우리의 해양사고 조사 보고서를 읽어 보십시오. 보고서에는 발생한 일, 조치 사항 및 이후의 권고가 담겨 있습니다.Read our marine accident investigation report, which includes what happened, actions taken and subsequent recommendations:
2012년 10월 2일, 벌크선 Wah Shan호의 승무원 1명이 메신저 라인에 맞아 치명상을 입었다. 그는 잉글랜드 이밍엄(Immingham)에 선박이 접안하기 위한 준비로 예선의 예인 와이어를 고정하려 하고 있었다.On 2 October 2012 a crew member, on board bulk carrier Wah Shan, was struck by a messenger line and fatally injured. He had been attempting to secure a tug’s tow wire in preparation for the vessel berthing at Immingham, England.
안전 쟁점Safety Issues
예선의 예인 와이어를 고정하는 데 수반되는 위험이 제대로 고려되지 않았다the risks involved in securing the tug’s tow wire had not been properly considered
선미 계류 작업조가 미흡한 선원 기술(seamanship)을 사용하였고 효과적인 팀으로 기능하지 못하였다the aft mooring party used poor seamanship practices and did not function as an effective team
선미 계류 갑판의 배치는 예인줄을 안전하게 끌어올리는 명백한 방법을 제공하지 않았다the configuration of the aft mooring deck did not provide an obvious method of heaving up the towline safely
권고Recommendations
Wah Shan호의 관리자에게 우수한 선원 기술과 리더십 역량을 개발하도록 교육 프로그램을 개선할 것을 권고하였다(2013/220).Wah Shan’s managers have been recommended (2013/220) to improve their training programmes to develop good seamanship practices and leadership skills.
예인선 4척 도착, Alma호가 선미에 접근
두 배 모두 약 6.4노트로 움직이는 중.
근거: 경위
07:00 무렵
메신저 라인을 Alma호로 내림 — 손으로 와이어를 끌다 예인선 항해사가 말림
근거: 경위
07:00–07:10
부적절한 경로로 워핑 드럼에 8~10회 감아 끌어올림
라이딩 턴이 생기고 줄이 드럼 끝으로 적어도 네 번 미끄러져 빠짐.
근거: 경위
07:05–07:10
예인선 선장 VHF 문의 → 도선사가 엉킨 줄을 보고 선교로 돌아감
근거: 경위
07:10 무렵
용접공이 '처음부터 다시' 조언 — 목수가 같은 방식 고집
이등항해사가 윈치를 넘겨받아 천천히 끌어올림, 목수는 드럼에 머리를 가까이 둠.
근거: 경위
07:12
목수가 메신저 라인에 목을 맞고 쓰러짐 — 이등항해사가 UHF 로 선장에 보고
근거: 경위
07:12 이후
도선사가 해안경비대 호출 — 헬기 최대 50분, 접안 후 후송하기로
근거: 경위
08:04
이밍엄 접안, 대기하던 구급대 승선
근거: 경위
08:15
사망 선언 — 경추 골절 탈구
근거: 경위
② 등장 요소와 관계
점선 상자는 있었지만 쓰이지 않았거나 쓰였는지 모르는 것, 점선 화살표는 보고서가 추정한 관계입니다.
③ 원인 사슬
왼쪽에서 오른쪽으로, 무엇이 무엇으로 이어졌는지입니다. 상자(원인)는 보고서 근거 대목에서 가져왔고, 상자 사이 화살표는 보고서가 직접 적지 않은 경우 모델이 판단해 이은 것입니다.
보고서가 밝히지 못한 것
VDR 기록이 없어 사고 전후 도선사·승조원·예인선 승조원 사이의 상세한 상호작용
VDR 주 전원이 꺼진 정확한 경위
권고·조치
2013/220 Sincere Navigation Corporation: 승조원 기술 능력 확보, 리더십·팀워크 향상, 위험한 작업 전 효과적 위험성 평가 습관화로 SMS 효과 개선
MAIB: 조선소 CSBC Corporation 에 장비 배치 설계 시 안전한 작업 방법 고려 서한, ICS 에 안전 전단 배포 요청
Sincere Navigation 은 선단 회람·계류 배치도 게시·훈련 패키지 등 자체 조치. 예인선 Alma호의 행동은 사고에 기여하지 않았다고 봄.
이 보고서는 2013년 7월 17일에 발간되었다.This report was published on 17 July 2013.
한국어는 모델 번역(검수 전)입니다. 표의 값은 흔한 말만 옮기고 나머지는 원문 그대로 둡니다.
본문
PDF 에서 뽑은 글 — 쪽 나눔·단 배치 때문에 줄 순서가 어긋난 곳이 있을 수 있습니다
Narrative Wah Shan departed Ijmuiden in The Netherlands at 2300 on 30 September 2012. At 0430 on 2 October, two pilots working on behalf of , Immingham, joined the vessel at the Humber light float. The vessel navigated up the River Humber on her approach to Immingham and at 0630 the announced arrival stations using the . The carpenter was the first to arrive at the aft station, followed by the second , a welder, an and a wiper. At 0655 four tugs arrived at Sunk Spit to meet the vessel and assist it to alongside. Two tugs, one forward and one on the shoulder, were made fast by a team of seven at the forward mooring station. A third tug stood by at the and the twin-unit Voith Schneider tug, Alma, approached
Figure 1: Tug Alma and Wah Shan approaching Immingham Reproduced from Admiralty Chart BA 1188-0 by permission of the Controller of HMSO and the UK Hydrographic Office
messenger line on the between the pedestal fairlead and winch and heaved it in by hand until all the slack line was taken up. Finally, the carpenter turned up the messenger line onto the warping drum, winding it on to the drum from the underside and leading it back towards the pedestal fairlead. The welder operated the winch controls, which were located at the opposite end of the winch (on the inboard side) to the warping drum. When standing at the winch controls, the welder could not see the carpenter due to the rope guards on the winch’s main drums. The second stood at the aft railing to watch the tow wire as it was heaved up, while the two stood by to help secure it. The carpenter had taken approximately eight to ten turns of the messenger line around the drum; and these turns accumulated towards the outboard end of the drum as it rotated due to the angle of the lead from the pedestal fairlead. The free end of the messenger line then became entangled in ‘riding turns’2, causing it to be heaved back into the 2 A line is normally led onto a warping drum and sufficient turns taken ( normally about three) so that there is enough friction for the rotating drum to pull the tensioned line. The free, or slack, part of the line should then be led away from the drum in the opposite direction and coiled down neatly well clear of the tensioned part. If the slack part of the line becomes tangled, or is trapped underneath the tensioned part it continues to rotate and is pulled back onto the warping drum. This is referred to as a ‘riding turn’. warping drum with the part under tension. As this was happening, the tow wire came up onto Wah Shan’s deck and the eye nearly reached the aft . As heaving continued, the messenger line slipped off the side of the warping drum causing the tow wire to drop back down towards the tug. The messenger line slipped off the side of the warping drum on at least four occasions, with the eye of the tow wire sometimes dropping all the way down to the
Figure 2: Layout of equipment and messenger line routing at the time of the accident Winch control 8-10 turns (thick rope) Warping drum Circumference:1.46m Height to centre:1.32m 4.80m 8.92m Rope guide Key Carpenter Second (winch operator) Crewmen 3.33m
사실 정보 경위 Wah Shan호는 2012년 9월 30일 2300에 네덜란드 아이마위던(Ijmuiden)을 출항하였다. 10월 2일 0430에 영국 연합항만회사(Associated British Ports) 이밍엄을 대리하여 일하는 도선사 2명이 험버 등부선(Humber light float)에서 선박에 승선하였다. 선박은 이밍엄 접근을 위해 험버강을 따라 항행하였고, 0630에 선장이 선내 방송(PA)으로 입항 배치를 알렸다. 목수가 가장 먼저 선미 계류 위치에 도착하였고, 이어 이등항해사, 용접공, 기관 급유원(oiler), 기관 청소원(wiper)이 도착하였다. 0655에 예인선 4척이 선박과 만나 접안을 돕기 위해 선크 스핏 부표(Sunk Spit Buoy)에 도착하였다. 예인선 2척은 선수에 1척, 우현 어깨(starboard shoulder)에 1척이 배치되어 선수 계류 위치의 갑판 승조원 7명으로 구성된 조가 고정하였다. 세 번째 예인선은 우현 선미 쪽에서 대기하였고, 쌍 유닛 보이트 슈나이더(Voith Schneider) 예인선 Alma호가 선미를 앞세워 Wah Shan호의 선미로 접근하였다(그림 1). 예인선의 예인 와이어를 연결할 준비를 하는 동안 Alma호와 Wah Shan호는 선미끼리 맞댄 위치에서 대수속력 약 6.4노트를 유지하고 있었다. Alma호의 선장과 기관장은 조타실에 있었고 항해사(mate)는 선미 갑판에 있었다. 기관장이 예인 와이어용 윈치를 조작하였고 선장이 항해를 맡았다. Wah Shan호의 갑판은 예인선 갑판보다 약 13m 높았고, Alma호 조타실의 승조원은 Wah Shan호의 선미 계류 갑판에서 무슨 일이 벌어지는지 볼 수 없었다. 0700경 Wah Shan호의 목수가 선박의 메신저 라인을 선미 중심선의 파나마 페어리드(Panama fairlead)를 통해 Alma호로 내려 보냈다. Alma호의 항해사가 줄을 받아 예인선의 메신저 라인에 묶었으며, 이 메신저 라인은 다시 강철 예인 와이어에 연결되어 있었다. Wah Shan호의 선미 계류 조는 메신저 라인의 느슨한 부분을 당기고 예인 와이어를 손으로 끌어올리려 하였다. Alma호의 항해사는 Wah Shan호 승조원이 하려는 일을 알아차리고, 소리를 지르고 손짓을 하여 윈치로 예인 와이어를 끌어올리라고 알렸다. 목수는 메신저 라인을 선미 중심선 비트(bitts)에 통과시킨 다음 갑판을 대각선으로 가로질러 우현 윈치의 안쪽을 지나 윈치 앞쪽의 페데스탈 페어리드(pedestal fairlead)까지 이어지게 하였다. 그다음 메신저 라인을 페데스탈 페어리드에 둘러 감아 페어리드의 바깥쪽에서 워핑 드럼(warping drum)으로 이어지게 하였다(그림 2). 그는 이어서 메신저 라인의 자유 끝을 그림 1: 이밍엄으로 접근하는 예인선 Alma호와 Wah Shan호 영국 해군성 해도 BA 1188-0 에서 영국 정부간행물청(HMSO) 관리관과 영국 수로국의 허가를 받아 복제 페데스탈 페어리드와 윈치 사이의 갑판에 쌓아 놓고, 느슨한 부분이 모두 당겨질 때까지 손으로 끌어당겼다. 마지막으로 목수는 메신저 라인을 워핑 드럼에 감았는데, 드럼의 아래쪽에서부터 감아 페데스탈 페어리드 쪽으로 되돌아 나오게 하였다. 용접공이 윈치 조작기를 운전하였으며, 조작기는 윈치의 워핑 드럼 반대쪽 끝(안쪽)에 있었다. 윈치 조작기 앞에 서 있으면 윈치 주 드럼의 로프 가드 때문에 용접공은 목수를 볼 수 없었다. 이등항해사는 예인 와이어가 끌어올려지는 것을 지켜보기 위해 선미 난간에 서 있었고, 기관부 부원 2명은 고정을 돕기 위해 대기하였다. 목수는 메신저 라인을 드럼에 약 8~10회 감았고, 이 감긴 줄들은 페데스탈 페어리드에서 오는 유도 각도 때문에 드럼이 회전하면서 드럼의 바깥쪽 끝으로 몰렸다. 그러자 메신저 라인의 자유 끝이 '라이딩 턴(riding turns)'2에 얽혀 장력을 받는 부분과 함께 워핑 드럼으로 다시 끌려 들어갔다. 2 줄은 통상 워핑 드럼에 감고 충분한 횟수(보통 3회 정도)를 감아 회전하는 드럼이 장력을 받는 줄을 끌어당길 만큼 충분한 마찰이 생기도록 한다. 그러면 줄의 자유 부분, 즉 느슨한 부분은 드럼에서 반대 방향으로 빼내어 장력을 받는 부분에서 충분히 떨어지게 깔끔하게 사려 놓아야 한다. 줄의 느슨한 부분이 엉키거나 장력을 받는 부분 아래에 끼면 계속 회전하며 워핑 드럼으로 다시 끌려 들어간다. 이를 '라이딩 턴(riding turn)'이라고 한다. 이런 일이 벌어지는 동안 예인 와이어가 Wah Shan호의 갑판 위로 올라왔고 예인 아이(towing eye)가 선미 비트에 거의 닿을 뻔하였다. 계속 끌어올리는 중에 메신저 라인이 워핑 드럼의 옆으로 미끄러져 빠지면서 예인 와이어가 예인선 쪽으로 다시 떨어졌다. 메신저 라인은 워핑 드럼의 옆으로 적어도 네 차례 미끄러져 빠졌고, 예인 와이어의 아이가 예인선의 거널(gunwale)까지 내려가는 경우도 있었다. 이에 예인선 선장이 초단파(VHF) 무선으로 Wah Shan호의 도선사를 호출해 예인 와이어를 고정하는 데 문제가 있는지 물었다. 0705에서 0710 사이에 예인선의 호출에 응하여 도선사 1명이 계류 작업을 확인하기 위해 선교 갑판의 우현 선미 쪽으로 갔다. 메신저 라인이 워핑 드럼으로 이어지면서 엉키고 꼬여 있는 것을 보고 그는 즉시 선교로 돌아와 두 번째 도선사에게 살펴봐 달라고 부탁하였다. 첫 번째 도선사가 선교로 들어올 즈음 메신저 라인이 다시 드럼에서 미끄러져 빠졌다. 용접공은 윈치를 멈추고 무슨 일이 일어나는지 확인하려고 드럼 쪽으로 돌아갔다. 엉킨 상태와 워핑 드럼 바깥쪽 끝에 줄이 쌓여 있는 것을 보고, 그는 목수에게 메신저 라인을 워핑 드럼에서 빼고 처음부터 다시 시작하라고 조언하였다. 목수는 이전과 같이 계속하겠다고 고집하였고 그림 2: 사고 당시 계류 장비의 배치와 메신저 라인의 경로 윈치 조작기 8~10회 감김(굵은 로프) 워핑 드럼 둘레: 1.46m 중심까지의 높이: 1.32m 4.80m 8.92m 로프 가이드 범례 목수 이등항해사(윈치 조작자) 승조원 3.33m
before, and persuaded the welder and the two to help him push the messenger line further onto the body of the warping drum. The second took over the winch control and started heaving very slowly. By this time, the carpenter was standing with his head a few centimetres away from the drum. Suddenly he was heard to cry out. The second officer stopped the winch and quickly moved around to the drum end. There, he found the carpenter slumped forward on the messenger line with a loop of rope hanging loosely around his neck. The members removed the loop and gently laid the carpenter on the . At 0712, the second officer informed the about the accident using his radio. Meanwhile the second , who was as yet unaware of the accident, had moved to the aft side of the . He saw a crew member lying on the deck and asked the master, who was already standing there, if he knew what had happened. The master told him that there had been an accident and emulated a slashing action across his neck with his hand. The casualty was tended to by one of the
