이 해양사고 조사 보고서에는 사고 경위, 조치 사항 및 이후의 권고가 담겨 있으니 읽어 보시기 바란다.Read our marine accident investigation report, which includes what happened, actions taken and subsequent recommendations:
2007년 2월 3일 1138(UTC), 고속 페리 Sea Express 1호와 일반화물선 Alaska Rainbow호가 짙은 안개 속의 머지강(River Mersey)에서 충돌하였다. 이 충돌로 페리의 우현 선체에 구멍이 생겨 선박은 수 초 만에 크게 기울고 트림이 생겼다. 그러나 승객의 부상은 경미하였고 선박은 계속 떠 있었다. Alaska Rainbow호에서는 부상자가 없었고 선박의 손상도 경미하였다.At 1138 (UTC) on 3 February 2007, the high speed ferry Sea Express 1 and the general cargo vessel Alaska Rainbow collided on the River Mersey in thick fog. The collision holed the starboard hull of the ferry, causing her to list and trim significantly within seconds. However, there were only minor injuries to passengers and the vessel remained afloat. There were no injuries on board Alaska Rainbow, and the damage to this vessel was minor.
안전 쟁점Safety Issues
좁은 수역의 강 통과 중에 대지 안정(ground stabilised) 레이더 화면이 사용되지 않아, 조작자가 움직이는 표적과 육지의 레이더 반사를 구분하기 어려웠다a ground stabilised radar display was not used in the confined waters of a river transit, thereby making it difficult for the operator to distinguish moving targets from land radar returns
도선사는 Alaska Rainbow호가 다른 선박에 초래하는 위험을 모든 관계자가 인식하도록 Sea Express 1호 및 선박교통관제(VTS)와 초기 단계에서 적극적으로 교신하지 않았고, 그 결과 불필요하게 근접상태가 발생하였다the pilot did not proactively communicate with Sea Express 1 and VTS at an early stage to ensure that all parties were aware of the hazard that Alaska Rainbow presented to other traffic, resulting unnecessarily in the development of a close quarters situation
VTS는 다른 교통 위치와 강 안 시정 불량을 알림. 페리는 대지속력 약 7노트로 감속해 계속 진행.
근거: 요약
11:38
안개 속 예인선·Alaska Rainbow호가 갑자기 나타나 피항 — 충돌
페리 우현 선미와 화물선 선수가 부딪힘.
근거: 요약
11:38 직후
페리 기관실·제트 펌프실 침수, 정전, 우현 기관 2대 정지
수 초 만에 크게 기울고 트림이 변함 — 사실상 항행 불능.
근거: 요약
충돌 40초 뒤
페리 선장이 머지 라디오에 통보
근거: 요약
그 뒤
예인선이 페리를 부선 잔교로 예인, 승객 하선
근거: 요약
② 등장 요소와 관계
점선 상자는 있었지만 쓰이지 않았거나 쓰였는지 모르는 것, 점선 화살표는 보고서가 추정한 관계입니다.
③ 원인 사슬
왼쪽에서 오른쪽으로, 무엇이 무엇으로 이어졌는지입니다. 상자(원인)는 보고서 근거 대목에서 가져왔고, 상자 사이 화살표는 보고서가 직접 적지 않은 경우 모델이 판단해 이은 것입니다.
보고서가 밝히지 못한 것
권고·조치
Isle of Man Steam Packet Company: 레이더 사용 지침·비상 시 외부 통신 절차 등 안전관리체제 검토
Isle of Man Steam Packet Company: 승객 안전 지침 카드를 좌석 아래 구명조끼 종류에 맞춤
J.G. Goumas (Shipping): 도선사와의 대화, 선교팀의 도선사 지원·조기 이의 제기에 관한 지침 제공
MDHC: VTS 운영·도선 실무·비상 절차의 PMSC 준수 검토 완료
MDHC: 검토 뒤 MCA에 리버풀항 PMSC 검증 방문 요청
MDHC: 시정 제한 시 음향 신호에 관해 머지 수로 충돌 규칙 검토
MDHC와 선사는 사고 뒤 VTS 운영, 도선 교육, 형식 승인 시험 준비 때 선교팀 임무 배정 등에 조치를 취함.
VTS 당직 직원들은 제한된 시계에서의 운영이 요구하는 추가 업무량을 감당하도록 기대되었다. 리버풀항(Port of Liverpool)의 안전관리체제에 대한 독립 감사가 이러한 미비점을 확인하였을 수 있다the VTS duty staff were expected to absorb the additional workload that operation in restricted visibility demands; an independent audit of the Port of Liverpool’s safety management system might have identified this shortfall
권고Recommendations
Isle of Man Steam Packet Company Limited, J.G. Gourmas (Shipping) Co S.A. 및 Mersey Docks and Harbour Company에 권고가 이루어졌다.Recommendations have been made to Isle of Man Steam Packet Company Limited, J.G. Gourmas (Shipping) Co S.A. and the Mersey Docks and Harbour Company.
이 보고서는 2007년 9월 27일에 발간되었다.This report was published on 27 September 2007.
한국어는 모델 번역(검수 전)입니다. 표의 값은 흔한 말만 옮기고 나머지는 원문 그대로 둡니다.
본문
PDF 에서 뽑은 글 — 쪽 나눔·단 배치 때문에 줄 순서가 어긋난 곳이 있을 수 있습니다
한국어 번역 · 모델 · 검수 전
원문 보기
[Synopsis]
개요SYNOPSIS
한국어 번역 · 모델 · 검수 전
요약 2007년 2월 3일 1138(UTC)에 짙은 안개 속의 머지강(River Mersey)에서 고속 페리 Sea Express 1호와 일반화물선 Alaska Rainbow호가 충돌하였다. 이 충돌로 페리의 우현 선체에 구멍이 뚫려 선박이 수 초 만에 크게 횡경사하고 트림이 변하였다. 그러나 승객의 부상은 경미하였고 선박은 계속 떠 있었다. Alaska Rainbow호에는 부상자가 없었고 손상도 경미하였다. Alaska Rainbow호는 2월 3일 0030에 바 등부표(Bar Light Buoy) 부근에 투묘하여 0830까지 투묘 상태를 유지하였다. 이 선박은 버컨헤드 부두(Birkenhead Docks)로 가는 중이었고, 이를 위해 앨프리드 갑문(Alfred Lock)을 통과해야 하였다. 도선사는 선박이 바 등부표 앞에 이른 0918에 승선하였다. 선박이 갑문 앞에 도착하기 전에 예인선 두 척이 연결되었다. 이곳에서 도선사는 조류를 거슬러 서도록 선박을 돌려 예정된 입거 시각과 안전한 접근이 가능할 만큼 시정이 개선되기를 기다렸다. Sea Express 1호는 0850에 맨섬(Isle of Man)의 더글러스(Douglas)를 출항하여 앨프리드 갑문 부근의 리버풀 부선 잔교(Liverpool Landing Stage)로 향하고 있었다. 선내에는 승객 274명, 선원 20명, 승용차 58대가 있었다. 여기에는 형식 승인(type rating) 시험 평가의 일환으로 리버풀에서 Sea Express 1호를 접안시킬 예정이던 실습 선장이 포함되어 있었다. 1033에 Sea Express 1호가 바 등부표에 접근할 때 실습 선장은 머지 라디오(Mersey Radio, VTS)와 교신하였고, 머지 라디오는 다른 교통의 위치와 강 안의 시정이 나쁘다는 조언을 전달하였다. Alaska Rainbow호에 대한 언급은 없었다. Sea Express 1호는 대지속력을 약 7노트로 줄이면서 안쪽으로 계속 진행하였다. 1138에 앨프리드 갑문 부근에서 Sea Express 1호는 안개 속에서 정면에 갑자기 나타난 Alaska Rainbow호의 앞쪽 예인선을 피하는 조치를 취하였다. 몇 초 뒤 Alaska Rainbow호가 나타났고 Sea Express 1호는 다시 피항 조치를 취하였다. 그러나 이미 늦어 Sea Express 1호의 우현 선미와 Alaska Rainbow호의 선수가 충돌하였다. 이 충돌로 Sea Express 1호의 우현 선체에 큰 구멍이 뚫려 기관실과 제트 펌프실이 즉시 침수되었다. 이로 인해 전기 정전이 일어나고 우현 기관 두 대가 모두 작동하지 않아 선박은 사실상 항행 불능이 되었다. Sea Express 1호 선장은 충돌 40초 뒤 머지 라디오에 통보하였고, 이어진 예인선 지원 요청에 따라 Sea Express 1호는 리버풀 부선 잔교로 예인되어 승객이 하선하였다. 머지 부두 및 항만회사(Mersey Docks and Harbour Company)와 맨섬 증기선 회사(Isle of Man Steam Packet Company Limited)는 사고 이후 특히 VTS 운영, 도선 교육, 형식 승인 시험 준비를 위한 선교팀 임무 배정과 관련하여 여러 조치를 취하였다. 아울러 MAIB는 사고에 대한 분석과 원인 및 상황 규명의 결과로 다음과 같이 권고하였다. • 맨섬 증기선 회사(Isle of Man Steam Packet Company Limited)에 다음을 권고한다. - 특히 레이더 사용에 관한 지침과 비상 시 외부 통신을 수행하는 선교팀 절차와 관련하여 안전관리체제를 검토할 것. - 승객 안전 지침 카드가, 그 카드가 제공되는 각 승객 좌석 아래에 비치된 구명조끼의 종류에 적합하도록 할 것.
›J.G. 구마스(해운) 주식회사(J.G. Goumas (Shipping) Co. S.A.)에 다음을 권고한다. 선장에게 도선사와의 효과적인 대화의 중요성을 상세히 설명하고, 선박 선교팀이 도선사를 지원하는 데 적극적이어야 하며 필요할 때 사고를 막기 위한 효과적인 시정 조치를 취할 수 있도록 도선사의 결정을 조기에 이의 제기해야 할 필요성을 밝히는 분명한 지침을 제공할 것. • 머지 부두 및 항만회사(MDHC)에 다음을 권고한다. - 특히 VTS 운영, 도선 모범 실무, 비상 절차와 관련하여 항만해사안전규약(PMSC) 요건의 준수 여부에 대한 검토를 완료할 것. - PMSC 준수 검토를 만족스럽게 마친 뒤 영국 해사연안경비청(MCA)에 리버풀항(Port of Liverpool)에 대한 PMSC 검증 방문을 실시하도록 요청할 것. - 시정 제한 시기에 근접하여 조종하는 선박에 요구되는 음향 신호와 관련하여 머지 수로 충돌 규칙(Mersey Channel Collision Rules)을 검토할 것.
원문 보기
At 1138 () on 3 February 2007, the high ferry Sea Express 1 and the general Alaska Rainbow on the River Mersey in . The collision holed the hull of the ferry, causing her to and significantly within seconds. However, there were only minor injuries to and the vessel remained afloat. There were no injuries on board Alaska Rainbow, and the damage to this vessel was minor. Alaska Rainbow had anchored in the vicinity of the Bar Light at 0030 on 3 February, and had remained at until 0830. She was bound for Birkenhead Docks, which required her to transit the Alfred Lock. The boarded once the vessel was off the Bar Light Buoy, at 0918. Two tugs were attached before the vessel arrived off the lock. Here, the
첨부 문서 2 SeaExpress1AlaskaRainbowReport.pdf
한국어 번역 · 모델 · 검수 전
Sea Express 1호와 Alaska Rainbow호의 머지강(River Mersey) 충돌 조사 보고서 2007년 2월 3일 영국 해양사고조사국 Carlton House Carlton Place Southampton United Kingdom SO15 2DZ 보고서 번호 22/2007 2007년 9월 영국 2005년 상선(사고 보고 및 조사) 규칙[The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2005] 5조 발췌: "2005년 상선(사고 보고 및 조사) 규칙에 따른 사고 조사의 유일한 목적은 사고의 원인과 상황을 규명하여 장래의 사고를 방지하는 것이다. 조사의 목적은 책임을 가리는 것이 아니며, 그 목적을 달성하는 데 필요한 경우를 제외하고는 과실을 나누는 것도 아니다." 참고 이 보고서는 소송을 염두에 두고 작성된 것이 아니며, 2005년 상선(사고 보고 및 조사) 규칙 13조(9)에 따라 책임이나 과실을 귀속하거나 나누는 것을 목적으로 하거나 그 목적 중 하나로 하는 어떠한 사법 절차에서도 증거로 인정되지 않는다. 인쇄본은 우편 주소나 다음을 통해 추가로 구할 수 있다. 전자우편: maib@dft.gsi.gov.uk 전화: 023 8039 5500 팩스: 023 8023 2459 모든 보고서는 웹사이트 www.maib.gov.uk 에서도 볼 수 있다.
보고서 목차(쪽 번호는 원본 PDF 기준)
목차 쪽 약어 및 두문자어 용어집 요약 1 1절 사실 정보 3 1.1 Sea Express 1호, Alaska Rainbow호 및 사고의 세부 사항 3 1.2 배경 7 1.2.1 Sea Express 1호 7 1.2.2 Alaska Rainbow호 10 1.2.3 선박교통관제(VTS) 11 1.3 경위 12 1.4 Sea Express 1호의 손상과 손상 복원성 19 1.5 Sea Express 1호 교육 21 1.5.1 형식 승인 22 1.5.2 비상 절차 23 1.6 도선사 교육과 자격 24 1.7 리버풀항 VTS 25 1.7.1 배경 25 1.7.2 운영자 교육과 자격 26 1.7.3 승무 편성과 업무량 26 1.7.4 시정 제한 시의 조치 27 1.7.5 VTSO 상시 지침 28 1.8 비상 대응 28 1.8.1 민간 비상사태법 28 1.8.2 항만해사안전규약 29 1.8.3 SEAVAC 작전 30 1.9 승객을 위한 선내 정보 30 1.10 승객 설문 30 2절 분석 32 2.1 목적 32 2.2 Sea Express 1호 32 2.2.1 선교팀이 Alaska Rainbow호를 탐지하지 못함 32 2.2.2 선교팀이 Alaska Rainbow호의 소리를 듣지 못함 34 2.2.3 실습 선장의 시험 35 2.3 Alaska Rainbow호 36 2.3.1 Sea Express 1호가 피항 조치를 취할 것이라는 기대 36 2.3.2 시이콤 잔교(Seacombe Stage) 가까이에서의 부적절한 조종 37 2.3.3 선교팀의 도선사 지원 부족 40 2.4 선박교통관제 41 2.4.1 인식 41 2.4.2 업무량 41 2.4.3 승무 편성 41 2.4.4 안개 시 일상 절차 42 2.4.5 위험성 평가 42 2.5 충돌 이후의 조치 43 2.5.1 예인선의 조치 43 2.5.2 승객 통제 43 2.5.3 구명조끼 44 2.5.4 VTS의 조치 45 2.5.5 충돌 통보 46
3절 결론 47 3.1 사고에 직접 기여하였고 권고로 이어진 안전 쟁점 47 3.2 조사 중 식별된, 역시 권고로 이어진 기타 안전 쟁점 47 3.3 조사 중 식별되어 권고로는 이어지지 않았으나 조치가 이루어진 안전 쟁점 48 4절 조치 사항 49 4.1 머지 부두 및 항만회사 49 4.2 맨섬 증기선 회사 49 5절 권고 50 부록 1 HSC 1994 코드 18장 부록 2 맨섬 증기선 회사 형식 승인 프로그램 기록부 발췌 부록 3 승객 안전 지침 카드 부록 4 승객 설문 의견 요약 부록 5 리버풀항 신규 절차
원문 보기
[SeaExpress1AlaskaRainbowReport.pdf]
Report on the investigation of the between Sea Express 1 and Alaska Rainbow on the River Mersey 3 February 2007 Carlton House Carlton Place Southampton United Kingdom SO15 2DZ Report No 22/2007 September 2007
Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2005 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2005 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 13(9) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2005, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. Further printed copies can be obtained via our postal address, or alternatively by: Email: maib@dft.gsi.gov.uk Tel: 023 8039 5500 Fax: 023 8023 2459 All reports can also be found at our website: www.maib.gov.uk
CONTENTS Page GLOSSARY OF ABBREVIATIONS AND ACRONYMS SYNOPSIS 1 SECTION 1 - FACTUAL INFORMATION 3 1.1 of Sea Express 1, Alaska Rainbow and accident 3 1.2 Background 7 1.2.1 Sea Express 1 7 1.2.2 Alaska Rainbow 10 1.2.3 (VTS) 11 1.3 Narrative 12 1.4 The damage to Sea Express 1 and damage 19 1.5 Training for Sea Express 1 21 1.5.1 Type 22 1.5.2 Emergency procedures 23 1.6 training and qualification 24 1.7 of Liverpool VTS 25 1.7.1 Background 25 1.7.2 Operator training and qualification 26 1.7.3 and workload 26 1.7.4 Actions in 27 1.7.5 Standing orders for VTSOs 28 1.8 Emergency Response 28 1.8.1 Civil Contingencies Act 28 1.8.2 29 1.8.3 Operation SEAVAC 30 1.9 On board information for 30 1.10 Passenger questionnaires 30 SECTION 2 - ANALYSIS 32 2.1 Aim 32 2.2 Sea Express 1 32 2.2.1 did not detect Alaska Rainbow 32 2.2.2 Bridge team did not hear Alaska Rainbow 34 2.2.3 Examination of trainee captain 35 2.3 Alaska Rainbow 36 2.3.1 Expectation that Sea Express 1 would take avoiding action 36 2.3.2 Inappropriate manoeuvre close to Seacombe Stage 37 2.3.3 Lack of support to the pilot from the bridge team 40 2.4 Vessel Traffic Services 41 2.4.1 Perception 41 2.4.2 Workload 41 2.4.3 Manning 41 2.4.4 Fog routine 42 2.4.5 42 2.5 Actions following the collision 43 2.5.1 Actions by tugs 43 2.5.2 Passenger control 43 2.5.3 44 2.5.4 Actions by VTS 45 2.5.5 Notification of collision 46
SECTION 3 – CONCLUSIONS 47 3.1 Safety issues directly contributing to the accident which have resulted in recommendations 47 3.2 Other safety issues identified during the investigation also leading to recommendations 47 3.3 Safety issues identified during the investigation which have not resulted in recommendations but have been addressed 48 SECTION 4 - ACTION TAKEN 49 4.1 Mersey Docks and Harbour Company 49 4.2 Isle of Man Steam Packet Company Limited 49 SECTION 5 - RECOMMENDATIONS 50 Annex 1 Chapter 18 from 1994 Code Annex 2 Extracts from the Isle of Man Steam Packet Company Limited’s Type Rating Programme Record Book Annex 3 Passenger Safety Instruction Cards Annex 4 Summary of comments from passenger questionnaires Annex 5 Port of Liverpool new procedures
약어·용어집GLOSSARY OF ABBREVIATIONS AND ACRONYMS AIS
한국어 번역 · 모델 · 검수 전
약어 및 두문자어 용어집 AIS - 선박자동식별장치(Automatic Identification System) ARPA - 자동레이더플로팅장치(Automatic Radar Plotting Aid) CCTV - 폐쇄회로 텔레비전(Closed Circuit Television) CHA - 관할 항만당국(Competent Harbour Authority) COLREGS - 개정된 1972년 국제해상충돌예방규칙(The International Regulations for Preventing Collisions at Sea 1972, as amended) CSO - 고객 서비스 담당자(Customer Service Officer) EBL - 전자방위선(Electronic Bearing Line) ETA - 도착 예정 시각(Estimated Time of Arrival) GPS - 위성항법장치(Global Positioning System) HSC 1994 코드 - 1994년 고속선 안전 국제 코드(International Code of Safety for High Speed Craft, 1994) IALA - 국제항로표지협회(International Association of Marine Aids to Navigation and Lighthouse Authorities) IMO - 국제해사기구(International Maritime Organization) IOMSPC - 맨섬 증기선 회사(Isle of Man Steam Packet Company) m - 미터 MCA - 영국 해사연안경비청(Maritime and Coastguard Agency) MDHC - 머지 부두 및 항만회사(Mersey Docks and Harbour Company) MGN - 해사지침 고시(Marine Guidance Note) MKD - 최소 키보드 표시장치(Minimum Keyboard Display) MoU - 양해각서(Memorandum of Understanding) MPTE - 머지사이드 여객교통청(Merseyside Passenger Transport Executive) MSC - IMO 해사안전위원회(Maritime Safety Committee of IMO) MSN - 상선 고시(Merchant Shipping Notice) OOW - 당직 항해사(Officer of the Watch) PEC - 도선 면제 증명서(Pilotage Exemption Certificate)
PMSC - 항만해사안전규약(Port Marine Safety Code) RNLI - 영국 왕립구명정협회(Royal National Lifeboat Institution) Ro-Ro - 롤온 롤오프(Roll on - Roll off) SAR - 수색구조(Search And Rescue) SOLAS - 해상인명안전협약(Safety of Life At Sea Convention) STCW95 - 개정된 1978년 선원의 훈련·자격증명 및 당직근무의 기준에 관한 국제협약(International Convention on Standards of Training, Certification and Watchkeeping for Seafarers 1978, as amended) t - 톤 TRC - 형식 승인 증서(Type Rating Certificate) TRE - 형식 승인 시험관(Type Rating Examiner) TRI - 형식 승인 교관(Type Rating Instructor) UTC - 협정 세계시(Universal Time Co-ordinated) VDR - 항해자료기록장치(Voyage Data Recorder) VHF - 초단파(Very High Frequency) VRM - 가변거리환(Variable Range Marker) VTS - 선박교통관제(Vessel Traffic Services) VTSO - 선박교통관제사(Vessel Traffic Services Operator)
원문 보기
-
개요SYNOPSIS
한국어 번역 · 모델 · 검수 전
요약 2007년 2월 3일 1138(UTC)에 짙은 안개 속의 머지강(River Mersey)에서 고속 페리 Sea Express 1호와 일반화물선 Alaska Rainbow호가 충돌하였다. 이 충돌로 페리의 우현 선체에 구멍이 뚫려 선박이 수 초 만에 크게 횡경사하고 트림이 변하였다. 그러나 승객의 부상은 경미하였고 선박은 계속 떠 있었다. Alaska Rainbow호에는 부상자가 없었고 손상도 경미하였다. Alaska Rainbow호는 2월 3일 0030에 바 등부표(Bar Light Buoy) 부근에 투묘하여 0830까지 투묘 상태를 유지하였다. 이 선박은 버컨헤드 부두(Birkenhead Docks)로 가는 중이었고, 이를 위해 앨프리드 갑문(Alfred Lock)을 통과해야 하였다. 도선사는 선박이 바 등부표 앞에 이른 0918에 승선하였다. 선박이 갑문 앞에 도착하기 전에 예인선 두 척이 연결되었다. 이곳에서 도선사는 조류를 거슬러 서도록 선박을 돌려 예정된 입거 시각과 안전한 접근이 가능할 만큼 시정이 개선되기를 기다렸다. Sea Express 1호는 0850에 맨섬(Isle of Man)의 더글러스(Douglas)를 출항하여 앨프리드 갑문 부근의 리버풀 부선 잔교(Liverpool Landing Stage)로 향하고 있었다. 선내에는 승객 274명, 선원 20명, 승용차 58대가 있었다. 여기에는 형식 승인(type rating) 시험 평가의 일환으로 리버풀에서 Sea Express 1호를 접안시킬 예정이던 실습 선장이 포함되어 있었다. 1033에 Sea Express 1호가 바 등부표에 접근할 때 실습 선장은 머지 라디오(Mersey Radio, VTS)와 교신하였고, 머지 라디오는 다른 교통의 위치와 강 안의 시정이 나쁘다는 조언을 전달하였다. Alaska Rainbow호에 대한 언급은 없었다. Sea Express 1호는 대지속력을 약 7노트로 줄이면서 안쪽으로 계속 진행하였다. 1138에 앨프리드 갑문 부근에서 Sea Express 1호는 안개 속에서 정면에 갑자기 나타난 Alaska Rainbow호의 앞쪽 예인선을 피하는 조치를 취하였다. 몇 초 뒤 Alaska Rainbow호가 나타났고 Sea Express 1호는 다시 피항 조치를 취하였다. 그러나 이미 늦어 Sea Express 1호의 우현 선미와 Alaska Rainbow호의 선수가 충돌하였다. 이 충돌로 Sea Express 1호의 우현 선체에 큰 구멍이 뚫려 기관실과 제트 펌프실이 즉시 침수되었다. 이로 인해 전기 정전이 일어나고 우현 기관 두 대가 모두 작동하지 않아 선박은 사실상 항행 불능이 되었다. Sea Express 1호 선장은 충돌 40초 뒤 머지 라디오에 통보하였고, 이어진 예인선 지원 요청에 따라 Sea Express 1호는 리버풀 부선 잔교로 예인되어 승객이 하선하였다. 머지 부두 및 항만회사(Mersey Docks and Harbour Company)와 맨섬 증기선 회사(Isle of Man Steam Packet Company Limited)는 사고 이후 특히 VTS 운영, 도선 교육, 형식 승인 시험 준비를 위한 선교팀 임무 배정과 관련하여 여러 조치를 취하였다. 아울러 MAIB는 사고에 대한 분석과 원인 및 상황 규명의 결과로 다음과 같이 권고하였다. • 맨섬 증기선 회사(Isle of Man Steam Packet Company Limited)에 다음을 권고한다. - 특히 레이더 사용에 관한 지침과 비상 시 외부 통신을 수행하는 선교팀 절차와 관련하여 안전관리체제를 검토할 것. - 승객 안전 지침 카드가, 그 카드가 제공되는 각 승객 좌석 아래에 비치된 구명조끼의 종류에 적합하도록 할 것.
›J.G. 구마스(해운) 주식회사(J.G. Goumas (Shipping) Co. S.A.)에 다음을 권고한다. 선장에게 도선사와의 효과적인 대화의 중요성을 상세히 설명하고, 선박 선교팀이 도선사를 지원하는 데 적극적이어야 하며 필요할 때 사고를 막기 위한 효과적인 시정 조치를 취할 수 있도록 도선사의 결정을 조기에 이의 제기해야 할 필요성을 밝히는 분명한 지침을 제공할 것. • 머지 부두 및 항만회사(MDHC)에 다음을 권고한다. - 특히 VTS 운영, 도선 모범 실무, 비상 절차와 관련하여 항만해사안전규약(PMSC) 요건의 준수 여부에 대한 검토를 완료할 것. - PMSC 준수 검토를 만족스럽게 마친 뒤 영국 해사연안경비청(MCA)에 리버풀항(Port of Liverpool)에 대한 PMSC 검증 방문을 실시하도록 요청할 것. - 시정 제한 시기에 근접하여 조종하는 선박에 요구되는 음향 신호와 관련하여 머지 수로 충돌 규칙(Mersey Channel Collision Rules)을 검토할 것.
