든 난파물의 처리 책임을 지며, 트리니티 하우스가 소유자로부터 회수할 수 없는 난파물 표지·제거 비용을 부담하는 것을 포함합니다. 6. 크기 때문에 조종제한선이 되는 선박이 수로를 정기적으로 이용한다는 것을 경고하는 항행통보를 월 단위로 발행하여야 합니다. 7. 모스틴항 유한회사는 상업 서비스를 시작하기 전에 도선 또는 도선 면제에 관한 만족스러운 체계가 마련되도록 하여야 합니다. 8. 작업에 사용되는 모든 선박은 개정된 1972년 국제해상충돌예방규칙(International Regulations for the Prevention of Collisions at Sea 1972)에 따라 음향 및 신호를 표시하여야 합니다. 9. 공사 개시 전에 모든 적절한 오염 방지 조치를 시행하여야 하며, 개시일은 확정되는 대로 웨일스 환경청(Environment Agency Wales)에 송부하여야 합니다. 10. 동의된 공사의 범위와 동의에 붙은 조건을 분명히 알 수 있도록, 공사의 전부 또는 일부를 수행하도록 선임된 각 시공자에게 이 동의서 사본을 제공하여야 합니다. 항해 안전을 확보하기 위해 해도에 필요한 모든 정정이 이루어지도록 공사의 진행 상황과 완료를 수로국(Hydrographic Office, Ministry of Defence, Taunton, Somerset, TAI 2DN)에 통보하여야 합니다. 웨일스 전원지역위원회(Countryside Council for Wales)는 퍼치 파일에 설치된 계측 장비에서 수집한 풍속, 조위, 유속, 파랑 환경에 관한 자료를 조석 디 이용자 그룹(Tidal Dee Users Group)의 데이터베이스의 일부로 제공해 달라고 요청하였습니다. 부록 중 조건 4와 관련하여 이 동의를 갱신하려는 신청은 만료일 최소 8주 전에 하여 주시기 바랍니다. 또한 동의가 유효하도록 수정될 수 있게 귀사의 명칭, 주소 또는 공사 소유권에 변경이 있으면 당 부처에 알려 주셔야 합니다. 토니 스프링소프 드림 1183702.doc
원문 보기
[Annexes (스캔본 · 글자 인식)]
Annex А Email to Echoship sent at 1420 BST on 8 August
<----- Original Message -- From: mvThunder ‹master.mvthunder@telaurus. net> To: chartering@echoship.dk ‹chartering@echoship.dk>; Received: 08-08-2006 15:20:29 Subject: [HJ] new voy > ‹new voy> > gå aftrn > > from 15.30 distance to Liverpool (Bar) 290,6 nm > eta Bar plt 09.08/20.00 lt › weather: west or south west 4 - 5, veering north or north west > for Mostyn approach I have not chart 1953, for thath reason › I need pilot from Bar pilot like in Raynes . > rgds › cpt.a.kobuszynski > >
Annex B Email to the agent at the of Mostyn sent at 1542 BST on 8 August
From: Sent: To: Subject: chartering@echoship.dk 08 August 2006 16:42 agency@portofmostyn.com Fw: new voy FROM: ECHOSHIP APS, SVENDBORG, DENMARK TEL +45 6221 5666 - TLX 58185 - FAX +45 6321 7700 EMAIL: chartering@echoship.dk WEBSITE : WWW.ECHOSHIP.DK ======= =======• Ref: 060808-HJ6169 hello Mostyn Funds for DA as per your break down will be tranferred tmrw mrng. from captain of m Thunder :-
Annex C Email to the agent at the Port of Mostyn sent at 1658 BST on 8 August
From: To: Sent: Subject: "Master mvThunder" <Master.mvThunder@telaurus.net> <agency@portofmostyn.com> 8 sierpnia 2006 17:58 eta gd aftm eta Bar(Liverpool) pilot 09.08/20.00 It wp I have not approach chart to Mostyn, please request pilot from Bar. max
부록ANNEX A1
한국어 번역 · 모델 · 검수 전
부록 A1: MWP1 10/93 동의의 표준 조건: 기타 공사(영구) 1. 국무장관이 언제라도 지시하는 경우, 공사는 일반 등대 당국(트리니티 하우스 또는 북부등대위원회)이 요구하는 대로 표지 및/또는 점등하여야 한다. 2. 공사는 항상 양호한 수리 상태로 유지되어야 한다. 3. 동의에 명시된 계획에서 벗어나는 변경은 당 부처의 추가 서면 동의 없이는 이루어져서는 안 된다. 4. 이 동의는 갱신되지 않는 한 동의일로부터 3년 이내에 설치된 공사에 대해서만 계속 효력을 갖는다. 5. 해상 주파수 대역에서 작동하는 무선 표지나 레이더 표지는 국무장관의 사전 서면 승인 없이 공사에 설치하거나 사용해서는 안 된다. 6. 공사와 관련하여, 또는 동의가 요구하는 대로 공사에 표지·점등을 하지 못하거나 공사를 양호하게 유지하지 못한 것, 또는 공사의 표류나 난파로 생기는 비상 상황에 대처하기 위하여 항행 경보 방송을 포함한 정부 부처의 지원이 필요하다고 국무장관이 판단하는 경우, 공사 소유자는 그러한 지원을 확보하는 데 든 모든 비용에 책임을 진다. 7. 영국 해안경비대(HM Coastguard) 직원 또는 국무장관이 승인한 그 밖의 사람이 합리적인 때에는 언제든지 공사를 점검하도록 허용하여야 한다. 8. 공사가 완료되면 당 부처에 알려 주시기 바랍니다. 동의에 점등 및/또는 표지 조건이 명시된 경우, 그것이 설치되면 당 부처와 점등 당국에 알려 주시기 바랍니다. 항만국 교통·지방정부·지역부 AIMWPI 1183702.doc
원문 보기
:MWP1 10/93 STANDARD CONDITIONS OF CONSENT: MISCELLANEOUS WORKS (Permanent) 1. The works should be marked and/or lighted as required by the general authority (Trinity House or the Northern Lighthouse Board) if the Secretary of State at any time so directs. 2. The works shall be maintained at all times in good repair. 3. No from the plans specified in the consent shall be made without the further written consent of this Department. 4. The consent shall continue in force, unless renewed, only in respect of the works in place within three ycars of the date of the consent. 5. No radio beacon or beacon operating in the Marine frequency bands shall be installed or used on the works without the prior written approval of the Secretary of State. 6. If in the opinion of the Secretary of State the assistance of a Goverment Department, including the broadcast of navigational warings, is required in connection with the works or to deal with any emergency arising from the failure to mark and light the works as required by the consent or to maintain the Works in good order or from the
, at the entrance to the Mostyn Outer Channel, based upon information received from the agent that provided details of the preferred
anchorage
. The
master
was not called by the
overnight. When he arrived on the
at 0800 the following morning he discovered that the vessel was lying
aground
on a sandbank 2.5 cables south-east of the preferred
anchorage
. There was no damage sustained by the vessel, no injuries to the
and no pollution. The
master
did not report that his vessel had
grounded
. During the forenoon, the Mostyn harbourmaster received a report from Liverpool
that a vessel was
aground
in his area. He checked the
position
of Thunder on
and, content that she was lying in the Wild Road
anchorage
, took no further action. During the next
, the
master
was unable to manoeuvre the vessel clear of the bank, and the prevailing wind and tide caused her to drag further inshore. The vessel was now lying in the
(
SHA
) area of the Dee Conservancy and was in danger of becoming neaped1. At 1625 on 10 August, Thunder was observed by the Dee Conservancy harbourmaster stranded off the Point of Ayr; this was the first official recognition that the vessel had
grounded
. When he was made aware of the accident, the Mostyn harbourmaster spoke to the
master
of Thunder and advised him of the most effective way to manoeuvre clear of the bank at the next
high water
, shortly after midnight. Thunder floated free at 0010 on 11 August. Once clear of the shallow water, a Mostyn
boarded the vessel and familiarised the
master
with channel lights and marks. He provided the
master
with a local chart, and advice on where to
anchor
. Due to deteriorating weather conditions, the
pilot
left the vessel shortly afterwards. Analysis The
master
was aware that an appropriate chart was not available on board. Although he had requested its supply from the Mostyn agent and the cargo operator, he did not notify the company marine superintendent, whose responsibility it was to ensure provision of nautical publications. 1 Neaped – As the
reduces towards Neap tides, there is insufficient water at
High Water
to refloat the vessel.
The Mostyn agent had taken it upon himself to send the waypoints for the approach channel, the
position
of a preferred
anchorage
and a
pilot
boarding area to the
master
. He had not consulted the harbourmaster about their accuracy or reliability. The
Port
of Mostyn
port
includes an area known as the Outer Channel, not currently part of a
or an
SHA
. In 2001, a
identified the need for compulsory
in this approach channel which has not yet been implemented. The
port
operates information only
within its
CHA
limits, but has no control or monitoring function over vessels in the Outer Channel which at ‘South Hoyle’ is a ‘one way only’ channel for larger vessels. The
port
passage plan
failed to: manage shipping movements in the Outer Channel, define minimum
for vessels, and examine the suitability of the Wild Road
anchorage
and promulgate the information. To support the requirement for compulsory
pilotage
, identified by
risk assessment
and by Trinity House, a
harbour revision order (HRO) was promoted by Mostyn Docks Limited in 2001. Opposition to the HRO, and the subsequent delay, saw final submission in 2003 which, together with a
draft
HRO submitted by the EA, resulted in a public inquiry in 2005, the results of which are still awaited. Recommendations The
Port
of Mostyn has been recommended to reinstate its recommended
pilotage
service from the North Rhyl
buoy
to the
port
; promulgate a comprehensive
port
passage plan
; and ensure that all charts and hydrographic publications are amended to reflect the revised procedures. The emergency response procedures for marine accidents should be reviewed, ensuring that the necessary actions for each emergency are identified. Reederei Erwin Strahlmann has been recommended to revise its
to include guidance for masters on
anchoring
and maintaining a safe
while at
anchor
. The
has been recommended to conduct a
verification check on the
Port
of Mostyn. The Secretary of State for Transport has been recommended, in considering his decisions on the Harbour Revision Orders, to take into account the need to clarify the status of the Mostyn Outer Channel.
10 1.4.6 Actions post arrival in
of Mostyn 11 1.5 Hydrographic publications 11 1.5.1 BA chart 1978 – Great Ormes Head to Liverpool (Scale 1:75000) 11 1.5.2 BA chart 1953 – Approaches to the River Dee (Scale 1:25000) 12 1.5.3 Sailing Direction NP37 – West Coasts of England and Wales 12 1.6
limits 16 1.9.1 History and background – Dee Conservancy 16 1.9.2 History and background –
Port
of Mostyn 17 1.9.3 Mostyn Docks Limited - current
pilotage
requirements 20 1.10 The Mostyn Outer Channel 20 1.11 Outer Channel development 20 1.11.1 Initial
20 1.11.2 Trinity House 21 1.11.3
Protection Act 1949 – section 34 application 23 1.11.4 Current Outer Channel maintenance 24 1.12 Current harbour revision orders 24 1.13 The future of the
36 2.9 Harbour authorities interaction 37 2.9.1 Present situation 37 2.9.2 Outer Channel 37 2.9.3 Harbour revision orders 38 SECTION 3 - CONCLUSIONS 39 3.1 Safety issues directly contributing to the accident which have resulted in recommendations 39 3.2 Other safety issues identified during the investigation also leading to recommendations 39 3.3 Safety issues identified during the investigation which have not resulted in recommendations but have been addressed 40 SECTION 4 - ACTION TAKEN 41 4.1 Reederei Erwin Strahlmann 41 4.2 The
Port
of Mostyn 41 SECTION 5 - RECOMMENDATIONS 42
SHA - 법정 항만당국(Statutory harbour authority)
SMS - 안전관리체제(Safety management system)
STCW - 훈련·자격증명 및 당직근무의 기준(Standards of Training, Certification and Watchkeeping)
UKC - 선저 여유수심(under keel clearance)
UKHO - 영국 수로국(United Kingdom Hydrographic Office)
UTC - 협정 세계시(Universal time constant)
VHF - 초단파(Very high frequency)
VTS - 선박교통관제(Vessel Traffic Services)
모스틴 수로(Mostyn Channel)
모스틴 딥(Mostyn Deep)과 모스틴 도크(Mostyn Docks) 사이를 남쪽으로 달리는 수로(BA 해도 1953의 삽입도 A 참조 - 그림 6)
Mostyn Docks Limited
Mostyn Docks Limited는 이 항만의 법정 항만당국이며, Port of Mostyn Limited의 전액 출자 자회사이다.
모스틴 운영 구역(Mostyn Operational Area)
모스틴항으로 오가는 선박이 통과하는 디강 관리청 구역의 해당 부분.
모스틴 외측 수로(Mostyn Outer Channel)
이너 패시지(Inner Passage), 웰시 채널(Welsh Channel) 및 현지에서 사우스 호일 채널(South Hoyle Channel)이라 불리는 수로로 구성된다.
사진 제공: ○○J. Allister 선장
원문 보기
- BA - BMT - British Maritime Technology BST - British summer time - Competent harbour authority DfT - Department for Transport - Designated person ashore - Estimated time of arrival EA - Environment Agency - Global positioning system - International Labour Organisation - International Safety Management Code LLA - Local Authority - Length Overall gt - HRO - Harbour Revision Order - Marine Accident Investigation Branch - Maritime and Coastguard Agency MOA - Mostyn Operational Area - Notice to Mariners - Officer of the watch - Pilotage exemption certificate - Port Marine Safety Code - Statutory harbour authority - Safety management system - Standards of Training, Certification and - under keel clearance - United Kingdom Hydrographic Office - Universal time constant - Very high frequency - Vessel Traffic Services
Mostyn Channel South channel between Mostyn Deep and Mostyn Docks (see insert A on BA chart 1953 - Figure 6) Mostyn Docks Limited Mostyn Docks Limited is the statutory harbour authority for the , and is a wholly owned subsidiary of the Port of Mostyn Limited. Mostyn Operational Area That part of the Dee Conservancy area through which vessels navigating to and from the Port of Mostyn pass. Mostyn Outer Channel Comprises the Inner Passage, Welsh Channel and the locally named South Hoyle Channel. Photograph courtesy of Captain ○○J. Allister
모스틴 대리점은 스스로 접근 수로의 경유점, 선호 묘박지의 위치, 도선사 승선 구역을 선장에게 보냈다. 대리점은 그 정확성이나 신뢰성에 대해 항만장과 협의하지 않았다. 모스틴항의 항만 항해계획(port passage plan)에는 외측 수로(Outer Channel)라고 알려진 구역이 포함되어 있는데, 이 구역은 현재 관할 항만당국(CHA)이나 법정 항만당국(SHA)에 속하지 않는다. 2001년 위험성 평가에서 이 접근 수로에 강제 도선이 필요하다고 확인되었으나 아직 시행되지 않았다. 이 항만은 CHA 구역 안에서 정보 제공만 하는 선박교통관제(VTS)를 운영하고 있으나, 대형 선박에게는 ‘사우스 호일(South Hoyle)’에서 ‘일방통행’ 수로인 외측 수로의 선박에 대해서는 통제나 감시 기능이 없다. 항만 항해계획은 외측 수로의 선박 운항 관리, 선박의 최소 선저 여유수심 규정, 와일드 로드 묘박지의 적합성 검토와 그 정보의 공표를 하지 못하였다. 위험성 평가와 트리니티 하우스(Trinity House)가 확인한 강제 도선 요건을 뒷받침하기 위해 모스틴 도크스 리미티드(Mostyn Docks Limited)는 2001년에 항만 개정 명령(HRO) 초안을 추진하였다. HRO에 대한 반대와 그에 따른 지연으로 최종 제출은 2003년에 이루어졌고, 환경청(EA)이 제출한 HRO 초안과 함께 2005년에 공개 심문이 열렸으나 그 결과는 아직 나오지 않았다.
권고
모스틴항에는 노스 라일 부표에서 항까지의 권장 도선 서비스를 복원하고, 포괄적인 항만 항해계획을 공표하며, 개정된 절차를 반영하도록 모든 해도와 수로 간행물이 수정되게 할 것을 권고하였다. 해양사고에 대한 비상 대응 절차를 검토하여 각 비상 상황에 필요한 조치가 확인되도록 하여야 한다. Reederei Erwin Strahlmann에는 안전관리체제(SMS)를 개정하여 선장을 위한 묘박 및 묘박 중 안전한 항해당직 유지에 관한 지침을 포함하도록 권고하였다. MCA에는 모스틴항에 대해 항만해사안전규약(PMSC) 검증 점검을 실시할 것을 권고하였다. 교통부 장관(Secretary of State for Transport)에게는 항만 개정 명령에 대한 결정을 검토할 때 모스틴 외측 수로의 지위를 명확히 할 필요성을 고려할 것을 권고하였다.
원문 보기
Narrative At 2100 BST on 9 August 2006, the Antigua and Barbuda registered general Thunder anchored in the Wild Road off the of Mostyn. Three shackles of cable were veered in 24m of water. The wind was gusting to 29 knots and a tidal stream of 2.5 knots was . Overnight the vessel dragged her , and in the early morning of the following day, during the last of the , she . The vessel had navigated the Mostyn Outer Channel without an appropriate navigational chart. The achieved this using a set of waypoints and the of a ‘preferred’ anchorage which had been sent to him in an email by the ship’s Mostyn agent. The master had changed his original plan of close to the North Rhyl , at the entrance to the Mostyn Outer Channel, based upon information received from the agent that provided details of the preferred anchorage. The master was not called by the overnight. When he arrived on the at 0800 the following morning he discovered that the vessel was lying aground on a sandbank 2.5 cables south-east of the preferred anchorage. There was no damage sustained by the vessel, no injuries to the and no pollution. The master did not report that his vessel had grounded. During the forenoon, the Mostyn harbourmaster received a report from Liverpool that a vessel was aground in his area. He checked the position of Thunder on and, content that she was lying in the Wild Road anchorage, took no further action. During the next , the master was unable to manoeuvre the vessel clear of the bank, and the prevailing wind and tide caused her to drag further inshore. The vessel was now lying in the (SHA) area of the Dee Conservancy and was in danger of becoming neaped1. At 1625 on 10 August, Thunder was observed by the Dee Conservancy harbourmaster stranded off the Point of Ayr; this was the first official recognition that the vessel had grounded. When he was made aware of the accident, the Mostyn harbourmaster spoke to the master of Thunder and advised him of the most effective way to manoeuvre clear of the bank at the next high water, shortly after midnight. Thunder floated free at 0010 on 11 August. Once clear of the shallow water, a Mostyn boarded the vessel and familiarised the master with channel lights and marks. He provided the master with a local chart, and advice on where to anchor. Due to deteriorating weather conditions, the pilot left the vessel shortly afterwards. Analysis The master was aware that an appropriate chart was not available on board. Although he had requested its supply from the Mostyn agent and the cargo operator, he did not notify the company marine superintendent, whose responsibility it was to ensure provision of nautical publications. 1 Neaped – As the reduces towards Neap tides, there is insufficient water at High Water to refloat the vessel.
The Mostyn agent had taken it upon himself to send the waypoints for the approach channel, the position of a preferred anchorage and a pilot boarding area to the master. He had not consulted the harbourmaster about their accuracy or reliability. The Port of Mostyn port includes an area known as the Outer Channel, not currently part of a or an SHA. In 2001, a identified the need for compulsory in this approach channel which has not yet been implemented. The port operates information only within its CHA limits, but has no control or monitoring function over vessels in the Outer Channel which at ‘South Hoyle’ is a ‘one way only’ channel for larger vessels. The portpassage plan failed to: manage shipping movements in the Outer Channel, define minimum for vessels, and examine the suitability of the Wild Road anchorage and promulgate the information. To support the requirement for compulsory pilotage, identified by risk assessment and by Trinity House, a harbour revision order (HRO) was promoted by Mostyn Docks Limited in 2001. Opposition to the HRO, and the subsequent delay, saw final submission in 2003 which, together with a draft HRO submitted by the EA, resulted in a public inquiry in 2005, the results of which are still awaited. Recommendations The Port of Mostyn has been recommended to reinstate its recommended pilotage service from the North Rhyl buoy to the port; promulgate a comprehensive portpassage plan; and ensure that all charts and hydrographic publications are amended to reflect the revised procedures. The emergency response procedures for marine accidents should be reviewed, ensuring that the necessary actions for each emergency are identified. Reederei Erwin Strahlmann has been recommended to revise its to include guidance for masters on anchoring and maintaining a safe while at anchor. The has been recommended to conduct a verification check on the Port of Mostyn. The Secretary of State for Transport has been recommended, in considering his decisions on the Harbour Revision Orders, to take into account the need to clarify the status of the Mostyn Outer Channel.
관리사
Reederei Erwin Strahlmann
선적항
세인트존스(St John’s)
선적국
앤티가 바부다(Antigua and Barbuda)
종류
단일 화물창 일반 화물선
건조
1984년 12월 22일, 독일 베벨스플레트(Wewelsfleth)
선급
독일선급(Germanischer Lloyd)
구조
강재
전장
82.30미터
총톤수
1559톤
기관 출력 및/또는 형식
Deutz 디젤 SBA 8M 528형, 620 rpm에서 441kW
상용 속력
10.0노트
기타 관련 정보
선수 추진기(bow thruster) 1기 132Kw
사고 세부 사항
시각 및 일자
2006년 8월 10일 0500 BST
사고 위치
53 21.61N 003 18.54W. 포인트 오브 에어 구 등대(Point of Ayr Old Lighthouse)에서 북동쪽 5케이블
탑승 인원
7명
부상자/사망자
없음
손상
없음
1.2 배경
Thunder호는 독일 마르네(Marne)의 Partenreederei MS Thunder가 소유하고 있으며, 독일 Reederei Erwin Strahlmann이 관리하는 유사 선박 53척 중 한 척이다. 이 선박은 앤티가 바부다의 세인트존스에 등록되어 있었으며 이전에 Sandfield, Paloma, Landkirchen이라는 이름을 가진 적이 있다. 사고는 디강 관리청(Dee Conservancy) 항만장이 보고하였으며, 그는 이 사고에 대한 초기 조사도 수행하였다. 조사 보고서는 사고 14일 후인 2006년 8월 25일 MAIB에 접수되었다.
1.3 환경 조건
1.3.1 기상 계
2006년 8월 9일 1800 UTC의 지상 분석도에는 스코틀랜드 북동쪽에 1000mb의 저기압계가 있는 것으로 나타났다. 이 기압계는 디강 하구(Dee Estuary) 일대에 서풍~북서풍, 보퍼트 풍력 5~6의 바람을 일으키고 있었으며 때때로 순간 29노트까지 불었다.
1.3.2 조석
모스틴항(Port of Mostyn)의 예측 및 기록 조석 자료는 표 1에 나와 있다. 영국 해군성 항로지(Admiralty Sailing Direction) NP37은 수로의 일반 방향으로 향하는 대조기 동향 최대 유속 2.5노트를 언급하고 있다. 그러나 대조기 상황에서는 리버풀(Liverpool)의 고조 3시간 45분 전부터 1시간 45분 전 사이에 유속이 최대 4노트에 이르는 짧은 시간의 급류가 발생할 수 있다.
Thunder호는 항해 용선(voyage charter)을 수행할 예정이었으며, 2006년 8월 7일 1855에 웨일스 남부 뉴포트(Newport)에서 공선(ballast)으로 출항하였다. 선박은 고철 화물을 적재하기 위해 쇼어햄(Shoreham)으로 향하고 있었다.
1.4.2 사건 순서: 묘박 전
2006년 8월 8일 1330에 Thunder호가 쇼어햄으로 가는 도중 리저드 포인트(Lizard Point) 정횡에 있을 때, 선장은 덴마크에 본사를 둔 선박의 화물 취급 운영자 Echoship으로부터 휴대전화를 받았다. 선장은 새로운 용선이 마련되어 디강 하구의 모스틴항으로 가서 강철 코일(steel coil) 화물을 적재해야 한다는 통보를 받았다. 화물 운영자는 선장에게 모스틴까지의 잔여 거리, 선박의 ETA 및 현재 기상 상태를 알려 달라고 요청하였다. 1330에 당직 항해사가 선박의 침로를 281로 변경하였고 모스틴으로의 항해가 시작되었다. 기상 상태는 양호하였다. 바람은 남풍 풍력 2였으며 북서풍으로 순전(順轉)할 것으로 예보되었고 시정은 좋았다. 해상 상태는 잔잔하였고 Thunder호는 평균 대지속력 10.1노트를 유지하였다. 선장은 항해사와 함께 리저드 포인트에서 모스틴까지의 항해용 해도를 점검하여 BA 해도 1953 ‘잉글랜드 및 웨일스, 디강 접근 수역(England and Wales Approaches to the River Dee)’이 선박에 비치되어 있지 않음을 확인하였다. 1420에 Echoship은 Thunder호 선장으로부터 이메일(부속서 A)을 받았는데, 이는 앞서의 질문에 답하고, BA 해도 1953이 비치되어 있지 않음을 알리며, 그 때문에 리버풀 바(Liverpool Bar)에서 도선사가 승선해 달라고 요청한 것이었다. 선장은 모스틴에서 서쪽으로 17마일 떨어진 레인스 부두(Raynes Jetty) - 란들뒬라스(Llanddulas)로 가기 위해 같은 위치에서 도선사를 승선시킨 적이 있었기 때문에 이곳이 승선 위치가 될 것으로 가정하였다. 1542에 Echoship은 선장의 요청 사본을 모스틴항의 대리점에 이메일로 보내고, 모스틴이 예상한 대금(disbursements) 내역에 따라 이튿날 아침 자금이 송금될 것임을 확인하였다(부속서 B). 1658에 선장은 ALRS 6(1)권의 지침에 따라 모스틴항 대리점에 예정 ETA의 28시간 전에 선박의 도착 정보를 제공하였다(부속서 C). 그는 리버풀 바에서 도선사가 승선해 달라고 요청하고 BA 해도 1953을 제공해 달라고 다시 한 번 요청하였다. 선박의 휴대전화 번호도 전달되었다. 1748에 모스틴 대리점은 Thunder호가 가입제 이메일 서비스만 갖추고 있어 자신의 이메일을 직접 받을 수 없을 것이라고 믿고2, 선장의 앞선 이메일에 Echoship에 답신하는 방식으로 회신하여(부속서 D) 선박으로 전달되도록 하였다. 이 이메일에는 다음 정보가 들어 있었다.