Figure 3: Chaffing marks on hydraulic pipe of winch Figure 4: Initial suggestion for an alternative method to take the
그림 3: 우현 윈치 유압관의 쓸림 흔적 그림 4: 예인줄을 잡는 대안 방법에 대한 최초 제안원본 PDF 6쪽
Figure 5: ’s suggestion for the ‘correct’ method to take the Figure 6: Forward arrangement on Wah Shan
그림 5: 예인줄을 잡는 '올바른' 방법에 대한 DPA 의 제안 그림 6: Wah Shan호의 선수 계류 장치원본 PDF 7쪽
copy of a risk checklist for the operation dated September 2012, signed by the , and bosun (who was nominated as the ‘person in charge’). Guidance on best practice ‘Mooring Equipment Guidelines’, a widely used textbook published by the (OCIMF), recommends that fairleads and warping drums should be located such that the fleet angle8 does not exceed 1.5º. The publication states that a ship’s mooring equipment should be designed for diverse requirements including mooring in , single point moorings, multi moorings, tug handling and mooring; therefore, all possible line leads for the various requirements must be considered. In the section ‘Requirements for tug handling’, the book states that there should be suitable equipment for the tug’s line on board, ‘to lead the heaving line onto the warping head of a mooring winch’ using, ‘suitable pedestal fairleads, guide posts or bollards.’ 8 The ‘fleet angle’ describes the orientation of a line as it leads onto a rotating drum. Ideally a line should be lead onto a drum at right angles to the axis of the drum. The fleet angle is the angle between an imaginary line at right angles to the drum’s axis and the line itself. If the fleet angle is too great, the line will not lead onto the drum evenly and will gather at one end, potentially causing the line to snag or be dragged off the end of the drum. The
Wah Shan could have suddenly put extra weight onto the messenger line, injuring anyone handling it at the time. Although there was no evidence to suggest that the came under a sudden load in this instance, several other accidents have occurred when lines have come under tension quickly. Tow lines made from synthetic fibre are significantly lighter, so that it is possible for one or two members to heave them in; however, the practice of heaving in heavy wires by hand should be avoided. It is considered unlikely that Wah Shan’s second would have allowed his team to attempt heaving in the steel tow wire by hand if he had properly understood and assessed the risks of the operation. Once the aft team decided to use the winch to heave up the tow wire, they chose, and then persisted with, an unsuitable lead for the messenger line. The messenger line not only damaged the winch’s hydraulic pipes, but also led onto the pedestal fairlead from the wrong direction. The pedestal fairlead was designed to assist in taking a breast or spring from ashore, with the line exiting from the pedestal on its inboard side. If it was used in this way, the line would lead onto the winch at a suitable fleet angle. There was also a rope guide positioned on the pedestal to support any slack lines when it was being used in this configuration (Figure 2). Routeing the messenger line around the pedestal fairlead from the inboard to the outboard side caused it to have a lead angle onto the warping drum of more than 1.5º. This made the messenger line accumulate at the outer end of the warping drum as it rotated. In this state, the messenger line was far more likely to develop riding turns and, or, slip off the outer edge of the warping drum. The aft
operations had ever been part of the aft mooring team. While most of the guidance that was available for handling mooring lines was also applicable to tugs’ tow lines, it is still very important to consider the specific risks associated with securing a tug’s tow wire to a ship while both are in motion. A thorough assessment of securing a tug’s line at the aft mooring station should have identified that the method of leading a messenger line onto a winch was unclear and needed to be defined. The actions of the aft mooring team on Wah Shan immediately prior to the accident contravened most of the available guidance on safe and effective mooring. Particular examples of this were: standing too close to the warping drum, applying too many turns of rope around the warping drum, standing too close to a rope under load, cluttering the line-handling area with the excess rope, and four people standing in the vicinity of the tensioned messenger line. While much of this can be attributed to the competence of those involved, the performance of the team as a whole was a significant factor. On Wah Shan’s aft mooring, poor practices were endorsed, and when safety concerns were raised they were overruled. To overcome these problems it is important that Wah Shan’s managers make a fair and accurate assessment of how their operates as a team. This must be done in order to understand the underlying reasons why the aft mooringcrew behaved as they did prior to the accident. More importantly, this knowledge should then be used to change crew attitudes and improve future performance. Irrespective of rank, crew members should be encouraged to spot hazards which might not have been identified during a written
SHIP Vessel’s name Wah Shan Flag Panama number/ numbers 9268825 Type Registered owner Newton Limited, Marshall Islands Manager(s) Sincere Navigation Corporation, Republic of China (Taiwan) Build 2003, China Shipbuilding Corporation, Kaohsiung (Taiwan) 289m 91165 14 Authorised cargo Dry bulk
-first towards Wah Shan’s
stern
(Figure 1). As preparations were made to connect the tug’s tow wire, Alma and Wah Shan were positioned
stern
to
stern
maintaining an approximate
of 6.4 knots through the water. Alma’s
and
were in the wheelhouse and the
was on the aft
deck
. The
chief engineer
operated the winch for the tow wire and the
skipper
was in charge of
. Wah Shan’s
deck
was approximately 13m above the tug’s
deck
and it was not possible for the
crew
in Alma’s wheelhouse to see what was happening on Wah Shan’s aft
mooring
deck
. At around 0700, Wah Shan’s carpenter lowered the ship’s messenger line through the aft
Panama fairlead to Alma. The
mate
of Alma received the line and tied it to the tug’s messenger line which was attached, in turn, to the
tow wire. The aft
mooring
team on Wah Shan took up the slack in the messenger lines and attempted to heave up the tow wire by hand. Alma’s
mate
realised what Wah Shan’s
crew
were trying to do and he indicated to them, by shouting and using hand gestures, to use a winch to heave up the tow wire. The carpenter passed the messenger lines through the aft
centreline
and then diagonally across the
deck
, past the inboard side of the
starboard
winch, to a pedestal fairlead which was forward of the winch. He then passed the messenger line around the pedestal fairlead so it
led
off the outboard side of the fairlead to the warping drum (Figure 2). He then piled the free end of the
of the tug. This prompted the tug
to
Wah Shan’s
using the
radio (
VHF
) to enquire if there was a problem with
the tow wire. Between 0705 and 0710, in response to the
call
from the tug, one of the pilots went to the
aft side of the
to check the
operations. Seeing that the messenger line was tangled up and twisted as it
led
onto the warping drum, he immediately returned to the
and asked the second
pilot
to have a look. At around the time the first
pilot
was entering the
bridge
, the messenger line slipped off the drum again. The welder stopped the winch and went around to the drum side to investigate what was happening. Seeing the tangled condition and the build-up of the line on the outer end of the warping drum, he advised the carpenter to remove the messenger line from the warping drum and start again. The carpenter insisted on carrying on as
crew
members while the others secured the tow wire using the
winch, assisted by a team from the forward
station that had arrived to help. The casualty was moved to a stretcher and prepared for evacuation, during which time he showed no signs of life. The
pilot
on the
called the local
by
radio and requested assistance. The
coastguard
informed the
pilot
that it would take up to 50 minutes for the helicopter to arrive3 and a decision was taken for the vessel to
as soon as possible and evacuate the casualty once alongside. Meanwhile, the carpenter was covered with blankets and made comfortable. At 0804, Wah Shan came alongside, where an ambulance team was waiting. After examining the carpenter, the paramedic declared him deceased at 0815. The post-mortem report stated the cause of death to be fracture dislocation of the cervical spine4. 3 Between 0800 and 2200, the
helico pters operate on 15 minutes notice to mobilise and on 45 minutes notice outside these hours. 4 Cervical spine is the anatomical term for neck. Ship manager Wah Shan was one of seven bulk carriers managed by the Sincere
Corporation, based in Taiwan. Of the seven vessels, five were ‘capesize’.