원문 보기
사실SECTION 1 - FACTUAL INFORMATION
한국어 번역 · 모델 · 검수 전
1절 사실 정보
1.1Sea Express 1호, Alaska Rainbow호 및 사고의 세부 사항 선박 세부 사항 Sea Express 1호(그림 1) 등록 소유자: MIOM 1 Ltd 관리 회사: 맨섬 증기선 회사(Isle of Man Steam Packet Company Limited) 선적항: 뉴헤이븐(Newhaven) 기국: 영국 종류: 로로(Ro-Ro) 화물/여객 페리, 쌍동선 HSC 코드 B급 선박 건조: 1991년 – 인캣(Incat) – 태즈메이니아(Tasmania) 선급: 노르웨이선급(Det Norske Veritas) 구조: 알루미늄 전장: 74m 총톤수: 3003 기관 형식: 4 x Rushton 16R K270 서비스 속력: 36노트 기타 관련 정보: 각 선체의 기관 두 대가 제트 펌프 하나를 구동한다. 네 제트의 제어는 독립적으로 또는 통합 제어 체계를 통해 할 수 있다
선박 세부 사항 Alaska Rainbow호(그림 2) 등록 소유자: Sea Echo ENE 관리 회사: J.G. 구마스(해운) 주식회사(J.G. Goumas (Shipping) Co. S.A.) 선적항: 피레우스(Piraeus) 기국: 그리스 종류: 하역 장비 보유 벌크 화물선 건조: 1985년 – 일본 선급: 일본해사협회(Nippon Kaiji Kyokai) 구조: 강철 전장: 157.26 m 총톤수: 13,898 기관 형식: Mitsubishi 6UEC 52L 서비스 속력: 13.7노트 기타 관련 정보: 단축 프로펠러, 일반 방향타. 선수 추진기 없음. 화물창 4개, 창마다 크레인 1대 사고 세부 사항 일시: 2007년 2월 3일 – 1138(UTC) 사고 장소: 위도 53º 24.625’N 경도 003º 00.617’W 머지강(River Mersey) – 앨프리드 갑문(Alfred Lock) 앞(그림 3) 탑승 인원: Sea Express 1호 - 승객 274명, 선원 20명 Alaska Rainbow호 – 선원 21명, 도선사 2명 부상/사망: Sea Express 1호 - 승객 13명 경상 피해: Sea Express 1호 - 우현 기관실에 큰 구멍, 4번 빈 공간(void)의 선체 갈라짐, 우현 선교 날개 파손 Alaska Rainbow호 – 경미한 손상.
그림 1 그림 2 Sea Express 1호 Alaska Rainbow호 충돌 위치 그림 3 영국 왕립출판청(HMSO) 관리관 및 영국 수로국의 허가를 받아 영국 해군성 해도 3490에서 복제함 머지강과 충돌 위치 12 Quays Terminal Alfred Lock Seacombe Stage Liverpool Landing Stage
1.2배경 1.2.1 Sea Express 1호 a) 선박 태즈메이니아에서 건조된 Sea Express 1호는 여러 회사가 서로 다른 항로에서 여러 이름으로 아일랜드해(Irish Sea)에서 운항해 왔다. 이 선박은 과거에 맨섬 증기선 회사(IOMSPC)가 운항하였으나 더 현대적인 선박으로 교체되었다. 선단의 다른 선박을 개조·수리하는 동안 그 선박을 대체하기 위해 2006년 9월 중순 IOMSPC가 이 선박을 다시 투입하였다. 알루미늄으로 건조된 Sea Express 1호는 쌍동선 선형이었고, 각 선체는 파도를 가르도록(wave piercing) 설계되었다. 이로써 승객이 편안하도록 안정된 플랫폼을 제공하면서 선박의 최고 속력을 최적화하였다. 두 선체는 각각 8개 구획으로 나뉘어 있었다. 맨 앞 공간은 선수창(forepeak)이었고, 그다음 다섯 개는 앞에서 뒤로 번호를 붙인 빈 공간(void)이었으며, 양쪽 선체의 4번 빈 공간은 장거리 항해용 벙커 탱크로 쓸 수 있었다. 사고 당시 이 빈 공간들은 깨끗하고 가스가 없는 상태였고, 1992년 태즈메이니아에서의 인도 항해 이후로 벙커용으로 사용된 적이 없었다. 7번과 8번 공간은 각각 기관실과 제트 펌프실이었다. 이 둘은 서로 통행이 없는 별개 공간으로 식별되었으나 둘 사이의 격벽이 수밀이 아니었으므로, 손상 복원성 목적상 하나의 공간으로 간주되었다. 선박은 겨울철과 여름철에 서로 다른 운항 시간표로 운항하였다. 사고 당시에는 겨울 시간표로 운항 중이어서 금요일, 토요일, 일요일에만 운항하였고, 더글러스에서 리버풀까지 가서 더글러스로 돌아오는 왕복 한 번으로 이루어져 있었다. 겨울 서비스가 운영되는 동안에도 선박 직원은 1주 근무 1주 휴무의 교대를 계속하였으며, 교대일은 수요일이었다. 운항이 없는 날에는 선박 직원이 선박에서 일반 정비와 교육 업무를 수행하였다. 그러나 객실 승무원은 겨울 계약으로 전환되어 운항일, 즉 금요일, 토요일, 일요일에만 근무할 수 있으면 되었다. b) 선교 배치와 장비 항해, 기관 제어, 경보 장비는 선교 앞쪽의 중심선에 배치된 책상에 설치되어 있었다(그림 4). 조작자를 위한 의자가 세 개 설치되어 있었다. 왼쪽 의자는 기관사 자리였다. 기관사 앞에는 기관실 장비의 경보반과 원격 조작반이 있었다. 기관실 폐쇄회로 텔레비전(CCTV) 카메라용 모니터는 의자 왼쪽에 놓여 있었고, 화재 경보반과 기관 경보반은 의자 바로 앞에 있었다. 가운데 의자는 선박의 중심선에 있었으며 조타에 쓰이는 자리였다. 조타륜은 의자 바로 앞에 있었고, 조타 전동기와 자동 기적 제어 장치는 조타륜 위에 설치되어 있었다. 이 의자의 왼쪽에는 선내 통신용 마이크, 선박 휴대전화, VHF 무선 송수화기가 있었다. 의자 오른쪽에는 기관 제어기 네 개가 있었다. 이는 두 개의 거치대에 설치된 레버 네 개로, 한 거치대는 좌현 기관용, 다른 하나는 우현 기관용이었다. 기관 제어기 앞의 책상 수직면에는 켈빈 휴스(Kelvin Hughes) 뉴클리어스(Nucleus)
분석SECTION 2 - ANALYSIS
한국어 번역 · 모델 · 검수 전
2절 분석
2.1목적 이 분석의 목적은 사고의 기여 원인과 상황을 규명하여, 향후 유사한 사고가 발생하지 않도록 하는 권고의 근거를 마련하는 것이다.
2.2SEA EXPRESS 1호 2.2.1 선교팀이 Alaska Rainbow호를 탐지하지 못함 a) 레이더 설정 Sea Express 1호의 VDR은 선장과 수습 선장이 사용하던 우현 레이더 화면을 기록하였다. 레이더는 화면을 북 기준(north-up)으로 하고 편심(off-centred)시킨 상태에서 진 항적(true trails)을 표시하도록 설정되어 있었고, 속력 입력은 로그(log)에서 받은 대수속력이었다. 따라서 이는 대수 안정(sea-stabilised) 방식이었다. 이 설정은 "진 항적"이 침로와 대수속력을, 따라서 목표물의 자세(aspect)를 나타내 준다는 장점이 있다. 좁은 수역에서 대수 안정 화면을 사용할 때의 큰 단점은 물에 대해 움직이는 모든 것이 진 항적을 만든다는 점이다. 여기에는 모든 육상 목표물이 포함되며, 강과 같은 상황에서는 레이더 화면이 이러한 항적으로 금세 어수선해진다. 대지 안정(ground-stabilised) 화면은 목표물의 대지 침로와 대지속력을 나타내며, 아마 더 중요한 점으로 진 항적이 대지에 대해 움직이는 반향에만 생성된다. 육상 목표물은 진 항적을 만들지 않으므로 화면이 훨씬 선명하다. VDR은 선교팀이 보는 레이더 화면의 영상을 15초 간격으로 기록한다. Sea Express 1호의 VDR 재생 결과 Alaska Rainbow호와 그 예선들은 레이더 화면에 보였으며, 진 항적은 이 선박이 처음에 서쪽으로 이동하여 시콤 부잔교(Seacombe Stage) 가까이 갔다가 충돌 직전에 강 중앙 쪽으로 움직였음을 보여 주었다(그림 16a, 16b, 16c). 그러나 시콤 부잔교와 다른 육상 목표물의 레이더 반향이 만든 항적이 Alaska Rainbow호의 반향을 부분적으로 가려, 움직이는 목표물을 식별하기가 어려웠다. 레이더에 대지속력 입력이 있었다면 육지의 항적은 나타나지 않아 화면이 선명했을 것이고, 대지에 대해 움직이는 모든 목표물이 항적을 만들어 선교팀에 그 존재를 부각시켰을 것이다. 수습 선장이 강 중앙의 예선 Svitzer Bidston호와 Thorngarth호의 레이더 반향을 식별하였고 일등항해사가 충돌 7분 전에 조류를 향해 서 있는 선박이 Alaska Rainbow호라고 제안하였음에도, 선교팀은 이 선박이 시콤 부잔교 가까이에 갔다가 강 쪽으로 다시 움직인 것은 탐지하지 못하였다. b) 주의 분산 Sea Express 1호의 선장, 수습 선장, 일등항해사는 모두 리버풀항 PEC를 보유하고 있었다. 항만 접근은 제한된 시계에서 이루어지고 있었는데 이는 비교적 드문 일이었고, 이 선박이 리버풀을 매우 자주 방문하기는 하였으나 안개 속에서 리버풀 부잔교에 접근하는 일은 흔하지 않았다. 따라서 준비는 교육 시간의 형식으로 이루어졌으며,그림 16a 11:33:25에 Sea Express 1호 VDR에 기록된 레이더 화면 그림 16b 11:34:53에 Sea Express 1호 VDR에 기록된 레이더 화면 Sea Express 1 Keewhit Alaska Rainbow and tugs Sea Express 1 Keewhit Alaska Rainbow and tugs Tugs Oakgarth and Adsteam Waterloo 선장이 수습 선장에게 안개 속에서 부잔교를 식별하는 방법을 안내하였다. 수습 선장의 주의가 부잔교 식별과 선박 접안 시험을 받을 준비에 쏠려 있었고, 충돌 회피 지원 업무를 맡은 선교팀 구성원이 따로 없었으므로, 다른 목표물은 인지되지 않았거나 그 움직임이 추적되지 않았다. 2.2.2 선교팀이 Alaska Rainbow호의 소리를 듣지 못함 a) 열린 창문 Sea Express 1호가 처음 안개 속으로 들어갔을 때, 선교 좌현 쪽에 서 있던 경계 요원에게 선교 창문을 열라고 요청하였다. 두 번째 경계 요원이 선교로 호출되었을 때 우현 쪽 창문도 열렸다. VDR 기록에는 시콤 부잔교의 안개 신호가 들렸다고 언급된 내용이 있다. Alaska Rainbow호와 두 척의 수행 예선은 COLREGS와 머지 수로 충돌 규칙(Mersey Channel Collision Rules)이 요구하는 안개 신호를 울리지 않고 있었는데, 이는 도선사가 그렇게 하는 것이 통례가 아니었기 때문이다. 신호를 울리지 않기로 한 결정으로 인해, 이 방법으로 Sea Express 1호가 Alaska Rainbow호의 존재를 알게 될 가능성이 사라졌다. Alaska Rainbow호와 수행 예선들이 안개 신호를 울리고 있었다면 Sea Express 1호의 경계 요원들이 그 소리를 제때 듣고 선교팀이 상황에 대응하여 효과적인 회피 조치를 취할 수 있었을 가능성이 높다. 그러나 좁은 수역에서 여러 선박이 바짝 붙어 조선하며 안개 신호를 울릴 때 발생하는 소음의 정도는 그림 16c 11:37:03에 Sea Express 1호 VDR에 기록된 레이더 화면 Sea Express 1 Keewhit Alaska Rainbow and tugs Tugs Oakgarth and Adsteam Waterloo
결론SECTION 3 – CONCLUSIONS
한국어 번역 · 모델 · 검수 전
3절 결론
3.1사고에 직접 기여하여 권고로 이어진 안전 쟁점 Sea Express 1호 관련 요인: 1. 강 통항이라는 좁은 수역에서 대지 안정 레이더 화면이 사용되지 않아 운영자가 움직이는 목표물과 육상 레이더 반향을 구별하기 어려웠다. [2.2.1] Alaska Rainbow호 관련 요인: 2. 도선사가 이른 단계에서 Sea Express 1호 및 VTS와 적극적으로 교신하여 Alaska Rainbow호가 다른 교통에 주는 위험을 모든 당사자가 알도록 하지 않았고, 그 결과 불필요하게 근접상태가 전개되었다. [2.3.1] 3. 도선사가 적극적으로 지원을 요구하지 않았고 선장이나 OOW도 도선사를 적극적으로 지원하지 않았으며, 그 결과 도선사의 업무량이 불필요하게 늘어났다. [2.3.3] 4. 도선사와 선장 누구도 안개 신호를 울리도록 지시하지 않아, Sea Express 1호가 Alaska Rainbow호의 존재를 알 수 있었던 수단을 빠뜨렸다. [2.2.2] VTS 스테이션 관련 요인: 5. 안개 대응 절차가 마련되어 있지 않았고, 그 결과 제한된 시계에서 안전한 교통 흐름을 보장하기 위한 선박 움직임의 더 면밀한 감시가 이루어지지 못하였다. [2.4.3] [2.4.4] 6. VTS 당직 인원이 제한된 시계에서의 운영이 요구하는 추가 업무량을 감당하도록 기대되었으며, 리버풀항 안전관리체제에 대한 독립적 감사가 있었다면 이러한 부족함이 확인되었을 수 있다. [2.4.5] 7. 제한된 시계 중에 근접하여 조선하는 선박에 요구되는 음향 신호에 관한 머지 수로 충돌 규칙을 검토하는 것이 적절해 보인다. [2.2.2]
3.2조사 중 확인되어 역시 권고로 이어진 그 밖의 안전 쟁점 Sea Express 1호 관련 요인: 1. Sea Express 1호 선장이 VTS에 보낸 최초 통신에는 상황의 심각성에 관한 긴박감과 상세한 내용이 부족하여, 적절한 외부 비상 대응이 지연되었다. [2.5.5] VTS 스테이션 관련 요인: 2. VTSO들이 충돌 최초 보고 이후 추가 정보를 확인하고 리버풀 해안경비대에 통보하는 데 적극적이지 않았으며, 그 결과 적절한 비상 대응이 지연되었다. [2.5.4] [2.5.5]
3.3조사 중 확인되었으나 권고로 이어지지는 않았고 이미 해결된 안전 쟁점(4절 참조) Sea Express 1호 관련 요인: 1. 형식 자격 시험 준비 중 선교팀 업무 배분이 불분명하여, 충돌에 이르기 직전의 시간 동안 부근에 있던 다른 선박의 존재를 놓쳤다. [2.2.1] [2.2.2] [2.2.3] Alaska Rainbow호 관련 요인: 2. 도선사는 당시 상황에서 Alaska Rainbow호의 위치를 유지하는 데 충분히 숙달되어 있지 않았고, 그 결과 선박이 서쪽 둑과 강 중앙 사이에서 크게 움직였다. [2.3.2] VTS 스테이션 관련 요인: 3. VTSO들이 평소 업무 수행이 최고조에 이른 시간에 도선 예약을 받아야 해서 생긴 추가 업무량이, 정보 제공 서비스를 맡은 VTSO의 주의를 흐트러뜨릴 가능성이 있었다. [2.4.2] 4. 승객 운송과 관련된 구체적 위험, 특히 비상 대응에 관한 위험이 별도로 평가되지 않았다. [2.5.4]
원문 보기
3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT WHICH HAVE RESULTED IN RECOMMENDATIONS Factors related to Sea Express 1: 1. A ground stabilised display was not used in the confined waters of a river transit, thereby making it difficult for the operator to distinguish moving targets from land
조치 사항SECTION 4 - ACTION TAKEN
한국어 번역 · 모델 · 검수 전
4절 조치 사항
4.1머지 도크 앤 하버 컴퍼니(MERSEY DOCKS AND HARBOUR COMPANY)의 조치 • 토요일 오전에 VTS 도선 데스크에 사무 지원 인력을 제공하였다. • PMSC 공식 위험성 평가와 안전관리체제에 대한 외부 검토를 마련하였으며, 이후 감사가 이어질 예정이다. 이 검토는 다음을 수행한다. - 공식 위험성 평가 과정에 선박 내 승객을 포함시킨다. - 안전관리체제에 제한된 시계에서의 항행 절차를 추가한다(부록 5 참조). - 위험에 비추어 VTS를 교통정리 서비스로 격상할 필요가 있는지 판단한다. • 리버풀 도선 서비스 유한회사(Liverpool Pilotage Services Ltd)에 시뮬레이터 훈련에 시정이 나쁠 때, 특히 조류를 향해 서 있을 때의 예선 사용을 포함하도록 요청하였다. • 리버풀 도선 서비스 유한회사에 대한 연례 감사 체계를 시작하였다. • 제한된 시계에서의 항행 절차에 관한 항행통보 9-2007을 발행하였다(부록 5 참조).
4.2맨섬 증기선 회사(ISLE OF MAN STEAM PACKET COMPANY LIMITED)가 마련한 사항 • 선장, 수습 선장, 일등항해사가 영국의 대학에서 고속선, 제한된 시계, 좁은 수로를 특별히 다루는 선교팀 관리(Bridge Team Management) 과정에 참석하도록 하였다. • 이미 시행 중인 선교팀 관리 훈련을 선단 전체의 모든 선장과 항해 사관으로 확대하기로 하였다. • 관련 고객서비스 인원이 교훈에 대한 논의를 포함한 군중 관리 훈련(Crowd Management Training) 보수 과정을 이수하도록 하였다. • 서비스 엔지니어가 Sea Express 1호 레이더의 기능을 시험하도록 하였다(만족스러운 것으로 확인됨). 이에 더하여 회사는 다음을 하였다. • 운항 매뉴얼(Route Operating Manual)을 개정하기 위해 모든 선박에 회람을 발행하여, 선장이 형식 자격 교육과 시험 전과 도중에 관련자 모두의 역할과 임무를 분명히 규정하도록 하였다. • 회사의 다른 선박에 있는 선교 관리와 항행 장비에 대한 독립적 감사를 실시하였다. • AIS 정보를 레이더/ECDIS와 통합하는 가능성에 관한 기술 평가를 수행하였다. • 대피 시 비상 절차의 일부가 될 상륙 카드(Landing Cards)를 절차에 도입하였다.
원문 보기
4.1 MERSEY DOCKS AND HARBOUR COMPANY HAS: • Provided clerical assistance to desk on Saturday mornings. • Arranged an external review of the formal and the
권고SECTION 5 - RECOMMENDATIONS
한국어 번역 · 모델 · 검수 전
5절 권고 맨섬 증기선 회사(Isle of Man Steam Packet Company Limited)에 다음을 권고한다. 2007/185 다음 사항을 특히 고려하여 안전관리체제를 검토할 것. • 강 통항이라는 좁은 수역에서 대지 안정 레이더 화면을 사용할 것 • 비상 시 긴박성과 상세함 측면에서 외부 통신을 개선할 것. 2007/186 승객 안전 지침 카드가 그 카드가 비치된 좌석 밑에 있는 구명조끼를 그림으로 보여 주도록 할 것. J.G.Goumas (Shipping) Co. S.A.에 다음을 권고한다. 2007/187 선장들에게 도선사와의 효과적인 대화의 중요성을 상세히 설명하고 선박 선교팀이 다음을 해야 할 필요성을 밝히는 명확한 지침을 제공할 것. • 도선사를 적극적으로 지원할 것 • 필요할 때 사고를 막기 위한 효과적인 시정 조치를 취할 수 있도록 도선사의 결정이나 행동에 이른 단계에서 이의를 제기할 것. 머지 도크 앤 하버 컴퍼니(Mersey Docks and Harbour Company)에 다음을 권고한다. 2007/188 PMSC 요건 준수에 대한 검토를 완료하되 특히 다음을 고려할 것. • VTS 운영: 효과적인 안개 대응 절차를 확립하고, VTS 스테이션이 제한된 시계에서의 운영이 요구하는 추가 업무량을 감당할 수 있도록 충분히 인원을 배치하며, VTSO가 사건 발생 시 추가 정보를 확인하는 데 적극적이도록 할 것 • 도선 모범 실무: 도선사가 불필요한 근접상태의 전개를 피하기 위해 접근하는 선박과 VTS에 이른 단계에서 적극적으로 교신하고, 선박 선교팀의 지원을 적극적으로 요구하며, 제한된 시계에서 적절한 안개 신호를 울려야 할 필요성을 강조할 것. 2007/189 PMSC 준수에 대한 검토를 만족스럽게 마친 뒤, MCA를 초청하여 리버풀항에 대한 PMSC 검증 방문을 실시하도록 할 것. 2007/190 제한된 시계 중에 근접하여 조선하는 선박에 요구되는 음향 신호에 관하여 머지 수로 충돌 규칙을 검토할 것. 영국 해양사고조사국 2007년 9월 안전 권고는 어떠한 경우에도 과실이나 책임이 있다는 추정을 낳지 아니한다.
원문 보기
The Isle of Man Steam Packet Company Limited is recommended to: 2007/185 Review its with particular respect to: • using ground stabilised display in the confined waters of a river transit; • improving external communications in the event of an emergency in terms of urgency and detail. 2007/186 Ensure that the safety instruction card illustrates the to be found under the seat for which the card is provided. J.G.Goumas (Shipping) Co. S.A. is recommended to: 2007/187 Ensure its masters are given clear guidelines which detail the importance of effective dialogue with pilots and identify the need for the ship’s
첨부 문서 3 Annexes
한국어 번역 · 모델 · 검수 전
부록 1 HSC 1994 코드 18장
18장 - 운항 요건
18.1선박 운항 통제 18.1.1. 고속선 안전증서, 고속선 운항 허가서 또는 그 인증 사본, 그리고 항로 운항 매뉴얼 사본, 선박 운용 매뉴얼 사본, 주관청이 요구할 수 있는 정비 매뉴얼 해당 부분의 사본을 선내에 비치하여야 한다. 18.1.2. 선박은 고속선 운항 허가서, 고속선 안전증서 또는 거기에 언급된 문서에 명시된 최악의 예정 조건 및 제한 범위를 벗어나 의도적으로 운항해서는 아니 된다. 18.1.3. 주관청은 운항자가 다음 사항을 포함하여 전반적으로 안전 측면에서 적절한 조치를 마련했다고 판단할 때 고속선 운항 허가서를 발급하여야 하며, 그러한 조치가 주관청이 만족하도록 유지되지 않으면 운항 허가를 취소하여야 한다. .1. 항로 운항 매뉴얼에 포함된 안전 제한 및 정보에 비추어 의도한 서비스에 대한 선박의 적합성 .2. 항로 운항 매뉴얼에 있는 운항 조건의 적합성 .3. 항해 개시를 허가할 근거가 되는 기상 정보를 얻기 위한 체제 .4. 18.1.4에 따른 시설을 갖춘 기점 항구(base port)가 운항 구역 내에 마련되어 있을 것 .5. 예를 들어 이용 가능한 기상 정보에 비추어 특정 항해를 취소하거나 연기하는 결정에 책임을 지는 사람의 지정 .6. 선박을 운항하고, 생존정을 전개하여 인원을 배치하고, 운항 허가서에 정의된 평상 및 비상 조건에서 승객·차량·화물을 감독하는 데 필요한 충분한 승무원 구성. 승무원 구성은 선박이 항행 중일 때 조종 구역(operating compartment)에 사관 2명이 근무하도록 하여야 하며, 그중 1명은 선장일 수 있다 .7. 해당 형식의 선박과 의도한 서비스에 대한 능력을 포함한 승무원의 자격과 훈련, 그리고 안전한 운항 절차에 관한 지시 .8. 근무 시간, 승무원 근무 편성, 충분한 휴식 기간을 포함하여 피로를 막기 위한 그 밖의 조치에 관한 제한 .9. 선박 운항과 비상 절차에 관한 승무원 훈련 .10. 운항과 비상 절차에 관한 승무원 능력의 유지 .11. 터미널의 안전 체제와, 해당되는 경우 기존의 안전 체제의 준수 .12. 교통 통제 체제와, 해당되는 경우 기존의 교통 통제의 준수 .13. 해당되는 경우 레이더 및/또는 기타 전자 항해 보조 장비의 사용을 포함하여 위치 확인, 야간 또는 제한된 시계 중 운항에 관한 제한 및/또는 규정 .14. 야간 운항 등 의도한 서비스의 특성 때문에 요구될 수 있는 추가 장비 .15. 사용할 무선 주파수와 유지할 청취를 포함하여 선박, 해안 무선국, 기점 항구 무선국, 비상 서비스 및 다른 선박 사이의 통신 체제 .16. 주관청이 다음을 확인할 수 있도록 기록을 보관하는 것: .16.1. 선박이 명시된 한계 안에서 운항되고 있다는 것 .16.2. 비상 및 안전 훈련/절차가 준수되고 있다는 것
.16.3. 운항 승무원의 근무 시간 .16.4. 선내 승객 수 .16.5. 선박에 적용되는 모든 법의 준수 .16.6. 선박 운항 및 .16.7. 승인된 일정에 따른 선박과 그 기관의 정비; .17. 장비가 주관청의 요건에 맞게 유지되도록 하고 운항자 조직의 운항 부문과 정비 부문 사이에 선박과 장비의 정상 작동 상태에 관한 정보의 조정이 이루어지도록 보장하는 체제 .18. 다음에 관한 적절한 지침의 존재와 사용: .18.1. 중량과 무게중심 제한을 효과적으로 지킬 수 있고 필요한 경우 화물이 적절히 고박되도록 하는 선박 적재 .18.2. 적절한 연료 예비량의 확보 .18.3. 합리적으로 예견 가능한 비상 상황에서의 조치 그리고 .19. 각 시나리오에 대한 모든 육상 활동을 포함하여 예견 가능한 사건에 대한 운항자의 비상 계획 마련. 이 계획은 운항 승무원에게 수색구조(SAR) 당국, 그리고 승무원이 보유한 장비로 수행하는 임무를 보완할 수 있는 지방 행정기관과 단체에 관한 정보를 제공하여야 한다(각주 참조). 18.1.4. 주관청은 18.1.3에 따라 마련된 사항을 평가한 후 기점 항구 또는 피난처로부터의 최대 허용 거리를 결정하여야 한다.