›‘도선사는 보통 디 부표(Dee Buoy) 도선사 승선 지점에서 승선한다’는 것
›선장이 BA 해도 1953 없이 노스 라일(North Rhyl) 부표에서 디 부표까지 항행할 수 있게 하는 GPS 경유점 세트
›그리고 ‘선호 묘박지’, 즉 와일드 로드(Wild Road) 묘박지의 위치
21분 뒤인 1709에 Echoship은 이 이메일을 Thunder호에 재전송하였다. 이 이메일에 대한 선장의 해석은 자신의 선박이 선호 묘박지에 묘박해야 한다는 것이었다. 이렇게 하려면 대리점이 제공한 GPS 경유점을 이용하여 적절한 항해용 해도 없이 모스틴 외측 수로(Mostyn Outer Channel)를 항행해야 했다.
2 이는 사실이 아니었으며, Thunder호에는 필요에 따라 이메일을 수신하고 송신할 수 있는 통신 장비가 설치되어 있었다.
선장은 확인을 구하기 위해 ALRS 6(1)권에 나와 있는 전화번호로 모스틴 대리점에 전화하려 하였으나 응답이 없었다. 8월 8일에서 9일로 넘어가는 밤사이에 선장은 자신에게 가능한 선택지를 검토하였다. 그는 적절한 해도 없이 모스틴 외측 수로를 항행하는 것에 만족하지 못하여, 도선사나 BA 해도 1953을 받을 때까지 기다리기 위해 노스 라일 부표 서쪽에 묘박하는 것이 가장 안전한 선택이라고 판단하였다. 선장은 경유점과 선호 묘박지 정보가 자격을 갖춘 선원에 의해 발행되고 승인되었다고 믿었다. 그러나 선장은 도선사 준비에 관한 연락이 없는 것을 불안하게 여겼고, 8월 9일 0710에 모스틴 대리점에 이메일(부속서 E)을 보내 이러한 우려를 표하면서 도착 시각에 빛이 약해질 가능성과 BA 해도 1978에 표시된 얕은 수심에 대한 우려를 언급하였다. 접안 예정 시각을 여전히 알지 못한 채, 선장은 묘박해야 할 필요가 있다면 노스 라일 부표 서쪽에 묘박할 의도라고 밝혔다. 결정적으로 그는 모스틴 대리점에 이전 이메일들이 수신되었는지 확인해 달라고 요청하였다. 선장은 이 이메일에 대한 회신을 받지 못하였다. 8월 9일 내내 Thunder호가 모스틴을 향해 계속 항해하는 동안, 선장은 도착 시 자신에게 가능한 선택지와 모스틴 대리점이 제공하는 지원 수준에 대해 점점 더 불안해졌다. 선장은 항해사와 ‘선호 묘박지’ 위치의 적합성에 대해 논의하였다. 두 사람 모두 그 위치가 경험 있는 도선사나 항만장이 정한 것이라고 믿었으나, 여전히 노스 라일 묘박지에 묘박하는 것이 가장 안전한 선택이라고 평가하였다. 그러나 선박이 모스틴에 가까워지자 선장은 다음과 같은 믿음에 근거하여 Thunder호를 ‘선호 묘박지’ 위치에 묘박하기로 결정하였다.
›도선사가 아마도 ‘선호 묘박지’에서 승선할 것이라는 것
›선호 묘박지 위치는 외부 기상 요소로부터 가장 잘 보호되는 경우에만 제공되었을 것이라는 것
›상업적으로 선박은 도선료를 줄이고 하역 준비 완료 통지(notice of readiness)를 하기 위해 선호 묘박지에 있어야 한다는 것
2000에 Thunder호 선장은 BA 해도 1978 ‘Great Ormes Head에서 Liverpool까지’를 사용하고 모스틴 대리점의 경유점을 GPS에 입력한 채, 노스 라일 부표 서쪽 1마일 지점에서 모스틴 외측 수로로의 접근을 시작하였다. 항해사가 조타를 맡았고 음향측심기(echo sounder)는 켜져 있었다. 일몰까지 남은 한 시간의 일광은 수로 경계를 규정하는 항로표지를 식별하는 데 도움이 되었으며, 선장은 항로표지의 올바른 쪽을 유지하는 것을 제외하면 안전한 항행을 전적으로 GPS 횡방향 편차(cross track error)에 의존하였다. 선장은 존재했을 수 있는 항행상의 위험을 전혀 알지 못하였다. 2100에 ‘선호 묘박지’ 경유점을 지침으로 삼아 Thunder호는 수심 24미터에서 좌현 닻을 내렸다. 앵커 체인 3섀클을 풀어 내렸고 세 번째 연결 섀클(joining shackle)이 갑판에 오도록 체인을 고정하였다. 항해 일지에 따르면 묘박을 마쳤을 때 Thunder호의 선교는 위도 53º 21.61’N 경도 003º 18.56’W의 위치에 있었으며, 이는 모스틴 뱅크(Mostyn Bank) 가장자리이자 Mostyn Docks Limited 관할 항만당국(CHA)의 관할 구역 안이었다(부속서 F).
1.4.3 사건 순서: 묘박 후
묘박한 뒤 선장은 VHF 무선 14번 및 16번 채널로 모스틴항(Port of Mostyn)과 교신을 시도하였다. 응답이 없자 휴대전화로 교신을 시도하였으나 마찬가지로 응답이 없었다. 바람은 북서풍 보퍼트 풍력 6이었고 대조기 창조류가 약 2.5노트로 동쪽으로 흐르고 있었다. 선장은 자정(2352의 고조 직후)에 자신이 이용할 수 있는 유일한 해도인 BA 1978에 선박의 위치를 확정하였다. 그는 묘박 당직을 삼등항해사에게 인계하면서, Thunder호가 좌현 닻으로 갑판 위 체인 3섀클을 유지하며 안전한 수역에 정박해 있다는 데 만족하였다. 닻 끌림 경보(anchor drag alarm)는 GPS에 내장된 기능이었으나 작동시키지 않았고, 선장은 GPS가 표시하는 위도·경도를 소수점 둘째 자리까지 사용하여 선박의 위치를 감시하는 것이 더 마음 편하다고 느꼈다. 8월 10일 자정부터 0800 사이, 선장이 휴식하는 동안 Thunder호는 닻이 끌려 모스틴 뱅크(Mostyn Bank)에 좌초하였다. 밤사이 어느 시점에도 선장은 호출되지 않았고 상황을 통보받지 못하였는데, 항해사는 이것이 이 묘박지의 정상적인 상태라고 믿고 있었다. 0800에 선장이 다시 당직을 인수했을 때 선박 주위에는 물이 없었다. 앵커 체인은 모래 해변 표면을 따라 드러나 있었으나 닻은 모스틴 외측 수로(Mostyn Outer Channel)의 더 깊은 부분에 잠겨 있었다. 선장은 더 큰 축척의 BA 해도 1953이 없었기 때문에 이것 역시 묘박지의 정상적인 상태라고 가정하였다. 선장은 VHF 무선 14번 및 16번 채널로 다시 모스틴항을 호출하려 하였으나 응답이 없었다. 회사 SMS에 들어 있는 좌주(stranding) 절차(부속서 G)에 따라 선장은 승조원에게 모든 탱크의 측심을 하도록 지시하였다. 기관장은 이 기회에 뭍으로 내려가 선체, 방향타, 프로펠러를 육안으로 점검하였다. 모든 탱크가 온전한 것으로 확인되었고 육안 점검에서 선체나 부속품에 뚜렷한 손상은 발견되지 않았다. 이 기간 동안 밸러스트 구성은 조정되지 않았다. BA 해도 1978만 참고할 수 있었기 때문에 선장은 정확한 간출고(乾出高, drying height)를 확실히 판단할 수 없었다. 그는 고조 때 선박이 충분히 떠올라 모스틴 뱅크에서 벗어나 조종하여 ‘선호 묘박지’로 돌아갈 수 있을 것이라고 마음속으로 확신하고 있었다. 고조 1시간 반 전인 1100경에 선박이 다시 떴다. 그러나 대조기 창조류와 풍력 5~6의 북서풍이 겹쳐 파도 충격으로 선박이 떨렸고, 가해지는 하중 때문에 앵커 체인이 진동하며 튀어 올랐다. 선장은 앵커 체인을 살펴보기 위해 선수로 갔고 닻이 끌리고 있음을 확인하였다. 선장은 선교로 돌아와 주기관, 방향타 및 선수 추진기를 이용하여 앵커 체인에 걸린 하중을 줄이려 하였다. 이 시도는 성공하지 못하였고 Thunder호는 계속 더 안쪽 연안으로 끌려갔다. 1200에 선박 항해 일지는 위치를 위도 53º21.5’N 경도 003º18.46’W로 기록하였다. 선박은 대조기 낙조류가 시작되면서 남동쪽으로 선수가 돌아갔다. 선장은 좌현 닻을 감아올리면서 주기관, 방향타 및 선수 추진기를 사용해 선박을 돌려 모래톱에서 벗어나 더 깊은 물로 조종하려는 시도를 계속하였다. 이 시도는 성공하지 못하였고, 1330경 선박은 위도 53º21.38N 경도 003 18.37W 위치에서 다시 좌초하였다. 이곳은 해도 기준면(chart datum) 위 간출고가 약 6.5미터인 구역이었다. Thunder호는 이제 디강 관리청(Dee Conservancy) 법정 항만당국(SHA)의 관할 구역과 Mostyn Docks Limited CHA의 관할 구역 안에 있었다(그림 1 및 2).
1.4.4 지역 항만당국의 관여
8월 10일 0909에 리버풀 해안경비대(Liverpool coastguard)는 호일레이크(Hoylake) 구명정의 코크스웨인(coxswain)으로부터 Thunder호가 포인트 오브 에어(Point of Ayr) 앞에서 좌초했다는 연락을 받았다. 0915에 리버풀 해안경비대는 모스틴 항만장에게 전화하여 Thunder호가 포인트 오브 에어 앞에서 좌초한 것을 확인해 줄 수 있는지 물었다. 모스틴 대리점이 전달한 정보를 근거로 항만장은 Thunder호가 노스 라일(North Rhyl) 부표 부근에 묘박해 있다고 믿고 있었다. 해안경비대에 확인해 주기 위해 그는 리버풀 AIS 웹사이트에 접속하여 Thunder호가 포인트 오브 에어 앞에 있음을 확인하였다. 그는 해안경비대에 선박이 ‘괜찮아 보이며’ 와일드 로드(Wild Road) 묘박지에 묘박해 있다고 알렸다. 해안경비대는 이 설명을 받아들이고 사건을 종결하였다. 1030경 항만장은 측량 작업을 시작할 예정이었고, 측량 런치(survey launch)가 항구 입구를 떠날 때 Thunder호가 항만장에게 처음으로 눈에 들어왔다. 그는 선박이 물로 둘러싸인 채 20노트의 미풍에 선수가 좌우로 흔들리고 있던 것을 기억하였다. Thunder호는 앞으로 24시간 동안은 접안할 예정이 아니었으며, 항만장은 측량 작업 중에 선박과 교신을 시도하지 않았다. 1400에 항만장은 8월 10일 자정에 예정된 도선 작업(pilotage act)에 앞서 쉬기 위해 항만을 떠나 귀가하였다. 8월 10일 1200에 모스틴 해운서비스(Mostyn Maritime Services)가 지정한 선박의 상업 대리점이 선박에 전화하여 선장에게 8월 11일 정오까지는 접안하지 않을 것이라고 알렸다. 선장은 그 의도를 인지하였다고 답했으나 Thunder호가 좌초하였다는 것은 보고하지 않았다. 1625에 디강 관리청 항만장은 동료와 함께 디강 하구를 돌아보던 중 포인트 오브 에어 앞의 모래톱 위 높은 곳에 좌초하여 좌주된 선박을 발견하였다. 그는 즉시 모스틴 항만장에게 연락하여 그가 이 상황을 알고 있는지 확인하였다. 모스틴 항만장은 몰랐으나 그날 앞서 리버풀 해안경비대와 나눈 전화 통화는 기억하고 있었다. 모스틴 항만장이 작성하는 주간 선박 이동 일정표는 디강 관리청 항만장이 모스틴항을 드나드는 선박 이동을 계속 파악하게 하기 위한 것이었다. 그러나 이번에는 촉박하게 마련된 용선 계약 때문에 Thunder호가 일정표에 포함되지 않았다. 그 결과 디강 관리청 항만장은 이 선박의 신원을 알지 못하였다. 그럼에도 그는 영국 환경청(EA) 수로 관리자와 함께 저조 시간대인 1830에서 2100 사이에 Thunder호를 방문하도록 조치하였다. 선장은 자신의 의무를 통보받았고, 자정의 다음 이초(離礁) 시도가 성공하지 못하면 선박이 소조기에 걸릴(neaped) 수 있음을 조언받았다. 디강 관리청 항만장은 또한 Thunder호가 이제 디강 관리청의 관할 구역에 있으므로 자신이 사고에 대한 전면 조사를 수행할 것이라고 모스틴 항만장에게 알렸다.
그림 1 및 2 8월 10일 오후 모스틴 뱅크에 좌초한 Thunder호 사진 제공: ○○J. Allister 선장 1.4.5 사건 순서: 이초(離礁)
선장은 8월 10일 1400까지 기다린 뒤에야 선박 소유주에게 연락하여 육상 지정자(DPA)에게 상황을 알렸다. 그는 DPA에게 Thunder호가 다음 고조 때 다시 뜰 것이라고 확신한다고 말했다. DPA는 선장이 다음 고조 때 Thunder호를 이초시키지 못할 경우에 대비하여 예인 계약을 준비하는 등 비상 계획 조치를 시작하였다. 오후 동안 선장은 불필요한 해수 밸러스트를 모두 배출하여 Thunder호의 흘수를 등흘수(even keel) 1.8m로 줄였는데, 이는 60cm 감소한 것이었다. 1700에 항만장은 대리점 사무실에서 선박 제원을 입수한 뒤 휴대전화로 Thunder호 선장에게 연락하여, 선박이 떠오른 후 벗어나 조종하는 가장 효과적인 방법을 설명하였다. Thunder호가 선수방위 120º로 놓여 있고 26노트의 바람이 정선미 방향에서 불어오는 상황에서 선장은 전속 후진을 사용하여 선수를 모래톱 쪽에 둔 채 주 수로로 후진(sternboard)하고 선미가 바람을 찾아가게 하라는 설명을 들었다. 항만장은 저조 때 도선사를 승선시키는 것을 검토하였으나 자정에 다른 도선 작업을 수행할 예정이었고 대기 도선사가 도착할 시간이 충분하지 않았다. 결과적으로 선장은 자신의 선박을 스스로 조종하도록 남겨졌으나, 2300부터는 모스틴 도선정(Mostyn pilot boat)이 도선사와 조언을 제공할 항만장을 태우고 와일드 로드 묘박지 부근에서 대기하였다. 2345에 선장은 선박 항해 일지에 ‘점검표에 따라 조선 준비 완료’라고 기재하였으나, 58시간 전에 처음 요청한 BA 해도 1953은 여전히 받지 못한 상태였다. 고조는 8월 11일 0036에 일어날 것으로 예측되었다. 바람은 294º에서 22노트로 불었고 때때로 순간 26노트였다. Thunder호의 기관은 5분 통보 대기 상태로 유지되었다. 8월 11일 0010에 Thunder호는 선장이 항만장의 조언대로 조종하여 자력으로 떴다. 선박이 더 깊은 물에 들어서자 도선사는 VHF 무선으로 선장을 호출하여 디 부표(Dee buoy) 서쪽 2케이블의 안전한 묘박지로 가기 위한 침로를 알려 주었다. 실제로 Thunder호는 앞서의 밸러스트 배출 작업 때문에 프로펠러와 방향타 대부분이 수면 위로 노출되어 조종성이 극도로 나빠, 지시받은 침로를 유지하지 못하고 있었다. 선장은 달성 가능한 최대 속력이 2노트라고 보고하였다. 도선사는 Thunder호가 지시된 침로를 유지하지 못하고 있음을 알아차리고 선박에 승선을 시도하기로 결정하였다. 0035에 그는 Thunder호에 승선하여 선장에게 BA 해도 1953의 구판(out of date) 사본을 건네고, 취해야 할 침로와 관련 시각 및 레이더 항로표지를 조언하였다. 기상이 악화되고 있어 도선사는 15분 뒤인 0050에 선박을 떠날 필요가 있다고 판단하였다. 도선정에서 Thunder호의 조종을 다시 지켜보던 도선사는 선박이 디 남방위표(Dee south cardinal buoy) 북쪽으로 통과하려 한다는 것을 알아차렸다. 도선사는 다시 VHF 무선으로 선박에 연락하여 선장에게 디 부표의 남쪽으로 통과하라고 지시하였다.
0110에 Thunder호는 디 부표(Dee buoy) 서쪽 2케이블 지점에 좌현 닻으로 앵커 체인 6섀클을 풀어 묘박하였다. 묘박을 마치고 선박이 안전하다는 것을 스스로 확인한 뒤, 그날의 사건으로 극도로 피곤함을 느낀 선장은 잠을 자러 아래로 내려갔다. 그는 선교 당직자들에게 앵커 체인에 걸리는 과도한 하중을 줄이고 선박이 더 끌릴 위험을 줄이기 위해 필요에 따라 기관과 선수 추진기를 사용하라는 야간 지시(night orders)를 남겼다. 밤사이 선박은 밸러스트를 적재하여 흘수가 선수 2.36m, 선미 2.78m가 되었다. 아침에 Thunder호가 밤사이 닻이 끌린 것이 드러났으며 선미는 디 부표에서 5m 이내에 있었다. 그러나 선박은 1240에 모스틴 도선사가 승선할 때까지 이 위치에 머물렀다. Thunder호는 마침내 1420에 모스틴항의 3번 선석에 우현을 대고 접안하였다.
1.4.6 모스틴항(Port of Mostyn) 도착 후 조치
현지 MCA 검사관이 Thunder호가 도착했을 때 선박에 와서 항만국통제 검사를 실시하였고 4건의 결함이 확인되었다.
›선박 등록증(certificate of registry)에 문자와 숫자로 명시된 총톤수가 일치하지 않았다.
›화물고박지침서가 기국의 승인을 받지 않았다.
›도착항에 대한 해도가 선박에 비치되어 있지 않았다(검사 중에 시정됨).
›SMS는 선박이 적절한 해도를 보유하지 않은 항구로 지시가 변경되는 경우를 다루지 않았다.
디강 관리청 항만장은 조사관(investigating officer)의 자격으로 선박에 승선하여 선장을 면담하고 선박의 좌주와 관련하여 이 사건을 MAIB에 보고해야 한다고 조언하였다. 그는 선장에게 EA 간행물 ‘디강 관리청 해역의 해상 안전 – 안전 항행 안내서(Marine Safety in the Dee Conservancy – a guide to safe navigation)’ 사본과, 사고와 중상의 법정 보고에 대한 지침을 제공하는 디강 관리청 지역 항행통보(Dee Conservancy Local Notice to Mariners) 3/2006호 사본을 제공하였다.
1.5 수로 간행물
1.5.1BA 해도 1978 – Great Ormes Head에서 Liverpool까지(축척 1:75000)
WGS 84 위치를 해도에 직접 작도할 수 있게 한 BA 해도 1978의 신판(8판)이 2001년 10월 25일 영국 수로국(UKHO)에서 발행되었다. 이 판은 Thunder호 선장이 이용할 수 있었으며 2006년 30주차 주간 항행통보(NTM)까지 포함하여 개정되어 있었다. 갱신 과정의 일환으로 8판에는 웰시 채널(Welsh Channel)이나 모스틴 이너 채널(Mostyn Inner channel)을 표시하는 부표가 더 이상 표시되지 않았다. 해도의 주기는 다음과 같이 설명한다. “이들 수로는 자주 변하기 쉬우며 해도에 표시된 것보다 수심이 얕을 수 있다. 부표는 필요에 따라 이동된다.” 8판은 이들 수로를 점선과 ‘부표 설치 수로(buoyed channel)’라는 범례로 표시하였다. 와일드 로드(Wild Road)의 수로 중앙에는 모스틴항의 도선사 승선 기호가 표시되어 있었고, 해도에 표시된 ‘중요 주의사항’은 선원들에게 ‘항상 적합한 가장 큰 축척의 해도를 사용하라’고 조언하였다. BA 해도 1953의 자홍색(magenta) 윤곽이 BA 해도 1978에 표시되어 있었다.
1.5.2BA 해도 1953 – 디강(River Dee) 접근 수역(축척 1:25000)
BA 해도 1953의 신판(6판)(그림 3)이 2006년 5월 11일 UKHO에서 발행되었다. 이 해도는 웰시 채널, 와일드 로드, 모스틴 딥(Mostyn Deep)을 큰 축척으로 다루었고, 별도의 평면도는 모스틴 도크(Mostyn Docks)까지 포함하는 모스틴 수로(Mostyn Channel)를 더 큰 축척으로 다루었다. 지시가 늦게 변경되었기 때문에 이 해도는 Thunder호 선장이 입수할 수 없었다. 선장은 모스틴 대리점과 선박의 화물 운영자 Echoship에 해도 공급을 요청하였으나, 선박 소유주는 선장이 BA 해도 1953을 갖고 있지 않다는 것을 알지 못하였다. BA 해도 1953의 직전 판(5판)(그림 4)은 2001년 10월 25일에 발행되었다. 이 해도에는 와일드 로드의 수로 중앙과 노스 라일 부표 남동쪽 7케이블 지점에 모스틴의 도선사 승선 지점이 표시되어 있었다. 6판에서는 노스 라일 부표 부근의 도선사 승선 위치가 삭제되었고, 두 개의 지향등(directional lights), 즉 웨스트 호일 스핏(West Hoyle Spit)(이어위그(Earwig)) 등 비콘(퍼치 파일, perch pile)3과 모스틴 도크 남서쪽 4.5케이블 육상에 위치한 두 번째 등이 추가되었다. 6판에서 와일드 로드의 권장 묘박지는 같은 위치에 유지되었으나, 모스틴 딥의 권장 묘박지는 서쪽으로 4케이블 이동하여 수로 남쪽으로 옮겨졌다.
1.5.3 항로지(Sailing Direction) NP37 – 잉글랜드·웨일스 서해안
UKHO가 2005년 8월 18일 발행한 항로지 NP37의 최신판, 즉 16/2005판은 Thunder호 선장이 이용할 수 있었다. 발행 이후 NP37 16판은 모스틴항이나 접근 수로에 영향을 주는 두 건의 개정이 있었다. 첫 번째 개정인 NTM 48/05는 정밀 지향등(precision direction light)의 위치를 독자에게 알렸다. 두 번째 개정인 NTM 13/06은 8.49항을 대체하였다. “모스틴 도크의 경우 노스 라일 등부표(North Rhyl Light-buoy) 동남동 7케이블의 외측 승선 위치에서 도선사를 승선시키는 것이 권장된다. 대안으로 도선사는 디 등부표(Dee Light-buoy)(53º22.0’N 003º18.8’W) 부근에서 승선한다”를 다음으로 대체하였다. “도선사는 디 등부표(Dee Light-buoy)(53º22.0N 003º18.7’W) 부근에서 승선한다” 두 개정 모두 모스틴 항만장이 발의하였으며 Thunder호 선장이 이용할 수 있었다.
1.6 묘박 계획
1.6.1 초기 계획
모스틴으로의 항해계획은 항해사와 선장이 공동으로 수립하였다. BA 해도 1953이 없었기 때문에 선장의 의도는 노스 라일 부표 부근에 묘박하는 것이었다. 그는 이 묘박지가 모든 조석 상태에서 바람과 파도에 노출되기는 하나 선회 여유 공간이 무제한이고 당장의 항행상 위험이 없다는 것을 인식하고 있었다. 게다가 이 묘박지는 항로지에서 흘수가 깊은 선박에 권장되었으므로 선장은 이를 안전한 선택으로 보았다.
3 웨스트 호일 스핏 정밀 지향등은 모스틴 항만당국의 승인에 따라 원격으로 작동된다. 퍼치 파일은 모스틴과 적절한 장비를 갖춘 선박에 바람, 조석, 조류 정보도 방송한다.
BA 해도 1953 6판 그림 3 도선사 승선 위치 삭제됨 HMSO 감독관(Controller of HMSO)과 영국 수로국의 허가를 받아 영국 해군성 해도 1953에서 복제 BA 해도 1953 5판 발췌 그림 4 HMSO 감독관과 영국 수로국의 허가를 받아 영국 해군성 해도 1953에서 복제 도선사 승선 위치
1.6.2 선박 운용술 측면
Thunder호가 묘박해 있는 기간에 대조기 조석 간만의 차는 9m를 넘을 것으로 예측되었고, 바람은 북서쪽에서 20노트를 넘는 상태로 유지될 것으로 예보되었다. 선장은 이러한 제약을 인식하고 좌현 닻을 투하하여 앵커 체인 3섀클을 풀고 세 번째 연결 섀클이 갑판에 올라오면 멈추는 것을 계획하였다. 선호 묘박지 위치에서 모스틴 뱅크까지의 거리는 약 167미터였으며, 선장이 3섀클을 풀려는 의도를 감안하면 오차 여유는 10.6미터 미만으로 줄어들었다.