Crew
There were 23
crew
members on board Wah Shan. The
master
,
,
and second engineer were from Taiwan; the rest of the
crew
were from the People’s Republic of China. The working language on board was Mandarin. The deceased, Mr ○○, was 35 years old and reputed to have been a hard working and responsible
crew member
. He was qualified as an able bodied
capable of being part of a
(STCW5 II/4). He joined Sincere
Navigation
in February 2012 as an
on board Wah Shan and was subsequently promoted to the role of carpenter in June 2012. He had previously been employed as bosun and carpenter in other companies. At the time of joining, and again after his promotion, Mr ○○ had signed an ‘Elementary Basic Safety Familiarization Checklist’ and a ‘Specific Shipboard Familiarization Checklist’ which included familiarisation with
mooring
equipment. He was well rested and was wearing appropriate
including helmet, gloves and safety boots at the time of the accident. He was 1.69m tall. The
master
had joined the vessel in February 2012. He was 64 years old and had 12 years’ experience as
master
, having joined Sincere
Navigation
as a third
officer
in 1984. He had a limited command of the English language. The second
officer
was 31 years old and held
II/1 Certificates of Competence issued by the administrations of the People’s Republic of China and the Republic of Panama. He had joined the vessel in October 2011 and kept the midnight to 0400 and noon to 1600 watches at
sea
. On the day of the accident he had slept about 2 hours before the accident and had 6 hours rest the previous evening. He reported that he did not feel unduly affected by
on the morning of the accident. The
chief officer
was responsible for the forward
mooring
station and the second
officer
for the aft
mooring
station. The forward and aft
mooring
teams always comprised the same
crew
members. In addition, two
deck
were assigned to 5
STCW
: International Convention on Standards of Training, Certifi cation and
for Seafarers.
rigging the ladder and gangway. Except for the , all the members in the aft team had completed the mooring winch familiarisation programme. This concentrated on the operation of the winches and did not cover tow wires or heaving in messenger lines. Mooring and arrangements There were three Rauma Brattvaag (Rolls Royce) hydraulic mooring winches on Wah Shan’s aft : one on each side and the third just to the side of the . Snap back zones were marked at all the fairleads around the edge of the deck. Each winch had a warping drum and two drums for storing mooring ropes. One of the hydraulic pipes connected to the starboard outer winch showed signs of chafing. A reconstruction of the lead used for the messenger line indicated that the chafing was consistent with the messenger line rubbing against the pipe (Figure 3) as it passed from the centreline to the pedestal fairlead. The hydraulic pipes on the winch also had minor chafing marks. platforms were provided by each winch so that could reach up to apply the brakes. The messenger lines from both Wah Shan and Alma were identical 38m long, 32mm diameter polypropylene ropes. Alma’s steel tow wire was 44mm in diameter and weighed 7.8 kg/m. While the use of steel wire ropes is common, a significant number of tugs use towlines made from synthetic fibre. These materials are significantly lighter than a steel wire of equivalent diameter and strength and therefore can often be heaved in by hand. Wah Shan’s centrelinebitts were fitted with a loop to which a stopper6 could be attached. A stopper was not rigged during the first attempt to heave up the tow wire prior to the accident. Following the accident, a stopper was rigged, and it was used successfully during the second attempt to secure the tow wire. From February 2012, when most of the current crew members had joined Wah Shan, tugs had been used around 20 times when the vessel arrived at or departed from ports. The winches had been used to lift up the tow wire of stern tugs on only three or four of these occasions. Of the 6 A stopper is used to take the strain off a wire or rope to allow the free end to be attached to the bitts. The stopper normally consists of a length of chain or rope (other types with special grips or chocks are also available), secured to a strong loop at the base of a set of bitts. A chain stopper is then crossed over the wire so that there is enough friction to grip the wire. remainder, the tow wires were physically lifted up by the mooring team, often helped by the crew members who were assigned to rig the gangway. Shortly after the accident, Wah Shan’s in consultation with marine surveyors acting on behalf of the ship owner produced a sketch showing what he considered to be a better alternative method of heaving in a tow wire (Figure 4). The (DPA) from Sincere carried out an investigation on board after the accident and produced a different plan showing the method that he thought to be ‘correct’ (Figure 5). The forward mooring and towing arrangements were more simply arranged and are shown in (Figure 6). inspectors went on board a randomly selected arriving at Immingham to study the process used to secure a tug aft. The selected vessel was a Panamax7 size bulk carrier and the tug Alma was in attendance. The mooring equipment on this vessel was well positioned, making it readily apparent how a messenger line should be led from the centreline fairlead to the warping drum. The entire operation, beginning with sending a heaving line to the tug and ending with the eye of the towing pennant on the bitts, took less than 5 minutes. The mooring equipment on the bulk carrier’s aft deck is shown in (Figure 7). Wah Shan’s safety management system (SMS) documentation was provided on board in both Mandarin and English languages. The system required an ‘operational risk check ’ for deck operations to be completed by the , for operations by the the , and by both for combined deck and engine operations. It also required the master to confirm that risk control procedures were appropriate and to ensure they were in place during the operations. Surveyors from the (MCA) carried out a Inspection on Wah Shan shortly after the accident. Several deficiencies were recorded, including one which noted that an operational risk checklist for joint operations by the deck and engine departments was not available on board at the time. The MCA surveyors asked the master to search for the document, and the master confirmed that no such document had been produced for the mooring operation. The DPA’s subsequent accident investigation report included a completed 7 The largest size vessel which can transit the Panama Canal – smaller than capesize vessels.
용접공과 기관부 부원 2명을 설득하여 메신저 라인을 워핑 드럼 몸통 쪽으로 더 밀어 넣는 것을 돕게 하였다. 이등항해사가 윈치 조작을 넘겨받아 아주 천천히 끌어올리기 시작하였다. 이때 목수는 머리를 드럼에서 불과 몇 센티미터 떨어진 곳에 둔 채 서 있었다. 갑자기 그가 소리를 지르는 것이 들렸다. 이등항해사가 윈치를 멈추고 재빨리 드럼 끝 쪽으로 이동하였다. 그곳에서 그는 목수가 메신저 라인 위로 앞으로 쓰러져 있고 줄 고리 하나가 목에 느슨하게 걸려 있는 것을 발견하였다. 승조원들이 고리를 벗기고 목수를 조심스럽게 갑판에 눕혔다. 0712에 이등항해사가 극초단파(UHF) 무전기로 선장에게 사고를 알렸다. 한편 아직 사고를 모르던 두 번째 도선사는 우현 선교 갑판의 선미 쪽으로 이동하였다. 그는 승조원 1명이 갑판에 누워 있는 것을 보고, 이미 그곳에 서 있던 선장에게 무슨 일이 있었는지 아느냐고 물었다. 선장은 사고가 있었다고 말하며 손으로 목을 가로지르는 베는 동작을 흉내 냈다. 피해자는 승조원 1명이 돌보았고, 나머지는 도우러 도착한 선수 계류 위치의 조와 함께 좌현 윈치를 이용해 예인 와이어를 고정하였다. 피해자는 들것으로 옮겨져 후송 준비를 하였으나 그동안 생명의 징후를 보이지 않았다. 선교의 도선사가 VHF 무선으로 지역 해안경비대를 호출해 지원을 요청하였다. 해안경비대는 도선사에게 헬리콥터가 도착하는 데 최대 50분이 걸린다3고 알렸으며, 선박이 가능한 한 빨리 접안하고 접안 후 피해자를 후송하기로 결정되었다. 한편 목수에게는 담요를 덮어 안정을 취하게 하였다. 0804에 Wah Shan호가 접안하였고 그곳에서 구급대가 기다리고 있었다. 목수를 진찰한 뒤 응급구조사는 0815에 사망을 선언하였다. 부검 보고서는 사인을 경추4 골절 탈구로 기재하였다. 3 0800에서 2200 사이에 수색구조 헬리콥터는 15분 전 통보로 출동하며, 그 외 시간에는 45분 전 통보로 출동한다. 4 경추(cervical spine)는 목에 대한 해부학 용어이다. 선박 관리 회사 Wah Shan호는 대만에 본사를 둔 Sincere Navigation Corporation 이 관리하는 벌크선 7척 중 하나였다. 7척 중 5척은 '케이프사이즈'였다. 승조원 Wah Shan호에는 승조원 23명이 승선하고 있었다. 선장, 일등항해사, 기관장, 이등기관사는 대만 출신이었고, 나머지 승조원은 중화인민공화국 출신이었다. 선내 업무 언어는 북경어(Mandarin)였다. 사망한 ○○ 씨는 35세였으며 성실하고 책임감 있는 승조원으로 평판이 좋았다. 그는 항해 당직의 일원이 될 수 있는 유능 갑판원(AB) 자격(STCW5 II/4)을 갖추고 있었다. 2012년 2월 Sincere Navigation 에 Wah Shan호의 보통 갑판원(OS)으로 입사하였고 이후 2012년 6월 목수 직책으로 승진하였다. 이전에는 다른 회사에서 갑판장과 목수로 근무한 적이 있었다. 입사 시와 승진 후에 ○○ 씨는 '기초 안전 숙지 점검표(Elementary Basic Safety Familiarization Checklist)'와 계류 장비 숙지를 포함하는 '선박 고유 숙지 점검표(Specific Shipboard Familiarization Checklist)'에 서명하였다. 그는 충분히 휴식을 취한 상태였고 사고 당시 헬멧, 장갑, 안전화를 포함한 적절한 개인보호구를 착용하고 있었다. 그의 키는 1.69m였다. 선장은 2012년 2월에 승선하였다. 64세였으며 선장으로서 12년의 경력이 있었고, 1984년에 삼등항해사로 Sincere Navigation 에 입사하였다. 그의 영어 구사 능력은 제한적이었다. 이등항해사는 31세였고 중화인민공화국과 파나마공화국 당국이 발급한 STCW II/1 해기 자격증명을 보유하고 있었다. 그는 2011년 10월에 승선하였고 항해 중 0000~0400과 1200~1600 당직을 섰다. 사고 당일 그는 사고 전에 약 2시간을 잤고 전날 저녁에 6시간 휴식하였다. 그는 사고 당일 아침 피로의 영향을 과도하게 느끼지 않았다고 보고하였다. 일등항해사는 선수 계류 위치를, 이등항해사는 선미 계류 위치를 책임졌다. 선수와 선미 계류 조는 항상 같은 승조원으로 구성되었다. 이에 더해 갑판부 부원 2명은 5 STCW: 선원의 훈련·자격증명 및 당직근무의 기준에 관한 국제협약.