18.2선박 문서 . 주관청은 선박이 안전하게 운항·정비될 수 있도록 기술 매뉴얼 형태의 적절한 정보와 지침을 갖추도록 보장하여야 한다. 기술 매뉴얼은 항로 운항 매뉴얼, 선박 운용 매뉴얼, 훈련 매뉴얼, 정비 매뉴얼, 정비 일정표로 구성되어야 한다. 이러한 정보가 필요에 따라 갱신되도록 조치하여야 한다. 18.2.1 선박 운용 매뉴얼 . 선박 운용 매뉴얼에는 적어도 다음 정보가 포함되어야 한다. .1. 선박의 주요 제원 .2. 선박과 그 장비에 대한 설명 .3. 부력 구획의 건전성을 점검하는 절차 .4. 2장 요건의 준수에서 비롯되어 비상 시 승무원에게 직접 실질적으로 유용할 만한 세부 사항 .5. 손상 통제 절차 .6. 기관 시스템의 설명과 작동 .7. 보조 시스템의 설명과 작동 .8. 원격 제어 및 경보 시스템의 설명과 작동 .9. 전기 장비의 설명과 작동.10. 최대 운항 중량, 무게중심 위치, 하중 분포를 포함한 적재 절차와 제한 .11. 화재 탐지 및 소화 장비의 설명과 작동 .12. 구조적 방화 체제를 나타내는 도면 .13. 무선 장비와 항해 보조 장비의 설명과 작동 .14. 17장에 따라 결정된 선박 조종에 관한 정보 .15. 해당되는 경우 최대 허용 예인 속력과 예인 하중 .16. 제한 사항을 포함한 드라이독 입거 또는 양중 절차 .17. 특히 이 매뉴얼은 주관청이 특별히 승인한 명확히 구분된 장으로 다음에 관한 정보를 제공하여야 한다. .17.1. 안전을 위태롭게 하는 비상 상황 또는 오작동의 표시, 취해야 할 조치, 그리고 그에 따른 선박이나 기관 운용에 대한 제한 .17.2. 대피 절차 .17.3. 최악의 예정 조건을 포함한 운항 제한 .17.4. 안전한 운항을 위해 준수가 요구되는 모든 기관 변수의 한계값. 기관이나 시스템 고장에 관한 정보와 관련하여, 자료는 선박 설계 중 작성된 FMEA 보고서의 결과를 고려하여야 한다. 18.2.2 항로 운항 매뉴얼 . 항로 운항 매뉴얼에는 적어도 다음 정보가 포함되어야 한다. .1. 대피 절차 .2. 파고, 해수 및 기온, 바람 조건 등 최악의 예정 조건을 포함한 운항 제한 .3. .2의 제한 범위 안에서 선박을 운항하는 절차 .4. 예견 가능한 사건에 대한 일차 및 이차 구조 지원을 위한 해당 비상 계획의 요소로서, 각 사건에 대한 육상 체제와 활동을 포함하는 것 .5. 기상 정보를 얻기 위한 체제 .6. "기점 항구"의 확인 .7. 항해 취소 또는 연기 결정에 책임을 지는 사람의 확인 .8. 승무원 구성, 기능, 자격의 확인 .9. 승무원 근무 시간 제한 .10. 터미널의 안전 체제 .11. 해당되는 경우 교통 통제 체제와 제한 .12. 레이더나 기타 전자 항해 보조 장비의 사용을 포함하여 위치 확인, 야간 및 제한된 시계 중 운항에 관한 구체적 항로 조건이나 요건, 그리고 .13. 사용할 무선 주파수와 유지할 청취를 포함하여 선박, 해안 무선국, 기점 항구 무선국, 비상 서비스 및 다른 선박 사이의 통신 체제. 18.2.3 훈련 매뉴얼 . 여러 권으로 구성될 수 있는 훈련 매뉴얼에는 대피, 화재 및 손상 통제 기구와 시스템, 그리고 최선의 생존 방법에 관한 지침과 정보가 가능한 한 그림을 곁들여 쉬운 용어로 담겨 있어야 한다. 이러한 정보의 어느 부분이든 매뉴얼 대신 시청각 자료 형태로 제공될 수 있다. 적절한 경우 훈련 매뉴얼의 내용은 선박 운용 매뉴얼에 포함할 수 있다. 다음 사항은 상세히 설명되어야 한다. .1. 해당되는 경우 구명조끼와 방수복의 착용 .2. 지정된 배치 장소에서의 집합 .3. 생존정과 구조정의 승선, 진수, 이탈 .4. 생존정 안에서 진수하는 방법 .5. 진수 장치로부터의 이탈 .6. 해당되는 경우 진수 구역의 보호 장치 방법과 사용 .7. 진수 구역의 조명 .8. 모든 생존 장비의 사용 .9. 모든 탐지 장비의 사용 .10. 그림의 도움으로 무선 구명 설비의 사용 .11. 드로그(drogue)의 사용 .12. 기관과 부속품의 사용 .13. 보관과 고박을 포함한 생존정과 구조정의 회수 .14. 노출의 위험과 따뜻한 의복의 필요성 .15. 생존을 위한 생존정 설비의 최선의 활용 .16. 헬리콥터 구조 장비(슬링, 바구니, 들것), 바지형 구조부이(breeches-buoy), 육상 구명 장비와 선박의 줄 발사 장치의 사용을 포함한 회수 방법 .17. 비상 소집표와 비상 지침에 포함된 그 밖의 모든 기능 그리고 .18. 구명 설비의 비상 수리 지침. .19. 방화 및 소화 기구와 시스템의 사용 지침 .20. 설치된 경우 화재 시 소방관 장구의 사용 지침 .21. 화재 안전과 관련된 경보와 통신의 사용 .22. 손상 조사 방법 .23. 수밀문과 빌지 펌프의 작동을 포함한 손상 통제 기구 및 시스템의 사용 그리고 .24. 여객선의 경우 비상 시 승객의 통제와 승객과의 통신.
18.2.4정비 및 점검 매뉴얼 . 선박 정비 및 점검 매뉴얼에는 최소한 다음이 포함되어야 한다. .1. 선박의 안전한 운항에 필요한 선박의 모든 구조, 기관 설비, 모든 설치 장비와 시스템에 대한 상세하고 그림을 곁들인 설명 .2. 모든 보충 가능한 유체 및 수리에 필요할 수 있는 구조 재료의 사양과 수량 .3. 변수 값, 진동, 보충 유체 소비량 측면에서의 기관 운용 한계 .4. 달력 시간이나 운전 시간에 따라 교체가 필요한 부품의 수명을 포함한 구조 또는 기관 부품의 마모 한계 .5. 취해야 할 안전 예방책이나 필요한 특수 장비를 포함하여, 주기관과 보조 기관, 동력 전달 장치, 추진 및 양력 장치, 유연 구조 부품을 탈거하고 설치하는 절차에 대한 상세한 설명 .6. 기관이나 시스템 부품을 교체한 뒤 또는 고장 진단을 위해 따라야 할 시험 절차 .7. 중량이나 자세 제한을 포함한 선박 양중 또는 드라이독 입거 절차 .8. 선박의 중량을 측정하고 세로 무게중심(LCG)의 위치를 정하는 절차 .9. 선박을 운송을 위해 분해할 수 있는 경우 분해, 운송, 재조립에 관한 지침이 제공되어야 한다 .10. 정비 매뉴얼에 포함되거나 별도로 발행되는 점검 일정표로서, 선박과 그 기관 및 시스템의 운항 안전을 유지하는 데 필요한 정기 점검 및 정비 작업을 상세히 기술한 것.
18.3훈련 및 자격 18.3.1. 선장과 각 승무원에게 필요하다고 여겨지는 능력 수준과 훈련은 해당 형식 및 모델의 선박과 의도한 서비스에 대하여 주관청이 만족하도록 다음 지침에 비추어 정하고 증명되어야 한다. 평상 및 비상 상황 모두에서 모든 필수 운항 업무를 수행하도록 둘 이상의 승무원이 훈련되어야 한다. 18.3.2. 주관청은 선장과 각 승무원에 대한 적절한 운항 훈련 기간을, 필요하다면 적절한 재훈련을 실시할 주기를 명시하여야 한다. 18.3.3. 주관청은 적절한 기간의 운항/시뮬레이터 훈련을 마치고, 해당 형식 및 모델의 선박과 항로의 선내 운항 업무에 상응하는 실기 시험을 포함한 시험을 마친 뒤 선장과 운항 역할을 맡은 모든 사관에게 형식 자격 증서를 발급하여야 한다. 형식 자격 훈련은 적어도 다음 항목을 포함하여야 한다. .1. 통신 및 항해 장비, 조타, 전기·유압·공압 시스템, 빌지 및 소방 펌프를 포함한 선내 모든 추진 및 제어 시스템에 대한 지식 .2. 제어, 조타, 추진 시스템의 고장 모드와 그러한 고장에 대한 적절한 대응 .3. 선박의 조종 특성과 운항 한계 조건 .4. 선교 통신 및 항해 절차 .5. 선박의 완전 상태 및 손상 복원성과 손상 상태에서의 생존 가능성 .6. 생존정 장비를 포함한 선박 구명 설비의 위치와 사용 .7. 선박 내 탈출로의 위치와 사용, 그리고 승객의 대피.8. 선내 화재 시 방화 및 소화 기구와 시스템의 위치와 사용 .9. 수밀문과 빌지 펌프의 작동을 포함한 손상 통제 기구 및 시스템의 위치와 사용 .10. 화물과 차량 적부 고박 시스템 .11. 비상 시 승객 통제와 승객과의 통신 방법 그리고 .12. 훈련 매뉴얼에 열거된 그 밖의 모든 항목의 위치와 사용. 18.3.4. 특정 형식 및 모델의 선박에 대한 형식 자격 증서는 해당 항로에서의 실기 시험을 마친 뒤 주관청이 그렇게 배서한 경우에만 그 항로 서비스에 유효하다. 18.3.5. 형식 자격 증서는 2년마다 재검증되어야 하며 주관청은 재검증 절차를 정하여야 한다. 18.3.6. 모든 승무원은 18.3.3.6부터 12에 명시된 대로 지시와 훈련을 받아야 한다. 18.3.7. 주관청은 해당 항로와 선박을 고려하여 신체 적합 기준과 건강 검진 주기를 명시하여야 한다. 18.3.8. 선박이 운항할 나라의 주관청이 기국과 다른 경우, 그 주관청은 선장과 각 승무원의 훈련, 경험, 자격에 만족하여야 한다. 선장이나 승무원이 보유한 적절히 배서된 유효 형식 자격 증서는, 그러한 면허나 증서를 보유하여야 하는 사람에 대해 발효 중인 선원의 훈련·자격증명 및 당직근무의 기준에 관한 국제협약(STCW)의 당사국인 기국이 발급한 현행 유효 면허 또는 증서와 함께, 선박이 운항할 나라의 주관청에 대하여 만족스러운 훈련, 경험, 자격의 증거로 받아들여져야 한다.
18.4생존정 인원 배치와 감독 18.4.1. 집합과 훈련받지 않은 사람의 지원을 위해 충분한 수의 훈련된 사람이 선내에 있어야 한다. 18.4.2. 선내 총인원의 퇴선에 필요한 생존정, 구조정, 진수 장치를 운용하기 위하여 충분한 수의 승무원이 선내에 있어야 하며, 이들은 갑판 사관이거나 자격 소지자일 수 있다. 18.4.3. 사용할 각 생존정에는 갑판 사관 또는 자격 소지자가 책임자로 지정되어야 한다. 다만 주관청은 항해의 성격, 선내 인원 수, 선박의 특성을 충분히 고려하여, 구명뗏목의 취급과 운용에 숙달된 갑판 사관, 자격 소지자 또는 사람들을 각 구명뗏목 또는 구명뗏목 그룹의 책임자로 지정하도록 허용할 수 있다. 18.4.4. 생존정 책임자는 생존정 승무원 명단을 가지고 있어야 하며 지휘 아래 승무원들이 자신의 임무를 숙지하도록 하여야 한다. 18.4.5. 모든 구조정과 동력 생존정에는 기관을 운전하고 경미한 조정을 할 수 있는 사람이 지정되어야 한다. 18.4.6. 선장은 18.4.1부터 18.4.3에 언급된 사람들이 선박의 생존정에 고르게 배분되도록 하여야 한다.
18.5비상 지침과 훈련 18.5.1. 출항 시 또는 그 전에 승객에게 구명조끼의 사용법과 비상 시 취할 조치에 관한 지시가 있어야 한다. 승객의 주의를 8.4.1과 8.4.3이 요구하는 비상 지침에 환기하여야 한다. 18.5.2. 승무원에 대한 비상 화재 및 대피 훈련은 선내에서 여객선은 1주, 화물선은 1개월을 넘지 않는 간격으로 실시하여야 한다. 18.5.3. 각 승무원 조의 모든 승무원은 매월 최소 한 번의 대피, 화재 및 손상 통제 훈련에 참여하여야 한다.
18.5.4. 선내 훈련은 실행 가능한 한 실제 비상 상황을 모의하도록 실시하여야 한다. 이러한 모의에는 선박의 대피, 화재, 손상 통제 기구 및 시스템에 대한 지시와 작동이 포함되어야 한다. 18.5.5. 선박의 대피, 화재, 손상 통제 기구 및 시스템에 대한 선내 지시와 작동에는 승무원의 적절한 교차 훈련이 포함되어야 한다. 18.5.6. 모든 출구, 대피로, 비상 장비, 구명 장비와 기구의 위치를 보여 주는 선박 개략도와 구명조끼 착용 그림을 포함한 비상 지침을 모든 승객과 승무원이 이용할 수 있어야 한다. 이는 각 승객 좌석과 승무원 좌석 가까이에 비치되어야 한다. 18.5.7. 기록 집합을 실시한 날짜, 퇴선 훈련과 화재 훈련의 세부 사항, 기타 구명 설비 훈련과 선내 교육은 주관청이 정하는 항해일지에 기록되어야 한다. 정해진 시간에 전체 집합, 훈련 또는 교육이 실시되지 않은 경우 그 사정과 실시된 집합, 훈련 또는 교육의 범위를 일지에 기재하여야 한다. 이러한 정보의 사본은 운항자의 경영진에게 송부되어야 한다. 18.5.8. 대피 훈련 18.5.8.1. 대피 훈련 시나리오는 서로 다른 비상 조건을 모의하도록 매주 달라져야 한다. 18.5.8.2. 각 대피 훈련에는 다음이 포함되어야 한다. .1. 8.2.2.2가 요구하는 경보로 승무원을 집합 장소에 소집하고, 비상 소집표에 명시된 퇴선 명령을 알고 있도록 확인하는 것 .2. 배치 장소에 보고하고 비상 소집표에 기술된 임무를 준비하는 것 .3. 승무원이 적절한 복장을 하였는지 점검하는 것 .4. 구명조끼가 올바르게 착용되었는지 점검하는 것 .5. 구명뗏목 진수에 데빗를 사용하는 경우 그 작동 .6. 해당 승무원의 방수복 또는 보온 보호복 착용 .7. 집합과 퇴선을 위한 비상 조명의 시험 그리고 .8. 선박 구명 설비의 사용과 해상에서의 생존에 관한 지시. 18.5.8.3. 구조정 훈련 .1. 합리적이고 실행 가능한 범위에서, 구조정은 대피 훈련의 일부로 매월 지정된 승무원을 태운 채 진수하여 물 위에서 조종하여야 한다. 모든 경우에 이 요건은 적어도 3개월에 한 번은 지켜져야 한다. .2. 구조정 진수 훈련을 선박이 전진 중인 상태에서 실시하는 경우, 관련된 위험 때문에 그러한 훈련은 보호된 수역에서만, 그리고 그러한 훈련에 경험 있는 사관의 감독 아래에서만 실시하여야 한다(각주 참조). 18.5.8.4. 개별 지시는 선박 구명 체계의 서로 다른 부분을 다룰 수 있으나, 선박의 모든 구명 장비와 기구는 여객선에서는 1개월, 화물선에서는 2개월의 기간 안에 다루어져야 한다. 각 승무원에게는 다음을 포함하되 반드시 이에 한정되지 않는 지시가 주어져야 한다. .1. 선박의 팽창식 구명뗏목의 작동과 사용 .2. 저체온증의 문제, 저체온증의 응급 처치와 기타 적절한 응급 처치 절차 .3. 악천후와 거친 해상 조건에서 선박의 구명 설비를 사용하는 데 필요한 특별 지시.
18.5.8.5. 데빗 진수식 구명뗏목 사용에 관한 선상 훈련은 그러한 설비를 갖춘 모든 선박에서 4개월을 넘지 않는 간격으로 실시하여야 한다. 실행 가능한 경우에는 언제나 구명뗏목의 팽창 및 하강을 포함하여야 한다. 이 구명뗏목은 훈련 목적으로만 쓰이는 특수 구명뗏목으로서 선박의 구명설비에 속하지 않는 것일 수 있다. 이러한 특수 구명뗏목에는 눈에 잘 띄게 표시하여야 한다. 18.5.9. 소화 훈련 18.5.9.1. 소화 훈련 시나리오는 선박의 서로 다른 구획에 대해 비상 상황이 모의되도록 매주 달리하여야 한다. 18.5.9.2. 각 소화 훈련에는 다음이 포함되어야 한다. .1. 승무원의 소화 배치 장소 소집, .2. 배치 장소에 집합하여 비상배치표에 기술된 임무를 준비함, .3. 소방복 착용, .4. 방화문 및 방화 댐퍼 조작, .5. 소화 펌프 및 소화 장비 조작, .6. 통신 장비, 비상 신호 및 일반 경보 조작, .7. 화재 탐지 시스템 조작, 그리고 .8. 선박의 소화 장비와 스프링클러 및 드렌처 설비(설치된 경우)의 사용 교육. 18.5.10. 손상 통제 훈련 18.5.10.1. 손상 통제 훈련 시나리오는 서로 다른 손상 상황에 대해 비상 상황이 모의되도록 매주 달리하여야 한다. 18.5.10.2. 각 손상 통제 훈련에는 다음이 포함되어야 한다. .1. 승무원의 손상 통제 배치 장소 소집, .2. 배치 장소에 집합하여 비상배치표에 기술된 임무를 준비함, .3. 수밀문 및 기타 수밀 폐쇄장치 조작, .4. 빌지 펌프 조작과 빌지 경보 및 빌지 펌프 자동 기동 장치 시험, 그리고 .5. 비상시 손상 조사, 선박 손상 통제 설비의 사용 및 승객 통제에 관한 교육. B부 - 여객선 요건
18.6형식 인정 훈련 18.6.1. 모든 승무원에 대한 형식 인정 훈련에는 18.3.6 에 더하여 승객의 통제 및 대피가 포함되어야 한다. 18.6.2. 선박이 화물을 운송하는 경우, 선박은 이 부에 더하여 이 장 C부의 요건을 충족하여야 한다.
18.7비상 지침 및 훈련 18.7.1. 모든 출구의 위치, 대피 경로, 비상 장비, 구명 설비 및 장구를 나타내는 선박 일반도와 구명조끼 착용 그림을 포함한 비상 지침을 각 승객에게 제공하고 각 승객의 좌석 가까이에 비치하여야 한다. 18.7.2. 승객이 승선할 때 비상 지침의 규정에 주의를 환기시켜야 한다. C부 - 화물선 요건
18.8형식 인정 훈련. 모든 승무원에 대한 형식 인정 훈련에는 화물 및 차량 적재 구역 고정 시스템에 관한 지식이 포함되어야 한다.
18.9비상 지침 및 훈련. 모든 출구의 위치, 대피 경로, 비상 장비, 구명 설비 및 장구를 나타내는 선박 일반도와 구명조끼 착용 그림을 포함한 비상 지침을 각 승무원에게 제공하여야 한다
부속서 2 맨섬 증기선사(Isle of Man Steam Packet Company Limited)의 형식 인정 훈련 프로그램 기록부 발췌
부속서 3 승객 안전 지침 카드
부속서 4 승객 설문조사 의견 요약
MAIB 1/3/255 Sea Express 1 대 Alaska Rainbow 승객 설문조사 - 의견 요약 의견 승객 위치 1 여승무원이 허둥거렸다 우현 2 여승무원의 말이 또렷하게 들리지 않았다 - 확성기를 입에서 너무 멀리 들고 있었다 전 구역 3 구명조끼가 안전 영상에 나온 것과 달랐다. 우현 및 중앙 구역 4 하선 시 인원 점검/확인이 없었다 전체 5 요청하였으나 여승무원이 구명조끼를 찾는 것을 도와주지 않았다 중앙 구역 6 구명조끼 끈이 엉켜 있어 착용하기 전에 푸는 데 4~5분이 걸렸다 전 구역 - 다수 의견 7 선장의 선내 방송은 또렷하고 침착하였다 전체 8 일반 경보 신호가 또렷하게 들렸다 전체 9 구명조끼를 좌석 밑에서 꺼내기 어려웠다. 전 구역 10 일부 승무원은 울거나 히스테리 상태였으며 이로 인해 상황이 악화되었다. 전체 11 영유아/어린이용 구명조끼를 지급받기까지 지연이 있었다 전체 12 다른 승객들의 휴대전화 소리 때문에 방송이 잘 들리지 않았다 좌현 13 리버풀의 IoM 증기선사 직원들은 체계가 없고 신경질적이었다 중앙 구역 14 IoM SP 는 직원 교육과 비상 대응 회사 절차를 재검토할 필요가 있다. 인원 점검이 이루어지지 않았고 대응이 미흡하였다 좌현 15 객실 승무원이 허둥대는 모습을 보였다 - 안심이 되지 않았다 좌현
18.1Craft operational control 18.1.1. The Safety Certificate, the Permit to Operate High Speed Craft or certified copies thereof, and copies of the route operational manual, craft operating manual, and a copy of such elements of the maintenance manual as the Administration may require, should be carried on board. 18.1.2. The craft should not be intentionally operated outside the worst intended conditions and limitations specified in the Permit to Operate High Speed Craft, in the High Speed Craft Safety Certificate, or in documents referred to therein. 18.1.3. The Administration should issue a Permit to Operate High Speed Craft when it is satisfied that the operator has made adequate provisions from the point of view of safety generally, including the following matters specifically, and should revoke the Permit to Operate if such provisions are not maintained to its satisfaction: .1. the suitability of the craft for the service intended having regard to the safety limitations and information contained in the route operational manual; .2. the suitability of the operating conditions in the route operational manual; .3. the arrangements for obtaining weather information on the basis of which the commencement of a may be authorized; .4. provision in the area of operation of a base fitted with facilities in accordance with 18.1.4; .5. the designation of the person responsible for decisions to cancel or delay a particular voyage, e.g. in the light of the weather information available; .6. sufficient
pilot
turned the vessel to
the tide and await the scheduled docking time, and for the
to clear enough for a safe approach to be made.
Sea
Express 1 left Douglas, Isle of Man, at 0850, bound for Liverpool
in the vicinity of Alfred Lock. On board were 274
passengers
, 20
and 58 cars. This included a trainee captain who was to
Sea
Express 1 in Liverpool as part of his assessment for type
examination. At 1033, as
Sea
Express 1 approached the Bar Light
Buoy
, the trainee captain made contact with Mersey Radio (
), who passed the positions of other traffic and advice that
visibility
in the river was poor. No mention was made of Alaska Rainbow.
Sea
Express 1 proceeded inwards, reducing her
to about 7 knots. At 1138, in the vicinity of Alfred Lock,
Sea
Express 1 took action to avoid Alaska Rainbow’s forward tug, which had suddenly appeared out of the fog directly
. Seconds later Alaska Rainbow appeared, and
Sea
Express 1 took further avoiding action. However, this was too late, and
Sea
Express 1’s
and Alaska Rainbow’s bow
collided
. The
collision
tore a large
in the
starboard
hull of
Sea
Express 1, immediately
the
and jet
. This caused an electrical blackout and the
of both
starboard
engines, effectively disabling the vessel. The captain of
Sea
Express 1 notified Mersey Radio 40 seconds after the
collision
and, following a subsequent request for tug assistance,
Sea
Express 1 was towed to the Liverpool
Landing Stage
, where the
passengers
were disembarked. Mersey Docks and Harbour Company and Isle of Man Steam Packet Company Limited have taken a number of actions following the accident, particularly with respect to
VTS
operations,
training and the allocation of
duties in preparation for type
rating
examinations. Additionally, as a result of its analysis of the accident and the ascertainment of its causes and circumstances, the
has made recommendations as follows: • Isle of Man Steam Packet Company Limited is recommended to: - Review its
with particular respect to its instructions on the use of
and
bridge team
procedures for conducting external communications in the event of an emergency. - Ensure that its
passenger
safety instruction card is appropriate for the type of
to be found under each
passenger
seat for which the card is provided.
• J.G. Goumas (Shipping) Co. S.A. is recommended to ensure that its masters are given clear guidelines which detail the importance of effective dialogue with pilots and identify the need for the ship's
bridge team
to be proactive in providing support to pilots and to challenge decisions taken by pilots at an early stage so that, when required, effective corrective action can be taken to prevent accidents. • Mersey Docks and Harbour Company (MDHC) is recommended: - To complete its review of compliance with the requirements of the
(
PMSC
) with particular reference to
VTS
operations,
pilotage
best practice and emergency procedures. - Following satisfactory completion of its review into
PMSC
compliance, invite the
(
MCA
) to conduct a
PMSC
verification visit to the
of Liverpool. - Review the Mersey Channel
Collision
Rules with respect to sound signals required by vessels manoeuvring in close proximity during periods of
.