1.6.3 선교 묘박 당직
묘박 중 안전한 항해당직을 유지하기 위한 지침은 STWC 코드 A-VIII/2 제3부 3-1에 규정되어 있으며 (부속서 H)에 나와 있다.
1.7 REEDERIE ERWIN STRAHLMANN – 안전관리
회사 안전관리증서는 2005년 8월 10일 독일선급(Germanischer Lloyd)이 발급하였다. 안전관리체제 중 이 사고와 직접 관련된 것은 두 가지였다.
›절차 VA-015 항해계획.
›NP-005 좌초 및 좌주 상황과 조치.
절차 VA-015는 포괄적이었다. 이 절차는 선교팀에 항해 계획 수립 요건에 대한 명확한 지침을 제공하였으며, 그 과정의 일부로 각자의 책임을 설명하였다. 항해 간행물의 주문, 갱신, 수정 절차가 설명되어 있었는데, 누락되었거나 낡은 해도를 주문해야 할 때마다 독자를 항해계획 항목으로 되돌려 보내도록 되어 있었다. 항해계획 항목에는 다음과 같이 기술되어 있었다. ‘해도와 간행물의 최신화 상태를 확인해야 한다(모든 수정이 이미 반영되었는지). 누락되었거나 낡은 해도와 그 밖의 간행물은 항해 시작 전에 인도되도록 주문해야 한다’ 이 절차는 항해계획의 변경과 그에 따라 선장이 취해야 하는 조치를 고려하지 않았다. 회사의 좌초 및 좌주 절차 점검표는 다음을 요구하였다.
›선장:
o 회사 비상 대응팀에 통보한다.
o VHF로 다른 선박에 알린다.
o 해안 무선국에 통보한다.
o 주간에는 흑구 3개를, 야간에는 전주등(all round light)인 홍등 2개와 선수미의 백등 2개를 표시한다.
o 선박이 더 뭍으로 밀리는 것을 막기 위해 밸러스트 탱크에 물을 채운다.
o 닻을 투하한다.
o 조석을 계산한다.
o 이초(離礁) 작업을 계획한다.
›항해사:
o 선박 주위의 이용 가능한 수심을 확인한다.
o 해저 저질(seabed)의 종류를 조사한다.
o 조석 상태를 기록한다.
1.8도선법 1987(The Pilotage Act 1987)
도선법 1987에서 CHA는 항만 내 선박 이동 규제와 항행 안전에 관한 법정 권한이 있고 그 항만이 활동 중인 전 도선 구역(former pilotage district)에 전부 또는 일부 속하는 모든 항만당국으로 정의된다. 정의상 Mostyn Docks Limited CHA는 관할 구역 내 선박 이동 규제와 항행 안전에 책임이 있다. 도선법 1987은 각 CHA가 다음을 계속 검토하도록 요구한다.
항만 내 또는 항만 접근 수역을 항행하는 선박의 안전을 확보하기 위해 어떤 도선 서비스가 제공되어야 하는지, 필요하다면 어떤 도선 서비스인지, 그리고 안전을 위해 그 항만이나 접근 수역의 어느 구역을 항행하는 선박에 대해 도선을 강제해야 하는지, 필요하다면 어떤 선박에 대해 어떤 상황에서 강제해야 하며 그 선박에 어떤 도선 서비스가 제공되어야 하는지.
1.9 법정 항만당국 및 관할 항만당국 구역
현재의 SHA와 CHA 구역은 부속서 I의 해도에 표시되어 있다.
1.9.1역사와 배경 – 디강 관리청(Dee Conservancy)
디강 하구는 A380 에어버스 날개 제조 공장이 있는 브로턴(Broughton)과 모스틴항을 잇는 중요한 상업 수로를 제공한다. 이곳은 여러 보전 지정의 대상이며 레저 선박 이용자에게 상당한 휴양 공간을 제공한다. 관리청(conservancy)에 대한 책임은 디강 관리청법 1889(Dee Conservancy Act 1889) 시행 이후 여러 기관을 거쳐 왔다. 현재 EA가 디강 하구의 지정 관리청이자 법정 항만당국이다. 항만법 1991(Ports Act 1991)은 지역 등대 책임을 트리니티 하우스(Trinity House)에서 지역 항만당국으로 이관하였으며, 그 결과 EA는 현재 이 하구의 지역 등대 당국으로서 책임을 지고 있다. PMSC의 시행에 따라 2000년 3월 EA는 자체 해사 운영에 대한 검토를 의뢰하였다. 이 검토는 기관이 의무와 책임을 이행하는 방식을 조사하였고 향후 20~50년간 이 하구의 항행 안전을 보장하는 데 필요한 조치에 대해 독립적 의견을 제시하였다. 이 조사와 관련하여 검토는 다음을 권고하였다.
›디강 하구의 항행 안전을 위한 최선의 체계는 관리청과 도선의 관할권을 단일화하는 것이다.
›이 단일 당국은 신탁 항만(trust port)이어야 한다. 그 사이에는 비법정 항행 자문위원회(Navigation Advisory Committee)를 도입해야 한다.
›EA는 필요한 해사 역량을 확보하고 항만장을 임명하기 위한 즉각적인 조치를 취해야 한다.
›EA가 관리청 관할 구역을 통과하는 선박에 사용료를 부과할 수 있도록 항만 개정 명령(harbour revision order)을 추진해야 한다.
›EA와 모스틴항은 PMSC를 공동으로 이행해야 한다. 여기에는 항행 기준, 사고 보고, 조사 및 기록과 같은 공동 체계가 포함되어야 한다.
이 검토의 즉각적인 영향은 EA 기능에 대한 철저한 위험성 평가였고, 이어서 디강 관리청 SHA의 항만장이 임명되었다.
1.9.2역사와 배경 – 모스틴항(Port of Mostyn)
모스틴항은 개인 소유이며 역사적으로 현지 철강 제품의 수출입, 로로(ro-ro) 여객 페리 운항, 해상 풍력발전단지 건설 및 유지보수, 수중 파이프 부설과 관련되어 왔다. 이 항만은 조석의 제약을 받으며, 더 큰 선박의 접근을 가능하게 하려면 내측 수로를 상당히 준설해야 했다(그림 5a 및 5b). 원래 Mostyn Docks Limited는 트리니티 하우스 도선 구역(Trinity House Pilotage District)에 속해 있었는데, 이 구역은 디강 하구 전역과 노스 라일 부표까지의 바다 쪽에서 항행 안전, 부표 설치, 도선에 대한 관할권을 가졌다. 도선법 1987(Pilotage Act 1987)이 도입되면서 이 항만은 노스 라일 부표까지의 모스틴 외측 수로를 제외한 하구 전체에 대해 SHA 관할권을 신청하였다. 그러나 이 제안에 대한 지역의 반대에 따라 모스틴은 SHA 구역을 항만 바로 주변 지역으로 줄였고, 이는 이후 모스틴 도크 항만 권한 부여 명령 1988(Mostyn Docks Harbour Empowerment Order 1988)에 의해 규정되었다. 선박이 모스틴항에 들어가려면 더 작은 모스틴 SHA에 들어가기 전에 디강 관리청의 SHA를 통과해야 한다. 선박이 통과해야 하는 디강 관리청 구역은 모스틴 딥(Mostyn Deep)과 모스틴 수로(Mostyn Channel)이다. 이 구역은 모스틴 운영 구역(MOA)(그림 6)으로 알려져 있으며 디강 관리청과 모스틴항 사이의 구체적인 합의의 대상이다. 그러나 모스틴 도크(도선) 항만 개정 명령 1989(The Mostyn Docks (Pilotage) Harbour Revision Order 1989)에 규정된 바와 같이 모스틴은 디강 하구 전체의 도선에 대한 CHA이다4. 항만 개발을 지지하고 모스틴 수로를 3m 수심까지 대규모 준설하도록 승인한 1996/7년의 공개 심문 이전에는 선박이 안벽에서 간출고 3.25m의 제약을 받았고 모든 선박 이동은 고조 때 이루어졌다. 소조기 전후 이틀 동안에는 선박 이동이 거의 없었으며, 당시 선박은 평균 길이 80미터, 흘수 3.5미터였다. 공개 심문 승인 이후 항만은 새로운 하드스탠딩(hard-standing), 새 부두, 새 로로 터미널이 조성되어 상당히 개선되었다. 2001년에 P&O Ferries가 이 항만에서 운항을 시작하였다. 그러나 내측 수로를 3m까지 준설하는 승인에는 유지 준설에 대한 허가가 포함되어 있지 않았고, 이후 모스틴 수로가 퇴적물로 메워지면서 회사가 정기 노선을 운항할 능력이 심각하게 제약되었다. 항만이 유지 준설을 수행하지 못하는 영향이 악화되는 가운데 공교롭게도 P&O Ferries의 운항은 상업적 사유로 중단되었다.
4 모스틴 외측 수로(Mostyn Outer Channel) 제외 재개발 후 모스틴항 그림 5a 및 b 재개발 중인 모스틴항 C1998 모스틴 운영 구역과 관할 항만당국으로서의 현행 관할 한계를 보여 주는 해도 그림 6 HMSO 감독관과 영국 수로국의 허가를 받아 영국 해군성 해도 1953에서 복제 현재 모스틴항은 연간 175,000~225,000세제곱미터의 가는 모래를 제거한다. 이로써 모스틴 수로에서 최대 2m의 준설 수심이 유지된다.
1.9.3 Mostyn Docks Limited - 현행 도선 요건
도선 지시(Pilotage directions)는 CHA를 대신하여 모스틴 항만장이 발령한다. 이 지시는 2004년에 갱신되어 3a호로 다시 공포되었으며, 디강 하구 도선 구역에서는 다음에 대해 도선이 강제된다고 명시하고 있다5.
›폭발물이나 벌크 위험화물을 운반하는 선박.
›예인 길이가 50m를 넘는 예인 작업에 종사하는 선박.
›길이 47.5m 이상의 어선.
›길이 20m 이상의 기타 모든 선박.
선박의 항행을 책임지는 사람이 디강 하구 도선 구역 내에서 안전하게 항행할 충분한 현지 지식이 있음을 항만장에게 입증한 경우 길이 50m 미만 선박에는 강제 도선 면제가 제공된다. 도선사 승선 구역은 디 부표 부근, 위도 53º 21.8’N 경도 003º 18.6’W로 명시되어 있다. 도선 지시는 도선사 승선 지점이 노스 라일 부표 부근이 될 모스틴 외측 수로에서의 ‘요청 시(on request)’ 도선 서비스를 언급하지 않는다. 그러나 이 지시는 어떤 규정도 선박의 안전한 운항을 보장해야 하는 선장의 우선적 의무를 면제하지 않는다는 점을 선장들에게 상기시킨다.
1.10모스틴 외측 수로(Mostyn Outer Channel)
바다 쪽에서 수로는 노스 라일 부표에서 시작하여 이너 패시지(Inner Passage), 사우스 호일 채널(South Hoyle Channel)로 알려진 구역, 웰시 채널(Welsh Channel)을 따라 와일드 로드(Wild Road) 권장 묘박지 부근의 디 부표에서 끝나며, 거리는 10마일이다. 해저는 주로 가는 모래와 펄이며, 이 수로는 디강 하구를 드나드는 복잡한 흐름과 상당한 조류 때문에 퇴적과 해저 이동이 일어나기 쉽다. 항만 항해계획(port passage plan)에 기술된 수로의 해도 기준면 수심은 디 부표의 최대 21m에서 미들 패치 스핏(Middle Patch Spit) 부근의 4m까지 다양하다. 지향등 부근과 웨스트 호일 스핏(West Hoyle Spit) 남쪽의 사우스 호일 채널로 알려진 수로 구역은 2001년에 4.7m로 준설되었다. 준설 구간은 3.3마일에 걸쳐 있으며 해도 기준면에서 해도상 폭 80m로 수로의 가장 좁은 부분이다. 약 1대 5의 수로 측면 경사 때문에 조위가 상승함에 따라 수로 폭이 비례하여 늘어난다. 가스 파이프라인이 사우스 호일 채널 동쪽의 웰시 채널을 가로질러 놓여 있다. BA 해도 1953은 외측 수로가 수심이 변한다고 주기하고 있다.
1.11 외측 수로 개발
1.11.1 초기 위험성 평가
2001년에 P&O Ferries 서비스가 이 항만에서 운항할 것을 예상하여 항만장은 제안된 운영에 대한 위험성 평가를 실시하도록 조치하였다. 이 평가는 더 큰 선박을 도입하기 위한 사우스 호일 채널을 검토하였으나, 제안된 페리의 크기와 속력 때문에 페리 운영과 수로 폭에 크게 중점을 두었다.
5 도선 지시는 강제 도선에 대한 일정한 면제를 규정하고 있다.
이 조사와 관련하여 위험성 평가는 상선이나 P&O 페리가 모스틴 외측 수로나 그 접근 수역에서 좌초 또는 좌주하는 위험을 검토하였다. 원인은 인적 오류, 도선사의 부재 또는 해당 구역에 대한 불숙지, 조위 높이 계산 실패, 선박이 수로 밖으로 표류하는 것으로 확인되었다. 예상되는 결과는 선체 손상에 따른 기름 유출과 다음 조석까지 기다려야 이초할 수 있다는 것이었다. 위험을 최소화하기 위한 조치는 정기 측량, 항로표지 감시, 위험 구역을 통제하기 위한 항만 구역 확대로 확인되었다. 위험성 평가 과정은 항만장이 다음을 포함하는 다수의 새로운 통제 조치가 필요하다는 것을 확인하는 데 도움이 되었다.
›가능한 한 빨리, 사우스 호일 채널과 그 접근 수역을 포함하도록 항만 구역을 확대하는 HRO.
›정밀 항행을 돕기 위한 섹터등(sectored light)의 설치.
미들 패치 스핏 부표(노스 라일 부표 남동쪽 7케이블)에서부터의 도선 요건에 따라 항만장은 2001년 5월 2일 개정된 도선 지시를 발령하였다. 지시 3항은 선원들에게 다음과 같이 조언하였다. ‘외측 도선사 승선 구역은 미들 패치 스핏 부표 부근, 위도 53º 22.4’N 경도 003º 33.0’W 이다. 강제 도선은 내측 승선 구역에서 시작되나, 특히 선장이 해당 구역에 익숙하지 않거나 선박의 길이가 100미터를 넘는 경우 외측 승선 구역에서 도선사를 승선시키고 하선시킬 것을 강력히 권장한다’.
1.11.2트리니티 하우스(Trinity House)
역사적으로 모스틴 외측 수로의 표지 설치는 일반 항행 권한에 근거하여 트리니티 하우스의 책임이었다. 2000년 11월 회의에서 Mostyn Docks Ltd는 트리니티 하우스와 다음 제안을 논의하였다. 폭 80m의 수로를 해도 기준면 아래 5.0m 수심까지 준설할 것, 지향등이 있는 파일을 설치할 것, 새 부유식 항로표지 6기를 설치할 것, 그리고 수로 측량 결과에 따라 기존 항로표지의 위치를 바꿀 것. 이 조사와 관련하여 같은 회의는 수로 내 선박 이동을 통제하는 조치를 논의하고 다음을 기록하였다.
›일정 길이를 초과하는 선박에는 도선이 강제되거나(위험성 평가 실시 예정) 도선 면제 증명서(PEC)를 소지해야 한다. 도선사 승선은 노스 라일 부표에서 이루어질 것으로 예상되었다.
›준설 수로에서는 VHF에 의한 VTS 통제 하에 일방통행 교통만 허용된다. 이 구역의 레이더 탐지 범위는 예상되지 않았다.
트리니티 하우스는 일부 제안에 대해 우려를 갖고 있었으며, 이를 해소하는 방법으로 모스틴항이 관할 구역을 준설 수로 접근부 바로 서쪽 지점까지 확대하는 신청을 하고 노스 라일 부표에서 안쪽으로 강제 도선/PEC 체계를 갖추도록 할 것을 제안하였다. 그래야만 모스틴이 좁은 준설 수로 내 선박 이동을 통제할 수 있었다. 모스틴항의 관할 구역 확대는 기존 항로표지의 책임을 트리니티 하우스에서 모스틴으로 재조정하는 것을 필요로 하였다. 항만은 수정된 구역 안의 기존 난파선과 새 난파선에 대한 책임 및 측량 책임을 모두 지게 된다. 회의는 모스틴 항만장이 자신의 제안에 대해 EA 및 영국 환경교통지역부(DETR)와 협의하기로 합의하며 끝났다. 2001년 3월에 모스틴 항만장은 트리니티 하우스에 2000년 11월 회의에서 논의된 항로표지의 변경을 제안하는 서한을 보냈다. 주로 변경은 수로를 표시하는 데 필요한 부표의 수와 관련된 것이었다. 2001년 3월 28일자 회신(사본은 DETR, MCA, EA 및 영국 수로국(UKHO)에 송부)에서 트리니티 하우스는 모스틴항이 관할 구역을 수로 서쪽까지 확대하고, 수로 내 선박 이동을 통제하며, 노스 라일 부표에서 안쪽으로 강제 도선/PEC 체계를 갖추지 않는 한 사우스 호일 채널(South Hoyle Channel) 이용에 대한 우려를 거듭 밝혔다. 최초 회의 이후 약 4개월이 지났고 2001년 7월에 페리 운항을 시작하는 것이 목표였으므로 트리니티 하우스는 HRO 초안 사본을 받았을 것으로 기대하였을 것이다. 트리니티 하우스는 관할 구역이 확대될 때까지는 사우스 호일 채널을 표시하는 항로표지의 설치에 동의할 수 없었다. Mostyn Docks Ltd가 좁은 준설 수로에서 선박 이동을 통제하는 데 필요한 권한을 갖출 때까지는 항로표지 설치를 승인할 용의가 없었다. 또 다른 우려는 모든 항로표지의 위치와 특성이 해결되고, 새로운 도선 보고/승선 기호의 위치가 확정되며, 준설 수로의 경계가 UKHO에 전달될 때까지는 관련 영국 해군성 해도의 신판을 확정할 수 없다는 점이었다. 모스틴항은 HRO 추진을 진행하도록 촉구받았다. 2001년 4월 2일 모스틴은 항만이 HRO를 신청할 것임을 확인하고, EA가 동시에 자신의 항행/관리청 책임에 대한 검토를 진행하고 있었고 어떤 HRO가 신청되기 전에 그 검토에 대해 공개 협의를 하고자 했다고 설명하는 회신을 트리니티 하우스에 보냈다. 모스틴은 합리적인 기간 안에 신청이 이루어질 수 있다면 EA의 계획을 기꺼이 수용하였다. 이 서한은 HRO가 신청되어야 할 뿐 아니라 이제는 발효되어 있어야 한다는 3월 28일자 트리니티 하우스의 회신에 대한 모스틴의 실망을 표명하였다. HRO의 신청과 수령이 지연될 가능성을 인식한 모스틴은 적용할 수 있는 임시 조치에 대해 트리니티 하우스에 조언을 요청하였다. 2001년 4월 18일 트리니티 하우스는 모스틴의 4월 2일자 서한을 언급하며 DETR과 MCA(EA와 UKHO에 사본 송부)에 서한을 보내, 준설 수로가 이를 이용하는 선박에 비해 좁고 모든 선박 이동에 대해 효과적인 선박 교통 통제 수단이 마련되어 있지 않다는 우려를 표명하였다. 더욱이 트리니티 하우스는 모든 선박 이동을 통제할 효과적인 권한이 마련될 때까지는 지역 비용으로 제공되는 것이든 아니든 어떤 추가 항로표지의 설치도 받아들일 용의가 없었다.
2001년 4월 30일 트리니티 하우스에서 모스틴항과 함께 열린 회의의 기록은, 모스틴이 여전히 HRO를 추진하기를 원하나 EA가 디강(River Dee) 관리청의 미래에 대한 협의를 진행하고 있어 노력이 현재 좌절되고 있음을 재확인하였다. EA는 모스틴의 HRO 신청이 시기상조라고 보고 반대하겠으나 임시 해결책에는 만족할 것이라고 밝혔다. 트리니티 하우스는 상황을 돕고 해결하려는 뜻을 확인하였으며, 모스틴항이 장기적으로 강제 도선 권한을 가져야 한다고 말하였다. 모스틴항 밖에 위치한 항행 보조 장비에서 발생하는 책임을 우려하여, 모스틴항이 수로 내 기존 부표를 대체할 부표를 제공하기 위한 동의를 해안 보호법 1949(Coast Protection Act 1949) 제34조에 따라 신청하는 것이 바람직할 수 있다고 결론지었다. 모스틴항은 HRO를 추진하지 않고는 강제 도선을 부과할 수 없다는 데 합의하였으나, 항만장은 항만이 모든 항만 고객에게 비강제 도선을 제공할 것이라고 확인하였다. 모스틴항은 EA 협의가 끝나는 대로, 어떤 경우든 2001년 말까지 HRO를 신청할 것으로 예상하였다.
1.11.3 해안 보호법 1949(Coast Protection Act 1949) – 제34조 신청
해안 보호법 1949 제34조(주로 상선법 1988(Merchant Shipping Act 1988) 제36조로 개정됨)에 따라 환경식품농촌부 장관(DEFRA)의 동의가 다음에 대해 필요하다.
›약최고만조면(mean high water springs) 아래의 해안 어느 부분의 위, 아래 또는 상공에서의 공작물의 건설, 변경 또는 개선.
›약최고만조면 아래에 물체나 물질을 퇴적하는 것.
›약최저저조면(mean low water springs) 아래의 해안에서 물체나 물질을 제거하는 것(예: 준설).
2001년 4월 23일 모스틴항은 모스틴 외측 수로에 퍼치 파일 1기와 항행용 부표 16기를 설치하기 위해 해안 보호법 1949에 따라 MAFF(현 DEFRA)와 DETR(현 DfT)에 신청하였다. 이 신청에 대한 의견을 구하는 DETR의 요청에 대해 트리니티 하우스는 외측 준설 수로가, 특히 이를 이용해야 할 선박의 크기에 비해 좁다는 우려를 거듭 밝혔다. 트리니티 하우스는 예방 조치가 취해지지 않으면 수로의 안전한 이용과 중대 사고 발생 위험에 대한 우려를 계속 갖고 있었다. 이 위험을 완화하려는 시도로 트리니티 하우스는 Mostyn Docks Ltd가 항로표지를 설치하고 유지하는 데 동의할 용의가 있었으나, 그 동의를 부여하기 전에 충족되어야 할 8개의 핵심 조건을 정하였다.
›모스틴항은 항만 구역을 확대하고 무엇보다도 항로표지 설치, 선박 이동 통제, 난파선 표시/제거 책임에 대한 권한을 부여하는 항만 개정 명령(Harbour Revision Order)을 신청한다. 신청은 늦어도 2001년 12월 31일까지 이루어져야 한다.
›신청이 이루어진 지 2년 이내에 항만 개정 명령이 취득되지 않으면 전체 상황을 재검토한다.
›모스틴항은 수로 운영을 위해 마련된 체계에 대한 독립적인 안전 평가를 의뢰하고 가능한 한 빨리 모든 권고를 이행한다.
›모스틴항은 접근 수로에 대해 정기 측량과 필요한 유지 준설을 수행한다.
›모스틴항은 수로 안에서 또는 수로 이용으로 발생하는 난파선을 처리하겠다고 명확히 수락한다.
›모스틴항은 크기 때문에 조종에 제약을 받는 선박이 수로를 정기적으로 이용함을 경고하는 항행통보를 월 단위로 발행한다.
›상업 서비스를 시작하기 전에 도선 또는 도선 면제에 대한 만족스러운 체계가 마련된다.
›또한 부표와 비콘의 설치 및/또는 유지에 종사하는 모든 선박은 충돌예방규칙(Collision Regulations)에 따라 신호를 표시한다.
그럼에도 P&O Ferries Ltd의 서비스 개시가 임박하여, 제34조 동의 번호 70078이 2001년 9월 4일 교통·지방정부·지역부 장관(Secretary of State for Transport, Local Government and the Regions)에 의해 부여되었다(부속서 K). 이 동의서에는 트리니티 하우스가 정한 조항 다수가 포함되었다. 모스틴항은 마침내 2003년 4월 17일 HRO 신청서를 제출하였다. 2003년 6월 2일 트리니티 하우스는 제안된 모스틴 HRO에 관하여 DfT에 서한을 보냈다. 이 서한은 세 가지 쟁점을 다루었다.
›위치를 명칭이 붙은 항로표지가 아니라 위도와 경도로 규정할 필요성.
›모든 항로표지가 제안된 관할 구역 안에 있도록 보장할 필요성.
›지역 등대 당국(LLA)을 하나로 하는 것이 바람직하며 그 당국은 항만당국인 Mostyn Docks Limited여야 한다는 트리니티 하우스의 선호.
1.11.4 현행 외측 수로 유지
모스틴 외측 수로의 존속 가능성이 모스틴항에 필수적이므로, 이 수로는 2001년 9월에 발급된 해안 보호법 동의의 조건 4에 따라 현재 모스틴 항만장이 측량하고 유지한다. 2001년에 사우스 호일 채널은 4.7m 수심으로 준설되었고, 항만장의 2006년 측량 계획은 사우스 호일 채널과 웰시 채널에 대해서는 부분6 측량을, 라일 플랫츠(Rhyl Flats), 미드 호일 수로(Mid Hoyle channel), 와일드 로드(Wild Road) 묘박지에 대해서는 정상 측량을 수행할 의도임을 보여 주었다.
1.12 현행 항만 개정 명령
2003년 4월 17일자 모스틴 HRO와 2005년 1월 26일자 디강 관리청 HRO는 서로 충돌하였고 이후 2005년 11월과 12월에 열린 공개 심문에서 검토되었다.
›제안된 디강 하구 관리청 HRO는 디강 하구의 관리청, 항만당국 및 지역 등대 당국으로서의 EA의 관할권을 변경하려는 것이 아니다. 그러나 1889년 법과 이전 지역 법령에 따른 기관의 기능을 폐지하고, 관리청, 항만당국 및 지역 등대 당국으로서의 역할에 관련된 현대적 권한과 의무로 대체하려는 것이다.