현측 사다리와 갱웨이를 설치하는 일에 배정되었다. 기관부 부원을 제외하고 선미 계류 조의 모든 구성원은 계류 윈치 숙지 프로그램을 이수하였다. 이 프로그램은 윈치의 조작에 중점을 두었으며 예인 와이어의 고정이나 메신저 라인의 끌어올리기는 다루지 않았다. 계류 및 예인 장치 Wah Shan호의 선미 갑판에는 Rauma Brattvaag(Rolls Royce) 유압 계류 윈치 3대가 있었다. 양현에 각 1대, 세 번째는 중심선의 우현 쪽에 있었다. 갑판 가장자리의 모든 페어리드에는 스냅백(snap back) 구역이 표시되어 있었다. 각 윈치에는 워핑 드럼 1개와 계류 로프를 보관하는 드럼 2개가 있었다. 우현 바깥쪽 윈치에 연결된 유압관 중 하나에 쓸림 흔적이 있었다. 메신저 라인에 사용된 유도 경로를 재현해 본 결과, 쓸림은 메신저 라인이 중심선 비트에서 페데스탈 페어리드로 지나가면서 유압관에 쓸린 것과 부합하였다(그림 3). 좌현 윈치의 유압관에도 경미한 쓸림 흔적이 있었다. 승조원이 손을 뻗어 브레이크를 걸 수 있도록 각 윈치 옆에 강철 플랫폼이 마련되어 있었다. Wah Shan호와 Alma호의 메신저 라인은 동일한 길이 38m, 직경 32mm 의 폴리프로필렌 로프였다. Alma호의 강철 예인 와이어는 직경 44mm 였고 무게는 7.8 kg/m 였다. 강철 와이어 로프의 사용은 흔하지만, 상당수 예인선은 합성섬유로 만든 예인줄을 사용한다. 이 재료는 같은 직경과 강도의 강철 와이어보다 상당히 가벼워 흔히 손으로 끌어올릴 수 있다. Wah Shan호의 중심선 비트에는 스토퍼(stopper)6를 걸 수 있는 고리가 달려 있었다. 사고 전 예인 와이어를 끌어올리려던 첫 번째 시도에서는 스토퍼가 설치되지 않았다. 사고 후에는 스토퍼가 설치되었고, 예인 와이어를 고정하는 두 번째 시도에서 이를 성공적으로 사용하였다. 현재 승조원 대부분이 Wah Shan호에 승선한 2012년 2월 이래 선박이 항구에 입항하거나 출항할 때 선미 예인선이 약 20회 사용되었다. 이 중 윈치를 사용하여 선미 예인선의 예인 와이어를 들어 올린 것은 세 번 또는 네 번에 불과하였다. 나머지 6 스토퍼는 와이어나 로프의 힘을 덜어 자유 끝을 비트에 연결할 수 있게 하는 데 사용한다. 스토퍼는 통상 비트 한 쌍의 밑동에 있는 튼튼한 고리에 고정한 체인이나 로프(특수한 그립이나 초크가 달린 다른 종류도 있다)로 이루어진다. 체인 스토퍼는 와이어를 가로질러 감아 와이어를 잡을 만큼 충분한 마찰이 생기게 한다. 경우에는 예인 와이어를 계류 조가 직접 손으로 들어 올렸으며, 갱웨이 설치를 맡은 승조원이 돕는 경우가 많았다. 사고 직후 Wah Shan호 선장은 선주를 대리하는 해사 검사관들과 협의하여 예인 와이어를 끌어올리는 더 나은 대안 방법이라고 생각하는 것을 보여 주는 스케치를 만들었다(그림 4). Sincere Navigation 의 육상 지정자(DPA)는 사고 후 선내 조사를 실시하고 자신이 '올바르다'고 생각하는 방법을 보여 주는 다른 계획을 작성하였다(그림 5). 선수 계류 및 예인 장치는 더 단순하게 배치되어 있으며 (그림 6)에 나타나 있다. MAIB 조사관들은 이밍엄에 입항하는 무작위로 선정한 벌크선에 승선하여 선미에서 예인선을 고정하는 과정을 살펴보았다. 선정된 선박은 파나막스(Panamax)7 크기 벌크선이었고 예인선 Alma호가 지원하고 있었다. 이 선박의 계류 장비는 위치가 잘 잡혀 있어 메신저 라인을 중심선 페어리드에서 워핑 드럼까지 어떻게 유도하여야 하는지가 쉽게 드러났다. 예인선에 히빙 라인(heaving line)을 보내는 것부터 예인 페넌트(towing pennant)의 아이가 비트에 걸리기까지 전체 작업이 5분이 채 걸리지 않았다. 이 벌크선의 선미 갑판 계류 장비는 (그림 7)에 나타나 있다. 안전관리체제 Wah Shan호의 안전관리체제(SMS) 문서는 북경어와 영어로 선내에 비치되어 있었다. 이 체제는 갑판 작업에 대해서는 일등항해사가, 기관 작업에 대해서는 기관장이, 갑판과 기관 합동 작업에 대해서는 양자가 '작업 위험 점검표(operational risk check list)'를 작성하도록 요구하였다. 또한 선장이 위험 통제 절차가 적절한지 확인하고 작업 중에 이행되고 있는지 보장하도록 요구하였다. 영국 해사연안경비청(MCA)의 검사관들이 사고 직후 Wah Shan호에 대해 항만국통제 검사를 실시하였다. 여러 결함이 기록되었으며, 그중에는 갑판부와 기관부의 합동 작업에 대한 작업 위험 점검표가 당시 선내에 없었다는 지적이 있었다. MCA 검사관들이 선장에게 해당 문서를 찾아보라고 요청하였고, 선장은 계류 작업에 대해 그러한 문서가 작성된 적이 없음을 확인하였다. DPA 의 이후 사고 조사 보고서에는 작성 완료된 7 파나마 운하를 통과할 수 있는 가장 큰 크기의 선박으로, 케이프사이즈 선박보다 작다.
OCIMF
publication ‘Effective
Mooring
’, provides eight safety reminders to
who are working with synthetic
mooring
ropes. These are: 1. Do not surge synthetic ropes on the drum end … it may stick to the drum or
and jump … 2. Do not stand too close to a winch drum or
bitt
when holding and tensioning a line … Stand back and grasp the line about one metre from the drum or
bitt
3. Do not apply too many turns over the warping drum end … 4. Do not bend the rope excessively 5. Do not stand in the bight of a rope 6. Do not stand close to a rope under load 7. Do not leave loose objects in the line handling area 8. Do not have more people than necessary in the vicinity of a line The
’s publication, ‘
(
COSWP
)’ was referred to in Wah Shan’s
as a source of additional information. Regarding the attachment of a tug’s tow wire,
COSWP
states:
Figure 7: Aft on a visited by
‘A messenger should be used to heave the tug’s tow wire on board by a winch, and then a stopper used while the eye is placed around the . Only enough turns of the messenger should be used on the warping drum end to heave in the tow wire.’ Team work and the use of design to prevent accidents In a publication sponsored by the , ‘The Human Element: a guide to human behaviour in the shipping industry’, (2010, Dick Gregory and Paul Shanahan), the authors indicate that violation of established rules is typically due to three different reasons: • When people attempt to solve a novel, but immediate problem using limited knowledge and experience. • When people resort to short-cuts which have proved effective in the past. • When supervision is ineffective. The authors quote established research in the subject of team skills, stating that there are five main team skills: • Team leadership, which includes the ability to direct, coordinate and motivate team members, as well as engaging with them in planning and feedback sessions; • Team members’ ability to monitor each other’s performance; • Supportive behaviour of team members, who are proactive in their understanding of others’ tasks and willing to share some of the load if necessary; • Adaptability, or the ability for team members to respond to external changes and modify their own work accordingly, and; • Team orientation, or the degree to which team members see the team’s goal as their own. The publication ‘The engineer’s view of human error’ by Trevor Kletz, a fellow of the Royal Academy of Engineering, states: We can, of , change people’s performance by better training and instructions, better supervision and, to some extent, by better motivation. What we cannot do is enable people to carry out tasks beyond their physical or mental abilities or prevent them making occasional slips or lapses of attention. We can, however, reduce the opportunities of such slips and lapses of attention by changing designs or methods of working. Wah Shan’s voyage data recorder (VDR) was manufactured by the Japan Radio Company (JRC) Limited. It was serviced, and had its annual performance test (APT) certificate issued, at Ijmuiden on 28 September 2012. The VDR service engineer reported that the system was operational when he left the vessel at around 1500 . During the APT, the service engineer remarked that the expiry date for the reserve power battery was June 2012; an order for a replacement was placed with JRC with the intention that the new battery would be fitted when the vessel called at Immingham. As part of the APT, the service engineer switched off the mains power supply and noted that the battery power was switched off automatically after 2 hours of recording. This test established compliance with the performance requirement standard for VDRs (IEC61996-19). The service engineer was unable to test the write mechanism for archiving the VDR data as neither he nor the had an appropriate recording disc available. He used his laptop to extract data directly from the VDR. Wah Shan’s crew members received and fitted the new battery on 2 October after the vessel had arrived alongside at Immingham. The examined the data stored on the VDR’s hard drive disk. No data had been recorded between 2022 UTC on 28 September and 1633 UTC on 2 October. The DVD RAM10 write mechanism of the VDR was found to be defective and there was no evidence to establish that it had ever worked. Regulation 18 of Chapter V, ‘Approval, Surveys and Performance Standards of Navigational Systems and Equipment and Voyage Data Recorder’ states that during the APT, the accuracy, duration and recoverability of the recorded data should be verified. IEC61996-1 states: ‘Means shall be provided to ensure that the recorded data may be saved by an appropriate method following an incident …’ 9 (IEC) standard 61996-1. 10 DVD RAM Digital Versatile Disc Random Access Memory.
On 29 September 2012, the (ABS), Wah Shan’s , issued the annual ‘ safety equipment certificate’ confirming that the vessel’s met the required standards. Previous fatal accidents in similar circumstances Since 1992, five fatal accidents have been reported to the that have been caused by tow wires and messenger lines during the process of a tug to a ship. • In 1992, the on board the dry cargo vessel Ocean Express was killed by a whiplash injury to the neck caused by a parted messenger line • In 2007, a on the tug Retainer suffered a fatal whiplash injury to his chest as the tow rope, which had on the equipment, suddenly released. • Similar accidents on the refrigerated cargo vessel Ice Bird (2002) and the tug Englishman (2008) killed two crew members. • In 2009, a crew member from the vessel Ever Smile was killed when he was struck by a messenger line which had jumped off the warping drum causing him to fall overboard.
ANALYSIS