-
Automatic Radar Plotting Aid
- Closed Circuit Television
-
Competent Harbour Authority
- The
1972, as amended CSO - Customer Service
-
Electronic Bearing Line
-
Estimated Time of Arrival
-
Global Positioning System
1994 Code - International Code of Safety for
High Speed Craft
, 1994
-
International Association of Marine Aids to Navigation and Lighthouse Authorities
-
International Maritime Organization
IOMSPC - Isle of Man Steam Packet Company m - metre
At 1138 () on 3 February 2007, the high ferry Sea Express 1 and the general Alaska Rainbow on the River Mersey in . The collision holed the hull of the ferry, causing her to and significantly within seconds. However, there were only minor injuries to and the vessel remained afloat. There were no injuries on board Alaska Rainbow, and the damage to this vessel was minor. Alaska Rainbow had anchored in the vicinity of the Bar Light at 0030 on 3 February, and had remained at until 0830. She was bound for Birkenhead Docks, which required her to transit the Alfred Lock. The boarded once the vessel was off the Bar Light Buoy, at 0918. Two tugs were attached before the vessel arrived off the lock. Here, the pilot turned the vessel to the tide and await the scheduled docking time, and for the to clear enough for a safe approach to be made. Sea Express 1 left Douglas, Isle of Man, at 0850, bound for Liverpool in the vicinity of Alfred Lock. On board were 274 passengers, 20 and 58 cars. This included a trainee captain who was to Sea Express 1 in Liverpool as part of his assessment for type examination. At 1033, as Sea Express 1 approached the Bar Light Buoy, the trainee captain made contact with Mersey Radio (), who passed the positions of other traffic and advice that visibility in the river was poor. No mention was made of Alaska Rainbow. Sea Express 1 proceeded inwards, reducing her to about 7 knots. At 1138, in the vicinity of Alfred Lock, Sea Express 1 took action to avoid Alaska Rainbow’s forward tug, which had suddenly appeared out of the fog directly . Seconds later Alaska Rainbow appeared, and Sea Express 1 took further avoiding action. However, this was too late, and Sea Express 1’s and Alaska Rainbow’s bow collided. The collision tore a large in the starboard hull of Sea Express 1, immediately the and jet . This caused an electrical blackout and the of both starboard engines, effectively disabling the vessel. The captain of Sea Express 1 notified Mersey Radio 40 seconds after the collision and, following a subsequent request for tug assistance, Sea Express 1 was towed to the Liverpool Landing Stage, where the passengers were disembarked. Mersey Docks and Harbour Company and Isle of Man Steam Packet Company Limited have taken a number of actions following the accident, particularly with respect to VTS operations, training and the allocation of duties in preparation for type rating examinations. Additionally, as a result of its analysis of the accident and the ascertainment of its causes and circumstances, the has made recommendations as follows: • Isle of Man Steam Packet Company Limited is recommended to: - Review its with particular respect to its instructions on the use of and bridge team procedures for conducting external communications in the event of an emergency. - Ensure that its passenger safety instruction card is appropriate for the type of to be found under each passenger seat for which the card is provided.
• J.G. Goumas (Shipping) Co. S.A. is recommended to ensure that its masters are given clear guidelines which detail the importance of effective dialogue with pilots and identify the need for the ship's bridge team to be proactive in providing support to pilots and to challenge decisions taken by pilots at an early stage so that, when required, effective corrective action can be taken to prevent accidents. • Mersey Docks and Harbour Company (MDHC) is recommended: - To complete its review of compliance with the requirements of the (PMSC) with particular reference to VTS operations, pilotage best practice and emergency procedures. - Following satisfactory completion of its review into PMSC compliance, invite the (MCA) to conduct a PMSC verification visit to the of Liverpool. - Review the Mersey Channel Collision Rules with respect to sound signals required by vessels manoeuvring in close proximity during periods of .
3 레이더가 설치되어 있었다. 이 레이더는 조타하는 사람 바로 앞에 있지는 않았으나 그 위치에서 쉽게 볼 수 있었다. 이 레이더의 조작반은 의자에서 쉽게 손이 닿는 곳에 있어서, 조타하는 사람이 레이더를 조작할 수 있었다. 오른쪽 의자는 조작자 바로 앞에 켈빈 휴스 뉴클리어스 2 6000A ARPA 레이더가 있었다. 왼쪽에는 선내 통신용 송수화기, 항해자료기록장치(VDR) 제어함, 음향측심기 지시기가 있었다. 오른쪽에는 위성항법장치(GPS) 수신기, 선박자동식별장치(AIS) 수신기, 선내 컴퓨터 화면이 있었다. 중심선 창 위의 천장(그림 5)에는 선속계, 풍속 지시기, 시계, 자기 컴퍼스를 보기 위한 잠망경 장치의 지시기들이 줄지어 있었다. 중심선 의자 뒤 선교 후방 격벽에는 승객 안전 방송을 위한 선내 시청각 시스템의 제어 장치가 있었다. 양쪽 선교 날개에는 선박을 부두에 접안시켜 조종하기 위한 제어반이 있었다. c) 선교 승무 편성과 관리 IOMSPC는 선교에 항상 선장, 일등항해사, 기관장, 경계원이 배치되도록 요구하였다. 기관장은 기관의 제어·감시 위치인 왼쪽 의자에 앉았다. 선장과 일등항해사는 중심선 의자와 오른쪽 의자를 차지하였다. 중심선 의자는 조타와 기관 제어를 위한 자리로 지정되어 있었다. 오른쪽 의자는 레이더 당직을 유지하고 통신 장비를 조작하는 자리로 지정되어 있었다. 선장과 일등항해사 중 누가 어느 의자에 앉을지는 선장이 정하였다. 일반적으로 선장은 입항할 때 조타륜을 잡고 일등항해사는 항해 및 충돌 회피 지원과 외부 통신을 맡았으며, 항해 중에는 역할이 반대였다. 그러나 이는 고정된 방식이 아니었으며 때때로 바뀌었다. 승선한 갑판장과 유능 갑판원 두 명은 카 데크(car deck) 상주 요건을 더해 경계 요건을 나누어 맡았는데, 경계 30분 다음에 카 데크 30분, 그다음 식당에서 30분 대기하는 식으로 편성되었다. 시정 제한으로 필요하면 두 번째 경계원이 선교에 배치되었다. 2007년 2월 3일에는 Sea Express 1호를 리버풀에서 접안시킬 형식 승인 시험의 일환으로 참가한 실습 선장이 포함되어 선교 승무 편성 인원이 늘어났다. 실습 선장은 이미 일등항해사로서 이 선박의 형식 승인 증서를 보유하고 있었고, 이번은 Sea Express 1호를 리버풀 부선 잔교에 접안시키는 조종 능력에 대한 최종 점검이었다. 선장은 이 선박에 대한 회사 지정 형식 승인 시험관(TRE) 중 한 명이었다. 선장, 실습 선장, 일등항해사는 모두 리버풀에 대한 도선 면제 증명서(PEC)를 보유하였고 이 항로에서 여러 해 근무하였다. 실습 선장이 항해 당직을 맡았고 선장이 가까이 있었다. 바 등부표(Bar Light Buoy)를 통과할 때 일등항해사는 중심선 의자에, 실습 선장은 오른쪽 의자에 앉아 있었고, 선장은 실습 선장 한쪽 옆에 서 있었다. 충돌 회피와 계획 항로 유지를 위한 조치는 실습 선장과 선장이 논의한 뒤, 침로나 속력을 조정하라는 명령을 실습 선장이 일등항해사에게 전달하였다.
그림 4 그림 5 Sea Express 1호 - 선교 Sea Express 1호 - 천장 계기 1.2.2 Alaska Rainbow호 a) 선박 Alaska Rainbow호는 해치가 네 개인 선박으로, 각 해치 앞쪽 끝에 전기 유압식 크레인이 한 대씩 있었다. 네 크레인은 선박의 중심선에 놓여 있었고 360º 회전할 수 있어서 크레인 두 대로 1, 2, 3번 화물창을 다룰 수 있었다. Alaska Rainbow호는 전 세계에서 영업하였다. 충돌 당시에는 철강 제품 일부를 적재하고 있었다. 이로 인해 흘수는 선수 5.8m, 선미 6.8m였다. 이는 밸러스트 상태보다 약간 깊은 정도였고, 선박의 최대 만재 흘수 9.91m보다 상당히 얕았다. 선박은 그리스인과 필리핀인이 섞인 선원 21명으로 운항하였다. 선내 업무 언어는 영어였으나 그리스어와 필리핀어도 널리 쓰였다. 승선한 그리스인 8명은 7개월 계약으로, 나머지 필리핀 선원 13명은 12개월 계약으로 고용되어 있었다. 대부분의 선원은 여러 계약 기간 동안 이 선박에서 근무하였고, 그리스인 선장은 이 선박에서 총 29개월 근무하였다. 선박은 4시간 근무 8시간 휴식의 3직 당직 체계로 운영되었고, 선교 당직은 그리스인 일등항해사와 필리핀인 이등항해사, 삼등항해사가 맡았다. 사고 당시에는 삼등항해사가 당직 중이었고, 일등항해사와 이등항해사는 각각 선수루와 선미루의 계류 요원을 맡고 있었다. b) 선교 배치와 장비 Alaska Rainbow호의 선교는 선박 폭의 약 3분의 1을 차지하였고, 양쪽에 넓게 트인 선교 날개가 있었다. 조타륜과 원격 유압 조타 장치(telemotor)는 조타실 중앙 중심선에 설치되어 있었다(그림 6). 원격 유압 조타 장치의 좌현 쪽에는 고정 의자가 있었고, 우현 쪽에는 레이더 두 대가 나란히 놓여 있었다. 레이더 앞쪽에는 선교 전면에 가깝게 기관 텔레그라프가 놓여 있었다. 우현 쪽 조타실 뒤에는 해도실이 있었다. 선박의 GPS 수신기 두 대와 AIS 수신기는 모두 해도실에 설치되어 있었는데, 자료를 조타실에서도 읽을 수 있는 위치였다. 중심선 위치에서 바로 정면을 보는 시야는 선박의 크레인 때문에 제한되었다. 좌현 레이더는 JRC JMA 9900 시리즈 ARPA였고, 우현 레이더는 켈빈 휴스 뉴클리어스 2 6000A로 이것도 ARPA였다. 두 레이더의 안테나는 주 마스트 꼭대기 가까이에 있었고, 어느 레이더에도 사각 구역은 나타나지 않았다. c) 선교 승무 편성과 관리 선교에는 선장, 삼등항해사, 조타수, 경계원, 그리고 도선사와 보조 도선사가 있었다. 역할은 선장과 도선사가 항해를 논의하고, 삼등항해사가 기관 텔레그라프 옆에서 선장의 명령을 따르며 벨 기록부(bell-book)를 작성하고, 조타수와 경계원이 각각 조타와 경계라는 자신의 임무를 지키는 식으로 배정되었다. 도선사는 항해와 레이더 당직을 수행하도록 맡겨졌고, 선장은 필요에 따라 레이더 화면 조정을 도왔다.
보조 도선사는 4급에서 3급으로 승급하는 교육 과정의 일환으로 승선하고 있었다. 이 과정은 여러 갑문을 드나드는 항해를, 특히 예인선 사용과 관련하여 여러 차례 참관하도록 요구하였다. 보조 도선사로서 그는 도선 초기 단계의 항해를 맡았고, 선박이 예인선에 접근하면서 상급 도선사가 인수하였다. 그 시점부터 보조 도선사는 관찰하는 역할을 하였으며 선박의 항해에 관한 결정에는 관여하지 않았다. 항해는 전적으로 상급 도선사와 선장의 손에 있었다. 1.2.3 선박교통관제(VTS) VTS 관제소는 24시간 운영되었으며 항상 VTS 운영자(VTSO) 두 명이 근무하였다. 각 VTSO는 도선사 배정 또는 VTS 정보 제공 서비스 중 특정 책임을 맡은 데스크를 담당하였다. 이들은 서로 다른 VHF 무선 채널을 감시하였고 서로 다른 호출부호로 응답하였다. 정보 제공 서비스는 VHF 무선 12번 채널로 제공되었고 호출부호 "머지 라디오(Mersey Radio)"를 사용하였다. 도선 데스크는 호출부호 "리버풀 파일럿츠(Liverpool Pilots)"를 사용하였고 11번과 16번 채널과 함께 9번 채널을 감시하였다. 항 안의 선박 이동은 주로 조석에 의존하였으며, 그 대부분은 갑문에 접근할 수 있는 고조 2시간 전부터 1시간 후 사이에 이루어졌다. 각 VTSO는 12시간 당직을 섰다. 그림 6 Alaska Rainbow호 - 선교 두 운영자는 각자의 데스크에서, 강과 접근로를 포괄하는 두 레이더 기지의 합성 레이더 영상을 해당 구역 해도 위에 겹쳐 보여 주는 화면을 이용할 수 있었다. 앵글시(Anglesey)의 포인트 리나스(Point Lynas) 레이더 영상도 적절한 해도 위에 겹쳐 접속할 수 있어서, 그 구역에서의 도선사 승선 작업과 북웨일스 해안을 따라 항에 접근하는 교통을 감시할 수 있었다. 각 VTSO는 필요에 따라 화면을 이용해 선박 이동을 감시하였는데, 교통 이동에 관해 조언하거나 도선사의 진행 상황과 위치를 감시하기 위해서였다.
1.3경위 (모든 시각은 UTC) Alaska Rainbow호는 2월 3일 0030에 리버풀 바 등부표(Liverpool Bar Light Buoy) 부근 묘박지에 도착하여, 다음 고조를 기다리기 위해 투묘하였다. 고조의 예상 시각은 1202였다. 선박은 버컨헤드 부두(Birkenhead Docks)로 가는 중이었고, 이를 위해 고조 1시간 전으로 예정된 시각에 앨프리드 갑문(Alfred Lock)을 통과해야 하였다. 닻은 0830에 올려졌고 선박은 도선사 승선 지점으로 향하였다. 도선사는 0918에 승선하였다. 그는 2급 도선사였고 이번에는 보조 도선사를 동반하였다. 선장과 도선사는 항 안으로의 항해와, 조류를 거슬러 서서 고조가 다가오기를 기다리려는 도선사의 의도를 논의하였다. 강 안의 당시 시정은 안개 때문에 나빴으나, 도선사와 선장은 Alaska Rainbow호가 앨프리드 갑문에 이를 무렵에는 안개가 걷힐 가능성이 크다는 데 동의하였다. 항해는 시정이 좋은 상태에서 시작되었고 보조 도선사가 항해를 맡았다. 그러나 선박이 안쪽으로 진행하면서 시정이 나빠졌고, 선박이 예인선을 연결하기 전에 상급 도선사가 인수하였다. 예인선 두 척이 1050에 연결되었는데, 선수 쪽은 Svitzer Bidston, 선미 쪽은 Thorngarth였다. 이때쯤 강 안의 시정은 약 100m로 크게 나빠져 있었다. 1101에 도선사는 "머지 라디오"를 호출하여 Alaska Rainbow호가 앨프리드 갑문 앞에서 조류를 거슬러 서기 위해 우현 쪽으로 선회를 시작하고 있다고 VTS에 알렸다. 1116에는 Alaska Rainbow호가 북쪽으로 향하여 조류를 거슬러 서서 갑문에 들어갈 만큼 시정이 확보되기를 기다리고 있었다. Sea Express 1호는 예정보다 10분 일찍 0850에 더글러스를 출항하였다. 출항 때 바다는 잔잔하고 시정은 좋았으며 하늘에는 구름이 없었다. 리버풀 해안경비대에 대한 정례 VHF 무선 호출이 0852에 이루어졌고, 선내 승객 및 승무원 수와 리버풀 부선 잔교(Liverpool Landing Stage) 도착 예정 시각이 통보되었다. 이후 항해는 아무 일 없이 계속되었다. 선박이 머지강(River Mersey) 접근 수로 입구에 다가가면서 "머지 라디오"의 방송이 더 또렷해졌고, 일단 머지강에 들어가면 안개로 시정이 나빠지리라는 점이 갑판 사관 세 명 모두에게 분명해졌다. 1032에 실습 선장은 "머지 라디오"에 연락하여 응답한 VTSO에게 Sea Express 1호가 바 등부표에서 10분 거리에 있다고 알리고, 입항 등록을 위해 자신의 PEC 번호를 알려 주었다. VTSO는 이 정보를 확인하고 Sea Express 1호보다 앞서 머지강에 있는 다른 교통의 위치를 전달하였다. 이어 VTSO에게 강 안의 시정 상태에 대한 최신 정보를 물었다. VTSO는 "짙은 안개 지대가 있다"고 답하였다. Alaska Rainbow호의 존재에 대한 언급은 없었다. Sea Express 1호는 안쪽으로 항해를 계속하였고, 1111에 실습 선장이 Sea Express 1호 앞에서 입항 중이던 탱커 Keewhit와 무선으로 교신하였다. 이는 시정 때문에 Sea Express 1호가 Keewhit호의 0.5마일 뒤에 머무르겠다는 점을 탱커에 확인하기 위한 것이었다. 시정은 크게 나빠졌고Sea Express 1호는 속력을 약 10노트로 줄였다. 1117에 Alaska Rainbow호의 도선사는 "머지 라디오"를 호출하여 Alaska Rainbow호가 트웰브 키스 터미널(Twelve Quays Terminal) 옆에서 조류를 거슬러 서 있다고 VTS에 알렸다. 1118에 준설선 WD Medway II가 "머지 라디오"에 조류를 거슬러 서 있는 선박의 이름을 확인해 달라고 하였고, Alaska Rainbow호이며 예인선 두 척이 따르고 있다는 답을 들었다. 이 대화는 VHF 무선 12번 채널로 Sea Express 1호에서도 수신되었으나 선교팀은 이를 알아차리지 못하였다. 당시 선장, 실습 선장, 일등항해사는 시정 상태와 조타 침로를 논의하고 있었다. 두 번째 경계원이 배치되어, 처음에는 선교 날개에, 이후에는 선수루에 자리 잡았다. Alaska Rainbow호에서는 도선사가 선박의 위치를 트웰브 키스 터미널과 시이콤 잔교(Seacombe Stage) 사이에 유지하려고 하고 있었다. 이 일은 시정 제한과, 침로 변화, 대지속력, 갑문까지의 거리를 가늠할 통과 방위선(transit) 같은 시각 단서의 부족 때문에 더 어려워졌다. 도선사가 Alaska Rainbow호를 두 잔교 사이의 위치에 유지하려고 하는 동안 선박은 강 서안 가까이에서 거의 강 중앙으로 옆으로 이동하였다. 1126에 "머지 라디오"는 Keewhit호에 Alaska Rainbow호가 조류를 거슬러 서서 앨프리드 갑문에 들어갈지 여부를 결정하고 있다고 알렸다. 이 VHF 무선 교신을 Sea Express 1호의 선장과 실습 선장은 놓쳤고, 이들은 이어서 리버풀 부선 잔교 접근을 논의하였다. 1130에 Keewhit호는 VHF 무선 12번 채널로 Alaska Rainbow호의 도선사를 호출하였고, VHF 무선 6번 채널로 바꾼 뒤 "녹색 대 녹색(green to green)"으로 지나가기로 합의하였다. 12번 채널에서 이루어진 최초의 VHF 무선 교신도 Sea Express 1호의 선장과 실습 선장이 다시 놓쳤는데, 이들은 일등항해사와 함께 교통 이동과 강 중앙 항적을 유지하기 위해 침로를 바꿀 필요성을 논의하고 있었다. 1131에 실습 선장이 AIS를 이용하여 예인선 Svitzer Bidston과 Thorngarth의 레이더 에코를 식별하였고, 일등항해사는 조류를 거슬러 서 있는 선박이 Alaska Rainbow호일 것이라고 제안하였다. 1134에 Keewhit호가 이제 지나가는 가운데, Alaska Rainbow호의 도선사는 Alaska Rainbow호의 선장 및 보조 도선사와 선택지를 논의하고 있었다. 도선사는 안개가 걷히더라도 고조 전에 갑문에 들어가기에는 시간이 부족하다고 판단하여, 조종을 중단하고 Alaska Rainbow호를 묘박지로 돌려보내기로 결정하였다. 보조 도선사는 선박이 아직 강 안에 있는 동안 도선정이 자신을 Alaska Rainbow호에서 하선시키도록 휴대전화로 연락해 마련하기 위해 선교 날개로 갔다. 그동안 Alaska Rainbow호는 강 서안 쪽으로, 그리고 시이콤 잔교 쪽으로 앞으로 움직이고 있었다. 도선사는 선수 예인선에 선박을 우현 쪽으로 당기고, 선미 예인선에 후진 방향으로 당기도록 명령하였으며, 기관의 후진도 명령하였다. 1135에 Sea Express 1호의 선장은 승객에게 방송을 하고 안개 신호를 시작하도록 명령하였다. 이때 선박의 대지속력은 약 7노트였다. 1136에 "머지 라디오"는 Sea Express 1호에 Sea Express 1호 앞에 있던 선박 Leistein이 선회하여 이제 출항 중이라고 알렸다. 1137에 선장은 "머지 라디오"에 Sea Express 1호가 시이콤 잔교 앞에 있으며 2~3분 뒤 좌현으로 선회할 것이라고 알렸고, "머지 라디오"는 Leistein이 Sea Express 1호의 남쪽에 있는 유일한 출항 선박이라고 답하였다. 시이콤 잔교를 벗어나자 Alaska Rainbow호의 도선사는 예인선을 풀라고 명령하였다. 예인선 Svitzer Bidston은 Alaska Rainbow호의 선수 예인선 역할을 하고 있었다. 예인선 제어 장치는 예인선 선장이 운전석에 있을 때 그가 향하는 선미 쪽에서 예인 상황을 지켜보고 있었다. 예인선을 놓아 보낼 것이라는 말을 듣고 그는 일어나 의도한 진행 방향인 전방을 향해 돌아섰다. 앞쪽을 살피려고 몸을 돌리던 순간, 약 20m 거리의 안개 속에서 Sea Express 1호가 나타나 마주하게 되었다. 쌍동선의 두 선체 사이가 곧바로 보일 정도였다. 시각은 1138이었으며, 다음 일들이 동시에 일어났다. 1. 예인선 선장이 즉시 좌현 쪽으로 변침하였다. 2. Alaska Rainbow호의 도선사가 VHF 무선으로 Sea Express 1호를 호출하여 "시콤(Seacombe) 앞쪽에 있는 선박이 맞습니까? 우리는 지금 예인선을 놓아 보내려는 참이고, 중단하고 곧 나가려고 합니다."라고 말하였다. 3. Sea Express 1호 선수루의 경계 요원이 휴대용 VHF 무선기로 선교를 호출하여 우현 쪽 정면 가까이에 예인선이 보인다고 보고하였다. 그는 그쪽을 가리키기도 하였다. Sea Express 1호의 선장이 Alaska Rainbow호의 도선사에게 "예, 저쪽에 있는 것이 잘 보입니다, 감사합니다."라고 응답하였다. 같은 시각에 수습 선장은 "hard-a-port(좌현 전타)"를 명령하였다. 일등항해사가 타를 돌린 뒤 "속력을 좀 올리겠습니다"라고 말하였다. Sea Express 1호는 좌현 쪽으로 변침하기 시작하였고 속력도 높아졌다. 선장과 수습 선장은 예인선과의 이격 거리를 확인하기 위해 우현 선교 날개로 이동하였으며, 예인선은 약 10m 거리를 두고 지나갔다. 두 사람이 선교를 가로질러 이동하던 중 Alaska Rainbow호가 안개 속에서 나타났고, 수습 선장이 일등항해사에게 "bring her to starboard(우현으로 돌려)"라고 말한 데 이어 선장이 Alaska Rainbow호의 선수에서 선미를 밀어내려는 의도로 "hard-to starboard(우현 전타)"를 명령하였다. 이어 수습 선장은 Alaska Rainbow호의 선수에서 벗어나려는 의도로 "full ahead(전속 전진)"를 명령하였다. 이 와중에 Alaska Rainbow호의 도선사가 VHF 무선으로 Sea Express 1호를 다시 호출하여 "Sea Express 1호, 우리가 보입니까?"라고 말하였으나 응답이 없었다. Sea Express 1호 우현 선체의 뒷부분과 Alaska Rainbow호의 구상선수가 충돌하여 기관실과 제트펌프실에 2.5m x 6.5m 크기의 구멍이 뚫렸다. 이로 인해 해당 구역이 급속히 침수되면서 우현 기관과 발전기 2대가 정지하였다. 그러자 전기 부하가 좌현 기관실의 발전기로 넘어가 과부하로 트립되었고, Sea Express 1호는 한동안 비상 전원에만 의존하게 되었다. 충격으로 Sea Express 1호가 우현 쪽으로 돌았고, 두 선박의 선체가 서로 나란한 상태에서 두 번째 충격이 가해졌다(그림 7, 8, 9). Sea Express 1호는 Alaska Rainbow호의 우현 쪽을 따라 계속 미끄러져 나갔고, 우현 선교 날개가 거주구 부근 현측 난간 바깥쪽에 보관되어 있던 Alaska Rainbow호의 현문 사다리와 접촉하였다. 이 충격으로 Sea Express 1호의 우현 선교 날개 지붕과 창문이 뜯겨 나갔고, 인접한 구명뗏목 보관 장치가 손상되었다. 이때 Sea Express 1호는 우현으로 기울고 선미 쪽으로 트림이 진 상태였다(그림 8). 수습 선장은 첫 충격 직후 비상 경보를 울렸고, 객실 승무원들이 승객을 관리하여 앉히고 구명조끼를 입히고 있었다. 주 전원은 복구되었으나 좌현 선체의 기관만 사용할 수 있어 선박은 조종이 되지 않았고, 조류를 타고 상류 쪽으로 떠내려갔다. 좌현 기관의 약한 추력과 우현 선체의 추가 항력이 결합하여 선박은 서서히 우현 쪽으로 돌았다.