6 부분 측량은 측선(lines)의 수를 줄여서 수행하는 것이다.
›제안된 모스틴 부두 항만개정명령(HRO)은 모스틴항(Port of Mostyn)에 대한 법정 항만당국(SHA)으로서의 모스틴의 기존 관할권을, 항에서 노스 릴 부표(North Rhyl buoy)까지 이어지는 폭 500미터의 지정 수로 안으로 확대하고자 하는 것이다. 이 명령이 내려지면, 현재 디 보전구역(Dee Conservancy) 안에 있는 지정 수로 부분에 대해 보전·항만·지방 등대 당국으로서 환경청(EA)이 갖는 관할권은 없어지게 된다. 또한 이 HRO는 도선 목적상 모스틴 부두 유한회사(Mostyn Docks Limited)의 관할 구역을 기존의 바다 쪽 한계로부터 노스 릴 부표까지의 지정 수로를 포함하도록 넓히게 된다. 두 항만개정명령 모두 정부의 인정 기관들로부터 추가 승인을 받지 않는 한 하구에서의 준설을 허가하지 않는다. 디 측과 모스틴 측 제출 자료 사이의 주된 의견 차이는 다음과 같았다. • 디 보전구역 안의 지정 수로에 대한 관할권을 가져야 할 적절한 기관이 모스틴인지 환경청인지. • 모스틴 부두 유한회사가 확대된 보전구역(모스틴 외측 수로)에 대해 법정 항만당국(SHA)의 관할권을 가져야 하는지. 이 조사를 시작할 때 운수부 장관(Secretary of State for Transport)은 두 HRO 신청 어느 쪽에 대해서도 결정을 내리지 않은 상태였다. 이에 따라 해양사고 수석조사관은 영국 교통부(DfT)에 서한을 보내, 이 조사에서 나온 권고 가운데 장관이 결정을 내리면서 다루게 될 쟁점과 관련이 있는 것이 있으면 장관이 이를 고려할 수 있도록, 장관이 이 조사 결과가 나올 때까지 해당 신청들에 대한 결정을 미루도록 제안하였다. 1.13 모스틴항의 장래 2005년 11월, 북웨일스 해안에서 13~15킬로미터 떨어진 곳에 귄트 이 모르(Gwynt y Môr) 풍력 발전단지를 개발하기 위한 신청서가 영국 통상산업부와 웨일스 의회(National Assembly for Wales)에 제출되었다. 이 단지는 약 200기의 풍력 터빈으로 구성되고 48평방마일에 걸치도록 계획되어 있다. 지리적으로 모스틴항은 초기 건설에 필요한 기지항 시설을 제공하기에 적합하며, 장기적으로는 유지보수 지원 시설을 제공하기에도 적합하다. 이 사업과 관련한 모스틴항의 선박 이동 증가를 합리적으로 예상할 수 있다. 에어버스 A380 날개의 생산은 향후 3~4년에 걸쳐 꾸준히 늘어날 것으로 예상된다. 날개를 브로턴(Broughton)에서 모스틴으로, 그리고 모스틴에서 프랑스 툴루즈(Toulouse)로 운송하는 데 필요한 선박 이동도 이에 맞추어 늘어날 가능성이 크다. 경쟁력 있는 상업 조직으로서 이 항만은 신규 사업 개발을 환영한다. 향후 단기에서 중기의 목표에는 항에서 정기 페리 운항을 재개하는 것이 포함된다. 1.14 항만해사안전규약 1.14.1 인증 항만해사안전규약(PMSC)은 2000년 3월 DfT가 발간하였다. 디 보전구역과 모스틴 부두 유한회사는 모두 PMSC 인증을 받겠다는 의사를 DfT에 밝혔다.
이를 충족하려면 두 당국 모두 공식 위험성 평가에 기초한 안전관리체제(SMS)를 만들어야 했다. 그 목표 기한은 2001년 12월 31일이었다. 디 보전구역의 SMS는 2001년 말까지 완료되었으나, PMSC 인증의 핵심은 모스틴 운영 구역(MOA), 즉 모스틴항을 오가는 선박이 지나가는 디 보전구역의 일부에 대한 절차에 관한 합의였다. 모스틴 부두 유한회사는 위험성 평가 과정을 돕도록 영국해사기술(British Maritime Technology, BMT)의 용역을 의뢰하였다. 그러나 디 보전구역 항만장은 MOA에 적용되는 위험성 평가가 철저하지도 견고하지도 않다고 보았다. 그 방법론은 일반적인 것이어서, 해당 구역과 관련된 중대한 위험요소를 식별하지 못하였고, 위험한 사건을 현실적으로 일으키거나 거기에 기여할 수 있는 각 위험요소와 관련된 위험을 평가하지도 않았다. 2002년 3월 5일 디 보전구역 항만장은 위험성 평가에 사용된 방법론이 왜 부적합하다고 보는지를 모스틴 항만장에게 설명하였다. 위험을 다시 평가할 필요가 있으며 이를 실시하기로 합의하였다. 수정·개선된 위험성 평가서가 2002년 3월 28일 모스틴에서 발행되었고, 디 보전구역은 이를 수용할 만하다고 보았다. 2002년 11월 디 보전구역 SMS가 발행되었는데, 여기에는 2002년 8월 모스틴 부두 유한회사와 공동으로 합의한 MOA 내 해상 운영 절차가 포함되어 있었다. 이 절차는 모스틴항이 MOA에서 수행하는 해상 운영이 PMSC가 요구하는 기준을 충족하는 방식으로 이루어지도록 하기 위해 마련된 것이었다. 2002년 10월 DfT는 모스틴 부두 유한회사에 PMSC 이행 진척 상황에 대한 최신 정보를 요청하였다. DfT는 모스틴 SMS의 개발이 2002년 11월 말까지 완료될 것이라는 답을 들었다. 2002년 11월 4일 모스틴 부두 유한회사는 SMS 개발을 지원하도록 스트래티직 마린 서비시스 유한회사(Strategic Marine Services Limited)에 용역을 의뢰하였으며, 최종안 기한은 11월 말이었다. 스트래티직 마린 서비시스의 컨설턴트로 활동한 디 보전구역 부항만장이 문서 작성을 도왔고, 모스틴 부두 유한회사는 이를 2002년 12월 13일 최종 발행하였다. 모스틴 부두 유한회사의 최종 SMS는 포괄적이었으며, MOA 안의 해상 운영에 관한 공동 약정과, 디 보전구역 항만장이 SMS 특히 MOA를 6개월마다 공동으로 검토해야 한다는 요건을 담고 있었다. 이 SMS는 또한 부항만장 직위의 필요성을 명시하였는데, 이 직위는 2004년 이래 공석으로 남아 있다. 2003년 6월 환경청과 모스틴 부두 유한회사 사이에 MOA에서 모스틴항의 해상 운영을 규율하는 협정이 체결되어 서명되었다. 그 결과 2003년 7월 환경청은 DfT 기한 직전에 디 보전구역 전 구역에서 PMSC가 이행되고 있음을 확인할 수 있었다. 모스틴항은 2002년 12월에 PMSC 준수를 보고하였으나, DfT는 이웃 당국의 수역을 가로지르는 접근 수로를 이용하는 상당한 규모의 페리 운항에 대해 우려하고 있었다. 항에는 이러한 우려가 통보되었으나, 페리 서비스를 항에서 다른 곳으로 옮기기로 결정함으로써 우려는 해소되었다.
1.14.2감사 체계 모스틴 부두 유한회사의 마지막 SMS 내부 감사는 2005년 11월에 지정자가 실시하였다. 감사 양식은 포괄적이었고 모든 것이 이상 없음을 나타내고 있었다. 2005년 10월 항만장이 작성한 연례 검토서는 다음 사항을 언급하였다. • 비공식 모니터링에서 나온 미결 사항은 없었다. • 두 차례의 MOA 공동 점검에서 나온 조치 사항(도선사 승인 서류)은 시정되었다. • 디 보전구역 항만장과 함께 실시한 다섯 차례의 연례 검토에서 기록된 중대한 결함은 없었다. • 감사 기간 중 항에서 항해 사고가 두 건 발생하였다. o 한 선박이 낙조류 때 계류 부두를 떠나다가 좌주하였고 다음 조석에 이초되었다. o 준설선 Tonne호가 안벽과 계류 중인 선박에 접촉하였다. 선장이 자동 조타와 수동 조타를 잘못 전환한 데 따른 실수였다. 모스틴은 PMSC 인증을 받은 이후 독립적인 외부 감사를 실시하지 않았다. 1.15 유사 사고 1.15.1 모스틴항 모스틴 및 디 보전구역의 기록에서 뽑은 모스틴의 사고·사건 일람표는 부록 J에 있다. 이 표에는 다음을 포함하여 10건의 사건이 나와 있다. • 좌주 및/또는 좌초 5건 • 부표 손상 2건 • 어구 손상 1건 • 선박 조타실에서의 시계 제한 1건 • 다른 선박의 행동으로 안전한 항해가 저해된 사건 1건 이 항의 좌주 이력은 MAIB가 이 조사를 시작하기로 결정할 때 고려되었다. 그러나 P&O 페리스 유한회사(P&O Ferries Ltd)가 모스틴에서 운항하던 때에는 항만의 안전에 많은 관심이 모아지고 있었다. Thunder호의 좌주는 페리 운항이 중단된 지 2년 뒤에, 상당히 다른 상황에서 발생하였다. 따라서 페리 좌주 사례는 이 보고서에서 더 이상 다루지 않는다. 1.15.2 닻이 끌린 선박 MAIB 데이터베이스에 따르면 1992년 이래 영국 영해에서 선박이 닻이 끌리고(주묘) 이어서 좌주한 사고가 18건 있었다. 이와 별도로 닻이 끌렸으나 좌주하지는 않은 위험 사건도 14건 기록되었다. 좌주의 주요 요인은 선택한 닻 위치, 신출한 닻줄의 길이, 기상 조건, 주기관의 준비 통보였다.
MAIB 자료를 분석하면, 선박이 이후 좌주한 거의 모든 사고에는 몇 가지 공통된 기여 요인이 있었다. • 당시 또는 예보된 기상 조건과 풍하 해안(lee shore)에 가까운 점을 감안할 때, 묘박지는 선장의 더 나은 판단에 반하여 선택된 경우가 많았다. 때로는 선장의 선택이 항만당국이나 승선한 도선사의 지시와 요구에 의해 '뒤집히기도' 하였다. • 많은 경우 주어진 수심에서의 닻줄 신출 길이(scope)가 권장되는 최소치에 크게 못 미쳤다. • 당직 항해사가 선박이 끌리고 있다고 판단한 뒤에야 비로소 닻줄을 더 내보내려는 시도가 이루어졌다. 선장이 예보된 기상을 철저히 평가하고 선박이 끌리기 시작하기 전에 닻줄을 더 내보냈더라면 피할 수 있었을 좌주가 여럿 있었을 것이다. • 사용한 닻줄의 양만으로는 선박이 끌리는 것을 막기에 충분하지 않았을 수 있으나, 많은 사례에서 주기관 준비 통보가 부적절하여, 선박이 끌리기 시작한 뒤 승무원이 그 결과에 신속히 대처하기 어려웠다. • 여러 차례, 예측된 선회원(swinging circle) 안에서 선박 위치를 감시하는 것이 부적절하여 당직 항해사에게 닻이 끌리기 시작했다는 조기 경보를 주지 못하였다.
원문 보기
1.1 OF THUNDER AND ACCIDENT Vessel details Registered owner : Partenreederei MS Thunder Manager(s) : Reederei Erwin Strahlmann : St John’s Flag : Antigua and Barbuda Type : Single , general cargo Built : 22 December 1984, Wewelsfleth, Germany : : : 82.30 metres : 1559 tonnes power and/or type : Deutz diesel type SBA 8M 528, 441kW at 620 rpm Service : 10.0 knots Other relevant info : 1 132Kw Accident details Time and date : 0500 BST 10 August 2006 Location of accident : 53 21.61N 003 18.54W. Five cables north east of the Point of Ayr Old . Persons on board : 7 Injuries/fatalities : None Damage : None
1.2 BACKGROUND Thunder is owned by Partenreederei MS Thunder, Marne, Germany and is one of 53 similar vessels managed by Reederei Erwin Strahlmann, of Germany. The vessel was registered in St John’s, Antigua and Barbuda and has held the previous names Sandfield, Paloma, and Landkirchen. The accident was reported by the Dee Conservancy harbourmaster who also conducted an initial investigation into the incident. The investigation report was received by the on 25 August 2006, 14 days after the accident. 1.3 ENVIRONMENTAL CONDITIONS 1.3.1 Weather system The surface analysis chart for 1800 on 9 August 2006 showed a system 1000mb, situated north-east of Scotland. The system was generating west to north-westerly winds, Beaufort force 5 to 6 over the Dee Estuary, occasionally gusting up to 29 knots. 1.3.2 Tides The predicted and recorded tidal data for the of Mostyn is shown in table 1. Admiralty Sailing Direction NP37 refers to a maximum easterly spring rate of 2.5 knots in the general direction of the channel. However, conditions can see sudden rushes of short duration with rates up to 4 knots between 3hr 45min and 1hr 45min before at Liverpool. Table 1 DATE PREDICTED RECORDED DIFFERENCE TIME (BST) HEIGHT (metres) TIME (BST) HEIGHT (metres) TIME (minutes) HEIGHT (metres) AUG 1827 1.41 - - - - 2352 9.29 2356 9.23 + 4 - 0.06 AUG 0655 0.83 0708 0.78 +15 - 0.05 1221 9.22 1230 8.99 +9 -0.23 1914 1.01 1930 0.91 +16 -0.10 AUG 0036 9.57 0040 9.46 +4 -0.11 0741 0.48 0810 0.40 +29 -0.08 1305 9.42 1310 9.02 +5 -0.40 1.4 NARRATIVE All times are British Summer Time (UTC +1). 1.4.1 Planned Thunder was due to undertake a voyage and had sailed from Newport, South Wales, at 1855 on 7 August 2006. The vessel was bound for Shoreham to load a cargo of scrap steel.
1.4.2 Sequence of events: pre- At 1330 on 8 August 2006, as Thunder was of Lizard Point en route to Shoreham, her received a mobile telephone from the vessel’s operator, Echoship, based in Denmark. The master was informed that a new charter had been arranged which required him to proceed to the Port of Mostyn, in the Dee estuary, to load a cargo of steel coil. The cargo operator requested that the master inform him of: the distance to run to Mostyn, the vessel’s and the prevailing weather conditions. At 1330, the altered the vessel’s to 281 and the passage to Mostyn commenced. Weather conditions were favourable; the wind was southerly force 2, forecast to veer north-west, and the was good. The sea conditions were benign, and Thunder made good an average of 10.1 knots. The master, together with the , checked the passage charts from Lizard Point to Mostyn and identified that BA chart 1953 ‘England and Wales Approaches to the River Dee’ was not held on board. At 1420, Echoship received an email from Thunder’s master (Annex A) which answered their earlier questions; informed them that BA chart 1953 was not held; and, for that reason, requested that a board the vessel at the Liverpool Bar. The master had assumed that this would be the boarding , having previously embarked a pilot for Raynes - Llanddulas, 17 miles west of Mostyn, from the same position. At 1542, Echoship emailed a copy of the master’s request to the agent at the Port of Mostyn and confirmed that, in accordance with Mostyn’s anticipated breakdown of disbursements, funds would be transferred the following morning (Annex B). At 1658, the master, in accordance with the instructions in volume 6(1), provided the agent at the Port of Mostyn with the vessel’s arrival information 28 hours in advance of the planned ETA (Annex C). He requested that the pilot board from the Liverpool Bar, and once again requested provision of BA chart 1953. The vessel’s mobile telephone number was also passed. At 1748, the Mostyn agent, believing that Thunder had a subscription-only email service and would not be able to receive his email direct2, responded to the master’s earlier email by replying to Echoship (Annex D), for onward transmission to the vessel. This email provided the following information: • That the ‘pilot normally boards at the Dee pilot station’; • A set of waypoints which would allow the master to navigate from the North Rhyl buoy to the Dee buoy without BA chart 1953; • And the position of the ‘preferred ’ – the Wild Road anchorage. Twenty one minutes later, at 1709, Echoship re-transmitted the email to Thunder. The master’s interpretation of this email was that his vessel should in the preferred anchorage. This would require him to navigate the Mostyn Outer Channel without an 2 This was not the case as Thunder was fitted with communications equipment capable of receiving and transmitting emails as required.
appropriate navigational chart, using the GPS waypoints provided by the agent. The master attempted to call the Mostyn agent, using the telephone number in ALRS volume 6(1), seeking clarification, but there was no answer. Overnight 08/09 August, the master considered the options available to him. He was not content to navigate the Mostyn Outer Channel without an appropriate chart, and decided that the safest option would be to anchor west of the North Rhyl buoy to await either a pilot, or BA chart 1953. The master believed that the and preferred anchorage information had been issued and approved by a qualified mariner. However, the master was uneasy with the lack of communication about the arrangements for a pilot, and at 0710 on 9 August sent an email to the Mostyn agent (Annex E) expressing this concern and noting the possibility of failing light at the time of arrival and his concern about the shallow depths identified on BA chart 1978. Still unaware of his predicted time of berthing, the master stated that it was his intention to anchor west of the North Rhyl buoy if it was necessary for him to anchor. Crucially, he requested confirmation from the Mostyn agent that his previous emails had been received. The master did not receive a response to that email. Throughout 9 August, as Thunder continued on passage toward Mostyn, the master became increasingly uneasy with the options available to him on arrival and the level of support offered by the Mostyn agent. He discussed the suitability of the ‘preferred anchorage’ position with the mate. Both men believed that the position had been identified by an experienced pilot or harbourmaster, but still assessed that the safest option was to anchor at the North Rhyl anchorage. However, as the vessel neared Mostyn, the master decided to anchor Thunder in the ‘preferred anchorage’ position, based on his belief that: • the pilot would probably board from the ‘preferred anchorage’; • the preferred anchorageposition would only have been provided if it offered the best protection from the elements; • commercially the ship was required at the preferred anchorage to reduce disbursements, and to serve notice of readiness. At 2000, using BA chart 1978 ‘Great Ormes Head to Liverpool’ and with the Mostyn agent’s waypoints in the GPS, Thunder’s master commenced his approach to the Mostyn Outer Channel from one mile west of the North Rhyl buoy. The mate was on the helm, and the echo sounder was on. The one remaining hour of daylight assisted identification of the marks defining the channel boundaries, and other than keeping to the correct side of the navigation marks, the master was totally reliant on GPScross error for safe navigation. He was completely unaware of any navigational dangers that might have been present. At 2100, using the ‘preferred anchorage’ waypoint for guidance, Thunder let go the in 24 metres of water. Three shackles of cable were veered and the cable was secured with the third joining on . The navigation showed that on completion of anchoring, the of Thunder laid in position Lat 53º 21.61’N Long 003º 18.56’W, on the edge of the Mostyn Bank (Annex F) and in the jurisdiction of the Mostyn Docks Limited (CHA).
1.4.3 Sequence of events: post-anchoring Once anchored, the master attempted to communicate with the Port of Mostyn using radio channels 14 and 16. Receiving no acknowledgement, he attempted to communicate by mobile telephone but, similarly, there was no response to his call. The wind was from the north-west Beaufort force 6, and the spring tide was easterly at about 2.5 knots. The master fixed the vessel’s position at midnight (shortly after high water at 2352) on the only chart available to him, BA 1978. As he handed over the to the third , he was content that Thunder was lying to the port anchor, 3 shackles on deck, in safe water. Although an anchor drag alarm was an integral part of the GPS, it was not activated, and the master felt more content using the indicated GPS latitude and longitude to two decimal places to monitor the vessel’s position. Between midnight and 0800 on 10 August, while the master was resting, Thunder dragged anchor and on the Mostyn Bank. At no point during the night was he called and advised of the situation, the mate believing that this was a normal condition of the anchorage. When the master took over the watch again at 0800, there was no water around the vessel; the was visible along the surface of the sandy beach, but the anchor was submerged in the deeper part of the Mostyn Outer Channel. The master, without the benefit of the larger scale BA chart 1953, also assumed this to be a normal condition for the anchorage. The master again attempted to call the Port of Mostyn on VHF radio channels 14 and 16, but there was no response. In accordance with the procedures for stranding (Annex G) contained within the company’s , the master instructed the to take soundings of all tanks. The took the opportunity to step ashore and carry out a visual inspection of the hull, rudder and . All tanks were confirmed intact, and the visual inspection revealed no apparent damage to the hull or fittings. The configuration of the was not adjusted during this period. With only BA chart 1978 for reference, the master could not determine with certainty the exact drying height. In his own mind he was confident that at high water the vessel would refloat sufficiently for him to manoeuvre clear of the Mostyn Bank and return to the ‘preferred anchorage’. At around 1100, 1½ hours before high water, the vessel refloated. However, the combination of the spring and the force 5 to 6 north-westerly wind caused the vessel to shudder from wave impact and the anchor cable to vibrate and jump due to the load force being applied. The master went forward to examine the anchor cable, and confirmed that the anchor was dragging. The master returned to the bridge and attempted to ease the weight on the anchor cable using the , rudder and bow thruster. The attempt was unsuccessful and Thunder continued to drag closer inshore. At 1200, the ship’s logbook recorded her position as Lat 53º21.5’N Long 003º18.46’W. The vessel swung to the south east with the onset of the spring . The master continued to try and manoeuvre the vessel clear of the bank and into deeper water by heaving in the port anchor while using the main engine, rudder and bow thruster to
turn the vessel. The attempt was unsuccessful, and at approximately 1330 the vessel grounded again, in position Lat 53º21.38N Long 003 18.37W, an area with a drying height above of approximately 6.5 metres. Thunder was now lying in the jurisdiction of the Dee Conservancy (SHA), and the Mostyn Docks Limited CHA (Figures 1 and 2). 1.4.4 Involvement of the local harbour authorities At 0909 on 10 August, Liverpool received a call from the coxswain of the Hoylake lifeboat reporting Thunder aground off the Point of Ayr. At 0915, Liverpool coastguard called the Mostyn harbourmaster by telephone and asked whether he could confirm that Thunder was aground off the Point of Ayr. Based on the information which had been passed to him by the Mostyn agent, the harbourmaster believed Thunder was anchored in the vicinity of the North Rhyl buoy. To provide confirmation for the coastguard, he logged on to the Liverpool website and identified Thunder off the Point of Ayr. He advised the coastguard that the vessel ‘looked ok’ and was at anchor in the Wild Road anchorage. The coastguard accepted the explanation and closed the incident. At about 1030, the harbourmaster was due to begin survey operations and, as the survey left the harbour entrance, Thunder became visible to the harbourmaster for the first time. He recalled seeing the vessel surrounded by water and yawing in the 20 knot breeze. Thunder was not scheduled to for a further 24 hours, and the harbourmaster made no attempt to establish communications with the vessel during the period of surveying operations. At 1400, the harbourmaster left the port and returned home to rest prior to undertaking a pilotage act planned for midnight 10 August. At 1200 on 10 August, the ship’s commercial agent, appointed from Mostyn Maritime Services, telephoned the vessel and informed the master that he would not be berthing until midday on 11 August. The master acknowledged the intention, but did not report that Thunder had been aground. At 1625, the Dee Conservancy harbourmaster was accompanying a colleague around the Dee Estuary and observed a vessel aground and stranded high on the bank off the Point of Ayr. He immediately contacted the Mostyn harbourmaster to find out if he was aware of the situation. The Mostyn harbourmaster was not aware, but did recall his telephone conversation with Liverpool coastguard earlier that day. A weekly vessel movements schedule, prepared by the Mostyn harbourmaster, was designed to keep the Dee Conservancy harbourmaster abreast of shipping movements in and out of the Port of Mostyn. On this occasion, however, the short notice charter arrangements meant that Thunder had not been included on the schedule. As a consequence, the Dee Conservancy harbourmaster was unaware of the vessel’s identity. He did, however, make arrangements to visit Thunder between 1830 and 2100, during the period of , in company with the Environment Agency (EA) waterways manager. The master was informed of his obligations, and was advised of the potential for the vessel to become neaped should the next attempt to refloat at midnight be unsuccessful. The Dee Conservancy harbourmaster also informed the Mostyn Harbourmaster that, because Thunder was now lying in the jurisdiction of the Dee Conservancy, he would be carrying out a full investigation of the accident.
Figures 1 and 2 Thunder aground pm 10 August on the Mostyn Bank Photographs courtesy of Captain ○○J. Allister
1.4.5 Sequence of events: The master had waited until 1400 on 10 August to contact the vessel’s owner, and inform the of the situation. He advised the DPA that he was convinced Thunder would refloat at the next high water. The DPA began contingency planning measures, making arrangements for a towage contract should the master not refloat Thunder on the next high water. During the afternoon, the master discharged all unnecessary salt water ballast, which reduced Thunder’s to 1.8m , a reduction of 60cm. At 1700, after obtaining vessel particulars from the agent’s office, the harbourmaster contacted Thunder’s master by mobile telephone and briefed him on the most effective way to manoeuvre clear, once the vessel was afloat. With Thunder lying on a of 120º, and with 26 knots of wind approaching from directly , the master was briefed to use power and, keeping the bow to the bank, sternboard into the main channel and let the seek the wind. Although the harbourmaster considered putting a pilot on board at low water, he was scheduled to conduct another pilotage act at midnight and there was insufficient time for the stand-by pilot to arrive. Consequently, the master was left to manoeuvre his own vessel, although from 2300 the Mostyn was standing by in the area of the Wild Road anchorage with a pilot, and the harbourmaster on board to provide advice. At 2345, the master made an entry in the ship’s logbook, ‘vessel prepared for manoeuvres as per checklists’, although he had still not been provided with BA chart 1953, first requested 58 hours earlier. High water was predicted to occur at 0036 on 11 August. The wind was from 294º at a speed of 22 knots, occasionally gusting 26 knots. Thunder’s engine remained on 5 minutes notice for readiness. At 0010 on 11 August, Thunder floated free - the master manoeuvring in accordance with the advice provided by the harbourmaster. Once she was in deeper water, the pilot called the master on VHF radio, giving him a course to steer to a safe anchorage 2 cables west of the Dee buoy. In fact, Thunder was not making good the course given due to extremely poor caused by the exposure of the majority of the propeller and rudder above the , a consequence of the earlier de-ballasting operation. The master reported a maximum attainable speed of 2 knots. The pilot became aware that Thunder was not making good the course given, and decided to try and board the vessel. At 0035 he boarded Thunder, handed the master an out of date copy of BA chart 1953, and advised him of the course he needed to steer and the relevant visual and navigation marks. Due to deteriorating weather, the pilot felt it necessary to leave the vessel 15 minutes later at 0050. Once again observing Thunder’s manoeuvring from the pilot boat, the pilot became aware that the vessel was intending to pass to the north of the Dee south cardinal buoy. The pilot again contacted the vessel by VHF radio and instructed the master to pass to the south of the Dee buoy.