, drugs and alcohol There was no evidence to suggest that the effects of fatigue, drugs or alcohol contributed to this accident. Although the second had only two after his watch on 2 October, he had rested well during the previous evening and reported that he did not feel unduly tired. His behaviour on the morning of the accident was not considered to be due to fatigue. The post-mortem examination of Mr ○○ found no evidence of recreational drugs or alcohol in his system that might have impaired his performance at the time of the accident. The accident A significant amount of energy would have been stored in the polypropylene messenger line due to the weight of the tow wire and the friction as the messenger line led through the resisted the tension created by the warping drum. In addition, the line would have been twisted each time a turn of rope slipped off the warping drum. The riding turns which accumulated on the warping drum would have created a complicated system – some turns would be trapped by their neighbours so that they were not under tension; other turns that were not trapped might experience the full amount of tension in the line. Any twist in a particular section of line might have caused a bight of rope to rotate rapidly as it came off the warping drum. During the accident, it was considered likely that one or more turns of the messenger line came off the warping drum in such a way that these forces were suddenly released, forming a bight that rapidly uncoiled in a whiplash action. Given that the height of the drum above the was 1.55m, Mr ○○ neck would have been adjacent to the upper part of the warping drum. The postmortem report stated that he had suffered a fractured neck. Hence, it is almost certain that Mr ○○ was fatally injured when a section of the tensioned messenger line slipped off the end of the warping drum and struck him on the neck. It was considered very unlikely that Mr ○○ injuries were caused by him being dragged into, or around, the warping drum even though a loop of the messenger line was found around his neck. The loop was much more likely to have been a bight formed in the part of the messenger line that had been trapped under the riding turns and isolated from the section which was under tension. Also, a bight of rope rotating as the warping drum turned would not have contained sufficient energy to inflict such a so rapidly. There was no evidence to suggest that the actions of the tug Alma contributed to the accident in any way. The tug maintained sufficient slack in the tow wire by matching Wah Shan’s and , and, by paying out the wire from their winch as necessary. The crew members at the aft station on Wah Shan attempted to heave in Alma’s tow wire by hand, and they only stopped when they were advised against doing so by the tug’s crew. Apart from lifting the weight of the wire from the tug up to the stern of Wah Shan (at least 100kg), there would also have been a considerable amount of friction as the wire passed through the stern fairlead and onto the bitts. It would have required the co-ordinated effort of several people to heave in the steel tow wire successfully and without injuring anyone. There was also the risk that any relative movement between Alma and
계류 작업 위험 점검표 사본이 포함되어 있었으며, 이는 2012년 9월 자로 선장, 일등항해사, 갑판장('책임자(person in charge)'로 지명됨)이 서명한 것이었다. 모범 실무에 관한 지침 석유회사국제해사포럼(OCIMF)이 발간하여 널리 쓰이는 교재인 '계류 장비 지침(Mooring Equipment Guidelines)'은 페어리드와 워핑 드럼을 플리트 각(fleet angle)8이 1.5º를 넘지 않도록 배치할 것을 권고한다. 이 간행물은 선박의 계류 장비가 항내 계류, 단점 계류, 다부표 계류, 예인선 취급, 바지선 계류를 포함한 다양한 요구에 맞게 설계되어야 하므로 여러 요구에 대한 모든 가능한 줄 유도 경로를 고려하여야 한다고 명시한다. '예인선 취급 요건(Requirements for tug handling)' 절에서 이 책은 예인선의 줄을 본선으로 끌어올리기 위한 적절한 장비가 있어야 하며, '적절한 페데스탈 페어리드, 가이드 포스트 또는 볼라드'를 사용하여 '히빙 라인을 계류 윈치의 워핑 헤드로 유도'하여야 한다고 기술한다. 8 '플리트 각(fleet angle)'은 회전하는 드럼으로 줄이 유도되는 방향을 나타낸다. 이상적으로 줄은 드럼 축에 직각으로 드럼에 유도되어야 한다. 플리트 각은 드럼 축에 직각인 가상의 선과 줄 자체 사이의 각이다. 플리트 각이 너무 크면 줄이 드럼에 고르게 유도되지 않고 한쪽 끝으로 모여 줄이 걸리거나 드럼 끝에서 끌려 빠질 수 있다. OCIMF 간행물 '효과적인 계류(Effective Mooring)'는 합성 계류 로프로 작업하는 승조원을 위한 여덟 가지 안전 상기 사항을 제시한다. 이는 다음과 같다. 1. 합성 로프를 드럼 끝에서 서지(surge)시키지 말 것 ... 드럼이나 비트에 달라붙었다가 튀어 오를 수 있다 ... 2. 줄을 잡고 장력을 줄 때 윈치 드럼이나 비트에 너무 가까이 서지 말 것 ... 뒤로 물러서서 드럼이나 비트에서 약 1미터 떨어진 곳의 줄을 잡을 것 3. 워핑 드럼 끝에 너무 많은 횟수를 감지 말 것 ... 4. 로프를 과도하게 구부리지 말 것 5. 로프의 고리(bight) 안에 서지 말 것 6. 하중을 받는 로프 가까이에 서지 말 것 7. 줄 취급 구역에 느슨한 물건을 두지 말 것 8. 줄 근처에 필요 이상으로 많은 사람이 있지 않게 할 것 MCA 의 간행물 '선원 안전작업 실무규약(Code of Safe Working Practices for Merchant Seamen, COSWP)'은 Wah Shan호의 SMS 에서 추가 정보의 출처로 언급되었다. 예인선의 예인 와이어 연결과 관련하여 COSWP 는 다음과 같이 명시한다. 그림 7: MAIB 가 방문한 벌크선의 선미 계류 갑판 '메신저를 사용하여 윈치로 예인선의 예인 와이어를 본선으로 끌어올리고, 아이를 볼라드에 걸 동안에는 스토퍼를 사용하여야 한다. 예인 와이어를 끌어올리는 데 필요한 만큼의 횟수만 메신저를 워핑 드럼 끝에 감아야 한다.' 팀워크와 사고 예방을 위한 설계의 활용 MCA 가 후원한 간행물 '인적 요소: 해운 산업의 인간 행동 안내서(The Human Element: a guide to human behaviour in the shipping industry)'(2010, Dick Gregory 및 Paul Shanahan)에서 저자들은 정해진 규칙의 위반이 통상 세 가지 다른 이유 때문이라고 밝힌다. • 사람이 제한된 지식과 경험으로 새롭지만 당면한 문제를 해결하려 할 때. • 과거에 효과가 있었던 지름길에 의존할 때. • 감독이 효과적이지 않을 때. 저자들은 팀 기량에 관한 확립된 연구를 인용하여 주요 팀 기량이 다섯 가지라고 말한다. • 팀원을 지시하고 조정하며 동기를 부여하고 계획 및 피드백 회의에 참여시키는 능력을 포함하는 팀 리더십; • 팀원이 서로의 수행을 감시하는 능력; • 다른 사람의 업무를 적극적으로 이해하고 필요하면 일부 부담을 기꺼이 나누는 팀원의 지원적 행동; • 팀원이 외부 변화에 대응하고 그에 맞게 자신의 업무를 수정하는 능력인 적응력; 그리고 • 팀원이 팀의 목표를 자신의 목표로 보는 정도인 팀 지향성. 영국 왕립공학아카데미(Royal Academy of Engineering) 회원인 Trevor Kletz 의 간행물 '인간 오류에 대한 엔지니어의 관점(The engineer's view of human error)'은 다음과 같이 기술한다. 우리는 물론 더 나은 훈련과 지침, 더 나은 감독, 그리고 어느 정도는 더 나은 동기 부여를 통해 사람들의 수행을 바꿀 수 있다. 우리가 할 수 없는 것은 사람들이 신체적 또는 정신적 능력을 넘어서는 일을 수행하게 하는 것이나 가끔 일어나는 실수나 주의력 저하를 막는 것이다. 그러나 설계나 작업 방식을 바꾸어 이러한 실수와 주의력 저하의 기회를 줄일 수는 있다. 항해자료기록장치 Wah Shan호의 항해자료기록장치(VDR)는 일본무선(Japan Radio Company, JRC) Limited 가 제조하였다. 이 장치는 2012년 9월 28일 아이마위던에서 점검을 받았고 연례 성능 시험(APT) 증명서가 발급되었다. VDR 점검 기술자는 약 1500 UTC 에 선박을 떠날 때 시스템이 작동 중이었다고 보고하였다. APT 중에 점검 기술자는 예비 전원 배터리의 유효 기한이 2012년 6월이라고 언급하였고, 선박이 이밍엄에 기항할 때 새 배터리를 장착할 의도로 JRC 에 교체품을 주문하였다. APT 의 일환으로 점검 기술자는 주 전원을 끄고 배터리 전원이 2시간 기록 후 자동으로 꺼지는 것을 확인하였다. 이 시험으로 VDR 의 성능 요건 표준(IEC61996-19) 준수가 확인되었다. 점검 기술자는 VDR 데이터를 보관하는 기록 장치를 시험할 수 없었는데, 그도 승조원도 적합한 기록 디스크를 가지고 있지 않았기 때문이다. 그는 자신의 노트북을 사용하여 VDR 에서 직접 데이터를 추출하였다. Wah Shan호 승조원은 선박이 이밍엄에서 접안한 뒤인 10월 2일에 새 배터리를 받아 장착하였다. MAIB 는 VDR 의 하드 드라이브 디스크에 저장된 데이터를 조사하였다. 9월 28일 2022 UTC 부터 10월 2일 1633 UTC 사이에는 기록된 데이터가 없었다. VDR 의 DVD RAM10 기록 장치는 결함이 있는 것으로 확인되었으며 그것이 한 번이라도 작동하였다는 증거는 없었다. SOLAS 제V장 제18규칙 '항해 시스템 및 장비와 항해자료기록장치의 승인, 검사 및 성능 기준'은 APT 중에 기록된 데이터의 정확도, 기간, 복구 가능성을 검증하여야 한다고 명시한다. IEC61996-1 은 다음과 같이 명시한다. '사고 후 적절한 방법으로 기록된 데이터를 저장할 수 있도록 하는 수단이 제공되어야 한다 ...' 9 국제전기기술위원회(International Electrotechnical Commission, IEC) 표준 61996-1. 10 DVD RAM 은 디지털 다기능 디스크 랜덤 액세스 메모리(Digital Versatile Disc Random Access Memory)이다.
2012년 9월 29일 Wah Shan호의 선급인 미국선급(ABS)은 선박의 VDR 이 요구 기준을 충족함을 확인하는 연례 '화물선 안전장비 증서(cargo ship safety equipment certificate)'를 발급하였다. 유사한 상황에서 발생한 이전의 치명적 사고 1992년 이래 예인선을 본선에 고정하는 과정에서 예인 와이어와 메신저 라인으로 인해 발생한 치명적 사고 5건이 MAIB 에 보고되었다. • 1992년에 건화물선 Ocean Express호의 일등항해사가 끊어진 메신저 라인에 의한 목의 채찍질 부상으로 사망하였다. • 2007년에 예인선 Retainer호의 승조원이 계류 장비에 걸려 있던 예인 로프가 갑자기 풀리면서 가슴에 치명적인 채찍질 부상을 입었다. • 냉동화물선 Ice Bird호(2002년)와 예인선 Englishman호(2008년)에서 발생한 유사한 사고로 승조원 2명이 사망하였다. • 2009년에 컨테이너선 Ever Smile호의 승조원이 워핑 드럼에서 튀어 나간 메신저 라인에 맞아 바다에 떨어져 사망하였다. 분석 피로, 약물 및 알코올 피로, 약물, 알코올의 영향이 이 사고에 기여하였음을 시사하는 증거는 없었다. 이등항해사는 10월 2일 당직 후 2시간만 휴식하였으나 전날 저녁에 충분히 휴식하였고 과도하게 피곤하다고 느끼지 않았다고 보고하였다. 사고 당일 아침 그의 행동은 피로 때문이라고 여겨지지 않았다. ○○ 씨의 부검에서는 사고 당시 그의 수행을 저해하였을 수 있는 기호성 약물이나 알코올의 증거가 발견되지 않았다. 사고 예인 와이어의 무게와, 메신저 라인이 비트를 통과하면서 생긴 마찰이 워핑 드럼이 만든 장력에 저항한 점 때문에 폴리프로필렌 메신저 라인에는 상당한 에너지가 저장되었을 것이다. 또한 줄이 한 바퀴씩 워핑 드럼에서 미끄러져 빠질 때마다 줄이 꼬였을 것이다. 워핑 드럼에 쌓인 라이딩 턴은 복잡한 계를 만들었을 것이며, 일부 감김은 이웃한 감김에 끼여 장력을 받지 않는 반면, 끼이지 않은 다른 감김은 줄의 장력 전체를 받았을 수 있다. 줄의 특정 구간에 생긴 꼬임은 줄이 워핑 드럼에서 빠져나올 때 줄의 고리(bight)가 빠르게 회전하게 하였을 수 있다. 사고 중에 메신저 라인의 감김 하나 이상이 이러한 힘이 갑자기 해소되는 방식으로 워핑 드럼에서 빠져나와, 채찍질하듯 빠르게 풀리는 고리를 형성하였을 가능성이 높다고 판단되었다. 드럼의 갑판 위 높이가 1.55m 였으므로 ○○ 씨의 목은 워핑 드럼의 윗부분에 인접해 있었을 것이다. 부검 보고서는 그가 목뼈 골절을 입었다고 기재하였다. 따라서 장력을 받던 메신저 라인의 한 구간이 워핑 드럼 끝에서 미끄러져 빠지며 ○○ 씨의 목을 때려 치명상을 입혔을 것이 거의 확실하다. 메신저 라인의 고리가 그의 목에 감겨 있는 것이 발견되었음에도, ○○ 씨의 부상이 워핑 드럼 안이나 둘레로 끌려 들어가 발생하였을 가능성은 매우 낮다고 판단되었다. 그 고리는 라이딩 턴 아래에 끼어 장력을 받는 구간과 분리된 메신저 라인 부분에 형성된 고리였을 가능성이 훨씬 높았다. 또한 워핑 드럼이 돌면서 회전하는 줄의 고리는 그토록 심각한 부상을 그렇게 빠르게 입힐 만한 에너지를 지니고 있지 않았을 것이다. 선미 예인선 Alma호의 행동이 사고에 어떤 식으로든 기여하였음을 시사하는 증거는 없었다. 예인선 승조원은 Wah Shan호의 침로와 속력에 맞추고 필요에 따라 윈치에서 와이어를 풀어 줌으로써 예인 와이어에 충분한 여유를 유지하였다. 선원 실무 Wah Shan호 선미 계류 위치의 승조원들은 Alma호의 강철 예인 와이어를 손으로 끌어올리려 하였으며, 예인선 승조원이 하지 말라고 조언한 뒤에야 중단하였다. 와이어를 예인선에서 Wah Shan호의 선미까지 들어 올리는 무게(최소 100kg) 외에도 와이어가 선미 페어리드를 거쳐 중심선 비트에 오르는 동안 상당한 마찰이 있었을 것이다. 강철 예인 와이어를 성공적으로 그리고 누구도 다치지 않게 끌어올리려면 여러 사람의 협응된 노력이 필요하였을 것이다. 또한 Alma호와
mooring
team did not follow the recommended practice of taking only sufficient turns on the drum to get traction (normally 3-4 turns), and backing up the tail of the messenger line as it payed off the drum. Instead, they decided to take up to 10 turns of the messenger line on the warping drum, effectively using the drum like a winch to wind up the messenger line until the eye of the tow wire was a short distance away from the bitts11. 11 As the circumference of the drum was 1.46m, taking 10 turns on the drum would have lifted the tow wire between 14m and 15m; Wah Shan's
was about 13m above Alma's
deck
. Once the eye of the tow wire had been heaved up to the
, some method would have been needed to
the wire safely while the eye was manhandled over the
bitts
. This would normally be done by holding the wire with a stopper. However, a stopper was only rigged during the second attempt to attach the tow wire, after the accident. That a stopper had not been rigged before the messenger line was taken to the warping drum was another indication that the aft
mooring
crew
had not given enough thought to carrying out their task. The free end of the messenger line was heaped between the pedestal fairlead and the winch, rather than being
led
away behind the winch in the normal manner. The combination of this arrangement and the number of turns on the warping drum considerably increased the likelihood of the free end being caught up in ‘riding turns’ and dragged back into the