그림 7 충돌 장면을 찍은 승객 사진 그림 8 충돌 20초 후 Alaska Rainbow호와 나란한 Sea Express 1호 - 트림과 기울기에 유의 Alaska Rainbow호의 도선사와 Sea Express 1호의 선장은 충돌 후 40초 이내에 "Mersey Radio(머지 라디오)"를 호출하였으며, 선장은 "죄송합니다만, 앨프리드 갑문(Alfred Lock)에서 나가던 선박과 접촉했습니다. 우리는 지금 이곳에 정지해 있습니다."라고 말하였다. 이어 Alaska Rainbow호의 도선사가 다시 "Mersey Radio"를 호출하여 "방금 Sea Express 1호와 충돌했습니다"라고 말하였다. VTSO는 이 호출에 "항해일지에 기록해 두었습니다."라고 응답하였다. 이후 Sea Express 1호의 선장이 일등항해사에게 "Mersey Radio"에 예선 지원을 마련해 달라고 요청하게 하였다. "Mersey Radio"는 VHF 12번 채널로 "머지강(River Mersey)에 있는 모든 예선"을 대상으로 Sea Express 1호가 지원을 필요로 한다고 일반 호출하였다. 충돌 현장 가까이에 있던 예선 Adsteam Waterloo호와 Oakgarth호가 Sea Express 1호 쪽으로 향하여 Adsteam Waterloo호는 선수 쪽, Oakgarth호는 선미 쪽에 예인삭을 걸었다. 갑판부 승무원들은 기관실 바로 앞쪽의 5번부터 시작하여 앞쪽으로 나아가며 공소(void space)를 점검하라는 지시를 받았다. 보안상 공소 탱크 뚜껑에 채워 둔 자물쇠의 열쇠를 선교에서 차량 갑판으로 보내야 했다. 그러나 점검 뚜껑은 신속히 열렸고 공소들이 건조하다는 사실이 선교에 보고되었다(그림 10). 한편 Alaska Rainbow호에서는 예선들이 풀려났고 도선사가 우현 닻을 투하하도록 지시하였다. 선장은 일등항해사에게 선수 쪽 구역의 손상 여부를 확인하고 선수 탱크를 측심하라고 지시하였다. 침수가 없고 눈에 띄는 손상도 없다는 보고가 선교에 들어오자 도선사는 닻을 올릴 것을 요청하였고, "Mersey Radio"에 바 등부표(Bar Light Buoy) 부근 묘박지로 돌아가겠다는 의도를 확인해 주었다. 도선사는 나중에 리버풀 해안경비대(Liverpool Coastguard)와 통화하여 바 등부표 앞 묘박지로 돌아가 닻을 내릴 의도임을 확인해 주었고, 도선선이 확인한 Alaska Rainbow호의 손상 정도는 선체 도장의 긁힘과 구상선수의 작은 찌그러짐이라고 알렸다. 그림 9 Alaska Rainbow호 갑판 위의 Sea Express 1호 파편 예선 Svitzer Bidston호와 Thorngarth호는 Alaska Rainbow호에서 풀려난 뒤 Sea Express 1호를 지원하러 향하였다. 수습 선장의 요청에 따라 예선 4척이 대기하고 그중 2척이 예인삭을 건 상태에서, Sea Express 1호는 강을 가로질러 리버풀 부잔교(Liverpool Landing Stage) 쪽으로 천천히 예인되었다(그림 11). 충돌 후 선장과 수습 선장은 승객들에게 여러 차례 안내 방송을 하여 일어난 일을 알리고 승무원의 지시를 따르도록 요청하였다. 1154에 VTSO가 전화로 리버풀 해안경비대에 충돌 사실을 알리고 지금까지 취한 조치를 보고하였다. 리버풀 해안경비대는 이어 뉴브라이턴(New Brighton)과 호일레이크(Hoylake)의 RNLI 구명정, 리버풀 부잔교에 배치된 해상 소방정, 호일레이크와 크로즈비(Crosby)의 해안구조대에 출동을 지시하였다. 1202에 해안경비대가 머지사이드 경찰에 연락하였고 부잔교에 경찰이 나가도록 조치되었다. 소방 및 구급 서비스도 출동하였으며, 1221에는 경찰, 소방, 구급 인력이 현장에 도착해 있다고 해안경비대에 보고되었다. Sea Express 1호가 부잔교에 접근하는 동안 선장은 VHF 무선으로 "Mersey Radio"와 교신하여 VTSO에게 선박 상황을 알렸다. 같은 시각 수습 선장은 예인삭을 건 예선 2척과 교신하여, 손상 부위를 바깥쪽(해상 쪽)에 둔 채 좌현을 부잔교에 접안하고 우현 계류 갑판이 물에 잠겨 있으므로 좌현 계류 갑판을 사용할 수 있게 하자고 제안하였다. 이 제안은 받아들여졌고, 예선 선장들은 우현 선회가 가장 좋은 조선 방법이라고 서로 협의하였다. 예인 상태를 지켜보며 대기하던 Svitzer Bidston호의 선장은 필요하면 밀 수 있도록 자신의 예선을 바깥쪽으로 옮기겠다고 제안하였다. 이어 선장은 VHF 무선으로 터미널과 교신하여 승객을 하선시킬 탑승교를 준비해 달라고 요청하였다. 평소 사용하는 탑승교는 일반적인 우현 접안에 맞추어 설치된 고정 구조물이었다. 다행히 부두에 이동식 탑승교가 하나 더 있어서 이를 이동시켜 제자리에 설치하였다. Sea Express 1호의 첫 계류삭이 1210에 육상으로 전달되었고, 승객 하선은 1214에 시작되었다. 구명조끼는 탑승교 상단에서 승객들로부터 회수하였다. 승객이 모두 선박에서 내렸다고 판단되자 그림 10 Sea Express 1호 - 공소 출입구 잠금 걸쇠 객실 승무원들이 객실을 샅샅이 점검하여 선내에 남은 사람이 없는지 확인하였다. 1226에 점검이 끝나자 선박의 고객서비스 사관(CSO)이 모든 승객이 선박에서 내렸다고 선장에게 보고하였다. 선장은 이어 필수 인원이 아닌 직원은 모두 하선하도록 지시하였다. 선박에 출동한 머지 소방구조대(Mersey Fire and Rescue Service)의 소방 부대는 소방차 2대, 전문 수색구조팀, 해상 소방구조팀으로 구성되었다. 승객이 선박에서 모두 벗어난 뒤 소방 부대도 선박을 점검하여 남아 있는 사람이 누구인지 확인하였고, 선박의 사관들과 선박 안정화를 어떻게 도울 수 있을지 논의하였다. 기관실과 제트펌프실의 물을 퍼내기 위해 선내에 펌프를 설치하기로 결정하였다. 그러나 이 작업을 시작하기 전에, 선장은 승객 차량을 하역하려는 시도를 할 수 있도록 선박을 돌려 선미를 적재 램프 쪽으로 향하게 하고자 하였다. 침수가 더 악화되지 않는 것으로 보였으므로, 펌프를 선내에 설치하기 전에 접안한 상태에서 선박을 돌리기로 결정하였다. 선박을 돌리면 손상된 선체가 부두 쪽에 붙게 되어 접근도 쉬워질 것이었다. 1253에 계류삭을 풀었고, 선박은 1322에 우현 접안으로 다시 계류되었다. 이어 소방대 펌프를 선내에 설치하고 기관실 배수를 시도하였다. 해당 구역이 강으로 열려 있었으므로 효과가 거의 없었고, 리버풀항 2단계 오염 대응팀의 더 큰 펌프가 투입되었다. 저조 정조 시간대인 1900에 잠수 조사를 하도록 준비하였고 해안경비대 해안구조팀이 현장 조명을 추가로 마련하였다. 그러나 수중 시정이 매우 나빴고 상황상 잠수사가 손상 부위에 접근할 수 없어 잠수 조사는 연기되었다. 펌프가 가동되면서 상황은 안정되었고, 구명정과 해안구조팀은 2050에 대기를 해제하였다. 구난업자(salvor)가 선정되었고 이튿날 1100에 이들이 선박을 인수하였다. 그림 11 예인 중인 Sea Express 1호
1.4SEA EXPRESS 1호의 손상과 손상 복원성 Sea Express 1호의 손상은 충돌 다음 날 수중 조사가 끝난 뒤에야 확정적으로 평가되었다. 이 조사에서 주된 손상은 제트펌프실 후단에서 앞쪽 기관실까지 이어지는 최대 6.5m x 2.5m의 구멍으로 확인되었다(그림 12a). 4번 공소에서는 손상된 흘수선 위 10cm 지점에서 시작되는 1.5m의 수직 균열이 발견되었다(그림 12b). 우현 선교 날개도 크게 손상되었다(그림 12c, 12d). 기관실로의 침수는 갑작스러웠고 구멍 크기 때문에 막을 수 없었다. 선내에는 비상 관리를 위한 의사결정 지원 시스템이 마련되어 있었다. 비상 계획에 포함된 손상 사례들은 이상적인 조건에서 간신히 견디는 경우를 나타낸 것으로, 즉 승객·차량·바람에 의한 횡경사 모멘트가 없는 평온한 조건에서 양의 부력과 GZ가 유지되는 경우였다. 손상이 조금이라도 늘어나면 선박은 침몰하게 된다. 계획에 첨부된 주의 사항에도 다음과 같이 명시되어 있었다. 실제 침수 상황에서는 승객과 차량의 이동, 파랑의 작용, 중간 침수 단계에서의 자유표면 증가 등으로 인해 복원성과 건현의 여유가 줄어들 것이다. 따라서 이 정보는 참고용으로만 제공된다. 선장은 여전히 자신의 판단을 발휘하여야 한다. 그림 12a 선체 외판 손상 일부를 보여 주는 수중 손상 조사 화면그림 12b Sea Express 1호 우현의 손상 그림 12c Sea Express 1호 우현 선교 날개의 손상 의사결정 지원 시스템의 손상 사례 11.30(그림 13 참조)은 우현 기관실, 우현 제트실, 우현 5번 공소의 침수를 다루고 있었다. 제트실과 기관실은 비수밀 격벽으로 나뉘어 있었으므로, 손상 복원성 측면에서는 이 두 구역을 하나로 간주하였다. 따라서 선박은 가장 뒤쪽의 수밀 구역 두 곳이 손상되어도 견딜 수 있었다. Sea Express 1호 승무원들은 선박이 가장 뒤쪽 두 구역의 침수를 견딜 수 있다는 말을 자주 되풀이해 왔는데, 손상 통제 의사결정 지원 시스템을 참조하지 않은 채 이것이 제트펌프실과 기관실을 뜻하는 것으로 받아들여지게 되었다. 그리하여 제트펌프실과 기관실이 침수되었을 때 선박이 손상 생존 한계에 있다는 큰 우려가 제기되었으나, 실제로는 5번 공소도 손상을 입을 수 있는 여유가 있었다.
1.5SEA EXPRESS 1호의 훈련 HSC 1994 코드는 이런 선박에 근무하는 사관의 안전 체제와 훈련 요건이 일반 선박과 다르다는 점을 규정하고 있다. 코드 18.3절은 고속선 근무에 필요한 추가 훈련과 능력에 관한 지침을 제시한다. 또한 이러한 선박의 운용 능력을 증명하기 위해 각 주관청이 채택하여야 하는 형식 자격(type rating) 증명의 요건도 정하고 있다. 부록 1(코드 18장)을 참조한다. 상선 고시(MSN) 1740(M) 고속선 사관 및 승무원의 훈련과 자격증명은 코드 18장의 요건을 영국에서 이행하는 것이다. 그림 12d 드라이독에 들어간 뒤의 Sea Express 1호 우현 선체 손상1.5.1 형식 자격 IOMSPC가 시행한 형식 자격 프로그램은 형식 자격 취득에 필요한 개별 능력 41개를 확인하였다. 이 41개 능력은 HSC 코드에 상세히 규정된 훈련 요소 12개와 직접 대응하는 단위 12개, 그리고 회사의 안전관리체제와 관련된 2개를 더한 14개 단위로 나뉘어 있었다. 갑판 사관용 형식 자격 프로그램은 세 단계의 훈련을 포괄하였다. 즉 신임 일등항해사의 훈련, 새 항로나 선박을 형식 자격에 추가하려는 현직 사관의 훈련, 그리고 세 번째로 선장 직무에 필요한 추가 훈련이었다. 기관 사관에게도 비슷한 제도가 마련되어 있었다. 각 사관은 14개 단위별로 필요한 개별 능력이 상세히 적힌 형식 자격 프로그램 기록부를 받았다. 부록 2에 이 프로그램의 발췌문이 있다. 능력은 책자에 상세히 설명되어 있었고, 책자 끝에는 응시자가 시험 볼 준비가 되었다고 느낀다는 표시를 하는 칸, 형식 자격 교관(TRI)이 응시자가 시험 볼 준비가 된 것으로 판단한다는 표시를 하는 칸, 형식 자격 시험관(TRE)이 해당 능력의 완료에 서명하는 칸이 있었다. 또한 그 능력을 어느 선박, 항로, 직급에 대해 완료하였는지 나타내는 칸도 있었다. 모든 능력에 서명이 끝나면 회사가 형식 자격 증서를 발급하였다. 이 훈련 제도는 영국 해사연안경비청(MCA)의 승인을 받았으며, 다음 조건 아래 유효하였다. 1. 발급된 증서의 진위를 확인할 수 있도록 기록을 보관할 것. 그림 13 손상 사례 11.30 2. 교육 과정 내용, 시설·장비 또는 프로그램 운영에 영향을 줄 수 있는 그 밖의 사항이 바뀌면 관할 해사사무소(Marine Office)에 지체 없이 보고할 것. 3. MCA의 훈련 프로그램 모니터링 결과가 만족스러울 것. 이 제도에 대한 전면 승인은 2004년 4월 30일에 MCA가 부여하였다. 형식 자격 시험은 기록부 작성 완료와 실무 능력 평가의 두 부분으로 이루어졌다. Sea Express 1호에는 회사가 지정한 TRE가 2명, TRI가 3명 있었다. TRE와 TRI의 역할은 분리되어 있어서, 교관으로 지정된 사람은 시험관이 아니었고 그 반대도 마찬가지였다. Sea Express 1호에 승선한 갑판 사관 3명 모두 해당 형식 자격 증서를 보유하고 있었으며, 수습 선장은 이 선형의 선장 형식 자격을 위한 시험 중 일부를 받고 있었다. 일등항해사도 리버풀 PEC 시험을 최근 마쳤으므로 선장 형식 자격 증서를 위한 시험 절차를 곧 시작할 예정이었다. 1.5.2 비상 절차 MSN 1740(M)은 고속선(HSC)에 고용된 갑판 및 기관 부원과 기타 인원이 자신의 직무에 맞는 훈련 프로그램을 이수하도록 요구한다. 이 훈련에는 영국 상선(훈련 및 자격증명) 규칙 1997(SI 1997/348)이 요구하는 숙지 훈련과 해당 STCW95 훈련 프로그램이 포함되어야 한다. 객실 승무원은 비상 상황에서 승객을 돕도록 지정되므로 추가 최소 훈련 요건이 권고된다. 이 추가 요건은 영국에서 MSN 1579로 공포되었으며, 이는 IMO 결의 A770(18) 여객선에서 비상 상황 시 승객 지원 인원에 대한 최소 훈련 요건 권고의 내용을 반영한 것이다. 객실 승무원을 위해 두 종류의 안전 훈련 프로그램이 제공되었다. 하나는 신규 직원이나 6개월 이상 쉬었다가 회사 선박에 복귀하는 직원을 위한 것이었고, 다른 하나는 선단 내 다른 선박으로 옮기는 직원을 위한 것이었다. 훈련은 회사가 지정한 교관이 실시하였으며, 이 교관은 선단에서 근무 중인 사관이기도 하였다. 단계마다 안전 훈련 기록부가 있어 응시자가 필요한 능력을 차례로 익히도록 하였다. 각 능력에는 응시자가 교육을 받았음을 나타내는 약식 서명(이니셜)과, 응시자가 능력을 갖추었다고 판단됨을 나타내는 약식 서명이 각각 필요하였다. 이후 책자 앞표지에 응시자, 교관, 평가자가 서명하였다. 회사는 객실 승무원을 위해 다음과 같은 사내 훈련 과정도 실시하였다. 화재 예방 및 소화 개인 안전 및 사회적 책임 위기관리와 인간 행동. 이는 MSN 1740이 요구하는 것이었으며 훈련의 형식과 내용에 관해서는 STCW95의 요건을 따랐다.
선박 승무원은 매주 최소 한 번의 훈련/연습을 실시하였다. 모든 승무원이 일등항해사의 지휘 아래 이 훈련에 참여하였다. 회사는 선박이 사용하도록 훈련 계획 일람표를 배포하여 여러 훈련이 모두 실시되고 승무원이 매주 같은 훈련만 하지 않도록 하였다. 사고 전날 승무원들은 일반 비상 배치에 소집되어 차량 갑판 화재 및 전원 퇴선 절차 훈련을 하였다. 이 절차는 탑승 승객 수에 따라 약간씩 달라졌고, 승객 수는 다시 필요한 승무원 수를 결정하였다. 표 1은 승객 수에 따라 필요한 승무원 수를 보여 준다. 각 인원 편성 수준을 모드(mode)라고 하며, 모드에 따라 비상 시 객실 승무원의 배치가 결정된다. 승무원은 각자 승무원 명부의 번호로 식별되었다. 비상 시 그 사람이 어디에 집합하여야 하는지를 나타내는 것이 바로 이 번호였다. 선장, 고객서비스 사관, 기관장 등 핵심 인원은 항상 같은 집합 번호를 가지고 있어서 늘 같은 장소에 집합하여 같은 임무를 수행하였다. 다른 승무원은 승무원 명부의 번호가 정하는 대로 집합하여 해당 위치에 필요한 임무를 수행하였다. 표 1 - 승무원 모드와 승객 수 모드 승객 승무원(임시 동승 인원) 합계 22 501 22(+9) 532 20 443 20(+11) 474 18 360 18(+13) 391 16 284 16 300 승무원은 여러 모드에서의 행동 요령에 대해 정기적으로 훈련을 받았고, 훈련 중에는 질의응답 시간을 넣어 다른 모든 "번호"가 어디에 집합하는지와 그 임무가 무엇인지를 철저히 이해하도록 하였다. 동승한 임시 인원(supernumerary)은 고객서비스 사관과 함께 집합하여 인력 예비 풀로 활동하였다.
1.6도선사 훈련 및 자격 머지 도크 앤 하버 컴퍼니(Mersey Docks and Harbour Company, MDHC)는 리버풀항의 관할 항만당국(CHA)이며, 따라서 리버풀항에서 일하는 도선사를 허가할 책임이 있다. CHA는 도선사를 직접 고용하지 않으며, 도선사는 자영업자로서 리버풀 도선 서비스 유한회사(Liverpool Pilotage Services Limited)를 통해 서비스를 제공한다. 이 회사가 도선사의 근무 순번과 휴가 일정을 편성한다. 리버풀 도선사의 훈련 프로그램은 1급 수준의 자격을 얻기까지 최소 5년 6개월이 걸릴 것으로 예상된다. 훈련은 6개월의 초기 훈련 기간으로 시작되는데, 이 기간에 훈련생 도선사는 정식으로 허가받은 도선사를 최소 78회 동승해야 하며, 입항과 출항이 각각 절반, 주간과 야간이 각각 절반이어야 한다. 이러한 "수심 측정수(leadsman)" 동승 횟수를 채우고 나면 응시자는 시험을 치르고 시험에합격하면 4급 도선사 자격을 얻는다. 다음 급으로 올라가려면 도선사는 최소한 그 다음 급 자격을 가진 도선사와 함께 leadsman 동승을 해야 한다. 따라서 1급 도선사로의 승급은 시험뿐 아니라 일련의 leadsman 동승을 통한 경험 쌓기를 거쳐 이루어진다. 표 2는 전체 훈련 프로그램을 보여 준다. 표 2 - 리버풀 도선사 훈련 프로그램 도선사 급 급별 예상 소요 기간 제한 승급에 필요한 동승 횟수 훈련생 6개월 자격 없음 78 4급 1년 95미터까지 14 3급 1년 130미터까지 15 2급 3년 2년간 160m까지 1년간 180m까지 1급 무제한 해당 없음 표 2에 상세히 나온 훈련에 더하여, MDHC는 도선사에 대한 훈련 협약도 도입하였고 이는 리버풀 도선 서비스 유한회사가 관리하였다. 각 도선사는 레어즈사이드 시뮬레이션 센터(Lairdside Simulation Centre)에서 일정 기간 시뮬레이터 훈련을 받기로 되어 있었다. 그러나 MDHC가 최근 필 포츠 그룹(Peel Ports Group)에 인수되었고 당해 연도 훈련 예산은 아직 확정되지 않은 상태였다.
1.7리버풀항 VTS 1.7.1 배경 VTS의 목적은 해상 교통이 초래할 수 있는 악영향으로부터 항행의 안전과 효율, 해상 인명의 안전, 해양환경 및/또는 인접 해안 지역·작업장·해양 시설의 보호를 개선하는 것이다1. VTS는 국제해사기구(IMO)가 정의하는 육상 측 시스템으로, 다른 선박의 위치나 기상 위험 경보와 같이 선박에 간단한 정보 메시지를 제공하는 것에서부터 항만이나 수로 안의 교통을 폭넓게 관리하는 것까지 범위가 다양하다. IMO 결의 A857(20)과 IALA VTS 매뉴얼 2002는 기능에 따라 세 가지 범주의 서비스(정보 제공 서비스, 항행 지원 서비스, 교통정리 서비스)를 설명한다. 이 문서들은 또한 증명서(V103)로 이어지는 훈련 기준도 규정한다. 따라서 VTS라는 용어는 V103 기준에 맞게 훈련된 인원이 운영하는 시스템을 가리키는 데 쓰인다. 1 2002년 영국 교통부(Department for Transport)가 항만해사안전규약과 연계하여 작성·발행한 "항만 해사운영 우수실무 지침" 7.3.11절에서 인용하였다.
영국 상선(선박교통 감시 및 보고 요건) 규칙 2004(The Merchant Shipping (Vessel Traffic Monitoring and Reporting Requirements) Regulations 2004) 제2조(1)는 선박교통관제를 다음과 같은 서비스로 정의한다. a) 선박 교통의 안전과 효율을 향상하고 환경을 보호하도록 설계되었으며, 해당 교통과 상호작용하고 VTS 구역에서 전개되는 교통 상황에 대응할 수 있는 서비스. b) 영국이 단독으로 또는 하나 이상의 국가와 공동으로 운영하는 서비스의 경우, 영국 안에서 제공되고 MCA가 서면으로 지정하였으며 상선 고시에 명시된 서비스. 영국에서는 항만해사안전규약(PMSC)에 따라 항행 위험에 대한 공식 평가가 요구되며, 이 평가가 항만에서 어떤 항행 관리가 필요한지를 결정한다. 이 위험성 평가는 또한 위험 완화에 감시와 교통 정리가 역할을 해야 하는지, 그리고 그렇다면 어느 정도여야 하는지도 결정한다. 리버풀항의 위험성 평가는 필요한 서비스 수준을 "정보 제공 서비스(Information Service)"로 결정하였다. 이 서비스 수준을 IMO는 다음과 같이 정의한다. 선내 항행 의사결정에 필수적인 정보를 제때 이용할 수 있도록 보장하는 서비스. 영국 해역 내 영국 VTS의 공식 식별은 MSN 1796 (M+F)에 나와 있다. 이 문서에서 리버풀항은 정보 제공 서비스를 제공하는 것으로 기재되어 있다. 리버풀항은 1948년에 세계 최초로 항만 감시 레이더를 가동하였다. 충돌 당시 운영되던 시스템은 항만과 접근 수역에 대한 레이더 및 CCTV 감시를 무선 및 전화 통신과 결합한 것이었다. 이 서비스는 2006년에 갱신된 Norcontrol VTS5060 시스템을 중심으로 이루어졌다. 이 시스템은 레이더, AIS, VHF 무선 송신 내용을 기록하였으며, 이는 MAIB 조사의 일환으로 재생되었다(그림 14). 1.7.2 운영자 훈련 및 자격 1998년 5월 국제항로표지협회(IALA)는 회원국에 권고 V103을 발행하였다. 이는 VTS 운영자의 훈련 및 자격증명 기준을 제시하였다. 자격을 얻으려면 승인된 교육기관에서 훈련 과정을 만족스럽게 마쳐야 하고, 지정된 VTS 센터에서 이루어진 구체적인 현장 훈련을 기록하는 VTS 자격 기록부(VTS Certification Log)도 완성하여야 하였다. 이 기록부에는 VTS 운영자 증서 번호와, 다른 VTS 센터에서 근무하기 위해 이수한 현장 훈련, 그리고 VTS 감독관이나 교관으로 승급하기 위한 추가 자격도 기록되었다. 리버풀항 VTS 스테이션에 고용된 VTSO는 모두 IALA V103 권고에 상세히 규정된 자격을 취득하고 있었다. 이는 항만이 정보 제공 서비스를 제공하기 위한 요건이었다. 1.7.3 인원 편성 및 업무량 평일에는 도선 예약을 받는 사무원 2명이 근무하였다. 항만 요금 체계상 업무 시간 외에 이루어진 예약은 요금이 할증되었으므로 예약의 대부분은 근무 시간 중에 이루어졌다. 이 시간에 토요일과 일요일 오전(0800-1000)도 포함되어 있어 이 시간에는 금전적 불이익 없이 예약할 수 있었다는 점이 주목할 만하다. 주말에는 사무 지원 인력이 없었으므로 도선 데스크를 맡은 VTSO는 도선 데스크의 통상 업무를 수행하는 것과 아울러 도선 예약도 받아야 하였다.