At 0110, Thunder anchored two cables west of the Dee buoy, using the port anchor with 6 shackles of cable veered. On completion of anchoring and satisfying himself that the vessel was safe, the master, who was feeling extremely tired after the day’s events, went below to sleep. He left night orders instructing the bridge watchkeepers to use the engine and bow thruster as necessary to reduce any undue strain on the anchor cable, and reduce the risk of the vessel dragging further. Overnight the vessel ballasted, which resulted in draughts of 2.36m forward and 2.78m aft. In the morning, it became apparent that Thunder had dragged anchor overnight, the stern being no more than 5m from the Dee buoy. However, she remained in this position until 1240 when the Mostyn pilot boarded. Thunder eventually berthed side alongside number three berth in the Port of Mostyn at 1420. 1.4.6 Actions post arrival in Port of Mostyn A local attended Thunder on arrival and conducted a inspection that revealed four deficiencies: • The gross tonnage specified in words and figures on the did not agree. • The was not approved by the Flag State. • No chart was available on board for the arrival port (rectified during inspection). • The SMS did not deal with a change of orders to a port where the vessel did not have appropriate chart coverage. The Dee Conservancy harbourmaster boarded the vessel in the capacity of investigating officer, interviewed the master in connection with his vessel’s stranding, and advised him that the incident should be reported to the MAIB. He provided the master with a copy of the EA publication ‘Marine Safety in the Dee Conservancy – a guide to safe navigation’ and a copy of the Dee Conservancy Local Number 3/2006 which provided guidance for the statutory reporting of accidents and serious injuries. 1.5 HYDROGRAPHIC PUBLICATIONS 1.5.1 BA chart 1978 – Great Ormes Head to Liverpool (Scale 1:75000) A new edition of BA chart 1978 - edition number 8, which allowed positions to be plotted directly onto the chart, was published by the on 25 October 2001. This edition was available to Thunder’s master and had been corrected by weekly Notice to Mariners (NTM) up to, and including, week 30 of 2006. As part of the updating process, edition 8 no longer displayed the buoys marking the Welsh Channel or the Mostyn Inner channel. A note on the chart explains that: “These channels are liable to frequent change and there may be less water than charted. The buoys are moved as necessary” Edition 8 marked these channels by pecked lines, and the legend ‘buoyed channel’. A pilot boarding symbol for the Port of Mostyn was displayed in the centre of the channel at Wild Road, and an ‘important note’ displayed on the chart advised mariners to ‘always use the largest scale chart appropriate’. The magenta outline of BA chart 1953 was displayed on BA chart 1978.
1.5.2 BA chart 1953 – Approaches to the River Dee (Scale 1:25000) A new edition of BA chart 1953 – edition number 6 (Figure 3), was published by the UKHO on 11 May 2006. The chart provided large scale coverage of the Welsh Channel, Wild Road, Mostyn Deep, and a separate plan provided larger scale coverage of the Mostyn Channel up to and including Mostyn Docks. Due to the late change of orders, this chart was not available to Thunder’s master. Although the master had requested its provision from the Mostyn agent and the vessel’s cargo operator, Echoship, the vessel’s owner was unaware that the master was not in possession of BA chart 1953. The previous edition of BA chart 1953 – edition number 5 (Figure 4), was published on 25 October 2001. This chart displayed pilot boarding points for Mostyn in the centre of the channel at Wild Road, and seven cables south east of the North Rhyl buoy. On edition 6, the pilot boarding position near the North Rhyl buoy had been removed, and two directional lights had been added: the West Hoyle Spit (Earwig) light beacon (perch pile)3, and a second light located ashore 4.5 cables southwest of Mostyn Docks. On edition 6, the recommended anchorage at Wild Road remained in the same position, while the recommended anchorage in the Mostyn Deep had been moved 4 cables west to the south side of the channel. 1.5.3 Sailing Direction NP37 – West Coasts of England and Wales The latest edition of Sailing Direction NP37, edition 16/2005 published by the UKHO on 18 August 2005 was available to Thunder’s master. Since its publication, NP37 - edition 16 has been the subject of two amendments that affected the Port of Mostyn, or the approach channel. The first amendment, NTM 48/05, informed the reader about the location of the precision direction light. The second amendment, NTM 13/06, replaced paragraph 8.49: “For Mostyn Docks it is recommended that a Pilot is embarked at the outer boarding position 7 cables ESE of the North Rhyl Light-buoy. Alternatively pilots board near Dee Light-buoy (53º22.0’N 003º18.8’W)” with: “Pilots board near Dee Light-buoy (53º22.0N 003º18.7’W)” Both amendments were originated by the Mostyn harbourmaster, and were available to Thunder’s master. 1.6 ANCHORING PLAN 1.6.1 Initial planning to Mostyn was conducted jointly by the mate and the master. Because BA chart 1953 was not available, the master’s intention was to anchor in the vicinity of the North Rhyl buoy. He appreciated that although the anchorage was exposed to the wind and sea at all states of tide, it provided unlimited swinging room, and was clear of immediate navigational dangers. Furthermore, the anchorage was recommended in the Sailing Directions for deep draught vessels and, therefore, the master considered it a safe option. 3 The West Hoyle Spit precision direction light is remotely activated as authorised by the Mostyn Harbour Authority. The perch pile also broadcasts wind, tide and current information to Mostyn and suitably equipped vessels.
BA Chart 1953 Edition No 6 Figure 3 Pilot boarding position removed Reproduced from Admiralty Chart 1953 by permission of the Controller of HMSO and the UK Hydrographic Office
Extract of BA Chart 1953 Edition No 5 Figure 4 Reproduced from Admiralty Chart 1953 by permission of the Controller of HMSO and the UK Hydrographic Office Pilot boarding position
1.6.2 aspects During the period of Thunder’s stay at anchor, the spring was predicted to exceed 9m, and the wind was forecast to remain in excess of 20 knots from the northwest. Aware of these constraints, the master planned to let go the port anchor and veer three shackles of cable, holding on when the third joining shackle was on the deck. The distance from the preferred anchorageposition to the Mostyn Bank was approximately 167 metres which, given the master’s intention to veer 3 shackles of cable, reduced the margin of error to less than 10.6 metres. 1.6.3 Bridgeanchor watch The instructions for maintaining a safe at anchor are laid down in the STWC Code Section A-VIII/2 part 3-1 and are shown at (Annex H). 1.7 REEDERIE ERWIN STRAHLMANN – SAFETY MANAGEMENT The company was issued by Germanischer Lloyd on 10 August 2005. There were two aspects of the safety management system directly relevant to this accident: • Procedure VA-015 voyage planning. • NP-005 Situations and actions for grounding and stranding. Procedure VA-015 was comprehensive. It provided the with clear guidelines on the requirements for planning a voyage and, as part of the process it explained individual responsibility. The procedure for ordering, updating, and correcting nautical publications was explained; it referred the reader back to the voyage planning section whenever it became necessary to order missing or out of date charts. The voyage planning section stated: ‘the actualisation of nautical charts and publications should be checked (if all corrections have already been inserted); missing or outdated nautical charts and other publications must be ordered for delivery before a voyage commences’ The procedure did not account for a change of voyage plan, and the subsequent action that was required to be taken by the master. The company’s grounding and stranding procedure checklist required that: • The master: o Inform the company emergency response team. o Inform other vessels by VHF. o Inform the coastal radio station. o Display by day three black balls, by night two all round red lights and two all round white lights and aft. o Flood ballast tanks to avoid ship shifting further ashore. o Drop anchor. o Calculate tides. o Plan refloating operation.
• The mate: o Check available depth of water around the vessel. o Investigate the type of seabed. o Note the . 1.8 THE PILOTAGE ACT 1987 Under the Pilotage Act 1987 a CHA is defined as any harbour authority: which has statutory powers in relation to the regulation of shipping movements and the safety of navigation within its harbour, and whose harbour falls wholly or partly within an active former . By definition, the Mostyn Docks Limited CHA is responsible for the regulation of shipping movements, and the safety of navigation within its area of jurisdiction. The Pilotage Act 1987 requires that each CHA shall keep under consideration: Whether any and, if so, what pilotage services need to be provided to secure the safety of ships navigating in or in the approaches to its harbour; and Whether in the interests of safety pilotage should be compulsory for ships navigating in any part of that harbour or its approaches and, if so, for what ships and in which circumstances and what pilotage services need to be provided for those ships. 1.9 STATUTORY AND COMPETENT HARBOUR AUTHORITY LIMITS The present SHA and CHA limits are shown on the chart at Annex I. 1.9.1 History and background – Dee Conservancy The Dee Estuary provides an important commercial waterway from Broughton, manufacturing plant of the A380 airbus wings, and the Port of Mostyn. It is the subject of multiple conservation designations, and provides significant recreational space for leisure craft users. Responsibility for conservancy has passed through several organisations since the implementation of the Dee Conservancy Act 1889. Currently, the EA is the designated conservancy and statutory harbour authority for the Dee estuary. The Ports Act 1991 transferred local lighthouse responsibilities from Trinity House to local harbour authorities, consequently the EA now holds responsibility as the local lighthouse authority in the estuary. Pursuant to the implementation of the , in March 2000 the EA commissioned a review of its marine operations. The review examined how the agency discharged its duties and responsibilities, and provided an independent opinion of the steps required to ensure the safety of navigation in the estuary for the succeeding 20 to 50 years. Relevant to this investigation the review recommended: • The best arrangement for navigational safety on the Dee Estuary would be a unitary conservancy and pilotage jurisdiction. • This unitary authority should be a trust port. In the interim, a non-statutory Navigation Advisory Committee should be introduced. • The EA should take immediate steps to obtain the necessary marine competency and appoint a harbourmaster.
• A harbour revision order should be promoted to allow the EA to charge dues to vessels transiting the conservancy jurisdiction. • The EA and the Port of Mostyn should jointly implement the PMSC. This should include joint systems, such as navigational criteria, accident reporting, investigation and recording. The immediate impact of the review was a thorough of the EA’s functions, followed by the appointment of a harbourmaster for the SHA of the Dee Conservancy. 1.9.2 History and background – Port of Mostyn The Port of Mostyn is privately owned and has, historically, been associated with the import and export of local steel products, ro-ro ferry operations, offshore wind farm construction and maintenance, and underwater pipe-laying. It is tidally constrained, and has required significant dredging of the inner channel to allow access for larger vessels (Figures 5a and 5b). Originally, Mostyn Docks Limited was in a Trinity House Pilotage District, which had jurisdiction for the safety of navigation, buoyage, and pilotage in the whole of the Dee Estuary and seaward to the North Rhyl buoy. With the introduction of the Pilotage Act 1987, the port applied for SHA jurisdiction for the whole of the estuary, excluding the Mostyn Outer Channel to the North Rhyl buoy. However, following local objection to the proposal, Mostyn reduced its SHA limits to an area immediately surrounding the port, and these were subsequently defined by the Mostyn Docks Harbour Empowerment Order 1988. For a vessel to enter the Port of Mostyn, it must pass through the SHA of the Dee Conservancy before it can enter the smaller SHA of Mostyn. The area of the Dee Conservancy that the vessel must pass is the Mostyn Deep and the Mostyn Channel. This area is known as the Mostyn Operational Area (MOA) (Figure 6), and it is the subject of a specific agreement between the Dee Conservancy and the Port of Mostyn. However, Mostyn is the CHA for pilotage in the whole of the Dee estuary4, as defined by The Mostyn Docks (Pilotage) Harbour Revision Order 1989. Prior to a public inquiry in 1996/7 which found in favour of port development and approved a capital dredge of the Mostyn Channel to a depth of 3m, vessels were constrained by a drying height of 3.25m alongside, and all shipping movements were conducted at high water. Two days either side of neap tides saw few shipping movements which, at that time, were vessels averaging 80 metres in length and 3.5 metres draught. Following the public inquiry approval, the port was substantially upgraded by the creation of new hard-standing, new jetties, and a new ro-ro terminal. In 2001, P&O Ferries commenced operating from the port. However, the approval to dredge the inner channel to 3m, did not include permission for maintenance dredging, and the subsequent silting of the Mostyn Channel severely constrained the company’s ability to operate a scheduled service. As the impact of the port’s inability to conduct maintenance dredging worsened, coincidentally, the P&O Ferries’ operation was suspended for commercial reasons. 4 Excluding the Mostyn Outer Channel
Port of Mostyn post redevelopment Figure 5a and b Port of Mostyn during redevelopment C1998
Chart showing the Mostyn Operational Area and the present limits of jurisdiction as the competent harbour authority Figure 6 Reproduced from Admiralty Chart 1953 by permission of the Controller of HMSO and the UK Hydrographic Office
Currently the Port of Mostyn removes between 175,000 and 225,000 cubic metres of fine sand per annum. This allows a dredged depth of up to 2m to be maintained in the Mostyn Channel. 1.9.3 Mostyn Docks Limited - current pilotage requirements Pilotage directions are issued by the Mostyn harbourmaster on behalf of the CHA. The directions were updated and re-promulgated as issue number 3a in 2004, and state that pilotage is compulsory in the Dee Estuary pilotage area for5: • Ships carrying explosives or bulk dangerous cargo. • Vessels engaged in where the length of the tow exceeds 50m. • vessels 47.5m or more in length. • All other vessels 20m in length or more. An exemption from compulsory pilotage is provided for vessels less than 50m in length, where the person in charge of the navigation of the vessel has satisfied the harbourmaster that they have sufficient local knowledge to navigate safely within the Dee Estuary pilotage area. The pilot boarding area is stated as the vicinity of the Dee buoy, Lat 53º 21.8’N Long 003º 18.6’W. The pilotage directions make no reference to an ‘on request’ Pilotage service in the Mostyn Outer Channel, for which the pilot boarding point would be in the vicinity of the North Rhyl Buoy. However, the directions do remind masters that nothing in the directions relieves them of their overriding obligation to ensure the safe conduct of their vessels. 1.10 THE MOSTYN OUTER CHANNEL To seaward, the channel starts at the North Rhyl buoy, follows the Inner Passage, the area known as the South Hoyle Channel, and the Welsh Channel until its completion at the Dee buoy in the vicinity of the Wild Road recommended anchorage, a distance of 10 miles. The seabed is predominantly fine sand and mud, and the channel is prone to silting and seabed movement caused by complex flows into and out of the Dee estuary, and significant tidal streams. Chart datum depths in the channel described in the portpassage plan vary from a maximum of 21m at the Dee buoy, down to 4m in the vicinity of Middle Patch Spit. The area of the channel in the vicinity of the directional light and south of the West Hoyle Spit, known as the South Hoyle Channel, was dredged to 4.7m in 2001. The dredged section stretches a distance of 3.3 miles and represents the narrowest part of the channel with a charted width of 80m at chart datum. A channel side slope gradient of about 1 in 5 proportionately increases the as the tide rises. A gas pipeline lies across the Welsh Channel, to the east of the South Hoyle Channel. BA chart 1953 notes that the Outer Channel is subject to changing depths. 1.11 OUTER CHANNEL DEVELOPMENT 1.11.1 Initial risk assessment In 2001, in anticipation of a P&O Ferries’ service operating from the port, the harbourmaster arranged for a risk assessment of the proposed operations to be carried out. The assessment examined the South Hoyle Channel for the introduction of larger vessels but, due to the size and speed of the proposed ferries, the assessment focused heavily on the ferry operation and channel width. 5 The pilotage directions lay down certain exemptions for compulsory pilotage.
Pertinent to this investigation, the risk assessment examined the hazards of a commercial vessel or P&O ferry grounding or stranding in the Mostyn Outer Channel or its approaches. The causes were identified as: human error; lack of a pilot or unfamiliarity with the area; failure to calculate the ; or the vessel out of the channel. The likely consequences were hull damage resulting in an oil spill, and that the vessel would have to await the next tide to refloat. Actions to minimise the risk were identified as: regular surveys, monitoring of navigational aids, and extending the harbour limits in order to have control of the risk area. The risk assessment process helped the harbourmaster to identify that a number of new control measures were required which included the following: • New pilotage directions recommending pilotage from the Middle Patch Spit buoy (7 cables south-east of the North Rhyl buoy). • A monthly NTM, reminding mariners about their responsibilities when encountering vessels constrained by their draught. • As soon as practicable, an HRO to extend the to encompass the South Hoyle Channel and its approaches. • The establishment of a sectored light to assist precise navigation. Pursuant to the requirement for pilotage from the Middle Patch Spit buoy (7 cables south east of the North Rhyl buoy), the harbourmaster issued revised pilotage directions on 2 May 2001. Paragraph 3 of the directions advised mariners that: ‘The outer pilot boarding area is in the vicinity of the Middle Patch Spit Buoy, at Lat 53º 22.4’N Long 003º 33.0’W ’. Compulsory pilotage commences at the inner boarding area, however it is strongly recommended that a pilot is embarked and landed at the outer boarding area, particularly if the master is unfamiliar with the area, or if the vessel is in excess of 100 metres in length ’. 1.11.2 Trinity House Historically, the marking of the Mostyn Outer Channel was the responsibility of Trinity House, based upon powers of general navigation. At a meeting in November 2000, Mostyn Docks Ltd discussed a proposal with Trinity House to dredge an 80m wide channel to a depth of 5.0m below chart datum; establish a pile with a directional light; establish six new floating aids to navigation and, dependent upon the result of a hydrographic survey, reposition existing aids to navigation. Relevant to this investigation, the same meeting discussed measures to control vessel movements in the channel and noted that: • Either pilotage would be compulsory for vessels over a particular length (risk assessment to be carried out) or they would have to be in possession of a . Pilot boarding was expected to be at the North Rhyl Buoy. • One way traffic only in the dredged channel would be permitted with control by VHF. Radar coverage for the area was not anticipated.
Trinity House had concerns over some of the proposals and suggested that a way of addressing these would be for the Port of Mostyn to apply for an extension of its jurisdiction limits to a position just west of the approach to the dredged channel, with compulsory pilotage/PEC arrangements in place from the North Rhyl Buoy inwards. Only then could Mostyn have control over vessel movements in the narrow dredged channel. An extension to the Port of Mostyn’s jurisdiction limits would necessitate a rearrangement of responsibility of the existing aids to navigation, from Trinity House to Mostyn. The port would assume responsibility for all existing wrecks, as well as new ones inside the revised limits, and survey responsibilities. The meeting concluded with the Mostyn harbourmaster agreeing to consult with the EA and the over his proposals. In March 2001, the Mostyn harbourmaster wrote to Trinity House proposing alterations to the aids to navigation discussed at the November 2000 meeting. Principally, the changes were related to the number of buoys needed to mark the channel. In its response dated 28 March 2001 (copies to the DETR, MCA, EA and United Kingdom Hydrographic Office) (UKHO), Trinity House reiterated its concern over the use of the South Hoyle Channel unless Port of Mostyn extended its limits of jurisdiction out to the west of the channel, had control of vessel movements in the channel, and had compulsory pilotage/PEC arrangements in place from the North Rhyl Buoy inwards. Some 4 months had elapsed since the initial meeting and, given that the aim was to commence ferry operations in July 2001, Trinity House would have expected to have received a copy of the draft HRO. Trinity House was precluded from granting its consent to establish aids to navigation to mark the South Hoyle Channel until such time as the limits of jurisdiction had been extended. It was not prepared to grant its approval to the establishment of the aids until such time as Mostyn Docks Ltd had the necessary powers in place to control vessel movements in the narrow dredged channel. A further concern was that until the position and characteristics of all aids to navigation had been resolved, the position of new pilotage reporting/boarding symbols finalised, and boundaries of the dredged channel passed to the UKHO, new editions of the relevant Admiralty Charts could not be finalised. The Port of Mostyn was urged to pursue the progression of its HRO. On 2 April 2001, Mostyn responded to Trinity House by confirming that the port would apply for an HRO, and explained that the EA had simultaneously been undertaking a review of its navigational/conservancy responsibilities and wished to go to public consultation on the review before any HRO was applied for. Mostyn was happy to accommodate the EA’s plans as long as the application could be made in a reasonable time. The letter expressed Mostyn's disappointment with the Trinity House response of 28 March, that not only was an HRO to be applied for, but it was now required to be in place. Aware of the potential delays in applying for and receiving an HRO, Mostyn requested advice from Trinity House as to any interim measures that might be applied. On 18 April 2001, Trinity House wrote to the DETR and the MCA (copied to EA and the UKHO) referring to Mostyn’s 2 April letter, and expressed their concern that the dredged channel was narrow in relation to the vessels using it, and that no effective means of vessel traffic control was in place for all vessel movements. Furthermore, Trinity House was not prepared to accept establishment of any additional aids to navigation, whether provided at local expense or not, until effective powers were in place to control all vessel movements.
Notes of a meeting, held at Trinity House on 30 April 2001 with the Port of Mostyn, reaffirmed that Mostyn still wished to promote an HRO, but that efforts were currently being frustrated by the EA going to consultation on the future of the River Dee conservancy. The EA had indicated that they would regard an application for an HRO by Mostyn as premature and it would be opposed, but they would be content for an interim solution. Trinity House confirmed its wish to assist and resolve the situation, and stated that the Port of Mostyn should, in the long term, have compulsory powers of pilotage. Concerned about liability arising from navigational aids situated outside of the Port of Mostyn, it was concluded that it might be preferable for the Port of Mostyn to apply under Section 34 of the Protection Act 1949 for consent to provide buoys to replace the existing buoys in the channel. It was agreed that the Port of Mostyn could not impose compulsory pilotage without promoting an HRO, but the harbourmaster confirmed that the port would offer non-compulsory pilotage to all customers of the port. The Port of Mostyn anticipated that it would apply for the HRO on completion of the EA consultation, and in any event by the end of 2001. 1.11.3 Coast Protection Act 1949 – section 34 application Under section 34 of the Coast Protection Act 1949 (as amended principally by section 36 of the Merchant Shipping Act 1988) the consent of the Secretary of State for Environment, Food and Rural Affairs () is required for: • the construction, or improvement of any works on, under or over any part of the lying below the level of mean high water springs; • the deposit of any object or materials below the level of mean high water springs; • the removal of any object or materials from the seashore below the level of mean low water springs (eg dredging). On 23 April 2001, the Port of Mostyn made applications to MAFF (now DEFRA) and DETR (now DfT) under the Coast Protection Act 1949 for the installation of a perch pile and 16 navigation buoys in the Mostyn Outer Channel. In response to DETR’s request for comment on the application, Trinity House reiterated its concern that the outer dredged channel was narrow, particularly in respect to the size of the vessels that would need to use it. Trinity House continued to have concerns about the safe use of the channel and the risk for a serious incident to occur unless precautionary measures were taken. In an attempt to mitigate the risk, Trinity House was prepared to consent to Mostyn Docks Ltd establishing and maintaining aids to navigation, but laid down eight key provisions that should be met prior to granting that consent. • The Port of Mostyn to apply for a Harbour Revision Order extending their Harbour Limits and giving them powers, amongst other things, to establish aids to navigation, control vessel movements, and marking/removal responsibilities. The application to be made by no later than 31 December 2001. • The entire situation to be reviewed if the Harbour Revision Order has not been obtained within two years of the application being made. • The Port of Mostyn commissioning an independent safety assessment of arrangements in place for the operation of the channel, and action any recommendations as soon as practicable. • The Port of Mostyn to carry out regular surveys and maintenance dredging of the approach channel as necessary.
• Clear acceptance by the Port of Mostyn for dealing with any wrecks that occur either in or through the use of the channel. • Issue by the Port of Mostyn at monthly intervals of Notices to Mariners warning of the regular use of the channel by vessels restricted in their ability to manoeuvre because of their size. • Satisfactory arrangements for Pilotage or Pilotage Exemption being in place prior to the commencement of the Commercial Service. • In addition any vessels engaged in establishing and/or maintaining the buoys and beacon to exhibit signals in accordance with the Regulations. This notwithstanding, the commencement of the P&O Ferries Ltd’s service was imminent, and section 34 consent, number 70078, was granted by the Secretary of State for Transport, Local Government and the Regions on 4 September 2001 (Annex K). This consent contained many of the provisions laid down by Trinity House. Port of Mostyn eventually submitted its HRO application on 17 April 2003. On 2 June 2003, Trinity House wrote to DfT regarding the proposed Mostyn HRO. The letter addressed three issues: • The need to define positions by latitude and longitude rather than by named navigational marks. • The need to ensure that all navigation marks were inside the proposed limits of jurisdiction. • Trinity House’s preference for only one LLA (Local Lighthouse Authority), which, it was opined, should be the harbour authority, Mostyn Docks Limited. 1.11.4 Current Outer Channel maintenance As the Mostyn Outer Channel’s viability is essential to the Port of Mostyn, it is currently surveyed and maintained by the Mostyn harbourmaster in accordance with Condition 4 of the Coast Protection Act consent issued in September 2001. In 2001, the South Hoyle Channel was dredged to a depth of 4.7m, and the harbourmaster’s 2006 surveying programme showed that the intention was to conduct partial6 surveys of the South Hoyle Channel and Welsh Channel, and normal surveys of the Rhyl Flats, Mid Hoyle channel, and Wild Road anchorage. 1.12 CURRENT HARBOUR REVISION ORDERS The Mostyn HRO dated 17 April 2003, and the Dee Conservancy HRO dated 26 January 2005, conflicted and were subsequently scrutinised at a public inquiry held in November and December 2005: • The proposed Dee Estuary Conservancy HRO does not seek to change the jurisdiction of the EA as conservancy, harbour and local lighthouse authority for the Dee Estuary. It does, however, seek to repeal the Agency's functions under the 1889 Act and earlier local legislation, and replace them with modern powers and duties relevant to its roles as conservancy, harbour and local lighthouse authority. 6 The partial surveys involved a reduced number of lines.