drum. One of the reasons why the carpenter was reluctant to remove the messenger from the warping drum when the welder challenged him was because he might have believed that only one or two more rotations of the drum would be needed to complete the task. Unfortunately, in persisting with a hazardous working method and positioning himself so close to the drum, he placed himself in an extremely dangerous situation. The aft
mooring
team showed a worrying absence of basic line-handling skills. The Sincere
Corporation’s senior
officers
and managers should take urgent action to ensure that all
crew
members have the necessary standard of competence. Teamwork The
crew
at the aft
mooring
station did not function as a cohesive team; many, and perhaps even all, of the elements that have been described as being necessary for effective team behaviour were missing. Further, the
crew
did not follow generally accepted safe working practices. It was apparent that there was little or no planning before the task; the
crew
expected to be able to heave up the
steel
tow wire by hand. There was no remedial planning when the situation changed and the
crew
were effectively faced with a novel, but immediate problem. The layout of the aft
mooring
deck
did not offer any obvious solutions to the problem of leading the messenger line to a warping drum and, without guidance, the
crew
were obliged to improvise. It is understandable how
the might have considered that the operation posed little risk – a task that would have been done by hand was now being made easier by using a machine. The second did not direct his team; he took little part in deciding how the tow wire should be heaved in, or how his team should deal with the problem. Consequently, there was little consideration of the hazards, no pre-task briefing, and therefore no shared plan of how to deal with them. The crew’s attempts to monitor one another were therefore compromised as they did not have a common understanding of what should have been happening. The only exception was the welder, who tried to persuade the carpenter to remove the messenger from the warping drum and start the operation again. Sadly, he did not receive any support from the other members of his team and his attempted intervention was undermined by the second officer moving to operate the winch. It was possible that the carpenter was not confident that a meaningful solution would emerge by discussing the problem with his teammates, three of whom were not experienced deckhands. His method for heaving in the tow wire, while unorthodox, appeared to be working and was therefore endorsed as being a reasonable solution. The practice of pushing the messenger line back onto the rotating drum rather than stopping the operation, also appeared to be successful – an obvious shortcut therefore seemed to be condoned and reinforced. It is doubtful whether any of the aft crew on Wah Shan considered the team’s goal as their own. They did only what they were asked to do and did not provide any other constructive help that morning. It is therefore not surprising that the carpenter felt compelled to act unilaterally. Leadership The second officer demonstrated very poor leadership immediately prior to the accident as he deferred to the wishes of the carpenter, despite witnessing the repeated of the messenger line. He was the officer-in-charge of the operation and had the responsibility for the safety of his team. Further, he had the authority to stop and review the operation at several junctures: • When he saw the convoluted path chosen by the carpenter to route the messenger line from the to the warping drum (Figure 2). • When an excessive number of turns of the messenger line was placed on the warping drum in order to heave in the tow wire. • When the turns of the messenger line bunched up and slipped off the warping drum several times. • When the tangled mass of slack messenger line was caught by riding turns and dragged into the rotating warping drum. • When the carpenter asked other crew members to push the messenger line back onto the warping drum. Despite these clear indicators of poor line-handling practice, the second officer continued to act in deference to the carpenter’s wishes, to the extent that he took the place of the welder to operate the winch. Even just before the accident, he could have ordered that a stopper be used to the messenger line or tow wire while the tangle of rope around the area of the warping drum was cleared away. It is considered likely that the second officer lacked the confidence to challenge his team when the operation changed and again when it started to go badly. It is also quite likely that he did not have sufficient knowledge or experience in a tug’s tow wire using the winch; the operation had generally been carried out by hand during his time on board Wah Shan. The second officer’s leadership skills were demonstrably ineffective; he lacked the knowledge and experience to carry out his supervisory role effectively. Consequently, it is understandable why the carpenter might not have wanted to consult the second officer or his colleagues and instead straight into the task. It is therefore vital that ship managers and senior officers ensure that their crews have effective leadership and team working skills. They should also ensure that their crews are equipped with the knowledge, familiarity and competence to carry out their jobs safely. Implementation of the on board Wah Shan Wah Shan’s SMS contained clear instructions for the crew to carry out for all potentially hazardous activities. Although a risk assessment for mooring operations had been signed as being completed in September 2012, the risks pertaining to securing tow wires had not been considered. Moreover, none of the three signatories to the risk assessment for
Wah Shan호 사이의 상대 운동이 갑자기 메신저 라인에 추가 하중을 가하여 그때 줄을 다루는 사람을 다치게 할 위험도 있었다. 이번 사례에서 예인줄이 갑작스러운 하중을 받았음을 시사하는 증거는 없었으나, 줄이 급격히 장력을 받을 때 발생한 다른 사고가 여러 건 있었다. 합성섬유로 만든 예인줄은 상당히 가벼워 승조원 한두 명이 끌어올릴 수 있다. 그러나 무거운 강철 와이어를 손으로 끌어올리는 관행은 피하여야 한다. Wah Shan호의 이등항해사가 작업의 위험을 제대로 이해하고 평가하였다면 팀이 강철 예인 와이어를 손으로 끌어올리려 하도록 허용하지 않았을 가능성이 높다고 판단된다. 선미 계류 조는 우현 윈치로 예인 와이어를 끌어올리기로 한 뒤 메신저 라인에 부적절한 유도 경로를 택하였고 그것을 고집하였다. 메신저 라인은 윈치의 유압관을 손상시켰을 뿐 아니라 잘못된 방향에서 페데스탈 페어리드로 유도되었다. 이 페데스탈 페어리드는 육상에서 오는 선수미 방향 계류줄(breast line)이나 스프링줄(spring line)을 취하는 것을 돕도록 설계되었으며, 줄은 페데스탈의 안쪽으로 나간다. 이렇게 사용하면 줄은 적절한 플리트 각으로 윈치에 유도된다. 이 구성으로 사용할 때 느슨한 줄을 받치도록 페데스탈에 설치된 로프 가이드도 있었다(그림 2). 메신저 라인을 페데스탈 페어리드 둘레에 안쪽에서 바깥쪽으로 돌려 유도하자 워핑 드럼으로 들어가는 유도 각이 1.5º를 넘게 되었다. 이로 인해 메신저 라인은 드럼이 회전하면서 워핑 드럼 바깥쪽 끝에 쌓였다. 이 상태에서는 메신저 라인에 라이딩 턴이 생기거나 워핑 드럼의 바깥쪽 가장자리에서 미끄러져 빠질 가능성이 훨씬 높았다. 선미 계류 조는 견인력을 얻는 데 충분한 횟수(보통 3~4회)만 드럼에 감고 드럼에서 풀려 나오는 메신저 라인의 끝을 받쳐 잡는다는 권장 실무를 따르지 않았다. 그 대신 워핑 드럼에 메신저 라인을 최대 10회 감기로 하여, 예인 와이어의 아이가 비트에서 조금 떨어진 곳에 올 때까지 사실상 드럼을 윈치처럼 사용해 메신저 라인을 감아올렸다.11 11 드럼의 둘레가 1.46m 이므로 드럼에 10회 감으면 예인 와이어가 14m에서 15m 사이로 올라갔을 것이며, Wah Shan호의 갑판은 Alma호 갑판보다 약 13m 높았다. 예인 와이어의 아이를 비트까지 끌어올린 뒤에는 아이를 사람 힘으로 비트에 거는 동안 와이어를 안전하게 붙들어 둘 방법이 필요하였을 것이다. 이는 통상 스토퍼로 와이어를 붙잡아 하는 일이다. 그러나 스토퍼는 사고 후 예인 와이어를 거는 두 번째 시도 때에만 설치되었다. 메신저 라인을 워핑 드럼에 걸기 전에 스토퍼를 설치하지 않았다는 점은 선미 계류 승조원들이 임무 수행에 대해 충분히 생각하지 않았음을 보여 주는 또 다른 표시였다. 메신저 라인의 자유 끝은 보통 방식으로 윈치 뒤쪽으로 빼내지 않고 페데스탈 페어리드와 윈치 사이에 쌓아 놓았다. 이 배치와 워핑 드럼의 감김 횟수가 맞물려 자유 끝이 '라이딩 턴'에 걸려 회전하는 드럼으로 다시 끌려 들어갈 가능성이 크게 높아졌다. 용접공이 이의를 제기했을 때 목수가 메신저 라인을 워핑 드럼에서 빼기를 꺼린 이유 중 하나는 작업을 마치는 데 드럼이 한두 번만 더 회전하면 된다고 믿었기 때문일 수 있다. 불행하게도 위험한 작업 방식을 고집하고 드럼에 그토록 가깝게 자리 잡음으로써 그는 극도로 위험한 상황에 스스로를 놓았다. 선미 계류 조는 기본적인 줄 취급 기량이 우려스러울 정도로 부족하였다. Sincere Navigation Corporation 의 상급 사관과 관리자들은 모든 승조원이 필요한 수준의 능력을 갖추도록 긴급히 조치하여야 한다. 팀워크 선미 계류 위치의 승조원들은 결속력 있는 팀으로 기능하지 못하였다. 효과적인 팀 행동에 필요하다고 설명된 요소들 중 많은 것이, 어쩌면 전부가 빠져 있었다. 또한 승조원들은 일반적으로 인정되는 안전 작업 관행을 따르지 않았다. 작업 전 계획이 거의 또는 전혀 없었음이 분명하였다. 승조원들은 강철 예인 와이어를 손으로 끌어올릴 수 있으리라 예상하였다. 상황이 바뀌어 승조원들이 사실상 새롭지만 당면한 문제에 직면했을 때에도 이를 바로잡는 계획이 없었다. 선미 계류 갑판의 배치는 메신저 라인을 워핑 드럼으로 유도하는 문제에 대해 명확한 해법을 제공하지 않았고, 지침이 없었으므로 승조원들은 즉흥적으로 대처할 수밖에 없었다. 손으로 했을 작업이 이제 기계를 사용해 더 쉬워졌으므로 승조원들이 그 작업이 위험이 거의 없다고 생각했을 수 있다는 점은 이해할 만하다. 이등항해사는 팀을 지휘하지 않았다. 그는 예인 와이어를 어떻게 끌어올릴지, 또는 팀이 그 문제를 어떻게 다룰지를 결정하는 데 거의 참여하지 않았다. 그 결과 위험 요소에 대한 고려가 거의 없었고 작업 전 브리핑도 없었으며, 따라서 이에 대처하는 공유된 계획도 없었다. 승조원들은 무슨 일이 일어나야 하는지에 대한 공통의 이해가 없었으므로 서로를 감시하려는 노력이 훼손되었다. 유일한 예외는 용접공이었는데, 그는 목수에게 메신저 라인을 워핑 드럼에서 빼고 작업을 처음부터 다시 시작하라고 설득하려 하였다. 안타깝게도 그는 팀의 다른 구성원들로부터 아무런 지지도 받지 못하였고, 이등항해사가 윈치를 조작하러 이동함으로써 그의 개입 시도는 무력화되었다. 목수는 팀원들과 문제를 논의해도 의미 있는 해법이 나오리라는 확신이 없었을 수 있으며, 팀원 중 3명은 경험 있는 갑판 부원이 아니었다. 예인 와이어를 끌어올리는 그의 방법은 비정통적이었으나 효과가 있는 것처럼 보여 합리적인 해법으로 용인되었다. 작업을 중단하는 대신 메신저 라인을 회전하는 드럼에 다시 밀어 넣는 관행도 성공적인 것처럼 보였고, 따라서 명백한 지름길이 묵인되고 강화되는 것처럼 보였다. Wah Shan호의 선미 계류 승조원 중 누구라도 팀의 목표를 자신의 목표로 여겼는지는 의심스럽다. 그들은 요청받은 일만 하였고 그날 아침 그 밖의 건설적인 도움은 주지 않았다. 따라서 목수가 단독으로 행동해야 한다고 느낀 것은 놀랍지 않다. 리더십 이등항해사는 메신저 라인이 반복적으로 미끄러지는 것을 보고도 목수의 뜻을 따랐으므로 사고 직전에 매우 불량한 리더십을 보였다. 그는 작업의 책임 사관이었고 팀의 안전에 대한 책임이 있었다. 또한 그는 여러 시점에서 작업을 중단하고 재검토할 권한이 있었다. • 목수가 메신저 라인을 중심선 비트에서 워핑 드럼으로 유도하려고 택한 복잡한 경로를 보았을 때(그림 2). • 예인 와이어를 끌어올리기 위해 메신저 라인을 워핑 드럼에 과도한 횟수로 감았을 때. • 메신저 라인의 감김이 몰리고 워핑 드럼에서 여러 번 미끄러져 빠졌을 때. • 메신저 라인의 느슨한 부분이 엉킨 덩어리가 라이딩 턴에 걸려 회전하는 워핑 드럼으로 끌려 들어갔을 때. • 목수가 다른 승조원들에게 메신저 라인을 워핑 드럼에 다시 밀어 넣으라고 요청하였을 때. 이처럼 불량한 줄 취급 관행을 보여 주는 분명한 징후가 있었음에도 이등항해사는 계속 목수의 뜻을 따랐으며, 급기야 용접공을 대신하여 윈치를 조작하기까지 하였다. 사고 직전에도 그는 워핑 드럼 주변에 엉킨 줄을 치우는 동안 스토퍼를 사용하여 메신저 라인이나 예인 와이어를 붙들어 두도록 명령할 수 있었다. 이등항해사는 작업이 바뀌었을 때, 그리고 일이 잘못되기 시작했을 때 팀에 이의를 제기할 자신감이 없었을 가능성이 높다고 판단된다. 또한 그가 윈치를 사용하여 예인선의 예인 와이어를 고정하는 데 충분한 지식이나 경험이 없었을 가능성도 상당히 높다. 그가 Wah Shan호에 승선한 동안 그 작업은 대체로 손으로 수행되었다. 이등항해사의 리더십 기량은 명백히 효과가 없었으며, 감독 역할을 효과적으로 수행할 지식과 경험이 부족하였다. 따라서 목수가 이등항해사나 동료들과 상의하고 싶어 하지 않고 곧바로 작업에 뛰어들었을 수 있다는 것은 이해할 만하다. 그러므로 선박 관리자와 상급 사관들이 승조원들에게 효과적인 리더십과 팀워크 기량이 있도록 하는 것이 중요하다. 또한 승조원들이 자신의 일을 안전하게 수행할 지식, 숙련도, 능력을 갖추도록 하여야 한다. Wah Shan호의 안전관리체제 이행 Wah Shan호의 SMS 에는 잠재적으로 위험한 모든 활동에 대해 승조원이 위험성 평가를 수행하도록 하는 명확한 지침이 담겨 있었다. 계류 작업에 대한 위험성 평가가 2012년 9월에 완료된 것으로 서명되었지만, 예인 와이어를 고정하는 일에 관한 위험은 고려되지 않았다. 더욱이 위험성 평가에 서명한 세 사람 중 누구도