이런 때에 도선 데스크 VTSO를 돕기 위해 정보 제공 서비스 VTSO가 가끔 그를 대신하여 전화를 받거나 VHF 무선기를 조작하였다. 1.7.4 제한된 시계에서의 조치 머지강(River Mersey)에서 제한된 시계가 보고되었을 때 선박 안전에 대한 추가 위협은, VTSO가 제한된 시계 초기 대응 카드(Initial Response Card for Restricted Visibility)를 참조하여 처리하였다. 이 카드는 제한된 시계의 의미를 정의하고 VTSO가 취할 다음 다섯 가지 조치를 제시하였다. 1. 선박에 제한된 시계 상황을 알리고 VTS 구역 전역의 선박으로부터 시정 평가 보고를 정기적으로 받는다. 2. 글래드스턴 도크 관리자(Gladstone Dockmaster)를 호출하여 C22 적색 캔 부표 안개 신호를 작동시킨다. 3. 앨프리드 도크 관리자(Alfred Dockmaster)를 호출하여 리버풀 부잔교의 안개 신호를 작동시킨다. 4. 머지사이드 여객 교통청(Merseyside Passenger Transport Executive, MPTE)을 호출하여 우드사이드(Woodside)와 시콤(Seacombe) 페리 부잔교의 안개 신호를 작동시킨다. 5. 트랜미어 유류 터미널(Tranmere Oil Terminal)을 호출하여 트랜미어 북쪽 및 남쪽 유류 부잔교의 안개 신호를 작동시킨다. VTSO에게 요구되는 추가 조치는 없었다. 그림 14 VTS 재생 화면 1.7.5 VTSO 상시 지시서 MDHC가 발행한 VTSO 상시 지시서(standing orders)는 사고 당시 검토 및 재작성 중이었다. 원래 문서는 이미 존재하지 않는 직위를 언급하였고, 근무 중인 VTSO에게 기대되는 업무에 대해 명확한 지침을 제시하지 못하였다. 11개 지시는 MDHC의 항행 지침을 되풀이하였으나 각 경우에 VTSO에게 기대되는 조치는 포함하지 않았다.
1.8비상 대응 1.8.1 민간 비상사태법 2004년 민간 비상사태법(Civil Contingencies Act 2004)은 2004년 11월 18일 국왕 재가를 받았으며, 영국의 민간 보호를 위한 단일 체계를 마련하도록 설계되었다. 이 법은 두 개의 실질 부분으로 이루어진다. 제1부는 민간 보호를 위한 지역 차원의 대응 체계를 다루며 지역 대응 기관의 역할과 책임에 관한 체계를 수립한다. 제2부는 비상 권한에 중점을 두며, 가장 심각한 비상사태에 대처하는 데 필요할 수 있는 특별 입법 조치를 사용하기 위한 체계를 수립한다. 이 법은 또한 1948년의 민방위 법령과 1920년의 비상권한법(Emergency Powers Act 1920)에서 정의되어 온 비상사태의 정의를 갱신한다. 2004년 법은 비상사태를 다음과 같이 정의한다. • 인간의 복지에 중대한 피해를 위협하는 사건 또는 상황 • 환경에 중대한 피해를 위협하는 사건 또는 상황 • 안보에 중대한 피해를 위협하는 전쟁, 테러. 이 법 제1부에서 이 정의는 지역 대응 기관이 민간 보호 의무를 이행할 때 대비하여야 하는 가능한 사건의 범위를 제시한다. 해양 환경에서의 계획 수립 목적상 여기에는 여객선의 급격한 우발적 침몰과 (해양사고나 고의적 행위로 인한) 수로 접근 차단이 포함된다. 지역 차원의 협력을 촉진하기 위해 다기관 회복력 포럼(multi-agency resilience fora)이 설치되어 지역사회 위험 등록부와 필요한 대응을 검토하였다. 경찰 관할 구역을 기준으로 할 때 머지강의 사건은 머지사이드 경찰청 관할이거나 체셔 경찰청 관할이다. 두 지역의 지역사회 위험 등록부는 모두 여객선 운항을 평가한 바 있었다. 체셔, 핼턴, 워링턴(Cheshire, Halton and Warrington) 지역사회 위험 등록부는 여객선의 단순한 급격한 침몰을 검토하여 위험 등급을 중간으로 판단하고, 이 위험을 효과적으로 관리하기 위해 이미 갖춰진 능력과 방벽으로서 MCA의 대형사고 계획을 언급하였다. 머지사이드 지역사회 위험 등록부는 해상 운송 위험 요소 세 가지를 확인하였다. 대형 여객선 침수, 대형 여객선 좌주(stranding), 여객선과 위험물 운반선의 충돌이었다. 여객선 좌주는 고위험으로, 나머지 둘은 중간 위험으로 평가되었다. 이 경우에도 능력은 MCA의 대형사고 계획과 1범주 대응 기관(즉 소방, 경찰, 구급 서비스)의 계획에 의존하였고, 방벽으로는 국가 및 국제 선박 규제와 규정 준수를 보장하는 항만국통제가 제시되었다.
1.8.2항만해사안전규약 PMSC 2.1.12항은 항만 내 비상 계획 수립 요건을 정하며 다음과 같이 말한다. 안전관리체제에는 비상 상황에 대한 준비가 포함되어야 하며, 이는 실행 가능한 한 공식 위험성 평가에서 식별되어야 한다. 비상 계획은 공표되고 훈련되어야 한다. PMSC의 부속 간행물은 항만 해사운영 우수실무 지침이며, 이 지침은 계획 수립이 모든 비상 상황에 대한 효과적인 대응이라고 설명한다. 이는 다음을 확보해 주기 때문이다. • 미리 설계된 업무 구조 • 신속한 대응 • 신중한 결정 • 우선순위 설정 • 다른 기관과의 조정. 항만당국의 비상 계획을 준비하는 사람들은 처음부터 다른 기관과 협의하도록 이 지침이 권고한다. 다른 기관들에도 스스로 이행하여야 하는 법정 의무가 있을 수 있으며, 협의 과정은 기관 간 조정이 효과적이고 노력의 중복을 피하도록 보장해 줄 것이다. 항만장은 소방, 경찰, 구급 및 기타 비상 서비스가 어떠한 비상 상황이든 처리·완화·예방하는 데 합리적으로 가능한 모든 지원을 제공하여야 한다. 항만 구역 내 수색구조의 책임도 이 지침에서 논의된다. 영국 해안경비대는 항만 구역 내 모든 조난의 수색구조 단계를 조정할 책임이 있으며, 항만당국은 지원을 제공한다. 이 지원은 다양한 형태일 수 있으며 한 예로 도선선의 사용이 있다. 영국 해안경비대는 또한 항만 비상 계획에 따라 수행되는 사건의 수색구조 단계에서 항만당국을 돕고 조정을 제공한다. 항만당국은 항만 비상 상황에 대한 전반적 대응을 관리할 책임을 계속 진다. 이 지침은 이어서 일부 항만당국이 항만 사건 발생 시 책임과 통신 체계에 관하여 영국 해안경비대와 양해각서(MoU)를 체결하고 있다고 설명한다. 리버풀항에는 그러한 MoU가 없었다. PMSC는 항만 내 해사 운영이 안전관리체제에 따라 이행될 것을 요구한다. 이 체제는 위험이 허용 가능하고 합리적으로 실행 가능한 한 낮도록 보장하기 위해 설계된, 항만 내 모든 해사 운영을 다루는 공식 위험성 평가를 바탕으로 하여야 한다. PMSC 2.2.10항은 또한 안전관리체제가 감시에서 얻은 정보와 전체 체제에 대한 독립적 감사에 근거한 성과의 체계적 검토에 대한 규정을 포함하여야 한다고 요구한다. 리버풀항 위험성 평가의 경우 승객 운송은 별도로 평가되지 않았다. 더욱이 안전관리체제는 독립적 감사를 받은 적이 없었다.
1.8.3SEAVAC 작전 SEAVAC 작전은 대형 해양 사건 이후 생존자를 다루기 위한 머지사이드 경찰의 비상 계획이었다. 고려된 사건 유형의 예로는 바다에서의 항공기 추락과 여객선 침몰이 있었다. 이 계획은 경찰이 사상자 수용 시설을 제공하여야 하는 요건을 다루었고, 생존자를 상륙시킬 머지사이드 지역의 상륙 지점 일곱 곳을 지정하였다. 또한 사고 현장에 경찰이 있을 가능성은 낮으며 수색구조 단계는 영국 해안경비대가 조정한다는 점도 인정하였다. 계획은 일곱 곳을 차례로 열거하고, 인근에서 이용 가능한 시설을 검토하였으며, 각 지점에서 경찰이 교통 통제, 생존자 수용, 임시 영안실 시설, 구급차 정렬을 어떻게 구성할지를 기술하였다. 계획 수행에 필요한 인력 자원도 상세히 기재되었다. 계획은 또한 해상 비상 상황의 통보자는 보통 영국 해안경비대라는 점을 언급하였고, 그렇지 않은 경우에는 즉시 해안경비대에 알려야 한다고 강조하였다. 따라서 이 계획은 대형 해양 사건에 대한 경찰의 대응을 열거하고, 다수의 생존자가 상륙하는 상황을 경찰이 어떻게 처리할지를 살펴보았다.
1.9승객을 위한 선내 정보 HSC 1994 코드는 승객에게 집합 장소, 비상 시 취해야 할 필수 조치, 구명조끼 착용 방법을 알리기 위하여 적절한 언어로 된 그림과 지침을 공용 구역에 게시하고 집합 장소, 기타 승객 구역, 각 좌석 가까이에 눈에 띄게 표시하도록 요구한다. Sea Express 1호의 각 승객 좌석에는 안전 지침이 적힌 카드가 비치되어 있었다(부록 3). 여기에는 비상 경보 신호와 경보 후 취해야 할 조치, 구명조끼 착용 지침, 어린이용 구명조끼가 상세히 적혀 있었고, 뒷면에는 대피 경로를 보여 주는 객실 구역 평면도가 있었다. 지침은 영어와 프랑스어로 되어 있었고, 출항 직후 상영되는 안전 비디오가 이를 뒷받침하였다. 이 안전 비디오에는 비치된 두 종류의 구명조끼를 입는 방법의 시연(그림 15a, 15b)과, 대피 경로 및 비상 경보 후 취할 조치의 시연이 포함되어 있었다. 그러나 안전 지침 카드에는 구명조끼 한 종류만 그려져 있었다.
1.10승객 설문 여객선 관련 사건이 발생하면 MAIB는 보통 우편 주소를 가진 모든 승객에게 승객 설문지 사본을 발송한다. 이 설문의 목적은 선박의 여러 곳에 있던 승객이 본 사건의 모습을 MAIB 조사관에게 제공하고 사건 전후의 상황에 대한 이해를 높이는 것이다. MAIB는 IOMSPC가 제공한 승객 주소로 설문지 175부를 보냈다. MAIB는 100건의 회신을 받았고 이를 조사의 일환으로 검토하였다. 승객 의견 요약은 부록 4에 있다.
그림 15a 구명조끼 시연 - 1형 그림 15b 구명조끼 시연 - 2형
원문 보기
1.1 OF EXPRESS 1, ALASKA RAINBOW AND ACCIDENT Vessel details Sea Express 1 (Figure 1) Registered owner : MIOM 1 Ltd Manager : Isle of Man Steam Packet Company Limited : Newhaven Flag : UK Type : Ro-Ro Cargo/ Ferry, Twin Hull Code Category B craft Built : 1991 – Incat – Tasmania : : Aluminium : 74m : 3003 type : 4 x Rushton 16R K270 Service : 36 knots Other relevant info : Two engines in each hull each drive a jet . Control of the four jets can be provided independently or through a combined control system
Vessel details Alaska Rainbow (Figure 2) Registered owner : Sea Echo ENE Manager : J.G. Goumas (Shipping) Co. S.A. Port of registry : Piraeus Flag : Greece Type : Geared Built : 1985 – Japan Classification society : Nippon Kaiji Kyokai Construction : Length overall : 157.26 m Gross tonnage : 13,898 Engine type : Mitsubishi 6UEC 52L Service speed : 13.7 knots Other relevant info : Single , conventional rudder. No . Four holds with one crane per Accident details Time and date : 3 February 2007 – 1138 () Location of incident : Lat 53º 24.625’N Long 003º 00.617’W River Mersey – off Alfred Lock (Figure 3) Persons on board : Sea Express 1- 274 passengers, 20 Alaska Rainbow – 21 crew, 2 pilots Injuries/fatalities : Sea Express 1 - minor injuries to 13 passengers Damage : Sea Express 1 - large in , split hull at No 4 , starboard crushed Alaska Rainbow – minor damage.
Figure 1 Figure 2 Sea Express 1 Alaska Rainbow
of the Figure 3 Reproduced from Admiralty Chart 3490 by permission of the Controller of HMSO and the UK Hydrographic Office River Mersey and location of the collision 12 Quays Terminal Alfred Lock Seacombe Stage Liverpool
1.2 BACKGROUND 1.2.1 Sea Express 1 a) Vessel Built in Tasmania, Sea Express 1 had been operated in the Irish Sea with several companies on different routes and under a number of different names. The ship had been operated by Isle of Man Steam Packet Company Limited (IOMSPC) in the past, but had been replaced by a more modern vessel. She was brought back into service by the IOMSPC in mid September 2006 to replace another of the fleet’s vessels during refit and repair of that vessel. Built of aluminium, Sea Express 1 had a catamaran hull form, with each hull designed for wave piercing. This optimised the top speed of the vessel while providing a stable platform for passenger comfort. Each of the two hulls was subdivided into eight compartments. The forward space was the , and the next five were void spaces numbered from forward to aft, with number four void of both hulls being available for use as a tank for long range voyages. At the time of the accident, these voids were clean and gas free, and had not been used for bunkers since the ship’s delivery from Tasmania in 1992. Spaces 7 and 8 were the engine and jet pump rooms respectively. Although they were identified as separate spaces with no access between them, the between the two was not , and they were therefore considered to be a single space for damage purposes. The vessel operated different timetables for the winter and summer seasons. Operating on the winter timetable at the time of the accident, there were sailings only on Friday, Saturday and Sunday, consisting of a single round trip from Douglas to Liverpool and return to Douglas. While the winter service was operating, the ship’s staff continued to work a weekon, week-off rota, with the changeover day of Wednesday. On the days with no sailing, the ship’s staff carried out general maintenance and training duties on the vessel. The staff, however, had transferred to a winter contract, requiring them to be available only on sailing days, i.e. on Fridays, Saturdays and Sundays. b) Layout and Equipment The , engine control and alarm equipment were mounted in a desk at the forward side of the bridge arranged on the (Figure 4). Three chairs were fitted for the operators. The left-hand chair was the engineer’s position. In front of the engineer were the alarm panels and remote operating panels for the equipment in the engine room. The monitor for the cameras in the engine room was set to the left of the seat, with the alarm and engine alarm panels directly in front of the seat. The middle seat was positioned on the centreline of the ship, and was the position used for steering. The wheel was situated directly in front of the chair, with the controls for the steering motors and automatic mounted above the wheel. To the left of this chair was a microphone for internal communications, the ship’s mobile phone and a radio handset. To the right of the chair were the four engine controls. These consisted of four levers set in two mounts, one mount for the engines and one for the starboard engines. of the engine controls and mounted in the vertical face of the desk was a Kelvin Hughes Nucleus
3 . This radar was not directly in front of the person steering, but was easily visible from that position. The control panel for this radar was in easy reach of the chair, so the radar could be operated by the person steering. The right-hand chair had a Kelvin Hughes Nucleus 2 6000A radar directly in front of the operator. To the left was a handset for internal communications, the (VDR) control box and an echo-sounder repeater. To the right were the (GPS) receiver, the (AIS) receiver, and the screens for the onboard computer. In the deckhead above the centreline window (Figure 5) was a series of repeaters for the speed log, indicator, time clock and the periscope arrangement for viewing the magnetic . Behind the centreline seat on the after bulkhead of the bridge were the controls for the ship’s audio-visual system for passenger safety announcements. On each bridge wing was a control panel for manoeuvring the vessel alongside a . c) Bridge and Management IOMSPC required that the bridge was manned by the captain, first , and a at all times. The chief engineer sat in the left-hand seat, which was the control and monitoring station for the engines. The captain and first officer occupied the centreline and right-hand seats. The centreline seat was designated for steering and controlling the engines. The right-hand seat was designated for maintaining the radar watch and operating the communications equipment. The decision concerning whether the captain or first officer should sit in which seat was determined by the captain. In general, the captain took the wheel on entering port, with the first officer providing navigational and support, and external communications, with the roles reversed at sea. However, this was not a fixed arrangement and was reversed from time to time. The bosun and two able seamen on board split the lookout requirement with the additional requirement for a presence on the , organised such that 30 minutes as lookout was followed by 30 minutes on the car deck, then 30 minutes standby in the mess room. If necessary, owing to , a second lookout was stationed on the bridge. On 3 February 2007, the bridgemanning complement was increased by the inclusion of a trainee captain who was to berthSea Express 1 in Liverpool as part of his type examination. The trainee captain already held a type rating certificate for the vessel as first officer, and this was to be a final check of his capability in manoeuvring Sea Express 1 alongside the Liverpool Landing Stage. The captain was one of the company’s designated type rating examiners (TRE) for this vessel. The captain, trainee captain and first officer all held Exemption Certificates () for Liverpool, and had worked on this route for a number of years. The trainee captain took charge of the with the captain in close proximity. On the Bar Light , the first officer was sitting in the centreline seat and the trainee captain was sitting in the right-hand seat, with the captain standing to one side of the trainee captain. Actions to avoid collision and maintain the planned were discussed between the trainee captain and the captain, before the order to adjust or speed was passed by the trainee captain to the first officer.
Figure 4 Figure 5 Sea Express 1 - bridgeSea Express 1 - deckhead instruments
1.2.2 Alaska Rainbow a) Vessel Alaska Rainbow was a four ship with a single electro-hydraulic crane at the forward end of each hatch. The four cranes were positioned on the centreline of the ship, and could operate through an arc of 360º, allowing two cranes to service holds 1, 2 and 3. Alaska Rainbow traded worldwide. At the time of the collision, she was carrying a part cargo of steel products. This gave her a of 5.8m forward and 6.8m aft. This was only slightly deeper than the condition, and considerably less than the vessel’s maximum loaded draught of 9.91m. The vessel was operated with a crew of 21, who were a mix of Greek and Filipino nationals. The working language on board was English, although Greek and Filipino were used extensively. The eight Greeks on board were employed on a 7 month contract, and the remaining 13 Filipino crewmen had signed 12 month contracts. Most of the crew had worked on the vessel for a number of contracts, with the Greek having served on the vessel for 29 months in total. The vessel operated a 3 watch system of 4 on 8 off watches, with bridge watches kept by the Greek and the Filipino second and third officers. At the time of the accident, the third officer was on watch, with the chief and second officers in charge of the and crews respectively. b) Bridge Layout and Equipment The bridge of Alaska Rainbow occupied approximately one third of the of the ship, with large open bridge wings to either side. The wheel and telemotor unit were mounted on the centreline in the middle of the wheelhouse (Figure 6). To port of the telemotor unit was a fixed chair, and to starboard were the two radars, positioned next to each other. Forward of the radars was the , positioned close to the bridge front. To starboard, and aft of the wheelhouse was the chart room. The ship’s two GPS receivers and the AIS receiver were all fitted in the chart room, in such a position that the data could also be read from the wheelhouse. The view directly ahead from a position on the centreline was restricted by the presence of the ship’s cranes. The portradar was a JRC JMA 9900 series ARPA, and the starboardradar was a Kelvin Hughes Nucleus 2 6000A, which was also an ARPA. The scanners for both radars were near the top of the main mast, and neither radar showed blind sectors. c) BridgeManning and Management The bridge was manned by the master, third officer, and lookout, plus the and a junior pilot. The roles were assigned such that the master and pilot discussed the navigation, the third officer stood by the engine telegraph following the orders of the master and completing the bell-book, and the helmsman and lookout kept to their respective tasks of steering and keeping a lookout. The pilot was left to carry out the navigation and radar watch, with the master offering assistance as necessary to adjust the radar display.
The junior pilot was on board as part of his training programme to advance from class 4 to class 3. This programme required that he witness a number of trips in and out of the various locks, particularly with regard to the use of the tugs. As the junior pilot, he had taken control of navigation for the initial stages of the pilotage, with the more senior pilot taking over as the vessel approached the tugs. From that point on, the junior pilot took an observing role, and had no part in the decisions concerning the navigation of the vessel. This was entirely in the hands of the more senior pilot and the master. 1.2.3 (VTS) The VTS station was manned for 24 hour operation with two VTS operators (VTSOs) on duty at all times. Each manned a desk with specific responsibilities for either organising pilots or for the VTS. They monitored separate VHF radio channels and responded with different signs. The information service was provided on VHF radio Channel 12 and utilised the call sign “Mersey Radio”. The pilotage desk utilised the call sign “Liverpool Pilots” and monitored Channel 9 as well as Channels 11 and 16. Shipping movements within the port were mainly tidal, with the majority of these being undertaken during the period from 2 hours before to 1 hour after when the locks were accessible. Each VTSO stood a 12 hour watch. Figure 6 Alaska Rainbow - bridge
Both operators had available at their respective desks a screen with a composite radar picture from the two radar sites covering the river and approaches superimposed on a chart of the area. The radar picture from Point Lynas in Anglesey, also superimposed on an appropriate chart, could also be accessed to monitor pilot boarding operations in the area and the traffic approaching the port along the North Wales . Each VTSO used his screen as required to monitor the shipping movements, either to advise on traffic movements or to monitor the progress and positioning of pilots. 1.3 NARRATIVE (All times UTC) Alaska Rainbow arrived at the in the vicinity of Liverpool Bar Light Buoy at 0030 on 3 February, and went to to await the next high water, the predicted time of which was 1202. She was bound for Birkenhead Docks, which required her to transit Alfred Lock at a scheduled time of 1 hour before high water. The anchor was weighed at 0830 and the vessel proceeded towards the pilot boarding station. The pilot boarded at 0918. He was a class 2 pilot, and on this occasion was accompanied by a junior pilot. The master and pilot discussed the passage into the port, and the pilot’s intention of to the tide and wait for the approach of high water. The prevailing in the river was poor due to fog; however, the pilot and master agreed that there was a good chance that the fog would have cleared by the time Alaska Rainbow reached Alfred Lock. The passage began in good visibility, with the junior pilot having control of the navigation. However, the visibility reduced as the vessel proceeded inwards, and the senior pilot took over before the vessel made the tugs fast. Two tugs were made fast at 1050, Svitzer Bidston forward and Thorngarth aft. By this time, the visibility in the river had substantially reduced to about 100m. At 1101, the pilot called “Mersey Radio” to inform VTS that Alaska Rainbow was starting to swing to starboard to stem the tide off Alfred Lock. By 1116, Alaska Rainbow was north, stemming the tide and awaiting sufficient visibility for entering the lock. Sea Express 1 left Douglas at 0850, which was 10 minutes ahead of schedule. On departure, the sea was calm, with clear visibility and a cloudless sky. The routine VHF radio call to Liverpool was made at 0852, giving numbers of passengers and crew on board and the vessel’s at the Liverpool Landing Stage. The passage then continued without incident. As the vessel approached the entrance to the River Mersey approach channel, the broadcasts by “Mersey Radio” became clearer, and it became apparent to all three officers that, once in the River Mersey, visibility would be reduced by fog. At 1032, the trainee captain contacted “Mersey Radio” and informed the responding VTSO that Sea Express 1 was 10 minutes from the Bar Light Buoy, and gave his PEC number for the entry. The VTSO acknowledged the information and passed the positions of the other traffic in the River Mersey ahead of Sea Express 1. The VTSO was then asked for an update on the state of visibility in the river. The VTSO replied that there were “patches of ”. No mention was made of the presence of Alaska Rainbow. Sea Express 1 continued her passage inwards, and, at 1111, the trainee captain made radio contact with a , Keewhit, which was proceeding inbound ahead of Sea Express 1. This was to confirm to the tanker that, because of the visibility, Sea Express 1 would remain 0.5 mile of Keewhit. Visibility had reduced substantially and
Sea Express 1 had decreased speed to about 10 knots. At 1117, the pilot of Alaska Rainbow called “Mersey Radio” to inform VTS that Alaska Rainbow was stemming the tide by Twelve Quays Terminal. At 1118, the WD Medway II asked “Mersey Radio” to confirm the name of the vessel stemming the tide, and was told that it was Alaska Rainbow and that she had two tugs in attendance. Although received on board Sea Express 1, these conversations on VHF radio Channel 12 were not noted by the . At the time, the captain, trainee captain and first officer were discussing the state of visibility and the course to steer. A second lookout was arranged, and positioned initially on the bridge wing and subsequently on the forecastle. On Alaska Rainbow, the pilot was trying to maintain the vessel’s position between Twelve Quays Terminal and Seacombe Stage. This task was made more difficult owing to the restricted visibility and the lack of visual clues, such as transits, to estimate changes of heading, , and distance off the lock. While the pilot was trying to maintain Alaska Rainbow in position between the two stages, the vessel moved laterally from close to the west bank of the river to almost mid-river. At 1126, “Mersey Radio” informed Keewhit that Alaska Rainbow was stemming the tide, deciding whether or not to enter Alfred Lock. This VHF radio exchange was missed by Sea Express 1’s captain and trainee captain, who then proceeded to discuss the approach to Liverpool Landing Stage. At 1130, Keewhit called the pilot of Alaska Rainbow on VHF radio Channel 12 and, having changed to VHF radio Channel 6, agreed to pass “green to green”. The initial VHF radio exchange on Channel 12 was again missed by the captain and trainee captain on Sea Express 1 as they and the first officer were discussing the traffic movements and a need to change course to maintain track midriver. At 1131, the trainee captain identified the radar echoes of the tugs Svitzer Bidston and Thorngarth using AIS, and the first officer suggested that the vessel stemming the tide was Alaska Rainbow. At 1134, with Keewhit now passing, the pilot of Alaska Rainbow was involved in discussions with Alaska Rainbow’s master and the junior pilot about their options. The pilot decided that there was insufficient time to enter the lock before high water even if the fog lifted, and so decided to abort the manoeuvre and take Alaska Rainbow back to the anchorage. The junior pilot went to the bridge wing to use his mobile phone to arrange for the to take him off Alaska Rainbow while the vessel was still in the river. Alaska Rainbow, in the meantime, was moving towards the west bank of the river, and ahead towards Seacombe Stage. The pilot ordered the head tug to pull the vessel to starboard, the tug to pull astern, and also ordered an astern movement on the engines. At 1135, Sea Express 1’s captain made an announcement to his passengers and then ordered the to be started. The vessel’s speed was now about 7 knots over the ground. At 1136, “Mersey Radio” informed Sea Express 1 that Leistein, a vessel ahead of Sea Express 1, had turned around and was now outbound. At 1137, the captain informed “Mersey Radio” that Sea Express 1 was off Seacombe Stage and would be turning to port in 2 or 3 minutes time, to which “Mersey Radio” replied that Leistein was the only outbound vessel to the south of Sea Express 1. Once clear of Seacombe Stage, Alaska Rainbow’s pilot gave orders to let the tugs go. The tug Svitzer Bidston was acting as the forward tug for Alaska Rainbow. The tug controls were arranged such that when the tug was in the driving seat, he faced
aft monitoring the tow. On being told that the tug was going to be let go, he stood up and turned to face forward, which was the intended direction of travel. As he turned to look ahead, he was confronted by Sea Express 1 appearing out of the fog at a distance of about 20m. He could see directly between the two hulls of the catamaran. It was 1138, and the following events occurred simultaneously: 1. The tug skipper immediately to port. 2. Alaska Rainbow’s pilot called Sea Express 1 by VHF radio, saying, “Is that you just off Seacombe? We are just about to let the tug go now, we are just aborting and heading out shortly.” 3. The lookout on the forecastle of Sea Express 1 called the bridge using his handheld VHF radio, reporting that he could see a tug fine to starboard. He also pointed towards it. Sea Express 1’s captain replied to Alaska Rainbow’s pilot, saying “Yes, we see you there okay, thank you.” At the same time, the trainee captain ordered that the wheel be put “”. The first officer put the wheel over, and then stated “I’ll get some speed on”. Sea Express 1 began to alter course to port and increase speed. The captain and the trainee captain moved to the starboardbridge wing to monitor clearance from the tug, which passed at about 10m range. As they were moving across the bridge, Alaska Rainbow appeared out of the fog, and the trainee captain told the first officer to “bring her to starboard”, followed by the captain ordering “hard-to starboard” in an attempt to kick the stern away from the bow of Alaska Rainbow. The trainee captain then ordered “”, to attempt to pull away from Alaska Rainbow’s bow. While this was happening, the pilot of Alaska Rainbow again called Sea Express 1, on VHF radio, saying, “Have you got us there Sea Express 1?” This call went unanswered. The aft part of the starboard hull of Sea Express 1 and the of Alaska Rainbow collided, ripping a hole 2.5m by 6.5m in the engine room and jet . This caused rapid of the space, stopping the starboard engines and the two generators. The electrical load then transferred to the generator in the portengine room which overloaded and tripped out, leaving Sea Express 1 temporarily on emergency electrical power only. The impact turned Sea Express 1 to starboard, and a second impact was made with the hulls of the two ships parallel to each other (Figures 7, 8 and 9). Sea Express 1 continued to slide down the starboard side of Alaska Rainbow, and the starboardbridge wing then made contact with Alaska Rainbow’s ladder stowed outboard of the ship’s side railings near the accommodation. This impact ripped away Sea Express 1’s starboardbridge wing roof and windows, and damaged adjacent stowage arrangements. By now, Sea Express 1 was listing to starboard and was trimmed by the stern (Figure 8). The trainee captain had sounded the emergency alarm shortly after the first impact, and the cabincrew were taking charge of the passengers, getting them to sit down and don . With main electrical power restored but only the engines in the port hull available, the vessel was not manoeuvrable, and she drifted upstream with the tide. The small amount of from the port engines, combined with the extra drag from the starboard hull, caused a turn to starboard.