• The proposed Mostyn Docks HRO seeks to extend Mostyn's existing jurisdiction as SHA for the Port of Mostyn, within a defined 500 metre wide channel from the Port out to the North Rhyl buoy. If made, this would remove the EA's jurisdiction as conservancy, harbour and local lighthouse authority over that part of the defined channel which presently lies within the Dee Conservancy. The HRO would also extend the area of Mostyn Docks Limited jurisdiction for the purposes of Pilotage, from the existing seaward limit to encompass the defined channel out to the North Rhyl buoy. Neither harbour revision order would authorise dredging in the estuary, without further approvals from the recognised government bodies. The main areas of disagreement between the Dee and Mostyn submissions were: • Whether Mostyn or the EA was the appropriate body to have jurisdiction over the defined channel within the Dee Conservancy. • Whether Mostyn Docks Ltd should have SHA jurisdiction over the extended conservancy area (the Mostyn Outer Channel). At the start of this investigation the Secretary of State for Transport had not reached a decision on either HRO application. Consequently, the wrote to the DfT suggesting that the Secretary of State defer decisions on those applications pending the outcome of this investigation, so that the Secretary of State could take account of any recommendations resulting from this investigation that proved to be relevant to the issues he would be addressing in reaching those decisions. 1.13 THE FUTURE OF THE PORT OF MOSTYN In November 2005, an application was submitted to the and the National Assembly for Wales, to develop the Gwynt y Môr wind farm 13 to 15 kilometres off the coast of North Wales. The site is designed to consist of around 200 wind turbines, covering 48 square miles. Geographically the Port of Mostyn is well suited to provide the base port facilities required for the initial build and, in the longer term, maintenance support facilities. An increase in shipping movements to the Port of Mostyn associated with the project work could be reasonably expected. The production of the Airbus A380 wings is expected to steadily increase over the next 3 to 4 years. A corresponding increase in shipping movements necessary to transport the wings from Broughton to Mostyn, and onward from Mostyn to Toulouse, France is probable. As a competitive commercial organisation, the port welcomes new business development. Future short to medium term ambitions include reinstating a scheduled ferry operation from the port. 1.14 PORT MARINE SAFETY CODE 1.14.1 Accreditation The Port Marine Safety Code was published by the DfT in March 2000. Both the Dee Conservancy and Mostyn Docks Limited indicated to the DfT their intent to seek accreditation with the PMSC.
To comply, it was necessary for both authorities to produce safety management systems (SMS) that had been based upon a formal risk assessment. Their target date for this was 31 December 2001. Although the Dee Conservancy SMS was completed by the end of 2001, key to accreditation with the PMSC was agreement over procedures for the Mostyn Operational Area (MOA), the part of the Dee Conservancy area through which vessels navigating to and from the Port of Mostyn pass. Mostyn Docks Limited commissioned the services of British Maritime Technology (BMT) to assist in the risk assessment process. However, the Dee Conservancy harbourmaster considered that the risk assessment applicable to the MOA was neither thorough nor robust. The methodology was generic, and did not identify significant hazards relevant to the area and evaluate the risk associated with each of the hazards which could realistically cause or contribute to a hazardous event. On 5 March 2002, the Dee Conservancy harbourmaster demonstrated to the Mostyn harbourmaster why he considered the methodology used in the risk assessments was unsuitable. It was agreed that a re-assessment of risk was necessary and would be undertaken. An amended and improved risk assessment was issued by Mostyn on 28 March 2002, which was considered acceptable to the Dee Conservancy. In November 2002, the Dee Conservancy SMS was issued, which included the procedures for marine operations in the MOA, jointly agreed with the Mostyn Docks Limited in August 2002. The procedures were designed to ensure that marine operations carried out by the Port of Mostyn in the MOA were conducted in a manner that met the standards required by the PMSC. In October 2002, DfT requested an update from Mostyn Docks Limited on their progress toward implementation of the PMSC. DfT was advised that the Mostyn SMS would complete development by the end of November 2002. On 4 November 2002, Mostyn Docks Limited commissioned Strategic Marine Services Limited to assist in the development of its SMS, with a deadline of the end of November for the final draft. The Dee Conservancy deputy harbourmaster, acting as a consultant with Strategic Marine Services, assisted in developing the document, which Mostyn Docks Limited finally issued on 13 December 2002. Mostyn Docks Limited’s final SMS was comprehensive and included joint arrangements for marine operations within the MOA and the requirement for a joint 6-monthly review of the SMS, specifically the MOA, by the Dee Conservancy harbourmaster. The SMS also identified the requirement for the position of a deputy harbourmaster, a position that has remained vacant since 2004. In June 2003, an agreement between the EA and Mostyn Docks Limited regulating marine operations by the Port of Mostyn in the MOA was reached, and signed. As a result, in July 2003, the EA was able to confirm implementation of the PMSC in all parts of the Dee Conservancy, just before the DfT deadline. Although the Port of Mostyn had reported its compliance with the PMSC in December 2002, DfT was concerned about the significant ferry operation using an approach channel that ran through the waters of a neighbouring authority. The port was alerted to these concerns, although they were abated by the decision to relocate the ferry service away from the port.
1.14.2 Audit regime Mostyn Docks Limited’s last SMS internal audit was undertaken by the in November 2005. The audit form was comprehensive, and indicated that all was in order. The annual review compiled by the harbourmaster in October 2005 made reference to: • No outstanding points arising from informal monitoring. • Actions arising from two joint MOA inspections had been rectified, (pilots’ authorisation documentation). • There were no major deficiencies recorded from the five annual reviews conducted in the company of the Dee Conservancy harbourmaster. • Two navigational accidents had occurred in the port over the audit period: o A vessel grounded leaving a berth on an ebb tide, and refloated at the next tide. o A , Tonne, made contact with the quay and a moored vessel; an error caused by the master incorrectly switching between automatic and . Independent external auditing had not been undertaken at Mostyn since the port achieved PMSC accreditation. 1.15 SIMILAR ACCIDENTS 1.15.1 Port of Mostyn A table of accidents and incidents at Mostyn, drawn from Mostyn and Dee Conservancy records, is at Annex J. The table shows 10 incidents including: • Five groundings and/or strandings; • Two damage to buoys; • One damage to ; • One incident of from a vessel's wheelhouse; • One incident of safe navigation compromised by the action of another vessel. This history of groundings at the port was taken into account when MAIB made the decision to commence this investigation. However, when P&O Ferries Ltd was operating from Mostyn, a lot of attention was being focussed on the safety of the port. The grounding of Thunder occurred 2 years after the ferry operation ceased, in significantly different circumstances. The ferry groundings are therefore not considered further in the report. 1.15.2 Vessels The MAIB database shows that since 1992 there have been 18 accidents in United Kingdom territorial waters that involved vessels dragging their anchor and subsequently grounding. A further 14 hazardous incidents were recorded that involved vessels dragging anchor but not grounding. Key factors to the groundings were: the chosen anchorposition; the length of cable veered; weather conditions; and the main machinery’s notice of readiness.
Analysis of MAIB’s data shows that nearly all accidents where the vessels subsequently grounded had some common : • The anchorage had often been chosen against the master’s better judgment, given the prevailing or the forecast weather conditions and the proximity of a lee shore. On occasions, the master’s choice had been ‘overridden’ by instructions and requirements from a port authority or embarked pilot. • In many cases the scope of cable in the given depth of water was substantially less than the minimum recommended. • Only when the OOW had determined that the vessel was dragging, was an attempt made to veer more cable. Several groundings would probably have been avoided had the master thoroughly assessed the forecast weather and veered more cable before the vessel started dragging. • The amount of cable used might not have been sufficient in itself to prevent a vessel dragging, but in many of the cases the main machinery notice of readiness was inadequate for the crew to deal promptly with the consequences once the vessel began to drag. • On several occasions, monitoring of the vessel’s position within its predicted swinging circle was inadequate, and therefore did not provide early warning to the OOW that the anchor had begun to drag.
2.4투묘와 감시 2.4.1 해도의 축척 선장은 BA 해도 1978을 이용해 와일드 로드 묘박지까지 항해하고 투묘하였기 때문에 선박 주변의 위험을 파악하는 데 필요한 세부 정보를 갖지 못하였고, 선교 당직자는 선회원 안에서 선박 위치를 정확히 측정하고 감시할 수 없었다. 사용 중이던 해도의 축척으로는 당직자가 닻이 끌리기 시작한 때를 신속히 알아볼 만한 정보를 얻지 못하였다. 2.4.2 묘박지의 선택 선장은 조석 간만의 차가 큰 항을 포함하여 영국 항구 앞바다에 투묘한 경험이 있었다. 그런 점에서 와일드 로드 묘박지는 다르지 않았다.
저조 때에는 와일드 로드의 수로 폭이 선회 공간을, 따라서 신출할 수 있는 닻줄의 양을 제한한다. 불행히도 선장은 3섀클이 모든 연안 수역에서 만족스럽다고 믿고, 닻줄을 더 내보내는 것이 닻이 끌리는 것을 막는 데 도움이 되지 않는다고 믿어 3섀클을 쓰기로 결정하였다. 이러한 믿음에서 선장은 투묘 원리를 근본적으로 오해하고 있음을 드러냈다. Thunder호의 닻줄 1섀클은 길이가 25m였다. BA 해도 1978에는 선호 묘박지 위치의 해도 수심이 약 15m로 나와 있었고, 조석 상승이 9m이므로 고조 때 예상되는 최대 수심은 24m였다. 저질의 종류와 품질에 관한 정보는 항로지나 BA 해도 1978에서 얻을 수 없었다. 공식7을 사용하면 다음과 같다. 필요한 섀클 수 = 1.5 x √ 수심(m) 섀클 수 = 1.5 x 4.89 = 7.3 예측된 선회원(닻에서 선미까지)은 다음과 같았다. • 닻줄 3섀클(75m) + Thunder호의 길이(82m) = 157m. • 닻줄 7섀클(175m) + Thunder호의 길이(82m) = 257m. 저조 때 수로 폭은 선장이 닻줄을 3섀클만 신출하는 경우에 한하여 선박이 안전하게 선회하기에 겨우 충분하였다. 선장이 필요한 닻줄의 양(7.3섀클)을 올바르게 계산하였더라면, 자신의 선박이 와일드 로드 묘박지에서 잠깐을 넘는 시간 동안은 안전하게 투묘 상태를 유지할 수 없다는 점을 깨달았을 것이다. 기상, 조석, 수심, 항해 위험과의 근접성을 감안할 때, 신출한 닻줄의 길이는 선박을 위치에 안전하게 붙들어 두기에 불충분하였다. 사용 중이던 해도의 축척 때문에 선장은 와일드 로드의 북쪽과 서쪽에 있는 안전한 수역을 더 잘 파악하지 못하였고, 당시의 바람을 고려할 때 묘박지를 그쪽으로 치우쳐 잡았더라면 얻을 수 있었던 이점도 파악하지 못하였다. 선장의 경험과 당시의 기상, 조석, 수심, 항해 위험과의 근접성을 감안하면, 그곳이 '선호 묘박지'라는 지시가 있었던 것으로 보이는데도 선장이 그 위치에 그토록 적은 닻줄로 투묘하기로 한 것은 놀랍다. 2.4.3 선교 투묘 당직 투묘를 마친 뒤 선교의 투묘 당직은 완전하게 유지되었다. 그럼에도 이번에는 STCW 95가 투묘 중인 선박에 대해 제공하는 지침의 중요한 측면들이 무시되었음이 분명하였다. 1. 선교 당직자가 레이더 거리, 육안 방위 또는 GPS로 선박 위치를 정확히 측정하는 능력은 BA 해도 1978의 축척 때문에 제한되었다. 그 결과 선박이 끌리는 것을 적정한 시간 안에 알아차릴 수 있는 능력이 크게 떨어졌다. 7 영국 해군성 선박 운용 교범(Admiralty Manual of Seamanship)
완만한 경사의 해안선에서 조석 간만의 차가 크면 해안 수선이 끊임없이 변하기 때문에 레이더 위치 측정의 정확도가 떨어지는 결과를 낳았다. 이는 또한 낮은 거리 눈금을 써서 레이더 화면의 두드러진 지점에 표시를 해 두고 닻이 끌리는 것을 일찍 알아내는 관행도 실행할 수 없었음을 뜻하였다. 가까운 부표까지의 거리를 레이더로 감시할 수는 있었을 것이나, 부표가 선교의 해도에 표시되어 있지 않았으므로 그 효과 역시 의문스러웠다. 이는 GPS '주묘 경보(anchor drag alarm)'를 사용했더라면 선교 당직자에게 닻이 끌리고 있음을 조기에 알려 주었을 특히 좋은 사례이다. 그러한 기능이 장착되어 있었으나 사용은 고려되지 않았다. 2. 선박이 좌주한 것이 선교 당직자에게 분명해진 뒤에도 선장에게는 알리지 않았다. 당시 당직자였던 항해사가 이것을 와일드 로드에서 으레 있는 일이라고 믿고 싶어 한 것은 당직 사관으로서의 책임을 무시한 것이다. 더구나 선박이 불행히도 구조 손상을 입었다면, 선장이나 선내 다른 누구에게든 통보가 늦어진 탓에 있을 수 있는 결과를 최소화하기 위한 적절한 숙고와 조치를 즉시 취할 수 없었을 것이다. 좌주·좌초에 관한 회사의 ISM 절차는 같은 날 한참 뒤에야 이행되었고, 그때에도 그 절차와 달리 선장은 사고를 국가 또는 지역 당국에 보고하지 않았다.
2.5도선 모스틴 부두 유한회사의 2001년 사우스 호일 수로(South Hoyle Channel) 상선 교통 및 페리 운항 위험성 평가는 모스틴 외측 수로에 강제 도선 또는 이에 상응하는 도선 면제 증명서(PEC) 제도가 필요하다고 보았다. 이 요건은 트리니티 하우스(Trinity House)가 뒷받침하였고, 2002년 2월 환경청에 배포된 모스틴 부두 유한회사의 HRO 초안은 이를 이루기 위한 권한을 요구하였다. 강제 도선 요건은 2003년 위험성 평가에서 다시 확인되었다. 그러나 페리 운항이 중단된 뒤에 이루어진 2004년 10월 위험성 평가는 모스틴 외측 수로에서의 해사 활동을 다루지 않았다. 이 무렵 모스틴 항만장은 영국 수로국에 노스 릴 부표 부근의 도선사 승선 기호를 삭제하고 영국 해군성 항로지의 안내를 그에 맞게 정정해 달라고 통보하였다. 그 결과 모스틴 부두 유한회사의 관할 항만당국(CHA) 구역 가장자리에 있는 디 부표에서 시작하는 전담 도선 서비스가 생겼으나, 항만장은 요청이 있으면 기상 조건이 허락하는 한 사우스 호일 수로에서도 도선 서비스를 제공할 용의가 있었다. 모스틴 항만장은 Thunder호 선장이 다음과 같이 한 것을 안전하지 않다고 보았다. 일몰 1시간 전에 모스틴 외측 수로에서 항해를 시작한 것, 적절한 해도 없이 진행한 것, 현지 조언을 구하거나 수로 접근 지향등을 이용하지 않은 것, 같은 조석에 접안을 기다리는 선박만 보통 쓰는 구역에 투묘하러 간 것. 이러한 점들은 2004년 이전의 위험성 평가에서 다루어졌었다.
1987년 도선법(Pilotage Act)은 항 안을 항해하는 선박뿐 아니라 항 접근로를 항해하는 선박의 안전도 확보할 필요가 있음을 인정하고 있다. 항만장은 이 구역에서 이용할 수 있는 도선 서비스를 줄임으로써, 자신의 이전 위험성 평가에서 식별된 핵심 위험 통제 수단 하나를 없앤 셈이다. 모스틴 외측 수로에 강제 도선이 마련될 때까지, 모스틴 부두 유한회사는 노스 릴 부표(North Rhyl Buoy)에서의 권장 도선 서비스를 복원해야 한다.
2.6항만 항해 계획 2.6.1 묘박지 모스틴항의 항해 계획에는 '깊은 흘수' 선박이 정의되어 있지 않으나, 그러한 선박은 필요하면 노스 릴 부표 부근에 투묘하도록 권고된다. 안전상의 이유로 Thunder호 선장의 애초 의도도 이 구역에 투묘하는 것이었다. 다음 사항을 고려할 때, • 이 항을 이용하는 현재와 장래의 해상 풍력 발전단지 관련 교통 • 동쪽의 천퇴 위험 • 재화중량톤수 6500t까지의 선박이 이 항에서 운영될 수 있다는 점 • 정기 페리 서비스를 지원할 기반 시설이 갖추어져 있다는 점 CHA인 모스틴 부두 유한회사는 정례 위험성 평가 검토의 일부로서 지정된 '모스틴 심수 묘박지'의 필요성을 검토해야 한다. 심수 묘박지의 경계는 해당 BA 해도에 표시하고, 이에 대응하는 항해자 대상 안내를 항로지에 제공해야 한다. 와일드 로드(Wild Road) 권장 묘박지는 모스틴 CHA 한계에 인접해 있다. 모스틴항의 SMS에 따라 이 묘박지는 가용 수심을 확인하기 위해 정기적으로 측량되었다. 그러한 정기 측량에도 불구하고, 모스틴 항만장은 이 묘박지가 Thunder호 같은 선박에는 접안을 위해 조석을 기다리는 짧은 시간을 제외하면 적합하지 않다고 인정하였다. 특히 와일드 로드 묘박지의 수심을 감안하면, 선박이 신출하는 닻줄의 양을 타협하지 않는 한 모든 조석 상태에서 안전하게 선회할 만한 충분한 해상 공간이 없었다. 이 묘박지의 적합성과 이용에 관해 항해자에게 더 포괄적인 안내를 제공하도록 항만 항해 계획과 항로지를 수정해야 한다. 2.6.2 이동 및 보고 모스틴항의 위험성 평가는 이 항이 다루는 선박 이동 빈도에는 VTS 정보 제공 서비스8로 충분하다고 판단하였다. CHA 구역 안의 선박 이동 파악은 개별 선박이 VHF 무선 14번 채널로 자신의 존재를 알리는 것과, 부근의 다른 선박이 그 방송을 수신했다는 가정에 의존하였다. 8 IMO가 정의한 바에 따르면, 선내 항해 의사 결정에 필수적인 정보를 제때 이용할 수 있도록 보장하는 서비스이다.
모스틴으로 가는 외측 수로 접근로는 현재의 CHA 한계 밖에 있으나, 그래도 항 접근로가 확장된 부분이며 일부 구간은 극히 좁다. 폭은 모스틴 부두 유한회사가 시행하는 준설 사업에 따라 정해지는데, 어느 크기의 선박이든 일부 구간에서는 한 번에 일방 통항만 지원할 수 있다고 볼 수 있다. 2001년 트리니티 하우스(Trinity House)는 수로의 좁음에 우려를 표하며, 모스틴 부두 유한회사가 수로와 그 부표에 대한 현지 지시권을 받기 전에 이 구역에 대한 CHA 지위를 획득해야 한다고 밝혔다. 이러한 제약을 감안할 때 수로 안의 선박 이동을 통제할 수 있는 능력은 중요한 안전 수단이며, 외측 수로에 대한 정례 위험 검토의 일부로 고려되어야 한다. 이동 통제를 시행하려면 효과적인 보고 체계가 필요하다. 선박 보고 체계가 갖추어져 있었더라면, Thunder호 선장이 항과 교신하고 낯선 구역에 대한 지시와 조언을 받을 수 있었을 것이다. 또한 항이 선박 접안 계획에 관해 선장에게 최신 정보를 알려 줄 기회도 되었을 것이다. 그랬다면 선장이 투묘 선택지를 더 잘 고려할 수 있었을 것이고, 아마도 이 사고의 발생을 막았을 것이다. 더구나 공식적인 보고 및 감시 절차가 있었다면, 모스틴 항만장이 해안경비대로부터 좌주 신고에 관한 질문을 받았을 때 선박의 위치를 완전히 알고 있었을 것이다. 필요하다면 그 구역에서 운항하는 다른 선박들에게 정례 항행 방송으로 Thunder호가 모스틴 외측 수로에 있음을 알릴 수도 있었을 것이다. 2.6.3 선저 여유수심 항만 항해 계획은 해당 구역을 항해하는 선박이 적용해야 할 최소 선저 여유수심(UKC)을 저질 종류, 퇴적 속도·측량 빈도, 좌주의 가능한 결과를 고려하여 명시하는 것이 좋은 관행이다. 또한 모스틴 외측 수로와 디 하구(Dee Estuary) 전체에서의 항해는 항해 전 구간에 걸쳐 가용 수심을 정밀하게 평가해야 한다. 항만 항해 계획은 CHA 구역에 접근하거나 그 안을 항해할 때 수용할 수 있다고 여기는 최소 UKC를 정해야 한다.
2.7안전 관리 2.7.1 상업 대리점 대리점 담당자는 모스틴항 조직의 일부인 모스틴 해사 서비스(Mostyn Maritime Services)에 고용되어 있었고, 회사의 상무이사이자 모스틴 부두 유한회사의 소유주이기도 한 회사 소유주에게 직접 보고하였다. 담당자는 해사 분야 경력이 없었다. 담당자는 회사 안에서의 자기 지위는 분명히 알고 있었으나 자신의 직무 책임은 분명히 알지 못하였고, 상업 대리점으로서의 업무를 다루는 직무 기술서가 없다는 점을 우려하였다. 담당자가 자신의 책임과 권한 수준을 충분히 통보받았더라면, 항해 정보를 Thunder호 선장에게 전달하는 것의 잠재적 결과를 더 잘 이해하고, 그 대신 요청받은 대로 BA 해도 1953을 공급할 적절한 조치를 취하기로 선택했을지도 모른다.
8월 8일 용선 확정서를 받은 때부터, 주요 당사자들 사이의 의사소통 수준은 더 높고 일관되어야 했다. 그랬다면 Thunder호에 적절한 해도가 없다는 사실이 항에 분명해졌을 때 더 단호한 조치가 취해졌을 수도 있었다. 또한 대리점 담당자와 선장이 주고받은 휴대전화 통화에 대한 두 사람의 기억이 서로 어긋나는 것은 수신 확인이 없는 통신 방식의 위험을 보여 준다. 대리점 담당자는 입항 선박과 일찍 의사소통할 수 있는 독특한 위치에 있다. 그러나 항만장의 사전 승인 없이 항해 안전 정보를 선박에 전해서는 안 된다. 앞으로 이러한 혼란을 피하려면, 항만장 및 입항 선박과 의사소통하는 대리점 담당자의 책임을 모스틴 해사 서비스의 운영 절차에 분명히 규정해야 한다. 2.7.2 비상 대응 조직 포괄적인 비상 대응 계획이 모스틴항 SMS에 포함되어 있다. 이 계획은 사고에 일찍 대응하고 즉각적인 조치와 자원이 필요한지 판단하는 데 바탕을 두고 있다. 그러나 8월 10일 해안경비대로부터 받은 전화는 항만장이 좌주 선박 신고를 철저히 조사하도록 이끌지 못하였다. 선박이 그곳에 있는 상황을 확실히 파악했더라면 비상 대응이 훨씬 일찍 시작될 수 있었을 것이고, 선박을 이초시킬 고조 시간대가 한 번 더 있었을 것이다. 저녁 늦게 비상 대응 계획이 시행된 뒤에는 예인 및 오염 방제 자산의 제공이 검토되었으나, 항은 아무런 준비도 하지 않았다. 선박이 소조(neap)로 인해 이초하지 못할 가능성을 고려하면, 적절한 예인 자산을 Thunder호 부근에 대기시키는 준비를 할 수 있었을 것이다. 그랬다면 선장이 선박을 스스로 조종해 벗어날 수 없을 경우 예인 지원을 즉시 받을 수 있다는 확신을 항만 당국들과 선박 소유주 모두에게 줄 수 있었을 것이다. 비상 대응 계획의 주된 초점은 다음 고조 때 선박을 이초시키는 것이었다. 선장이 피곤하고, 주변 환경에 익숙하지 않았으며, 적절한 항해 해도도 없었다는 점을 감안하면, 그는 제공할 수 있는 모든 도움이 필요했고 그럴 자격이 있었다. 그날 늦게 예정된 선박 이동에도 불구하고, 저녁 저조 시간대에 도선사가 해변에서 Thunder호에 승선할 기회가 놓쳐졌다. 그랬다면 선장과 도선사가 계획을 세울 시간이 생기고, 도선사가 선박에 익숙해져 선박이 이초된 뒤 선장이 벗어나도록 조종하는 것을 도울 준비를 할 수 있었을 것이다. 도선사가 실제로 승선했을 때에도, 선박을 모스틴 외측 수로 밖으로, 아마도 노스 릴 부표 부근의 안전한 묘박지로 도선할 또 한 번의 기회가 놓쳐졌다. 대신 선박은 와일드 로드에 다시 투묘하였고 밤새 닻이 계속 끌렸다. 다행히 Thunder호는 이초되었고, 다시 닻이 끌렸음에도 세 번째로 좌주하지는 않았다. 그러나 더 견고한 비상 대비를 분명히 갖출 수 있었고, 당시 조건에서는 그것이 적절했을 것이다.