. Most significantly, managers and
crew
must understand that the primary purpose of
risk assessments
is to prevent accidents on board and not merely to satisfy regulatory requirements. Arrangement of the aft
mooring
deck
equipment The arrangement of the equipment on the aft
mooring
deck
of Wah Shan did not provide an obvious safe method of using a winch to heave in a tug’s tow wire through the centre lead. This was reflected in the two different methods proposed independently by the
and the
after the accident. While both these methods were an improvement on the attempts made on the day of the accident, they were both complicated. This complexity increased the potential for error. It was immediately apparent from the layout of the equipment on the
of Wah Shan, and on the other
visited during the investigation, how a messenger line should be
led
onto a winch. Compared with these examples, the configuration for heaving up a tug’s
onto the aft
deck
of Wah Shan was poor. The relative ease and
with which the operation of
securing
a tug can be achieved on better laid out
mooring
decks, illustrates the importance of good design. The rope guards at each end of the
drums on the
winch of Wah Shan’s aft
deck
obscured the winch operator’s view of any activities at the warping drum end of the winch. Relocating the winch control to a
that would afford the winch operator with a good view of the operation/activity and of the personnel involved would improve his/her ability to react effectively to an unsafe situation developing. In isolation, none of these improvements to the design would have prevented this accident on their own, because poorly considered working methods breached all the major safety barriers. However, well-designed, ergonomically12 efficient equipment has a major role in preventing accidents by naturally encouraging people to work safely and discouraging bad practices. Conversely, poorly designed equipment increases the likelihood of people taking short-cuts and making errors. It is concerning that there are probably other ships built to the same design as Wah Shan. Shipyards, owners and managers should therefore make every effort to identify and rectify areas where poor equipment design might inadvertently encourage unsafe working practices to develop.
No
VDR
data had been recorded for the period around the time of the accident. The reason for this could not be adequately explained by 12 The International Ergonomics Association defines ergonomics or human factors as follows: Ergonomics (or human factors) is the scientific discipline concerned with the understanding of interactions among humans and other elements of a system, and the profession that applies theory, principles, data and methods to design in order to optimize human well-being and overall system performance.
the or technician. One reason why data recording had stopped at 2022 on 28 September might have been that the crew of Wah Shan had switched off the main power to the VDR in preparation for replacing the battery at Immingham. It was established by the VDR service engineer during the APT that, with no mains power, the battery power would have been switched off after 2 hours of recording. It is considered extremely unlikely that the service engineer left the vessel with the VDR being powered only by the reserve battery because he left the vessel at 1500 UTC on 28 September. At the very latest, the data recording would have stopped at 1700 UTC, not at the recorded time of 2022 UTC. It is therefore more likely that the ship’s crew switched off the main power after the service engineer left the vessel, either deliberately (in preparation for changing the battery) or inadvertently. The DVD RAM write mechanism was not functional at the time of the accident and it could not be established that it had ever worked. The APT should have identified this deficiency because the DVD RAM write mechanism was the only means of archiving data when the ‘data save’ function was activated after an accident. Even if the DVD RAM write mechanism had been working, it could not have archived the data because there was no disc in the drive. It is concerning that the service engineer issued an APT certificate without being able to confirm the user-initiated ‘data save’ function was serviceable. It is even more concerning that the vessel’s VDR continued to pass several audits, surveys and inspections from 2003 onwards without a functional archiving mechanism. The VDR is a mandatory piece of equipment, and it is the responsibility of the vessel’s owner and crew to ensure that it is fully functional at all times. Importantly for this investigation, the absence of VDR data meant that it was not possible to form a detailed picture of the interaction between the pilots, the ship’s crew and tug crew prior to and immediately after the accident. Emergency response The injury suffered by Mr ○○ was extremely severe and it was very unlikely that either the crew or pilots could have saved his life; they were neither qualified nor equipped to deal with the medical trauma which confronted them. However, in the circumstances, they made Mr ○○ as comfortable as possible while awaiting professional medical assistance. The decision to carry on with berthing rather than waiting for the helicopter to arrive was considered appropriate given the circumstances. CONCLUSIONS • It was considered most likely that the carpenter, Mr ○○, was fatally injured when a section of the tensioned messenger line slipped off the end of the warping drum and struck him on the neck. • The aft team did not use the equipment that was available to them effectively, or follow safe line-handling practices. • The second , who was in charge of the operation on the aft mooring, demonstrated very poor leadership. He had not understood or assessed the risks involved effectively and, despite several indications that the task was not progressing well, he did nothing to prevent the errors from compounding. • The aft mooring team of Wah Shan did not work effectively as a team, resulting in the carpenter taking several unilateral decisions on the morning of the accident. • The instructions set out in Wah Shan’s , for the risks involved in potentially hazardous work activities to be assessed, were not followed effectively. • The arrangement of the equipment on the aft mooringdeck of Wah Shan did not provide an obvious safe method of using a winch to heave in a tug’s tow wire. In addition, the rope guards at each end of the drums obscured the winch operator’s view of any activities at the warping drum end of the winch. • The power to the VDR was lost shortly after the VDR service engineer left the vessel at Ijmuiden. The absence of the VDR data meant that it was not possible to form a detailed picture of the interaction between the pilots, the ship’s crew and the tug crew prior to and immediately after the accident.
ACTION TAKEN
actions The MAIB has written to the ship builder, CSBC Corporation, Taiwan, highlighting the importance of considering safe working methods when designing equipment layouts. The MAIB has also asked the to disseminate a short safety flyer based on this report to its members in order to raise awareness of the safety issues identified from this accident. Actions taken by other organisations The Sincere Corporation has taken the following actions: • Carried out an accident investigation on board Wah Shan • Issued a fleet circular entitled ‘Precautions in and tug operations’ which includes: ◦ Reiteration of the requirement to use the ‘Operational Risk Check ’ to assess, control and mitigate the risk of and mooring operations. ◦ A requirement to display the correct mooring and towing arrangements both on the and at mooring stations. ◦ An instruction to in charge of mooring teams to dynamically assess the risk of the planned task, including the layout and lead of lines. ◦ An instruction to senior officers to carry out familiarisation for new members and to demonstrate correct practices when there is a change of crew member in charge of mooring operations. • Provided crew companies with a mooring and tug operations summary with illustrations in order to aid in the safety training of joining crew members. • Provided all vessels in the fleet with computerbased training packages on safe mooring and towing operations, to be included as part of shipboard training programmes. The produced a report about the accident which was copied to the MAIB and the Panamanian administration.