Figure 7 Passenger photograph of the collision Figure 8 Sea Express 1 parallel to Alaska Rainbow 20 seconds after the collision - note and
Alaska Rainbow’s pilot and the captain of Sea Express 1 called “Mersey Radio” within 40 seconds of the collision, the latter saying, “I’m afraid we’ve made contact with the vessel outbound from Alfred Lock. We’re just stopped here for the moment”. The pilot of Alaska Rainbow then again called “Mersey Radio”, saying “Just had a collision with Sea Express 1”. The VTSO responded to this call by saying “That’s noted in the .” The captain of Sea Express 1 then told the first officer to request “Mersey Radio” to arrange tug assistance. “Mersey Radio” then made a general call on VHF radio Channel 12 to “any tugs in the River Mersey”, informing them that Sea Express 1 required assistance. Tugs Adsteam Waterloo and Oakgarth, which were close to the scene of the collision, made their way towards Sea Express 1, and then made fast, with Adsteam Waterloo forward and Oakgarth aft. The deckcrew were instructed to start checking the void spaces, starting with number 5, which was just forward of the engine room, and then progressing forward. The keys to the padlocks attached to the void space tank lids for reasons of security had to be sent from the bridge to the car deck. However, the access lids were opened quickly, and the fact that the voids were dry was reported to the bridge (Figure 10). Meanwhile, on board Alaska Rainbow, the tugs had been released and the pilot had ordered the to be let go. The master ordered the chief officer to check the forward spaces for damage, and to sound the forward tanks. As soon as reports were received on the bridge that there was no water ingress, and no visible damage, the pilot asked for the anchor to be weighed, and confirmed to “Mersey Radio” his intention to return to the anchorage in the vicinity of the Bar Light Buoy. The pilot later spoke to Liverpool Coastguard to confirm that his intention was to return to anchor off the Bar Light Buoy, and that the extent of damage to Alaska Rainbow had been confirmed by the pilot boat as scrapes to the hull paintwork and a small dent in the bulbous bow. Figure 9 Debris from Sea Express 1 on the deck of Alaska Rainbow
Once the tugs Svitzer Bidston and Thorngarth had been released from Alaska Rainbow they made their way towards Sea Express 1 to assist. At the request of the trainee captain, with four tugs in attendance, two of which were made fast, Sea Express 1 was towed slowly across the river towards the Liverpool Landing Stage (Figure 11). Following the collision, the captain and trainee captain made a number of announcements to the passengers, telling them what had happened and asking them to follow the crew’s instructions. At 1154, the VTSO informed Liverpool Coastguard of the collision by telephone, and gave an update of the actions taken so far. Liverpool Coastguard then tasked the lifeboats at New Brighton and at Hoylake, the marine fire craft based at the Liverpool Landing Stage, and the coastguard rescue teams at Hoylake and Crosby. At 1202, the coastguard contacted Merseyside police, and attendance at the Landing Stage was arranged. Fire and ambulance services were also activated, and by 1221, police, fire and ambulance units were reported to the coastguard as being in attendance. As Sea Express 1 approached the stage, the captain spoke to “Mersey Radio” by VHF radio to update the VTSO of the vessel’s situation. At the same time, the trainee captain spoke to the two tugs made fast and suggested that the vessel berthport side to the stage, keeping the damage offshore, and allowing the use of the portmooringdeck, the starboard one being underwater. This was agreed, and the tug skippers arranged between themselves that a starboard turn would be the best manoeuvre. The skipper of Svitzer Bidston, which was standing by the tow, suggested that he move his tug to the offshore side in order to push on if required. The captain then spoke to the terminal by VHF radio to arrange for a gangway to disembark the passengers. The usual gangway was a fixed structure sited for the normal starboard-side-to docking. Fortunately, there was another, mobile, gangway available on the , and this was manoeuvred into position. The first lines from Sea Express 1 went ashore at 1210, and the passengers started to disembark at 1214. The lifejackets were collected from the passengers at the top of the gangway. Once it was thought that all of the passengers Figure 10 Sea Express 1 - access to void space Locking hasp
were off the vessel, the cabin staff swept through the cabin to make sure that no-one had been left on board. At 1226, with the sweep completed, the vessel’s Customer Service Officer (CSO) reported to the captain that all the passengers were off the vessel. The captain then ordered all non-essential staff off the ship. Fire brigade units from Mersey that attended the vessel included two fire appliances, a specialist team and the marine fire and rescue team. Once the passengers were clear of the vessel, the fire brigade units also made a sweep of the vessel to confirm who was left on board, and to discuss with the ship’s officers how they could assist in stabilising the vessel. It was decided to place pumps on board to try and pump out the engine room and jet pump space. However, before this could start, the captain wanted to turn the vessel around so that she would be stern-to the loading ramp in order that an attempt could be made to the passengers’ cars. It was decided that since the water ingress did not seem to be getting any worse, the vessel would be turned on the berth before the pumps were placed on board. Turning the vessel would also bring the damaged hull next to the quay, making access easier. The lines were cast off at 1253, and the ship was re-secured starboard side to at 1322. Fire brigade pumps were then put on board, and an attempt started to pump out the engine room. This had little effect because the spaces were open to the river, and larger pumps were engaged from the Port of Liverpool’s level 2 team. A diver survey was arranged for 1900 during the slack period, and additional lighting for the scene was obtained from the coastguardcoast rescue team. However, the underwater visibility was very poor, and the situation did not permit the diver to access the damaged area, and so the diver survey was postponed. With the pumps , the situation was now stable, and the lifeboat and coast rescue teams stood down at 2050. Salvors were appointed, and at 1100 the following day they took charge of the vessel. Figure 11 Sea Express 1 under tow
1.4 THE DAMAGE TO SEA EXPRESS 1 AND DAMAGE STABILITY The damage to Sea Express 1 was not conclusively assessed until an underwater survey was completed the day after the collision. This identified the main damage as a hole with a maximum extent of 6.5m by 2.5m stretching from the aft end of the jet pump room, forward into the engine room (Figure 12a). A 1.5m vertical split was found in number 4 void, starting 10cm above the damaged (Figures 12b). Substantial damage was also received to the starboardbridge wing (Figures 12c and 12d). Water ingress into the engine room was sudden and, due to the size of the hole, unstoppable. A decision support system for emergency management was provided on board. The damage cases included in the emergency plans represented those which just survive in ideal conditions, i.e. those that retained positive and GZ in flat calm conditions with no passenger, car, or wind . Any increase in damage would result in the vessel . The notes attached to the plans also stated that: in a real flooding situation, the reserves of stability and would be less due to passenger and vehicle movement, wave action, increased during intermediate flooding etc. Therefore this information is provided for guidance only. The master must still exercise his judgement. Figure 12a Still from underwater damage survey showing part of the damage
Figure 12b Damage to Sea Express 1's starboard side Figure 12c Damage to Sea Express 1's starboardbridge wing
Damage case 11.30 (see Figure 13) of the decision support system referred to flooding in the starboardengine room, starboard jet room and void number 5 starboard. Since the jet room and engine room were separated by a non-, these two spaces were considered as one for the purposes of damage stability. Therefore, the vessel could have survived damage in the two aftermost watertight spaces. The statement that the vessel could have survived flooding in the two aftermost spaces had been often repeated by the crew(s) of Sea Express 1, and, without referral to the damage control decision support system, had come to be accepted as meaning the jet pump room and engine room. Therefore, when the jet pump room and engine roomflooded, great concern was raised that the vessel was at the limit of damage survivability, when in fact number 5 void could also have sustained damage. 1.5 TRAINING FOR SEA EXPRESS 1 The HSC 1994 Code provides for the fact that the safety regime and training requirements for officers serving on such vessels differ from those of a conventional ship. Section 18.3 of the Code provides guidelines for the additional training and competences required for service on high speed craft. It also establishes the requirement for type rating certification to be adopted by Administrations to evidence competence in the operation of these craft. See Annex 1 (Chapter 18 of the Code). (MSN) 1740(M) Training and Certification of officers and crew of high speed craft implements in the UK the requirements of Chapter 18 of the Code. Figure 12d Showing damage to starboard hull of Sea express 1 once vessel dry-docked
1.5.1 Type rating The type rating programme implemented by IOMSPC identified 41 individual competencies which would be required for a type rating qualification. These 41 competencies were divided into 14 units, which are in direct relation to the 12 elements of training detailed in the HSC Code, plus a further 2 relating to the company’s . The type rating programme for deckofficers covered three levels of training, namely the training of new first officers, the training of current officers wishing to add new routes or craft to their type rating, and, thirdly, the additional training required for the role of captain. A similar arrangement was in place for engineer officers. Each officer was issued with a Type Rating Programme record book, in which were detailed the individual competencies required for each of the 14 units. Extracts of this programme are shown at Annex 2. The competencies were described in detail in the booklet, at the end of which were spaces for the candidate to indicate that they felt ready for examination; for the Type Rating Instructor (TRI) to indicate that the candidate was thought to be ready for examination; and for the Type Rating Examiner (TRE) to sign the competence as completed. Additionally, a space was available to show for which craft, route and rank the competency had been completed. Once all the competencies were signed off, a Type Rating Certificate was issued by the company. This training scheme was approved by the (MCA), and remained valid on the condition that: 1. Records were maintained such that the authenticity of any certificate issued could be verified. Figure 13 Damage case 11.30
2. Any change in the course content, facilities equipment, or other matter that may affect the delivery of the programme was reported to the inspecting Marine Office without delay. 3. Monitoring of the training programme by the MCA proved to be satisfactory. Full approval for this system was granted by the MCA on 30 April 2004. The examination for type rating consisted of two parts, the completion of the record book, and the assessment of practical ability. For Sea Express 1 there were two company appointed TREs, and three TRIs. The roles of TRE and TRI were separate, with none of the instructors appointed as examiners, and vice versa. All three deckofficers on board Sea Express 1 held the appropriate Type Rating Certificates, with the trainee captain undergoing part of his examination for type rating as captain for this class of vessel. The first officer was also due to start the process of examination for a type rating certificate as captain, having recently completed the PEC examination for Liverpool. 1.5.2 Emergency procedures MSN 1740(M) requires that deck and and other personnel employed on high speed craft (HSC) must undergo a training programme appropriate to their duties on board. This training should include the familiarisation and appropriate STCW95 training programmes required by The Merchant Shipping (Training and Certification) Regulations 1997 (SI 1997/348). For cabin staff, additional minimum training requirements are advised, as they are nominated to assist passengers in emergency situations. This additional requirement is promulgated in the UK by MSN 1579, which reflects the content of Resolution A770(18) Recommendation on Minimum Training Requirements for Personnel nominated to assist Passengers in Emergency Situations on Passenger Ships. There were two types of safety training programmes provided for cabin staff. The first was for new staff or those staff re-joining a company vessel after an absence of 6 months or more, and the second was for staff transferring to a different vessel in the fleet. The training was carried out by a company-appointed instructor, who was also a serving officer in the fleet. For each stage, there was a safety training record book, which led the candidate through the required competencies. Each competency was required to be initialled, to show that the candidate had been instructed in it and a further initial to show that the candidate was considered competent. The front cover of the booklet was then signed by the candidate, instructor and assessor. The company also carried out the following in-house training courses for cabin staff: Fire Prevention and Fire-Fighting Personal Safety and Social Responsibility Crisis Management and Human Behaviour. These were as required by MSN 1740, and followed the requirements of STCW95 with respect to the format and content of the training.
The ship’s staff carried out at least one drill/training exercise per week. All crew members took part in these drills, under the direction of the first officer. The company issued a planned drills matrix for use by the vessel to ensure that the different drills were all practised, and the crew did not conduct the same drill every week. On the day before the accident, the crew had been mustered at general and exercised in vehicle deckfire and full procedures. These procedures changed slightly depending on the number of passengers carried, which in turn determined the number of crew required. Table 1 shows the number of crew required for different numbers of passengers. Each level of manning is described as a mode, and the different modes determine the positioning of the cabin staff during an emergency. Each crew member was identified with a number on the . It was this number which then identified where that person should muster during an emergency. Key players, such as the master, customer service officer, and chief engineer, always had the same muster list number, and so always mustered in the same place and carried out the same tasks. Other crew members mustered as their number on the crew list dictated, and performed the duties required for that position. Table 1 – Crew modes and passenger numbers Mode PassengersCrew (supernumeraries) Total 22 501 22(+9) 532 20 443 20(+11) 474 18 360 18(+13) 391 16 284 16 300 The crew were regularly drilled in their actions under the different modes, with question and answer sessions included in the drill to ensure a thorough understanding of where all of the other “numbers” mustered, and what their duties were. Any supernumeraries carried mustered with the customer service officer, and acted as a pool of manpower. 1.6 PILOT TRAINING AND QUALIFICATION The Mersey Docks and Harbour Company (MDHC) is the (CHA) for the Port of Liverpool, and therefore has responsibility for authorising pilots working in the Port of Liverpool. The CHA does not directly employ the pilots; instead the pilots are self-employed, offering their services through Liverpool Pilotage Services Limited. This company organises the rotas and leave arrangements for the pilots. The training programme for a Liverpool pilot is expected to take at least 5½ years before the pilot qualifies at first class level. It begins with a 6 month period of initial training, during which time the is expected to accompany duly authorised pilots on at least 78 trips, half inward and half outward, half in daylight and half at night. Having completed these “leadsman” trips, the candidate is examined and successful
completion of the examination qualifies the candidate as a class 4 pilot. To advance to the next class, a pilot has to carry out leadsman trips with a pilot qualified at least to the next class. Advancement to a class 1 pilot is therefore through a series of leadsman trips gaining experience as well as by examination. Table 2 shows the training programme as a whole. Table 2 - Liverpool Pilot training programme Class of pilot Expected time in class Restriction Trips to advance Trainee 6 months Not qualified 78 4th 1 year Up to 95 metres 14 3rd 1 year Up to 130 metres 15 2nd 3 years 2 years up to 160 m 1 year up to 180 m 1st Unlimited N/A In addition to the training detailed in Table 2, the MDHC had also introduced training agreements for the pilots, and these were administered by Liverpool Pilotage Services Limited. Each pilot was expected to undertake a period of simulator training at Lairdside Simulation Centre. However, the MDHC had recently been purchased by Peel Ports Group, and the training budget for the current year had yet to be finalised. 1.7 PORT OF LIVERPOOL VTS 1.7.1 Background The purpose of VTS is to improve safety and efficiency of navigation, safety of life at sea and the protection of the and/or the adjacent shore area, worksites and offshore installations from possible adverse effects of maritime traffic1. VTS is defined by the International Maritime Organization (IMO) as shore side systems which range from the provision of simple information messages to ships, such as position of other traffic or meteorological hazard warnings, to extensive management of traffic within a port or waterway. IMO Resolution A857(20) and the VTS Manual 2002 describe three categories of service (Information Service, Navigational Assistance Service and ) by reference to their functionality. The references also specify a standard for training, leading to a certificate (V103). The term VTS is therefore used to describe a system operated by personnel trained to the V103 standard. 1 Taken from section 7.3.11 of “”, prepared in conjunction with the and published by the Department for Transport in 2002.
Regulation 2(1) of The Merchant Shipping (Vessel Traffic Monitoring and Reporting Requirements) Regulations 2004, defines a vessel traffic service as a service: a) which is designed to improve the safety and efficiency of vessel traffic and to protect the environment and which is capable of interacting with that traffic and responding to traffic situations developing in the ; and b) which, in relation to a service operated by the United Kingdom, either alone or in conjunction with one or more states, is a service provided from within the United Kingdom which has been designated by the MCA in writing and is specified in a Merchant Shipping Notice. In the UK, a formal assessment of navigational risk is required under the Port Marine Safety Code (PMSC), and this determines what management of navigation is required in the port. This also determines whether, and to what degree, monitoring and traffic organisation needs to play a role in mitigating risk. The risk assessment at the Port of Liverpool determined that the level of service required was an “Information Service”. This level of service is defined by IMO as: a service to ensure that essential information becomes available in time for onboard navigational decision making. Formal identification of UK VTS within UK waters is provided in MSN 1796 (M+F). In this document, the Port of Liverpool is listed as providing an Information Service. The Port of Liverpool inaugurated the world’s first harbour surveillance radar in 1948. The system in operation at the time of the collision combined radar and CCTV surveillance of the port and approaches, with radio and telephone communication. The service was based around a Norcontrol VTS5060 system, which had been updated in 2006. This recorded the radar, AIS and VHF radio transmissions, which were replayed as part of the investigation (Figure 14). 1.7.2 Operator training and qualification In May 1998, The International Association of Marine Aids to Navigation and Lighthouse Authorities (IALA) issued recommendation V103 to its national members. This provided the standard for training and certification of VTS operators. Qualification required satisfactory completion of a training course at an approved training establishment, plus completion of a VTS Certification Log used to record specific on-the-job training at a specified . This log also recorded the VTS operator certificate number and any on-the-job training completed to allow work at a different VTS centre, as well as any further qualifications to advance to VTS supervisor or Instructor. All VTSOs employed at the Port of Liverpool VTS station had attained the qualification detailed by the IALA V103 recommendation. This was a requirement for the port to provide an Information Service. 1.7.3 Manning and workload During the working week, two clerks were available to take the bookings for pilotage. Under the port charges regime, any booking made out of hours was subject to increased fees, so the vast majority of bookings were made during office hours. It is of note that these hours also included Saturday and Sunday mornings (0800-1000), so bookings could be made at this time without financial penalty. Since there was no clerical support at the weekends, the VTSOmanning the pilotage desk was required
to take the pilotage bookings as well as carry out the normal business of the pilotage desk. To assist the pilotage desk VTSO at such times, the information serviceVTSO occasionally answered the phone or operated the VHF radio for him. 1.7.4 Actions in restricted visibility The additional threat to the safety of shipping on the River Mersey when restricted visibility was reported was dealt with by the VTSOs with reference to an Initial Response Card for Restricted Visibility. This defined the meaning of restricted visibility, and gave the following five actions for the VTSOs to take: 1. Advise shipping of restricted visibility conditions and obtain regular visibility assessment reports from vessels across the VTS area. 2. Call Gladstone Dockmaster to activate the C22 red can boat beacon fog signal. 3. Call Alfred Dockmaster to activate fog signals at Liverpool landing stage. 4. Call Merseyside Passenger Transport Executive MPTE to activate fog signals at Woodside and Seacombe ferry landing stages. 5. Call Tranmere Oil Terminal to activate fog signals at north and south Tranmere oil stages. No further actions were required of the VTSOs. Figure 14 VTS replay
1.7.5 Standing orders for VTSOs The standing orders for VTSOs issued by the MDHC were in the process of being reviewed and re-written at the time of the accident. Reference was made in the original document to job titles that no longer existed, and gave no clear direction to the tasks expected of the VTSOs when on duty. The 11 orders re-iterated the MDHC directions for navigation, but did not include the actions expected of the VTSOs in each case. 1.8 EMERGENCY RESPONSE 1.8.1 Civil Contingencies Act The Civil Contingencies Act 2004 received Royal Assent on 18 November 2004 and was designed to deliver a single framework for civil protection in the UK. The Act is in two substantive parts. Part 1 deals with local arrangements for civil protection, and establishes a framework of roles and responsibilities for local responders. Part 2 focuses on emergency powers, and establishes a framework for the use of special legislative measures that might be necessary to deal with the most serious emergencies. The Act also updates the definition of what constitutes an emergency, which has been defined in Civil Defence legislation dating from 1948, and in the Emergency Powers Act 1920. The 2004 Act defines an emergency as: • An event or situation which threatens serious damage to human welfare; • An event or situation which threatens serious damage to the environment; or • War, terrorism, which threatens serious damage to security. For Part 1 of the Act the definition sets out the range of possible incidents for which local responders must prepare when fulfilling their civil protection duties. For planning purposes in the maritime environment, this includes a rapid accidental sinking of a passenger vessel, and a blockage of access to a waterway (as a result of a maritime accident or deliberate act). To facilitate co-operation at the local level, multi-agency resilience fora were established to review the community risk register and the responses required. Based around the police force areas, incidents on the River Mersey are either within the area of the Merseyside Police Force or the Cheshire Police Force. The community risk registers for both areas had assessed operations. Cheshire, Halton and Warrington Community risk register looked at the straightforward rapid sinking of a passenger vessel, and identified the risk rating as medium, and referred to MCA major incident plans as the capability and barriers already in place to effectively manage this risk. Merseyside community risk register identified three maritime transport hazards. These were a major passenger shipflooding, a major passenger ship stranding, and a collision between a passenger ship and a ship carrying hazardous material. Passenger ship stranding was assessed as high risk, with the other two as medium risk. Again, the capability relied on MCA major incident plans and those of Category 1 responders (ie fire, police and ambulance services), with the barrier of national and international regulation of shipping, and to ensure compliance with the regulations.
1.8.2 Port Marine Safety Code Paragraph 2.1.12 of the PMSC establishes a requirement for emergency planning within a port, and states: A safety management system should include preparations for emergencies – and these should be identified as far as practicable from the formal risk assessment. Emergency plans need to be published and exercised. The accompanying publication to the PMSC is A guide to good practice on port marine operations, and this explains that planning is an effective response to all emergencies since it will secure the following: • A pre-designed structure to work • A swift reaction • Measured decisions • Prioritisation • Co-ordination between other agencies. Those preparing harbour authority emergency plans are advised by the guide to consult other agencies from the start. The other agencies may have statutory obligations to meet in their own right, and the consultation process would ensure that the co-ordination between agencies is effective and avoids duplication of effort. The harbourmaster should give every reasonable assistance to the fire, police, ambulance and other emergency services for dealing with, alleviating or preventing any emergency. The responsibility for search and rescue in harbour limits is also discussed in the guide. HM Coastguard is responsible for co-ordinating the search and rescue phase of any distress within harbour limits, with the harbour authority providing support. This support can be in many forms, an example of which is the use of pilot boats. HM Coastguard will also assist the harbour authority, and provide co-ordination in the search and rescue phase of any incident which is being carried out under the Port Emergency Plan. The harbour authority will remain responsible for managing the overall response to a port emergency. The guide goes on to explain that some port authorities have a Memorandum of Understanding (MoU) with HM Coastguard on lines of responsibility and communication in the event of a port incident. No such MoU existed for the Port of Liverpool. The PMSC requires that marine operations within the port are discharged in accordance with a safety management system. This system should be informed by a formal risk assessment, covering all marine operations in the port, designed to ensure that the risks are tolerable and as low as reasonably practicable. Paragraph 2.2.10 of the PMSC additionally requires that the safety management system should include provision for systematic review of performance based on information from monitoring and from independent audits of the whole system. In the case of the Port of Liverpool risk assessment, the carriage of passengers had not been separately assessed. Furthermore, the safety management system had not been subject to an independent audit.