2.7.3부항만장 SMS는 항만장의 많은 직무와 책임을 규정하고 언급하고 있다. CHA 도선 구역은 넓고, 측량 및 수로 관련 업무는 상당하며, 항만장의 활동은 디 보전구역(Dee Conservancy) 항만장과 합의하고 그가 실시하는 MOA 감사 절차의 일환으로 빈번한 검토를 받는다. SMS는 부항만장의 직무와 책임을 자주 언급하지만 이 직위는 2004년 이래 공석으로 남아 있다. 이 공석은 2005년 모스틴 SMS 감사의 첨부 서한에서도 언급되었고, 2005년 8월 24일 MOA 해상 운영에 적용되는 모스틴 SMS에 대한 디 보전구역 연례 검토 회의록에서도 언급되었는데, 회의록은 항만장이 곧 임명이 이루어질 것으로 예상한다고 기록하였다. 적절한 자격을 갖춘 사람을 항의 부항만장 자리에 채용하면 항만장이 SMS 안의 의무를 제대로 이행하고, 항만 관리, 특히 항해 안전을 위한 견고한 절차의 개발에 집중할 수 있을 것이다. 중요한 점은, 이 사안에서는 그렇게 했더라면 항만장이 상황을 더 전략적으로 보고, Thunder호의 상황 전개를 철저히 감시하며 적절한 방식으로 대응할 수 있었을지도 모른다는 것이다.
2.8PMSC 모스틴항은 DfT로부터 PMSC 인증을 받음으로써 이 규약의 원칙을 준수하겠다고 약속하였다. 그 핵심 요건은 항 SMS 안의 약점과 결함을 능동적으로 찾아내는 감사 절차이다. 인증 이후 연례 감사는 모스틴항 지정자인 재무 관리자가 실시하였다. 2005년 감사는 SMS 요건에 대해 20개 활동을 다루었다. 모든 활동이 만족스럽다고 요약되었으나, 도선정 항해일지만은 불만족스럽다고 평가되어 감사 결함 통보를 받았다. 부항만장의 부재는 의무 보유자에게 보낸 감사자의 첨부 서한에 기록되었다. 이 조사의 결과를 감안하면, 이 감사는 2004년 10월 위험 검토의 더 제한된 범위를 충분히 깊이 살피지 못한 것으로 보이며, 따라서 의무 보유자는 항 SMS의 효과성에 대해 불완전하고 부정확한 그림을 받았다. PMSC는 주기적인 외부 감사와 검증을 실시할 것을 권고한다. 모스틴항의 SMS는 디 보전구역 항만장이 실시하는 점진적 연례 검토(2.9절 참조)를 받고 있으나, 그 범위가 제한적이며 외부 감사의 요건을 충족하지 못한다. 독립적인 외부 감사는 모스틴에서 아직 실시된 적이 없지만, 그러한 절차라면 SMS를 상세히 검토하고 의무 보유자에게 SMS가 견고하고 효과적이며 항의 현재와 장래의 필요를 충족하고 있다는 확신을 줄 수 있을 것이다. PMSC의 또 다른 주요 원칙은 항의 SMS가 공식 위험성 평가에 근거하고 이를 바탕으로 마련되어야 한다는 것이다. 모스틴항에서는 새로운 사업이 실현될 때마다, 이 사안에서는 구체적으로 P&O 페리스(P&O Ferries) 운항이 시작될 때 공식 위험성 평가가 이루어졌다. 그러나 그 사업이 중단되자 이후의 위험 검토는 모스틴 외측 수로를 항해하는 다른 상선들도 여전히 같은 위험에 직면하고 있다는 점을 인식하지 못하였다.
모스틴 외측 수로의 위험을 간과함으로써 항은 그 위험이 '합리적으로 실행 가능한 한 낮은' 수준으로 줄어들도록 하는 적절한 통제 수단을 시행하지 못하였다. 모스틴항은 위험성 평가 검토와 감사 절차에서 PMSC 원칙을 따르려고 하였다. 그러나 SMS에 대한 독립적인 외부 검토가 없었으므로, 항은 사실상 자기 숙제를 자기 내부 기준으로 스스로 채점하고 있었던 셈이다. 모스틴항은 가능한 한 빨리 SMS의 외부 감사를 도입해야 하며, 항의 성장 목표에 비추어 MCA도 이 항에 대한 PMSC 검증 감사를 실시할 것을 권고한다.
2.9항만당국 간 상호작용 2.9.1 현재 상황 다른 법정 항만당국(SHA)의 한계 안에 SHA가 있는 것은 드문 일이 아니다. PMSC는 그러한 당국들이 이 규약의 모든 측면에서 필요에 따라 협력하도록 요구한다. 디 보전구역과 모스틴 부두 유한회사 사이에는 어느 정도의 협력이 이루어졌다. 두 항의 SMS는 디 보전구역의 SHA가 CHA인 모스틴 부두 유한회사의 SMS를 검토하고 MOA에서 수행되는 운영을 점검하는 것을 허용한다. 이 합의의 목적은 디 보전구역 항만장이 그 구역에서 수행되는 해상 운영이 PMSC 기준을 충족하는지 스스로 확인할 수 있도록 하는 것이었다. 합의가 시작된 지 5년 동안 디 보전구역 항만장은 SMS 검토와 활동 공동 점검을 정기적으로 실시하였다. 점검 과정은 여러 자연 보전 지정이 걸린 구역에 대해 환경청(EA)에 책임을 지는 항만장에게 핵심 동인이었다. 검토 회의록에는 식별된 안전 쟁점에 대한 디 보전구역 항만장의 우려, 모스틴 부두 유한회사가 대응하는 데 걸린 시간과 그 대응의 들쭉날쭉함이 반영되어 있고, 점검 과정의 중요성과 효과성에 대한 그의 견해도 강조되어 있다. 반대로 모스틴 항만장은 이 과정의 중요성을 인정하면서도, 소규모 상업항의 일상 운영에 관한 자신의 다른 직무와 책임의 범위가 넓은 점을 감안할 때 점검이 시간을 많이 잡아먹고 주의를 분산시킨다고 보았다. 원칙적으로 공동으로 합의한 절차는 PMSC 원칙에 따른 포괄적이고 효과적인 관리 수단이었다. 실제로는 절차를 이행하고 감시하는 과정이 두 조직의 서로 다른 우선순위를 부각시키는 결과가 되었다. 2.9.2 외측 수로 원래 디 하구 전체와 그 바다 쪽 접근로에서의 도선과 항로표지 제공은 트리니티 하우스(Trinity House)의 책임이었다. 1987년 도선법(Pilotage Act) 도입에 따라 책임이 트리니티 하우스에서 웨일스 수도국(Welsh Water Authority, 환경청의 전신)으로 넘어간 것은 당시 모스틴항의 규모를 감안하면 타당하였다. 1990년대 후반 항이 재개발되어 훨씬 더 큰 교통량을 수용할 수 있게 되었을 때, 이 교통에 대한 모스틴 외측 수로의 항해 위험은 항과 트리니티 하우스 모두에게 인식되었다. 이에 트리니티 하우스는 모스틴 부두 유한회사가 모스틴 외측 수로의 소유권9을 갖도록 HRO를 신청할 것을 권고하였다.
정기 페리 운항 개시가 임박한 가운데, 모스틴 부두 유한회사가 수로의 항로표지를 보강할 수 있도록 1949년 해안보호법(Coast Protection Act)을 이용한 '임시' 우회 조치가 채택되었다. 2004년 초 모스틴에서 페리 서비스가 중단되면서 모스틴 외측 수로의 안전에 대한 관심이 사라지는 결과가 되었다. 항의 2004년 해상 운영 위험성 평가 검토는 외측 수로에서의 항해를 포함하지 않았고, 모스틴 항만장은 노스 릴 부표(North Rhyl buoy) 부근의 도선 기호를 삭제하기로 하였다. 이후 도선 기호는 BA 해도 1953 제6판에서 삭제되었고, 항로지도 그 도선사 승선 지점에 대한 언급이 없어지도록 수정되었다. 2004년 페리 운항이 중단되면서 좌주 사고의 가능성이 낮아졌음은 인정된다. 그럼에도 항은 모스틴 외측 수로의 위험에 똑같이 취약한 대형 상선을 계속 받아들였다. 트리니티 하우스가 지적하고 1949년 해안보호법 동의서에 언급된 HRO 절차는 사실상 정체되어 있었으나, 이것이 '전체 상황'(부록 K)에 대한 검토를 촉발하지는 않았다. 그 결과 해안보호법 34조 동의가 그대로 유효하게 남아 모스틴항이 모스틴 외측 수로를 운영해 온, 그리고 계속 운영하는 수단이 사실상 되어 버렸다. 이 상황은 만족스럽지 않으며, 더구나 노스 릴 부표에서의 도선 서비스 제공과 관련한 문제도 해결되지 않은 채 남아 있다. 2.9.3 항만개정명령 Thunder호가 좌주할 당시, 모스틴 부두 유한회사는 모스틴 외측 수로를 포함한 모스틴 접근 수로 전체의 SHA가 되겠다는 신청이 담긴 HRO를 제출한 상태였다. 이에 맞서 환경청은 현재 SHA 구역에서의 자신의 권한과 의무를 갱신하고 여객·선박·화물 부과금을 징수할 권한을 갖겠다는 HRO를 제출하였다. 두 HRO는 현재 디 보전구역 안에 있는 모스틴 접근 수로의 SHA 관할권을 두고 충돌하였다. HRO 신청이 제기한 쟁점을 결정하는 절차의 일부로 공개 심문이 열렸다. MAIB의 이 조사로 보아, 모스틴 외측 수로의 지위가 해결되어야 함은 분명하다. 그 뒤 책임 당국은 다음을 마련해야 한다. • 외측 수로에 대한 철저하고 독립적인 위험성 평가를 실시할 것. 이 평가는 다음을 포함해야 한다. o 강제 도선 요건. o VTS 요건. o 적합한 묘박지의 식별. o 수로 측량과 유지 준설 요건. • 독립적 위험성 평가를 통해 식별된 통제 수단을 즉시 시행할 것. 9 트리니티 하우스의 2001년 5월 30일자 서한 - 조항 1 - 항만 한계를 확장하고 그들에게 특히 항로표지 설치, 선박 이동 통제, 난파물 표지·제거 책임에 관한 권한을 부여하는 것.
원문 보기
2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 The on board Thunder allowed the to work a 4 hours on and 8 hours off routine. Although the were recorded on a combined rest and overtime form, the records showed that for the months of July and August, hours of rest for bridge watchkeeping were equal to, or in excess of, 14 hours per day. On four occasions during the 2 month period rest hours were reduced to 12 hours per day. The hours of rest obtained by the bridge watchkeepingofficers on board Thunder were in excess of and requirements, and fatigue is not considered a in the on 10 August 2006. 2.3 PLANNING 2.3.1 Chart requirement When the change of orders was received re-directing Thunder to the of Mostyn, both the and the acted in accordance with the instructions given in the company’s for voyage planning. Availability of the required passage charts and publications was checked, and the absence of BA chart 1953 was identified. The company’s SMS addressed voyage planning and obtaining charts while in port. However, it did not provide the master with either a procedure to follow in the event of a change of orders while on passage, or a process to obtain nautical publications should they be required. The master took immediate steps to try and ensure supply of the missing chart by contacting, on two separate occasions, the vessel’s cargo operator and the commercial agent at Mostyn. Critically, however, he did not inform the owner’s marine superintendent who was ultimately responsible for ensuring that vessels were fully equipped with all necessary nautical publications. Consequently, the owner was unaware of the master’s difficulties and therefore unable to provide him with the assistance that he required. Only when he was in possession of BA chart 1953 could the master have made: a full navigational assessment of the approaches to the Dee Estuary; an informed decision on the most secure ; and, if it was then deemed necessary, safely navigated Thunder through the Mostyn Outer Channel to the Wild Road anchorage. 2.3.2 Apprehensive that the critical chart for entering Mostyn was not available to him, he and the mate continued to plan by using the smaller scale BA chart 1978, and by referring to Admiralty Sailing Directions. Although the latest correction to the Sailing Direction was held on board, it had not been referred to. Consequently, the master was unaware of an amendment to the Sailing Directions which advised that the Mostyn now boarded vessels at the Dee , and not 7 cables ESE of the North Rhyl Light buoy.
Had the master been in possession of BA chart 1953 he would have noted the only pilot symbol laid close to the Dee buoy. Having identified the shallow water areas surrounding the Mostyn Outer Channel on BA chart 1978, the master had no intention of navigating Thunder along the outer channel without either the largest scale chart available, or the services of a local pilot. Further, experience told him that, if necessary, by close to the North Rhyl buoy his vessel would be clear of immediate navigational dangers and a lee . 2.3.3 Decision making process The master was confused by the email from the Mostyn agent that provided a series of waypoints, a ‘preferred anchorage’, and a declaration that the pilot boarding station was at the Dee buoy. He believed that the information had been sent, or authorised, by a senior professional with a maritime background. This was the single most important factor which, at the last moment, caused him to change his arrival plan. He made the decision to navigate the Mostyn Outer Channel using the waypoints provided, and in the ‘preferred anchorage’ ready to board a pilot as required. His decision was directly influenced by the information forwarded by the agent and, to some extent, a perceived commercial pressure for the vessel to be correctly positioned to allow him to tender a valid notice of readiness for loading. Once the decision to proceed to the Wild Road inner anchorage had been made, the master navigated the vessel through a dangerous channel, without an appropriate navigational chart, to an unsuitable long term anchorage, without pilot assistance. Weather conditions were poor; daylight was fading, and tidal stream increasing. The action was contrary to good and practice, was potentially dangerous, and could have resulted in far greater consequences for the vessel and . Although the master had made several attempts to contact the port on radio, the port did not maintain a continuous radio listening watch. Had an Outer Channel vessel traffic monitoring or reporting system been in operation, the master could have provided, and received, advice about his intended movements. 2.4 ANCHORING AND MONITORING 2.4.1 Scale of chart By using BA chart 1978 to navigate to, and then anchor in the Wild Road anchorage, the master did not have the necessary detail to gain an appreciation of the dangers surrounding his vessel, and the was unable to precisely fix, and monitor, the vessel’s within the swinging circle. The scale of chart in use did not provide the with sufficient information for him to quickly identify when the anchor started to drag. 2.4.2 Choice of anchorage The master had previous experience of anchoring off United Kingdom ports, including ports with large tidal ranges. In that respect the Wild Road anchorage was no different.
At low states of tide, the width of the channel at Wild Road does restrict swinging room, and thus the amount of cable that can be veered. Unfortunately, the master decided to use three shackles in the belief that this was satisfactory for all coastal waters, and that veering additional cable would not help to prevent dragging. In this belief, the master showed a fundamental misunderstanding of the principles of anchoring. One of cable on Thunder was 25m in length. BA chart 1978 showed that the preferred anchorageposition had a charted depth of approximately 15m and, with 9m rise of tide, the greatest expected depth at was 24m. Information regarding the type and quality of the holding ground was not available from the Sailing Direction, or BA chart 1978. Using the formula7: Number of shackles required = 1.5 x √ depth in m Number of shackles = 1.5 x 4.89 = 7.3 The predicted swinging circle (anchor to ) was: • 3 shackles of cable (75m) + length of Thunder (82m) = 157m. • 7 shackles of cable (175m) + length of Thunder (82m) = 257m. At , the was just sufficient for the vessel to swing safely provided the master deployed only 3 shackles of cable. Had he correctly calculated the amount of cable required (7.3 shackles), he would have realised that his vessel could not remain safely at anchor in the Wild Roads anchorage for anything more than a brief period. Given the weather, tide, depth of water, and the proximity of navigational danger, the scope of cable deployed was insufficient to the vessel securely in position. The scale of the chart in use prevented the master from gaining a better appreciation of the safe water available to the north and west of Wild Road, and the benefits, given the prevailing wind, that could have been gained by biasing his anchorage in that direction. Given the master’s experience and the prevailing weather, tide, depth of water, and the proximity of navigational danger, it is surprising that he chose to anchor where he did and with so little cable, despite the apparent instruction that it was the ‘preferred anchorage’. 2.4.3 On completion of anchoring, full bridgeanchor watches were maintained. Nevertheless, it was evident on this occasion that important aspects of the guidance for ships at anchor, provided in STCW 95, had gone unheeded: 1. The ability of the bridge watchkeeper to precisely fix the vessel’s position, by , visual bearing, or was limited given the scale of BA chart 1978. As a consequence, his ability to detect the vessel dragging in a reasonable time frame was substantially decreased. 7 Admiralty Manual of Seamanship
The large range of tide on a gently sloping coastline had the effect of reducing accuracy due to the constantly changing coastal water line. This also meant that the practice of marking prominent points on the radar display, using lower range scales to gain an early indication of dragging, was also impracticable. It is possible that the distance of nearby buoys could have been monitored by radar, but the effectiveness of this was also questionable given that the buoys were not displayed on the bridge chart. This is a particularly good case where the use of the GPS ‘anchor drag’ alarm would have provided the bridge watchkeeper with an early indication of dragging. Although such a feature was fitted, its use had not been considered. 2. Even when it became apparent to the bridge watchkeeper that the vessel was aground, the master was not informed. That the mate, who was the watchkeeper at the time, preferred to believe that this was a standard occurrence at Wild Road, shows a disregard for his responsibilities as a watchkeepingofficer. Furthermore, had the ship been unfortunate enough to suffer structural damage, the delay in notifying the master or anyone else on board meant that proper consideration and actions could not be immediately carried out to minimise the potential consequences. The company procedure for grounding / stranding was not implemented until much later the same day and still, contrary to that procedure, the master failed to report the incident to a national or local authority. 2.5 Mostyn Docks Limited’s 2001 of commercial traffic and ferry operations in the South Hoyle Channel identified the need for compulsory pilotage, or equivalent status, in the Mostyn Outer Channel. This requirement was reinforced by Trinity House, and Mostyn Docks Limited’s HRO circulated to the EA in February 2002 sought the powers to achieve this. The requirement for compulsory pilotage was reaffirmed in the 2003 risk assessment. The October 2004 risk assessment, which occurred after the ferry operation had ceased, however, did not cover marine activity in the Mostyn Outer Channel. Around this time, the Mostyn harbourmaster notified the that the pilot boarding symbol near the North Rhyl buoy should be removed and the advice in the Admiralty Sailing Directions amended accordingly. The result was a dedicated pilotage service commencing from the Dee buoy, on the edge of Mostyn Docks Limited’s area, although the harbourmaster was willing to provide a pilotage service from the South Hoyle Channel, weather conditions permitting, on request. The Mostyn harbourmaster considered it unsafe that Thunder’s master had: begun navigating in the Mostyn Outer Channel 1 hour before sunset; proceeded without an appropriate chart; not sought local advice or made use of the channel approach directional light; and proceeded to anchor in an area normally only used by vessels waiting to on the same tide. These points had been covered in his risk assessments prior to 2004.
The 1987 Pilotage Act recognises the need to secure the safety of vessels navigating in the approaches to a harbour, as well as those navigating within its limits. By reducing the pilotage service available in this area, the harbourmaster removed one of the key risk control measures identified in his earlier risk assessments. Until such time as provision is made for compulsory Pilotage of the Mostyn Outer Channel, Mostyn Docks Limited should reinstate the recommended Pilotage service from the North Rhyl Buoy. 2.6 PORTPASSAGE PLAN 2.6.1 Anchorages Although ‘deep draught’ vessels are not defined in the Port of Mostyn passage plan, such vessels are advised, if necessary, to anchor in the vicinity of the North Rhyl buoy. For safety reasons, the initial intention of Thunder’s master was to anchor in this area. Given: • the present and likely future offshore wind farm traffic using the port • the dangers of to the east • that vessels up to 6500t can operate from the port • the infrastructure is in place to support a scheduled ferry service Mostyn Docks Limited, as CHA, should examine as part of its routine risk assessment review, the need for a defined ‘Mostyn deep water anchorage’. The boundaries of the deep water anchorage should be displayed on the appropriate BA charts, with corresponding advice to mariners provided in Sailing Directions. The Wild Road recommended anchorage lies adjacent to the Mostyn CHA limits. In compliance with the Port of Mostyn’s SMS, the anchorage was regularly surveyed to confirm the available depth of water. Notwithstanding the regular survey, the anchorage was acknowledged by the Mostyn harbourmaster to be unsuitable for vessels, such as Thunder, other than for short periods while awaiting a tide to berth. Specifically, given the depth of water in the Wild Road anchorage, there was insufficient for a vessel to swing safely at all states of tide unless it compromised on the amount of it deployed. The portpassage plan and the Sailing Directions should be amended to provide more comprehensive advice to mariners on the suitability and use of this anchorage. 2.6.2 Movement and reporting The Port of Mostyn’s risk assessment determined that a information service8 was adequate for the frequency of shipping movements that the port handled. Awareness of vessel movements within the CHA area relied upon individual vessels reporting their own presence on VHF radio channel 14, and an assumption that other vessels in the vicinity had received the broadcast. 8 Defined by the , as a service to ensure that essential information becomes available in time for onboard navigational decision making.
The outer channel approach to Mostyn is outside the present CHA limits, but nevertheless is an extended part of the port approach and is, in parts, extremely narrow. The width is determined by the dredging campaign undertaken by Mostyn Docks Limited, but for vessels of any size it can be considered, in parts, to only support one-way traffic at a time. In 2001, Trinity House expressed concern about the narrowness of the channel and stated that Mostyn Docks Limited should achieve CHA status for the area before being given local direction of the channel and its buoys. The ability to control vessel movements in the channel, given the constraints, is a significant safety measure and one which should be considered as part of the routine risk review of the Outer Channel. To effect movement control, an effective reporting system is required. Had a vessel reporting system been in place, it would have ensured that Thunder’s master was able to communicate with the port, and receive instructions and advice on what was an unfamiliar area. Also, it would have provided an opportunity for the port to update the master on the intentions for berthing the vessel. This would have allowed the master to better consider his options for anchoring and would, probably, have prevented this accident from occurring. Furthermore, a formal reporting and monitoring process would have allowed the Mostyn harbourmaster, when questioned by the about a reported grounding, to have been fully aware of the vessel’s location. If necessary, other vessels operating in the area could have been made aware of Thunder’s presence in the Mostyn Outer Channel by routine navigation broadcast. 2.6.3 It is good practice for a portpassage plan to specify a minimum under keel clearance (UKC) to be applied by vessels navigating in its area, taking into account type, rate of silting / frequency of surveying, and the likely consequences of grounding. Further, navigation in the Mostyn Outer Channel and whole of the Dee Estuary, requires a precise assessment of the available depth of water available throughout the passage. The portpassage plan should define the minimum UKC that is considered acceptable when navigating in the approaches to and within the CHA area. 2.7 SAFETY MANAGEMENT 2.7.1 Commercial agent The agent was employed by Mostyn Maritime Services, an integral part of the Port of Mostyn’s organisation, and reported directly to the managing director and owner of the company, who was also the owner of Mostyn Docks Limited. The agent had no previous maritime background. Although the agent was clear about his position within the company, he was not clear about his job responsibilities, and was concerned that there were no terms of reference covering his duties as the commercial agent. Had the agent been fully apprised of his responsibilities and level of authority, he might have better understood the potential consequences of forwarding the navigational information to Thunder’s master, and chosen instead to make suitable arrangements for supply of BA chart 1953, as requested.
From receipt of the fixing note on 8 August, the standard of communications between the key parties should have been higher and more consistent. Had it been so, more decisive action might have been taken when it became apparent to the port that the appropriate chart was not held on board Thunder. Further, the discrepancies in the agent’s and master’s recollections of the mobile telephone calls made between them shows the dangers associated with non-receipted methods of communication. The agent is uniquely placed to have early communication with visiting vessels. However, he should not be navigational safety information to vessels without the prior approval of the harbourmaster. To avoid such confusion in the future, the agent’s responsibilities for communicating with the harbourmaster and visiting vessels should be clearly defined within Mostyn Maritime Services’ operating procedures. 2.7.2 Emergency response organisation A comprehensive emergency response plan is incorporated within the Port of Mostyn SMS. The plan is based upon reacting early to the accident and determining whether immediate action and resources are required. However, on 10 August, the telephone received from the coastguard failed to prompt the harbourmaster to thoroughly investigate the report of a grounded vessel. Had he determined with certainty the circumstances surrounding the vessel’s presence, then the emergency response could have been generated much earlier, and an additional high water period would have been available for the vessel. Later in the evening, once the emergency response plan had been implemented, consideration was given to the provision of and counter-pollution assets, however no arrangements were put in place by the port. Considering the potential for the vessel to become neaped, arrangements could have been made for a suitable towing asset to be standing by in the vicinity of Thunder. This would have provided reassurance to both harbour authorities and the vessel’s owner that towage assistance was readily available should the master be unable to manoeuvre his vessel clear. The main focus of the emergency response plan was refloating the vessel at the next high water. Considering that the master was tired, unfamiliar with his surroundings, and without an appropriate navigational chart, he needed and deserved all the assistance it was possible to provide. Notwithstanding the shipping movements programmed for later that day, an opportunity was missed during the evening low water period for a pilot to board Thunder from the beach. This would have provided time for the master and pilot to formulate a plan, and the pilot to become familiar with the vessel and ready to assist the master to manoeuvre clear once the vessel refloated. When a pilot did board, a further opportunity was missed to pilot the vessel clear of the Mostyn Outer Channel and into a safe anchorage, probably in the vicinity of the North Rhyl buoy. Instead, the vessel re-anchored at Wild Road and continued to drag anchor overnight. Fortuitously, Thunder did refloat and, despite dragging again, did not ground a third time. However, more robust emergency arrangements could certainly have been made, and these would have been appropriate given the prevailing conditions.