RECOMMENDATIONS
The Sincere Corporation is recommended to: 2013/220 Improve the effectiveness of the safety management systems on board its managed vessels by: • Ensuring have the necessary technical competence to complete hazardous tasks • Improving leadership and team-working skills among their crews • Encouraging crew members to develop the habit of carrying out effective before carrying out any hazardous tasks. Safety recommendations shall in no case create a presumption of blame or liability
계류 작업의 위험성 평가에 선미 계류 조의 일원이었던 적이 있는 사람은 없었다. 계류줄 취급에 관해 이용할 수 있는 지침 대부분은 예인선의 예인줄을 고정하는 데에도 적용될 수 있었으나, 두 선박이 모두 움직이는 상태에서 예인선의 예인 와이어를 본선에 고정하는 일과 관련된 구체적인 위험을 고려하는 것은 여전히 매우 중요하다. 선미 계류 위치에서 예인선의 줄을 고정하는 일을 철저히 평가하였다면, 메신저 라인을 윈치에 유도하는 방법이 분명하지 않아 정해 두어야 한다는 점이 확인되었을 것이다. 사고 직전 Wah Shan호 선미 계류 조의 행동은 안전하고 효과적인 계류에 관하여 이용할 수 있는 지침의 대부분을 위반하였다. 그 구체적인 예는 다음과 같다. 워핑 드럼에 너무 가까이 서 있음, 워핑 드럼에 너무 많은 횟수를 감음, 하중을 받는 로프 가까이에 너무 가까이 서 있음, 남은 로프로 줄 취급 구역을 어지럽힘, 장력을 받는 메신저 라인 근처에 4명이 서 있음. 이 중 상당 부분은 관련된 사람들의 능력 탓으로 돌릴 수 있지만, 팀 전체의 수행이 중요한 요인이었다. Wah Shan호의 선미 계류 갑판에서는 불량한 관행이 용인되었고, 안전에 대한 우려가 제기되었을 때에는 묵살되었다. 이러한 문제를 극복하려면 Wah Shan호의 관리자들이 승조원이 팀으로서 어떻게 일하는지를 공정하고 정확하게 평가하는 것이 중요하다. 선미 계류 승조원들이 사고 전에 왜 그렇게 행동하였는지 근본적인 이유를 이해하려면 이를 반드시 수행하여야 한다. 더 중요한 것은 이 지식을 활용하여 승조원의 태도를 바꾸고 향후 수행을 개선하여야 한다는 점이다. 계급에 관계없이 승조원은 서면 위험성 평가에서 확인되지 않았을 수 있는 위험 요소를 찾아내도록 장려되어야 한다. 가장 중요한 것은 관리자와 승조원이 위험성 평가의 주된 목적이 단지 규제 요건을 충족하는 것이 아니라 선내 사고를 예방하는 것임을 이해하여야 한다는 점이다. 선미 계류 갑판 장비의 배치 Wah Shan호 선미 계류 갑판의 장비 배치는 중심 유도 경로를 통해 예인선의 예인 와이어를 끌어올리는 데 윈치를 사용하는 분명하고 안전한 방법을 제공하지 못하였다. 이는 사고 후 선장과 DPA 가 각각 독자적으로 제안한 두 가지 다른 방법에 반영되어 있다. 이 두 방법 모두 사고 당일 시도된 방식보다는 개선된 것이었으나 둘 다 복잡하였다. 이러한 복잡성은 오류의 가능성을 높였다. 메신저 라인을 윈치로 어떻게 유도하여야 하는지는 Wah Shan호의 선수 갑판 장비 배치와 조사 중에 방문한 다른 벌크선의 배치에서 즉시 분명하게 드러났다. 이러한 예에 비해 Wah Shan호의 선미 갑판으로 예인선의 예인줄을 끌어올리는 구성은 불량하였다. 배치가 더 잘된 계류 갑판에서는 예인선을 고정하는 작업을 비교적 쉽고 빠르게 해낼 수 있다는 점이 좋은 설계의 중요성을 보여 준다. Wah Shan호 선미 갑판 우현 윈치의 계류줄 드럼 양쪽 끝에 있는 로프 가드가 윈치 조작자의 시야를 가려 윈치의 워핑 드럼 쪽에서 벌어지는 어떤 활동도 볼 수 없었다. 윈치 조작기를 윈치 조작자가 작업/활동과 관련 인원을 잘 볼 수 있는 위치로 옮기면 안전하지 않은 상황이 전개될 때 효과적으로 대응하는 능력이 향상될 것이다. 개별적으로 보면 이러한 설계 개선 중 어느 것도 그것만으로는 이 사고를 막지 못하였을 것이다. 충분히 고려되지 않은 작업 방식이 모든 주요 안전 방벽을 뚫었기 때문이다. 그러나 잘 설계되고 인간공학적12으로 효율적인 장비는 사람들이 자연스럽게 안전하게 일하도록 유도하고 불량한 관행을 억제함으로써 사고 예방에 중요한 역할을 한다. 반대로 설계가 불량한 장비는 사람들이 지름길을 택하고 오류를 범할 가능성을 높인다. Wah Shan호와 같은 설계로 건조된 다른 선박이 아마 있을 것이라는 점은 우려스럽다. 따라서 조선소, 선주, 관리자는 장비 설계의 불량이 의도치 않게 안전하지 않은 작업 관행의 형성을 부추길 수 있는 부분을 찾아 바로잡기 위해 모든 노력을 기울여야 한다. VDR 사고 시점 전후의 기간에는 VDR 데이터가 기록되지 않았다. 그 이유는 12 국제인간공학회(International Ergonomics Association)는 인간공학(ergonomics) 또는 인적 요소(human factors)를 다음과 같이 정의한다. 인간공학(또는 인적 요소)은 인간과 시스템의 다른 요소 사이의 상호작용을 이해하는 것과 관련된 과학 분야이며, 인간의 안녕과 전체 시스템 성능을 최적화하기 위해 이론, 원리, 데이터, 방법을 설계에 적용하는 전문 분야이다.
승조원이나 VDR 기술자가 충분히 설명할 수 없었다. 9월 28일 2022 UTC 에 데이터 기록이 중단된 한 가지 이유는 Wah Shan호 승조원이 이밍엄에서 배터리를 교체할 준비로 VDR 의 주 전원을 껐기 때문일 수 있다. 주 전원이 없으면 배터리 전원이 2시간 기록 후 꺼진다는 것을 VDR 점검 기술자가 APT 중에 확인하였다. 점검 기술자가 VDR 이 예비 배터리로만 전원을 공급받는 상태로 선박을 떠났을 가능성은 극히 낮다고 판단되는데, 그가 9월 28일 1500 UTC 에 선박을 떠났기 때문이다. 아무리 늦어도 데이터 기록은 기록된 시각인 2022 UTC 가 아니라 1700 UTC 에 중단되었을 것이다. 따라서 점검 기술자가 선박을 떠난 뒤 선박 승조원이 고의로(배터리 교체 준비로) 또는 부주의로 주 전원을 껐을 가능성이 더 높다. DVD RAM 기록 장치는 사고 당시 작동하지 않았고 그것이 한 번이라도 작동하였는지 확인할 수 없었다. APT 가 이 결함을 확인했어야 하는데, 사고 후 '데이터 저장' 기능이 작동하였을 때 DVD RAM 기록 장치가 데이터를 보관하는 유일한 수단이었기 때문이다. DVD RAM 기록 장치가 작동하였더라도 드라이브에 디스크가 없었으므로 데이터를 보관할 수 없었을 것이다. 점검 기술자가 사용자가 개시하는 '데이터 저장' 기능이 사용 가능한 상태인지 확인하지 못한 채 APT 증명서를 발급하였다는 점은 우려스럽다. 이 선박의 VDR 이 2003년 이래 작동하는 보관 장치 없이 여러 차례의 감사, 검사, 점검을 계속 통과하였다는 점은 더욱 우려스럽다. VDR 은 의무 장비이며 항상 완전하게 작동하도록 하는 것은 선주와 승조원의 책임이다. 이 조사에서 중요한 점은 VDR 데이터가 없었으므로 사고 전과 직후의 도선사, 선박 승조원, 예인선 승조원 사이의 상호작용에 대한 상세한 그림을 그릴 수 없었다는 것이다. 비상 대응 ○○ 씨가 입은 부상은 극도로 심각하였고, 승조원이나 도선사가 그의 생명을 구했을 가능성은 매우 낮았다. 그들은 직면한 의학적 외상에 대처할 자격도 장비도 갖추고 있지 않았다. 그러나 그 상황에서 그들은 전문 의료 지원을 기다리는 동안 ○○ 씨를 최대한 편안하게 해 주었다. 헬리콥터의 도착을 기다리지 않고 접안을 계속하기로 한 결정은 그 상황에서 적절하였다고 판단되었다. 결론 • 목수 ○○ 씨는 장력을 받던 메신저 라인의 한 구간이 워핑 드럼 끝에서 미끄러져 빠지며 목을 때려 치명상을 입은 것이 가장 유력하다고 판단되었다. • 선미 계류 조는 이용할 수 있는 장비를 효과적으로 사용하지 않았고 안전한 줄 취급 관행을 따르지 않았다. • 선미 계류 갑판의 작업을 책임졌던 이등항해사는 매우 불량한 리더십을 보였다. 그는 관련된 위험을 효과적으로 이해하거나 평가하지 못하였고, 작업이 순조롭게 진행되지 않는다는 여러 징후가 있었음에도 오류가 가중되는 것을 막기 위해 아무것도 하지 않았다. • Wah Shan호의 선미 계류 조는 팀으로서 효과적으로 일하지 못하였고, 그 결과 목수가 사고 당일 아침 여러 차례 독단적인 결정을 내렸다. • 잠재적으로 위험한 작업 활동에 따르는 위험을 평가하도록 한 Wah Shan호 SMS 의 지침이 효과적으로 이행되지 않았다. • Wah Shan호의 선미 계류 갑판 장비 배치는 윈치를 사용하여 예인선의 예인 와이어를 끌어올리는 분명하고 안전한 방법을 제공하지 못하였다. 또한 계류줄 드럼 양쪽 끝의 로프 가드가 윈치 조작자의 시야를 가려 윈치의 워핑 드럼 쪽에서 벌어지는 어떤 활동도 볼 수 없었다. • VDR 점검 기술자가 아이마위던에서 선박을 떠난 직후 VDR 의 전원이 끊겼다. VDR 데이터가 없었으므로 사고 전과 직후의 도선사, 선박 승조원, 예인선 승조원 사이의 상호작용에 대한 상세한 그림을 그릴 수 없었다.
조치 사항 MAIB 의 조치 MAIB 는 선박 건조 업체인 대만의 CSBC Corporation 에 서한을 보내 장비 배치를 설계할 때 안전한 작업 방법을 고려하는 것이 중요함을 강조하였다. 또한 MAIB 는 이 사고에서 확인된 안전 쟁점에 대한 인식을 높이기 위해 이 보고서를 바탕으로 한 짧은 안전 전단을 회원사에 배포해 달라고 국제해운회의소(International Chamber of Shipping)에 요청하였다. 다른 기관의 조치 Sincere Navigation Corporation 은 다음 조치를 취하였다. • Wah Shan호에서 사고 조사를 실시하였다. • '계류 및 예인선 작업 시 주의사항(Precautions in mooring and tug operations)'이라는 제목의 선단 회람을 발행하였으며 여기에는 다음이 포함된다. ◦ 예인 및 계류 작업의 위험을 평가, 통제, 완화하기 위해 '작업 위험 점검표(Operational Risk Check List)'를 사용하라는 SMS 요건의 재강조. ◦ 올바른 계류 및 예인 배치를 선교와 계류 위치 양쪽에 게시하라는 요건. ◦ 계류 조를 책임지는 사관에게 줄의 배치와 유도 경로를 포함한 계획된 작업의 위험을 동적으로 평가하도록 하는 지시. ◦ 상급 사관에게 신규 승조원에 대한 숙지 교육을 실시하고, 계류 작업을 책임지는 승조원이 교체될 때 올바른 관행을 시연하도록 하는 지시. • 신규 승선 승조원의 안전 훈련을 돕기 위해 승조원 배승 회사에 삽화가 들어간 계류 및 예인선 작업 요약서를 제공하였다. • 선단의 모든 선박에 안전한 계류 및 예인 작업에 관한 컴퓨터 기반 훈련 패키지를 제공하여 선내 훈련 프로그램의 일부로 포함하도록 하였다. 영국 해사연안경비청은 사고에 관한 보고서를 작성하여 MAIB 와 파나마 당국에 사본을 보냈다. 권고 Sincere Navigation Corporation 에 다음을 권고한다. 2013/220 다음을 통하여 관리 선박의 안전관리체제의 효과를 개선할 것. • 승조원이 위험한 작업을 완수하는 데 필요한 기술적 능력을 갖추도록 할 것 • 승조원의 리더십과 팀워크 기량을 향상시킬 것 • 승조원이 위험한 작업을 수행하기 전에 효과적인 위험성 평가를 수행하는 습관을 기르도록 장려할 것. 안전 권고는 어떠한 경우에도 과실이나 책임을 추정하게 해서는 안 된다
of departure Ijmuiden, The Netherlands Port of arrival Immingham, UK Type of Short international Cargo information Coal 23
INFORMATION
Date and time 2 October 2012, 0712 Type of or incident Very Serious Marine Casualty Location of incident 53º 31’ 00N, 000º 10’ 00E Place on board Aft Injuries/fatalities 1 fatality Damage/environmental impact None Ship operation Arrival segment River passage External & internal environment 17 knots, SW wind, daylight, calm sea, dry, good Persons on board 23
선박 제원 선명 Wah Shan 기국 파나마 선급 미국선급(American Bureau of Shipping) IMO 번호/어선 번호 9268825 종류 벌크선 등록 선주 Newton Navigation Limited, 마셜 제도 관리 회사 Sincere Navigation Corporation, 중화민국(대만) 구조 강철 건조 2003년, China Shipbuilding Corporation, 가오슝(대만) 전장 289m 총톤수 91165 최소 안전 승조원 수 14 허가 화물 건화물(Dry bulk) 항해 제원 출항항 아이마위던, 네덜란드 입항항 이밍엄, 영국 항해 유형 단거리 국제 화물 정보 석탄 승조원 23 해양사고 정보 일시 2012년 10월 2일 0712 해양사고 또는 준해양사고의 종류 매우 중대한 해양사고 사고 장소 북위 53º 31' 00, 동경 000º 10' 00 선내 장소 선미 계류 갑판 부상/사망 사망 1명 손상/환경 영향 없음 선박 운용 입항 항해 구간 하천 항행 외부 및 내부 환경 17노트, 남서풍, 주간, 잔잔한 바다, 건조, 시정 양호 탑승 인원 23