2.7.3 Deputy harbourmaster The SMS defines and refers to the many duties and responsibilities of the harbourmaster. The CHApilotage area is large, the surveying and hydrography commitments are substantial, and his activities are subject to frequent review as part of the MOA audit procedures agreed with, and undertaken by, the Dee Conservancy harbourmaster. The SMS makes frequent references to the duties and responsibilities of the deputy harbourmaster, a position that has remained vacant since 2004. The vacancy was noted in the covering letter of the 2005 Mostyn SMS audit, and also in the 24 August 2005 minutes of the Dee Conservancy annual review of the Mostyn SMS applicable to marine operations in the MOA, which noted that the harbourmaster anticipated an appointment would be forthcoming. Recruiting a suitably qualified person to fill the post of deputy harbourmaster in the port would allow the harbourmaster to properly fulfil his obligations within the SMS, focus on port management and, in particular, the development of robust procedures for the safety of navigation. Importantly, in this case, it might have allowed the harbourmaster to take a more strategic view of events, thoroughly monitor developments with Thunder and respond in an appropriate manner. 2.8 Having received PMSC accreditation from the DfT, the Port of Mostyn has committed to complying with the principles of the Code; a key requirement of which is an audit process that proactively searches for weaknesses and failings within the port’s SMS. Since accreditation, annual audits have been carried out by the Port of Mostyn , the finance manager. The 2005 audit covered 20 activities against the requirement of the SMS. All activities were summarised as being satisfactory, with the exception of the which was assessed as unsatisfactory and received an audit deficiency. The absence of a deputy harbourmaster was recorded on the auditor’s covering letter to the duty holder. Given the findings of this investigation, it appears probable that the audit did not explore in sufficient depth the more limited scope of the October 2004 risk review, and therefore the duty holder was presented with an incomplete and inaccurate picture of the effectiveness of the port’s SMS. The PMSC recommends that periodic external audit and verification is carried out. Although the Port of Mostyn’s SMS undergoes a progressive annual review conducted by the Dee Conservancy harbourmaster (see Section 2.9), this is limited in its scope and it does not fulfil the requirement of an external audit. An independent external audit has yet to be conducted at Mostyn, but such a process would be able to examine the SMS in detail and provide the duty holder with confidence that the SMS is robust, effective and meeting the current and future needs of the port. Another, main principle, of the PMSC, is that a port’s SMS should be informed by and based upon formal risk assessments. In the Port of Mostyn, formal risk assessments were conducted as new business ventures were realised; specifically, in this case, the P&O Ferries operation. However, with the cessation of that business, subsequent risk reviews failed to recognise that the same risks were still faced by other commercial
vessels navigating the Mostyn Outer Channel. By overlooking the risks of the Mostyn Outer Channel, the port neglected to implement adequate control measures to ensure that the risk was reduced to ‘as low as reasonably practicable’. In its risk assessment reviews and auditing process, the Port of Mostyn was attempting to adhere to PMSC principles. However, without an independent external review of its SMS, the port was, in effect, marking its own homework to its own, internal, standards. The Port of Mostyn should introduce external auditing of the SMS at the earliest possible opportunity and, in light of the port’s growth aspirations, it is recommended that the also conducts a PMSC verification audit of the port. 2.9 HARBOUR AUTHORITIES INTERACTION 2.9.1 Present situation Having an situated within the limits of another SHA is not unique. The PMSC requires such authorities to collaborate, as necessary, on all aspects of the Code. Some co-operation between the Dee Conservancy and Mostyn Docks Limited has been achieved. The ports’ respective SMSs allow the SHA of the Dee Conservancy to review the SMS of the CHA, Mostyn Docks Limited, and inspect operations being conducted in the MOA. The purpose of the agreement was for the Dee Conservancy harbourmaster to satisfy himself that marine operations being conducted in the area met the standards of the PMSC. In the 5 years since the agreement’s inception, the Dee Conservancy harbourmaster has conducted regular SMS reviews and joint inspections of activities. The inspection process was a key driver for the harbourmaster who was responsible to the EA for an area which holds several conservation designations. The minutes of the reviews reflect the Dee Conservancy harbourmaster’s concerns over safety issues identified; the time taken by, and the variable nature of, Mostyn Docks Limited’s response; and highlighted his views about the importance and the effectiveness of the inspection process. Conversely, the Mostyn harbourmaster, while recognising the importance of the process, found the inspections time consuming and diverting given the wide scope of his other duties and responsibilities in respect of the day to day of a small commercial port. In principle, the jointly agreed procedures provided a comprehensive and effective management tool following the principles of the PMSC. In practice, the process of implementing and monitoring the procedures served to highlight the different priorities of the two organisations. 2.9.2 Outer Channel Originally, provision of Pilotage and aids to navigation within the whole of the Dee Estuary and its seaward approaches were the responsibility of Trinity House. The switch of responsibility from Trinity House to the Welsh Water Authority (the predecessor to the EA) following the introduction of the Pilotage Act 1987 made sense given the Port of Mostyn’s capacity at that time. When the port was re-developed in the late 1990s, and became capable of accepting much larger traffic, the navigation hazards of the Mostyn Outer Channel to this traffic were recognised by both the port and Trinity House. Trinity House consequently recommended that Mostyn Docks Limited make an HRO application to take on ownership9 of the Mostyn Outer Channel.
With the commencement of a regular ferry operation imminent, ‘temporary’ work-around measures, using the Coast Protection Act 1949, were adopted to allow Mostyn Docks Limited to enhance the navigation marks in the channel. The cessation of the ferry service from Mostyn in early 2004, had the effect of removing focus on the safety of the Mostyn Outer Channel. The port’s 2004 review of risk assessment for marine operations did not include navigation in the Outer Channel and the Mostyn harbourmaster elected to remove the pilotage symbol from the vicinity of the North Rhyl buoy. The pilotage symbol was subsequently removed from Edition 6 of BA chart 1953, and the Sailing Directions amended to remove reference to that pilot boarding point. It is acknowledged that when the ferry operation ceased in 2004, the likelihood of a grounding incident had reduced. Nonetheless, the port continued to accept large commercial vessels which were equally susceptible to the hazards of the Mostyn Outer Channel. The HRO process identified by Trinity House and referred to in the Coast Protection Act 1949 consent, effectively had stalled, but this had not triggered a review of the ‘entire situation’ (Annex K). As a result, the Coast Protection Act - section 34 consent remained in place and became, by default, the means by which the Port of Mostyn operated, and continues to operate the Mostyn Outer Channel. The situation is unsatisfactory, and furthermore the issues regarding the provision of a Pilotage service from the North Rhyl Buoy remain unresolved. 2.9.3 Harbour revision orders At the time of Thunder’s grounding, Mostyn Docks Limited had submitted an HRO which included an application to become the SHA for the whole Mostyn approach channel, including the Mostyn Outer Channel. In counterpoint, the EA had submitted an HRO applying to update its powers and duties in its current SHA area, and assume powers to levy , ships and goods dues. The two HROs conflicted over SHA jurisdiction of the Mostyn approach channel inside the current Dee Conservancy area. A public inquiry has been held as part of the procedure for determining the issues raised by the HRO applications. It is clear from this investigation by that the status of the Mostyn Outer Channel must be resolved. Thereafter, the responsible authority needs to arrange for: • A thorough and independent risk assessment of the Outer Channel to be conducted. The assessment should include: o Compulsory pilotage requirements. o VTS requirements. o Identification of suitable anchorages. o Hydrographic surveying and maintenance dredging requirements. • Immediate implementation of the control measures identified through the independent risk assessment. 9 Trinity House’s letter 30 May 2001 - provision 1 - extending their harbour limits and giving them powers, among other things, to establish aids to navigation, control vessel movements, and marking/removal responsibilities.
and
practice, was dangerous, and ultimately could have resulted in far greater consequences for the vessel and
. [2.3.3] 2. The
showed a fundamental misunderstanding of the principles of
. Given the weather, tide, depth of water, and the proximity of navigational danger, the scope of cable deployed was insufficient to
the vessel securely in
. [2.4.2] 3. Until such time as provision is made for compulsory
of the Mostyn Outer Channel, Mostyn Docks Limited should reinstate the recommended
pilotage
service from the North Rhyl
. [2.5] 4. The
and the Sailing Directions should be amended to provide more comprehensive advice to mariners on the suitability and use of the Wild Road
, and the availability of alternative arrangements for deep
vessels. [2.6.1] 5. The status of the Mostyn Outer Channel must be resolved. [2.9.3] 3.2 OTHER SAFETY ISSUES IDENTIFIED DURING THE INVESTIGATION ALSO LEADING TO RECOMMENDATIONS 6. The
master
was unaware of an amendment to the Sailing Directions which advised that the Mostyn
boarded vessels at the Dee
buoy
. [2.3.2] 7. Although a
drag alarm was fitted, its use was not an option that had been considered. [2.4.3] 8. The
did not
the
master
when it became apparent that the vessel had
. [2.4.3] 9. The
master
failed to report the
grounding
to either a national or local authority. [2.4.3] 10. Had a vessel reporting system been in place, it would have ensured that Thunder’s
master
was able to communicate with the
port
and receive instructions and advice. [2.6.2] 11. The
port
passage plan
should define the minimum
that is considered acceptable when navigating in the approaches to and within the
area. [2.6.3]
12. Had the harbourmaster determined with certainty the circumstances surrounding the vessel’s presence in the Wild Road
anchorage
, then the emergency response could have been generated much earlier, and an additional
period would have been available to assist
the vessel. [2.7.2] 13. An independent external audit has yet to be conducted at Mostyn, but such a process would be able to examine the
in detail and provide the duty holder with confidence that the
SMS
is robust, effective and meeting the current and future needs of the
port
. [2.8] Specifically: i. The agent’s duties, responsibilities, and authority should be clearly defined within Mostyn Maritime Services’ operating procedures. [2.7.1] ii. Recruiting a suitably qualified person for the role of deputy harbourmaster in the
port
would allow the harbourmaster to fulfil his obligations within the
SMS
. [2.7.3] 3.3 SAFETY ISSUES IDENTIFIED DURING THE INVESTIGATION WHICH HAVE NOT RESULTED IN RECOMMENDATIONS BUT HAVE BEEN ADDRESSED 14. The company’s
SMS
did not provide the
master
with a procedure to follow in the event of a change of orders while on passage, or a process to obtain the necessary nautical publications should they be required. [2.3.1] 15. The
master
did not inform the owner’s marine superintendent who was ultimately responsible for ensuring that vessels were fully equipped with all necessary nautical publications. [2.3.1] 16. The
master
believed that the
information had been sent, or authorised, by a senior professional with a maritime background. This was the single most important factor which, at the last moment, caused him to change the arrival plan. [2.3.3] 17. The scale of chart in use did not provide early enough warning to the
when the
anchor
started to drag. [2.4.1]
Port
of Mostyn issued a memorandum to the agent and harbourmaster that: o Masters of vessels intending to
should do so at the North Rhyl
. o Vessels to listen on
radio channels 14 & 16 for instructions. o If a
master
requests further navigational information, he should be referred to the harbourmaster.
service from the North Rhyl
, and ensure that all applicable charts and hydrographic publications are amended accordingly. • Amend its
port
to provide comprehensive guidance for masters of vessels using the channel and
anchoring
in the approaches to Mostyn. • Review its emergency response procedures for marine accidents, ensuring that the necessary actions for each emergency are identified, and that
port
and harbour personnel are trained and familiar with the requirements. The
is recommended to: 2007/143 Conduct a
verification check on the
Port
of Mostyn. As a minimum, the check should encompass the safety of
of vessels arriving and departing the
port
, the
port
passage plan
, and emergency response procedures for marine accidents. The Secretary of State for Transport is recommended to: 2007/144 In considering his decisions on the Harbour Revision Orders submitted by the Environment Agency and Mostyn Docks Limited, take into account the need to clarify the status of the Mostyn Outer Channel, such that the responsible authority has the necessary powers to ensure the safety of
navigation
in the channel.
June 2007 Safety recommendations shall in no case create a presumption of blame or liability
2,65m ship's mobil +49 171 6044794 please request following charts: 180 1953 2214 and notices to mariners No.31 and up to date I.S.P.S.
notification and
please
to agent in my last
port
Newport phone +44 117 982 5836 Denholm Barwil rgds cpt.a.kobuszynski
Annex D Email sent to Echoship at 1748 BST on 8 August
‹-- Original Message --> To: ‹chanering i schoshio dIP: Received: 08-08-2006 17:48:33 Subject: [HU] RE: new voy > ‹RE: new voy> > - > Good afternoon. - Please in atached at Daypoin Pite North Rhyl >
to Dee
Buoy
... > Regards > Agent > MMS A PLEASE PASS TO
MASTER
OF M V_
Pilot
boarding station is at Dee
Buoy
. 53'21.8 N 03'18.8 W
Waypoints from North Rhyl
Buoy
to Dee
Buoy
: 53'23.00 N 03'34.60 W (North Rhyl
Buoy
) 53'21.70 N 03'31.35 W 53 21.25 N 03 24.60 W 4) 5) 6) 53'21.35 N 03'24.00 W 53°21.90 N 03/22.00 W 53'21.90 N 03'18.60 W Preferred
is Wild Road
anchorage
53'21.75 N 03'18.80 W Please maintain listening watch on
CH 14 for
Pilot
instructions prior to
Pilot
boarding. regards HJ 2006-08-10
Annex E Email to the agent at the
Port
of Mostyn sent at 0710 BST on 9 August
From: Sent: To: Subject:
Master
mvThunder (
Master
.mvThunder@telaurus.net) 09 August 2006 08:10 agency@portofmostyn.com
eta
gd ming my
eta
mostyn
pilot
09.08/21.00 lt wp approach waypoints I received please discuse with
pilot
: what time he will board vessel today or tommorow before h.w.
eta
21.00 lt start to be dark and buoys will be unvisible my max
draft
is 2,65m and from charts I see depts 2, 0m or 1,7m which I must pass. if I must drop
I will do it 1,5 nm west of Nort Rhyl
buoy
please confirm did you receive two e-mails abt charts to request rgds cpt.a.kobuszynski
Annex F Chart BA 1953 showing positions of Thunder between 9 and 10 August Reproduced from Admiralty Chart 1953 by permission of he Controller of HMSO and the UK Hydrographic Office
1 - Initial
anchor
position
09 August (
) 2 -
Position
am 10 August after
dragged on the first occasion 3 -
Position
pm 10 August after
port anchor
dragged on the second occasion E BAN K Salisbury Middle Wild Road Mostyn Deep a Depths and Buoys NEL MOSTYN ENGLAND AND WALES APPROACHES TO THE RIVER DEE
Annex G Procedures for stranding contained within Reederei Erwin Strahlmann's
ready for manoeuvring. Ascertains posilion using radio-
navigation
equipment. (
GPS
,
etc.). Makes entry in
Deck
Log-book. Takes over command on arrival on
bridge
. Assesses situation. Gives instruction for
. Assemble in Muster Station. Conducts roll
call
. Institutes search of missing person. Gives instructions (
). Distributes portable radio. Establishes contact with the other ship. Agrees immediate action. Gives and receives from other party the following information: ship dates, owner's address and communication number,
Club, kind of the cargo. Informs Emergency Response Team (ERT) in Main Office (Li-001). Inform other ships via
VHF
channel 16 (SECURITE). Inform coastal radio station. Visual and audible signals: Day: two black balls. Night: two red all-round lights, if vessel still
, also sides and
lights. Fog: Audible signal - •• ; minimum 2 minute intervals Informs Emergency Response Team (ERT) in Main Office (Li-001). Informs other ships via
VHF
channel 16 (SECURITE). Informs coastal radio station. Visual and audible signals: Day: three black balls. Night: two red all-round lights, white all-round lights
and aft. Fog: Bell ***- •** ; minimum 1 minute intervals See NP-001 Where applicable, attends to injured person - see NP-004 Checks and completes
watertight
integrity. Continually sound all tanks, bilges,
and cofferdams. Notes water levels and changes thereof, informs
bridge
. Checks all conduits; hydraulic piping and electric lines for damage or leaks. Switches off circuits, which will be
to avoid
fire
or black out. Floods
ballast
tanks to avoid ship
further ashore. Drops
anchor
. Calculates tide. Plans
with next high tide. Checks available depths of water around the ship. Investigates ground (rocks, sand). Notes
. Calculates
. Activates
bilge
pumps. Stops leak from outside with tarpaulin/
collision
mat. Stops leak from inside IP-005 Revision 6 01.08.2004 Page 1 z 4
Situation Assistance cont. Danger of ship
All hands Description Checking / containment of dangers to the environment through overflow of cargo-generated substances, also of fuels, lubricants etc. (SOPEP, NP-008) Obtains weather report, check changes of weather, contacts
weather station or company. Calculates timing (high tide).
out to change
. Manoeuvres of
engine
. Assess damage to ship (e.g.
engine
,
, rudder, hull). Take photographs, videos. Draw sketches of positions of ships in various phases of incident. Search for leaks. Checks vessel's
. Investigates necessity of requesting assistance from other ships / tug. Maintains contact with ships standing by. Releases ship if no real danger. Accepts assistance, if necessary and confirmation from ERT. Considers whether lightening required. Order lighters / barges via agent. Stay on board as long as possible - ship offers better
than boats.
Abandon ship
only when in danger of
sinking
Assessment situation, checking
stability
, take decision. On
Master
order prepares life-saving appliances (NP-002). See NP-002 - Abandoning Ship. Informs ERT. Records, as exactly as possible, situation (
position
,
,
, etc), action taken. Makes entries in
Deck
Log-book and
Engine
Log-book. Collects all information, evidence and data required to reconstruct sequence of events: data on
(s), Owners and personal data of witnesses (from other ship, if possible). Collects all messages despatched and received Holds other ship liable in writing, does not admit liability, makes no promises, agrees nothing! Repudiates liability. When we are blamed, uses stamp "For receipt only" Writes report of what, when and how it happened and of action taken. Enclosures: log extracts, photographs if any, description of casualties and damage to the ship and cargo,
manoeuvring data printer (compare times). Doesn't forget fil Non Conformity Report (Fo-004). Discuss situa ing there from, proposal for improvement. Do not blame individuals. Revision 6 01 08 2004 Page 2 z 4
Annex H STWC Code Section A-V111/2 part 3-1
Section A-VIII/2 part 3-1 Ship at
anchor
If the
master
considers it necessary, a continuous
shall be maintained at
anchor
. While at
anchor
, the
of the
navigational watch
shall: 1 determine and plot the
ship's position
on the appropriate chart as soon as practicable; .2 when circumstances permit, check at sufficiently frequent intervals whether the ship is remaining securely at
anchor
by taking bearings of fixed
navigation
marks or readily identifiable
shore
objects; .3 ensure that proper
is maintained; .4 ensure that inspection rounds of the ship are made periodically; 5 observe meteorological and tidal conditions and the state of the
sea
; 6 notify the
master
and undertake all necessary measures if the ship drags
anchor
; .7 ensure that the state of readiness of the main engines and other
machinery
is in accordance with the
master
's instructions; 8 if
visibility
deteriorates, notify the
master
; 9 ensure that the ship exhibits the appropriate lights and shapes and that appropriate sound signals are made in accordance with all applicable regulations; and .10 take measures to protect the environment from pollution by the ship and comply with applicable pollution regulations. VIII
Code
STCW
Code - 159
Annex l Present
and
limits Re Codie or no any the hydrographic once
WGS84 POSITIONS Proposed Gwynt y Mor wind farm Present limits of Jurisdiction of Mostyn Docks Ltd as
Competent Harbour Authority
(ie
authority) (
CHA
). Present Mostyn Harbour Present limits of Jurisdiction of Dee Conservancy Authority (DCA) APPROACHES TO THE RIVER DEE
Annex J Table of accidents and incidents at Mostyn, drawn from Mostyn and Dee Conservancy records
Date 18 December 2001 29 December 2001 August 2002 23 April 2003 14 June 2003 11 July 2003 08 August 2003 09 September 2003 05 November 2003 06 May 2004 Vessel European Envoy European
European Envoy Jan Rasmus Frisium European Ambassador Forth Guardsman
LN 170 European Ambassador Afon Dyfrdwy Incident type
Grounding
and Stranding
Grounding
Contact
Grounding
and Stranding Hazardous occurrence Allegation Contact Excessive
speed
Stranding Stranding Event In the approaches to Mostyn. The
master
(
holder) failed to tidal stream. In the approaches to Mostyn. Damage to Middle Patch Spit
buoy
. On Bug Bank in the
Port
of Mostyn. Forward view from the wheelhouse obstructed by cargo. approaching Mostyn. Damage to the North East Mostyn
buoy
. Damage to equipment alleged to have been due to excessive
speed
of another vessel within the Mostyn Channel. On Bug Bank in the
Port
of Mostyn, whilst attempting to depart in strong wind conditions. On Flint Bank
Reported by the Dee Conservancy. No record No record No record No record No record Reported by the
port
authority No record Reported by the
. Reported by the Dee Conservancy.
Annex K
Coast
Protection Act 1949 consent
DTLR TRANSPORT LOCAL GOVERNMENT REGIONS Mr J P O'Toole Managing Director The
Port
of Mostyn Limited Mostyn Holywell Flintshire CH8 9HE TONY SPRINGTHORPE PORTS DIVISION DEPARTMENT FOR TRANSPORT, LOCAL GOVERNMENT AND THE REGIONS ZONE 2/31 GREAT MINSTER HOUSE 76 MARSHAM STREET LONDON SWIP 4DR DIRECT LINE: 020 7944 5106 FAX: 020 7944 2188 GTN CODE: 3533 5106 E-MAIL: anthony.springthorpe@dtlr.gsi.gov.uk WEB SITE: www.dtlr.gov.uk OUR REF: MNA 151/1837/2 YOUR REF: JPO'T/LS 4 SEPTEMBER 2001 Dear N.. - Foole
COAST
PROTECTION ACT 1949: CONSENT NUMBER 70078 INSTALLATION OF PERCH PILE AND 16
NAVIGATION
BUOYS IN THE MOSTYN OUTER CHANNEL I refer to your application of 23 April as amended in your letter of 1 May 2001. I am directed by the Secretary of State to issue this letter as a consent, solely for the purposes of Section 34 of the
Coast
Protection Act 1949, as amended by Section 36 of the Merchant Shipping Act 1988, to the installation of a perch pile and 16
navigation
buoys, hereinafter called the works, over part of the
lying below the level of mean
springs by The
Port
of Mostyn Limited in the Mostyn Outer Channel, North Wales as shown on the attached
foreshore
plan number 70078. This consent is given subject to conditions 1-11 set out below and the standard conditions set out in the Annex Al. MWPI attached to this letter. It relates only to the works described in your application for consent and on the specified
foreshore
plan. Neither you, nor any contractor, engaged to undertake all or part of the works may construct any other works, or deposit any other object, or any other materials whether permanently or temporarily - on any part of the
seashore
below the level of mean higl water springs, without the further written consent of the Department. Without prejudice to the generality of the above, no causeway or other means of temporary access to the works, nor any temporary buoys or moorings, may be laid without a further prior written consent as aforesaid. Your company should satisfy itself that it has obtained any other necessary permissions and powers to undertake the works including the permission of the owner of the
foreshore
. The
Port
of Mostyn Limited is required to put in place measures to control vessel movements and to take responsibility for
marking/removal on a non-statutory basis, until such time as a Harbour Revision Order is promoted to provide a solution for the entire estuary and its approaches. 2. The entire situation will be reviewed by the Department for Transport, Local Government and the Regions (DTLR) if a Harbour Revision Order has not been obtained within two years of the application being made. INVESTOR IN PEOPLE 1183702
doc
3. The
Port
of Mostyn Limited must commission an independent safety assessment of arrangements in place for the operation of the channel, and act on any recommendations as soon as practicable. 4. The
Port
of Mostyn Limited must carry out regular surveys and maintenance dredging of the approach channel must be carried out as necessary. 5. The
Port
of Mostyn Limited must accept responsibility for dealing with any wrecks, including meeting the costs of any
wreck
marking/removal that Trinity House cannot recover from the owners, that occur either in or through the use of the channel. 6. Notices to Mariners must be issued at monthly intervals warning of the regular use of the channel by vessels restricted in their ability to manoeuvre because of their size. 7. The
Port
of Mostyn Limited must ensure that satisfactory arrangements for
Pilotage
or
Pilotage
exemption are in place prior to the commencement of the commercial service. 8. Any vessels used in the operations are to exhibit the sounds and signals in accordance with the International Regulations for the Prevention of Collisions at
Sea
1972 as amended. 9. All appropriate pollution prevention measures must be implemented prior to the works commencing and the commencement date forwarded to Environment Agency Wales when available. 10. A copy of this consent must be given to each contractor appointed to carry out part or all of the works in order that they are clear about the extent of the works for which consent has been given and the conditions that are attached to the consent. You must notify the Hydrographic Office, Ministry of Defence, Taunton, Somerset, TAI 2DN of both the progress and completion of the works in order that all necessary amendments to nautical charts are made, to ensure navigational safety. The Countryside Council for Wales has requested that data collected from the instrumentation mounted on the perch pile regarding
, tidal height, current velocity and wave climate be provided to the Tidal Dee Users Group as part of its database. You are asked to make any application to renew this consent in respect of condition 4 of the attached annex at least eight weeks before its expiry date. You should also inform this Department of any change in your name, address or the ownership of the works so that the consent may be amended to ensure its validity. Yours sincerely Tony Springthorpe 1183702.
doc
or
of the works, the owner of the works shall be liable for any expenses incurred in
such assistance. 7.
of HM
, or any other person authorised by the Secretary of State, should be permitted to inspect the works at any reasonable time. 8. Would you please inform this Department when the works have been completed If the consent specifies lighting and/or marking conditions would you inform the Department and the lighting authority when they have been established. Ports Division Department for Transport, Local Government and the Regions AIMWPI 1183702.