1.8.3 Operation SEAVAC Operation SEAVAC was a Merseyside police emergency plan for dealing with survivors following a major maritime incident. The examples of the type of incident considered included an aircraft crash in the sea, and a passenger shipsinking. The plan dealt with the requirements for the police to provide casualty reception facilities, and nominated seven landing sites in the Merseyside area for survivors to be brought ashore. It also acknowledged that it was unlikely for there to be a police presence at the scene of the incident, and that the search and rescue phase would be co-ordinated by HM Coastguard. The plan listed the seven sites in turn, reviewed the facilities available nearby, and how the police would establish traffic control, survivor reception, temporary mortuary facilities, and ambulance marshalling at each site. It also detailed the manpower resources necessary to carry out the plan. The plan also noted that the informant for any sea-based emergency was usually the HM Coastguard, and emphasised that in the event that this was not the case, then the coastguard should be informed immediately. The plan, therefore, listed the police force’s reaction to a major maritime incident, and looked at how the police force would deal with large numbers of survivors coming ashore. 1.9 ON BOARD INFORMATION FOR PASSENGERS The HSC 1994 Code requires illustrations and instructions in appropriate languages to be posted in public spaces and be conspicuously displayed at muster stations, at other passenger spaces and near each seat to inform passengers of their muster station, the essential actions they must take in an emergency, and the method of donning lifejackets. Available at each passenger seat on board Sea Express 1 was a card containing safety instructions (Annex 3). This detailed the emergency alarm signal and actions to take following the alarm, instructions for donning a lifejacket, and a children’s lifejacket and, on the reverse, a plan of the cabin area showing the evacuation route. The instructions were in English and French and supported by a safety video shown shortly after departure from port. This safety video included demonstrations of how to don both types of lifejacket carried (Figures 15a and 15b), and a demonstration of the evacuation routes and action to be taken following the emergency alarm. The safety instruction card, however, illustrated only one type of lifejacket. 1.10 PASSENGER QUESTIONNAIRES After an incident involving a passenger vessel, the MAIB normally issues a copy of a passenger questionnaire to all those passengers for whom it has a postal address. The object of this questionnaire is to provide MAIB Inspectors with a description of the incident as seen by passengers located in various parts of the vessel, and to provide an enhanced insight into the events both before and after the incident. The MAIB sent 175 questionnaires to passengers’ addresses provided by IOMSPC. The MAIB received 100 replies, which were reviewed as part of the investigation. A summary of the passenger comments is at Annex 4.
Figure 15a Lifejacket demonstration - type 1 Figure 15b Lifejacket demonstration - type 2
VHF 무선 통신과 같은 다른 형태의 의사소통과 선박 승무원의 집중력에 악영향을 줄 수도 있다. 제한된 시계 중에 근접하여 조선하는 선박에 요구되는 음향 신호에 관한 머지 수로 충돌 규칙을 검토하는 것이 적절해 보인다. b) VHF 무선 호출 Sea Express 1호는 Alaska Rainbow호의 존재에 대해 직접 통보를 받지는 못하였으나, 이 선박은 항만의 작업 주파수인 12번 채널의 여러 VHF 무선 대화에서 언급되었고 이는 Sea Express 1호에서 수신되었다. 특히 Sea Express 1호 앞의 선박인 Keewhit호가 "앨프리드 갑문 앞에 대기 중인 선박"을 호출하였고 VTS가 그 선박이 Alaska Rainbow호라고 알려 주었다. 이는 충돌 12분 전의 일이었으며, 일등항해사는 이를 알아채 언급하였으나 선장과 수습 선장은 이를 인지하지 못하였다. 2.2.3 수습 선장의 시험 a) 형식 자격 제도 형식 자격 시험 절차는 고속 페리의 사관에게 필요한 추가 능력을 시험하고 그 사관이 해당 직위를 맡을 능력이 있음을 확인하도록 하는 견실한 제도이다. IOMSPC가 사용하는 특정 방식은 MCA가 HSC 1994 코드가 요구하는 제도의 좋은 사례로 평가하고 있다. b) 시험 형식 시험 자체는 일부는 실기, 일부는 구술이다. 응시자는 평소의 일상 업무와 비상 훈련을 수행하는 모습을 관찰받고 이론적 측면에 대해 질문을 받는다. 시험 절차는 TRE에게 맡겨져 있었고 회사가 제공한 절차 지침은 없었다. 충돌 당일 수습 선장은 추가 승무원이었다. 선장은 감독 역할과 전반적 지휘권을 유지하였다. 구체적으로 이 시험은 수습 선장의 선박 조종 능력, 특히 리버풀 부잔교 접근에 관한 능력을 검토하는 것이었다. 출항 전 협의의 일부와 더글러스(Douglas)에서 리버풀로 가는 항해 중에 이어진 대화는 선장과 수습 선장이 여러 기상 조건에서 부잔교에 접안하는 방법을 논의하는 내용이었다. 선교팀이 부잔교 접근에 집중하고 있었음을 알 수 있다. 머지강에 안개가 낀 것이 이 논의를 더욱 부각시켰는데, 이제는 안개 속에서 부잔교를 식별할 수 있어야 했기 때문이며, 관심이 "시계 없는(blind)" 접근에 대한 논의로 옮겨졌다. c) 수습 선장의 역할 항해 중 수습 선장의 역할은 선장의 감독 아래 선박의 통제를 맡는 것이었다. Sea Express 1호가 머지강에 들어선 뒤에도 이 역할은 계속되어, 수습 선장은 오른쪽 좌석에 있었고 일등항해사는 중앙선 좌석에서 조타와 기관 조작을 하였다. 선장은 수습 선장 옆에 자리를 잡아 자신도 레이더 화면을 볼 수 있게 하였다.
선박이 강 안쪽으로 계속 나아가면서 시정은 서서히 나빠졌다. 안개 속 항행 시의 예방 조치는 수습 선장이 이행하였으며, 수습 선장은 이 단계에서 항해당직을 계속 책임지고 있었다. 그러나 충돌 직전의 시간대에 선장이 VHF 무선 통신을 넘겨받아 수습 선장이 내린 지시를 확인해 주기 시작하였고, 수습 선장과 일등항해사는 마치 수습 선장에서 선장으로 통제권 이양이 이루어지고 있거나 곧 이루어질 것처럼 항해 상황 갱신을 선장에게 직접 보고하기 시작하였다. 선교팀 내 이러한 역할 조정은 한 번도 논의되지 않았는데, 수습 선장이 동승하지 않고 선박이 평소의 운용 방식으로 운항되었다면 이러한 조정은 필요하지 않았을 것이다. 또한 선장은 시험이 언제 시작되는지를 분명히 알리지 않은 채 수습 선장과 부잔교에 대한 "시계 없는" 접근에 관해 논의하였다. 수습 선장은 앞으로 있을 접안 조선에 주의를 돌리면서 충돌 회피 지원을 제공하는 역할이 훼손되었다. 팀원 누구도 다른 팀원이 어떤 역할을 수행하고 있는지 확실히 알지 못하는 상황에서는 일부 업무가 중복되거나 아예 빠뜨려지기 쉽다. 이 사례에서는 부잔교를 식별하고 "시계 없는 접근"을 논의하는 노력이 중복되어 Alaska Rainbow호가 강에 있다는 사실을 놓치게 되었다.
2.3ALASKA RAINBOW호 2.3.1 Sea Express 1호가 회피 조치를 취할 것이라는 기대 a) 다른 선박의 조선에 대한 의존 Alaska Rainbow호는 예선을 붙인 채 대지에 대해 정지하여 시정이 나아지기를 기다리고 있었으므로, 그 도선사는 다른 모든 선박이 비켜 갈 것으로 기대하였다. 다른 선박들이 지나갈 때 도선사는 Alaska Rainbow호를 강의 서쪽에 유지하였고, 지나가는 선박들은 대체로 동쪽을 이용하였다. 그 결과 우현 대 우현으로 통과하게 되었다. Sea Express 1호가 접근하자 Alaska Rainbow호의 도선사는 같은 절차가 이루어질 것으로 기대하였다. Alaska Rainbow호의 도선사는 Sea Express 1호의 선장도 우현 대 우현 통과 조선을 예상하고 있을 것이며 그에 맞추어 선박을 항행시킬 것이라고 가정하였다. Sea Express 1호가 바로 앞까지 다가오고 나서야 Alaska Rainbow호의 도선사는 Sea Express 1호가 아직 비켜 가는 조선을 하지 않았다는 점이 걱정스러워졌다. 이때는 이미 Alaska Rainbow호가 어떤 조선을 해도 효과가 없을 만큼 늦었고, 그는 Alaska Rainbow호가 탐지되었는지, 그리고 Sea Express 1호가 변침할 것인지를 확인하려고 Sea Express 1호에 VHF 무선 호출을 하였다. VHF 무선 교신을 이렇게 늦게 한 탓에 도선사는 충돌 회피를 Sea Express 1호의 조선에 의존할 수밖에 없었다. 페리가 Alaska Rainbow호의 존재를 알고 비켜 갈지 확신할 수 없었기 때문에, 도선사는 상황을 바로잡으려는 시도로 VHF 무선 호출을 하였다. 훨씬 이른 단계에서 VHF 무선 교신이 이루어졌다면 Sea Express 1호가 Alaska Rainbow호의 존재를 알고 제때 회피조치를 취하도록 보장할 수 있었을 것이다. Alaska Rainbow호의 도선사가 VHF 무선 호출을 했을 때에도 그는 Alaska Rainbow호가 어디에 있는지 말하지 않았고, Sea Express 1호의 응답이 Alaska Rainbow호가 탐지되었음을 확인해 주기는 하였으나 임박한 충돌을 피하기 위해 어떤 조치를 취할 생각인지는 확인해 주지 않았다. b) 항만 충돌 규칙 2002년 6월 MDHC는 머지 수로 충돌 규칙(Mersey Channel Collision Rules)이라는 제목의 간행물을 발행하였다. 이 규칙은 COLREGS에 추가되는 것으로, 여러 규정 가운데 강의 부두에 계류한 선박이 표시하여야 하는 등화와 진수 시의 특별 요건을 상세히 정하고 있다. 이 규칙은 달리 규정한 경우를 제외하고는 COLREGS의 준수를 요구한다. 머지 수로 충돌 규칙에는 제한된 시계에서 취할 조치에 관한 구체적 언급이 없으므로 COLREGS, 특히 규칙 19 제한된 시계에서의 선박의 행동이 적용된다. COLREGS 규칙 19(c)는 레이더만으로 다른 선박의 존재를 탐지하고 근접상태가 전개되고 있거나 충돌의 위험이 있다고 판단한 선박이 충분한 시간적 여유를 두고 회피 조치를 취하도록 요구한다. 규칙 19(e)는 또한 자기 선박의 정횡 앞쪽에 있는 다른 선박과의 근접상태를 피할 수 없는 선박이 침로를 유지할 수 있는 최소 속력까지 속력을 줄이고, 필요하면 모든 전진력을 없애며, 어떤 경우에도 충돌 위험이 사라질 때까지 극도로 주의하여 항행할 것을 요구한다. Alaska Rainbow호의 도선사는 Sea Express 1호와 근접상태가 전개되고 있음을 알고 있었으나, Sea Express 1호가 Alaska Rainbow호의 존재를 알고 있고 비켜 갈 것이라는 잘못된 가정에 따라 규칙 19(c)에 어긋나게 회피 조치를 취하지 않았다. 도선사는 Alaska Rainbow호를 제 위치와 침로에 유지하려고 시도하였으나 선박은 서쪽 둑 가까운 위치에서 강 중앙 가까이까지 옆으로 움직였다. COLREGS 규칙 2(a)는 선원의 통상적 관행이나 특수한 사정이 요구하는 예방 조치를 취할 것을 요구한다. Alaska Rainbow호의 제한된 조종성과 도선사가 위치 유지에 겪던 어려움을 고려하면, 도선사는 Sea Express 1호와 VTS 양쪽과 적극적으로 교신하여 두 곳 모두 Alaska Rainbow호의 위치, 신원, 의도와 이 선박이 다른 교통에 미치는 위험을 알도록 하는 예방 조치를 취하는 것이 현명하였을 것이다. 2.3.2 시콤 부잔교 가까이에서의 부적절한 조선 a) 조류 영향 앨프리드 갑문(Alfred Lock)에 들어가야 하는 선박은 통상 창조류 때 머지강에 진입하여 만조 전에 갑문 앞에 도착하도록 요구된다. 이어 선박은 갑문에 들어가기 전에 선수와 선미에 예선을 붙이고 필요에 따라 세 번째 예선이 대기한다. 이런 선박은 보통 조류를 향하도록 선회하고, 강 서쪽의 시콤 부잔교와 트웰브 키스 터미널(Twelve Quays Terminal) 사이, 주 수로 밖의 갑문 앞에 위치시킨다. 그러나 만조가 가까워지면 낙조류가 강변 가까이에서 흐르기 시작하고 조류 소용돌이의 폭이 점차 넓어진다. 따라서 대기 중인 선박은 강 중앙의 창조류 끝자락과 강변 쪽 낙조류의 시작 사이의 조류선(tide line)이 계속 변하는 것을 경험하게 되며, 이는 선박의 위치와 선수 방향에 대한 영향을 상쇄하기 위해 주기적인 조선을 필요로 한다.
창조류를 향해 서 있을 때, 선박이 대지에 대해 정지해 있으려면 기관을 전진 약 3노트가 나오도록 설정한다. 강변 쪽으로 조금만 움직여도 선박은 낙조류에 들어가게 되고, 자체 속력과 낙조류의 유속 때문에 대지에 대해 움직이게 된다. 선박이 앞으로 나아가기 시작할 것이며, 특히 선박이 시콤 부잔교에 가까워질 때에는 전진 운동을 멈추기 위해 강력한 조선이 필요하다. VTS 레이더, Sea Express 1호 VDR의 레이더 화면, AIS 자료(그림 17)에 기록된 Alaska Rainbow호의 움직임은 도선사가 위치를 유지하지 못하였고 서쪽으로 조선하는 동안 최적 위치를 지나쳐 전개되고 있던 낙조류에 들어갔음을 보여 준다. 이로 인해 선박은 북쪽으로 움직였고, 시콤 부잔교를 피하기 위해 양 기관과 조타, 예선의 도움을 사용한 큰 조선이 필요하였으며, 그 결과 강 중앙 쪽으로 크게 이동하였다. 그림 17 Sea Express 1호(적색)와 Alaska Rainbow호(청색)의 AIS 자료
›b) 예선을 붙인 상태의 선박 조종 리버풀 도선사 훈련 제도는 예선과 함께 대형 선박을 조종하는 것이 길러야 하는 기술임을 인정하고 있었는데, 승급을 위한 특별한 요건이 예선과 함께 작업하는 leadsman 동승이기 때문이다. 또한 레어즈사이드 시뮬레이션 센터의 보수 과정이 이러한 기술에 집중하였으므로, 도선사에게는 레이더 사용과 시계 없는 항행 기법에 대한 충분한 지식이 필요하다는 점도 인식되고 있었다. 그러나 이 두 가지 중요한 기술은 안개 속에서 예선을 붙인 채 위치를 유지하도록 도선사를 구체적으로 준비시키는 맞춤형 훈련으로 결합되어 있지 않았다. 항만에서 안개가 비교적 드물게 끼기 때문에, 훈련생 도선사가 다음 급으로 승급하기 전에 이 기술의 시연을 경험하지 못할 수 있으며, 어떤 경우에도 이미 허가받은 도선사들이 이를 폭넓게 연습하지는 않는다. c) 선박 위치에 대한 주의 Alaska Rainbow호가 조류를 향하도록 선회한 뒤 도선사는 강 안에서 선박의 위치를 감시하도록 레이더를 설정하였다. 동서 방향의 움직임을 감시하기 위해 가변거리환(VRM)을 1.5케이블에 맞추었는데, 이것이 도선사가 선박을 유지하려고 한 둑으로부터의 거리였기 때문이다. 남북 방향의 움직임을 감시하기 위해서는 레이더의 전자방위선(EBL)을 레이더에서 식별 가능한 버컨헤드 독(Birkenhead docks)의 선에 맞추었다. 이 방식은 평행 지표선(parallel index line) 같은 추가 기능에 의존하지 않고 어떤 레이더에서든 사용할 수 있다는 장점이 있었다. 그런 기능은 레이더 장비를 처음 사용하는 도선사에게는 사용법이 바로 분명하지 않을 수 있다. 레이더만으로 선박의 위치를 감시할 때에는 방위 및 거리 표지가 육상의 레이더 반향에 대해 보이는 움직임을 면밀히 지켜보아야 한다. 관찰자는 육지까지의 거리나 방위가 변하는 속도를 추정하여 그 움직임을 상쇄하고 위치를 유지하는 데 얼마나 빠르고 크게 대응해야 하는지를 결정해야 한다. 맑은 날씨에는 이 지역에 자연 중시선(natural transit)이 많아 선박의 어떤 움직임도 쉽게 드러난다. 위치의 작은 변화는 매우 빠르게 상쇄할 수 있다. 그러나 제한된 시계에서는 이러한 시각적 단서가 없으므로 관찰자가 선박이 움직이고 있음을 처음 아는 것은 레이더에서 보이는 거리나 방위의 변화이다. 이 변화를 평가하여 취할 시정 조치의 크기를 결정해야 한다. 따라서 레이더 화면을 계속 관찰하고 있다고 가정하더라도 레이더를 이용한 시정 조치에는 본질적인 지연이 있다. 작은 움직임을 평가하기 어렵기 때문에 최적 위치를 지나칠 가능성이 높아지고, 위치를 되찾으려면 다시 큰 변경이 필요해진다. Alaska Rainbow호의 도선사는 충돌 회피뿐 아니라 선박의 위치 감시에도 레이더를 사용하고 있었으며, 동시에 서로 다른 VHF 무선 주파수로 예선들 및 "Mersey Radio"와 무선으로 교신하고 있었다. 그의 업무량과 당시 상황에서 선박 위치를 계속 감시하는 일의 중요성을 감안하면, 도선사는 Alaska Rainbow호 선교팀의 더 많은 지원을 받는 편이 도움이 되었을 것이다.
2.3.3선교팀의 도선사 지원 부족 a) 안전관리체제 요건 Alaska Rainbow호에서 사용 중이던 안전관리체제에는 도선사 승선(Pilot on Board)이라는 제목의 절차가 있었다. 이 절차는 선교팀과 도선사의 책임을 기술하고 절차와 기록 보관 요건을 설명하였다. 책임을 상술하면서 이 절차는 IMO 결의 A.285 (VIII) 부속서 A(v)를 인용하였는데, 이는 다음과 같이 말한다. 도선사의 임무와 의무에도 불구하고, 그가 승선해 있다고 해서 선장이나 당직 항해사가 선박의 안전에 대하여 지는 임무와 의무가 면제되는 것은 아니다. 이 절차는 또한 선장과 도선사 간의 정보 교환과, 도선사가 도선 카드(pilot card)를 확인할 것을 요구하였다. 이번에는 이 절차가 이행되어 선교 항해일지에 기록되었다. 이 절차는 또한 당직 항해사(OOW)가 해도에 위치를 자주 기입하고, 레이더가 적절히 조정되어 있으며 도선사가 사용 중인 거리 눈금을 알고 있도록 하고, 도선사의 지시가 올바르게 이해되고 이행되도록 할 것을 요구하였다. OOW는 기관 텔레그라프 옆에 배치되었고 추가로 벨 기록부(bell book) 작성 임무를 맡고 있었다. 선교 배치 때문에 OOW는 자신이 서 있는 곳에서 레이더 화면을 볼 수 없었으므로 도선사의 레이더 경계를 도울 수 없었다. 선장의 책임과 조치도 이 절차에 기술되어 있었다. 선장이 선박의 안전에 대해 궁극적인 책임을 지며 도선사는 항행을 보조하기 위해 승선한다고 명시되어 있었다. 충돌 몇 분 전 선장은 선교 날개에서 서성이며 가끔 조타실로 돌아와 레이더와 해도를 보고 있었다. 따라서 그는 도선사의 선박 항행 업무를 돕고 있지 않았고 계속적인 레이더 경계를 유지하는 일도 돕고 있지 않았다. 그 결과 도선사는 선박 선교팀의 감독 없이 혼자 항행과 레이더 경계를 수행하고 있었다. Alaska Rainbow호의 안전관리체제는 OOW가 도선사의 지시를 이행하는 방식의 수동적 지원을 제공하도록 요구하였으나, 선장과 OOW가 적극적 지원을 하도록 하는 구체적 지침은 포함하지 않았다. b) 도선사가 지원을 적극적으로 요구하지 않음 도선사는 좌현 레이더를 볼 수 있고 조타자와 기관 텔레그라프 옆의 삼등항해사를 볼 수 있는 위치에 선교에서 자리를 잡고 있었다. 따라서 그는 항행을 감시하고 자신이 내린 지시가 올바르게 이행되는지 눈으로 확인할 수 있는 위치에 있었다. 그가 선교팀에 도움을 요청했다면, 선교 인원 구성상 선장이나 OOW 가운데 누구든 도울 수 있었을 것이다. 훈련생 도선사도 도선사를 도울 수 있었으나 그렇게 하도록 요청받지 않았다.
2.4선박교통관제 2.4.1 인지 1034부터 충돌 시점까지 Sea Express 1호와 VTS 스테이션은 VHF 무선으로 네 차례 교신하였다. 매번 교통 동향이 선박에 전달되었으나 어느 메시지에도 Alaska Rainbow호는 언급되지 않았다. 충돌 1분 남짓 전에 선장이 VTS를 호출하여 Sea Express 1호가 부잔교 쪽으로 좌현 선회를 하려 한다고 운영자에게 알렸다. Alaska Rainbow호가 Sea Express 1호 우현 선수 쪽 2케이블 이내에 있었는데도, 정보 제공 서비스 VTSO는 자신의 판단으로 이 선회와 상충할 수 있는 선박으로 Leistein호 한 척만 경고하였으며, 이 선박은 플럭링턴 뱅크(Pluckington Bank) 남쪽으로 2마일 넘게 떨어져 있었다. 충돌에 이르는 동안 정보 제공 서비스 VTSO는 Alaska Rainbow호가 Sea Express 1호에 근접해 있다는 점을 구체적으로 전달하지 않았다. 그 이유는 VHF 12번 채널에서 Alaska Rainbow호가 이미 여러 번 언급된 데다, Alaska Rainbow호가 앨프리드 갑문으로 들어가고 있는 것으로 보였고 Sea Express 1호는 안전하게 비켜 지나가는 것으로 보였기 때문이다. 이어 그의 주의는 선회하여 이제 출항 중인 Leistein호와, 이 변화를 Sea Express 1호 선장에게 알려야 할 필요성에 쏠렸다. VTSO는 Alaska Rainbow호에 관한 상황을 잘못 해석하였다. 제한된 시계에서는 접근하는 선박들이 서로의 상황을 눈으로 판단할 수 없으므로, 정확한 전체 상황 파악을 유지하고 이를 극복하기 위해 VTS의 감시와 교신을 늘리는 것이 필수적이다. 2.4.2 업무량 리버풀항의 교통 이동은 대체로 만조 전후 시간대에 집중되었으며, 이때 두 VTSO의 업무량이 최고조에 이른다. 만조 시각이 0800에서 1000 사이인 토요일이나 일요일 오전에는, 평소 바쁜 시간대가 도선 데스크 VTSO가 추가로 도선 예약을 받아야 하는 시간과 겹쳤다. 정보 제공 서비스 VTSO가 가끔 전화를 받거나 VHF 무선기를 조작하여 도선 데스크 VTSO를 돕는 것이 통상적 관행이었다. 이번 사례에서 중요한 요인은 아니었으나, 만조 시각을 감안할 때 두 VTSO의 평소 업무량이 최고조에 이를 가능성이 높은 시간대에 도선 예약을 받으면서 생기는 추가 업무량은, 정보 제공 서비스 VTSO가 머지강의 선박에 다른 교통의 위치, 신원, 의도에 관한 정보 서비스를 제공하는 본연의 기능에서 주의가 흐트러지는 결과를 낳을 가능성이 있었다. 2.4.3 인원 편성 VTSO 2명으로 VTS 스테이션을 운영하는 것은 평상 조건에서 평일의 일상적 운영을 담당하기에는 충분할 수 있다. 그러나 도선 데스크 VTSO가 앞으로 있을 도선 업무에 대한 예약을 다수 받아야 하거나, Mersey Radio VTSO가 제한된 시계로 인해 안전한 교통 흐름을 보장하기 위해 선박 움직임을 더 면밀히 지켜보아야 할 때는 업무량이 크게 늘어날 수 있다. 이런 때에는 두 VTSO 가운데 누구도 상대를 도울 여유가 없을 수 있다.
2.4.4안개 대응 절차 VTS 구역에 안개가 끼는 것은 안전한 항행에 큰 장벽이다. 제한된 시계 속에서 좁은 수역을 항행하는 데 따르는 위험은 VTS가 제공할 수 있는 추가 지원, 즉 모든 선박에 다른 교통의 위치, 신원, 의도, 움직임을 자주 갱신하여 알려 주고 해당 구역의 선박에 시정 상태도 자주 알려 주는 것으로 완화할 수 있다. 이러한 강화된 수준의 지원에는 VTSO의 추가 조치가 필요하며, 항만당국은 이를 "안개 대응 절차(fog routine)"의 형태로 상세히 정할 수 있다. 충돌 당시 리버풀항 VTS 스테이션에는 확립된 "안개 대응 절차"가 없었다. 업무는 제한된 시계 초기 대응 카드에 열거된 조치 외에는 안개 때문에 취해진 추가 조치 없이 평소처럼 진행되었다. 그 이유는 머지강에서 안개가 비교적 드물게 발생하므로 구체적인 "안개 대응 절차"를 도입하는 것은 불필요하다고 보았기 때문이다. 그러나 안개가 드물더라도 그에 따른 위험이 받아들일 수 없을 만큼 높다면 그 위험을 완화하기 위한 절차가 마련되어야 한다. VTS 스테이션이 "안개 대응 절차"의 일부로 도입할 수 있는 조치는 다음과 같다. • 걸려 오는 전화를 자동응답기로 돌리기 • 당직 인원 추가 배치 • VTS 구역을 통항하는 선박으로부터 시정 상태에 대한 상세한 보고 받기 • VTS 구역의 현재 시정과 교통 동향에 관한 정기적이고 더 잦은 방송 • 선박 움직임에 대한 제한. 2.4.5 위험성 평가 PMSC는 항만 해사안전의 모든 측면에 대한 국가 기준을 도입하였다. 이는 항만당국이 항만을 안전하게 운영하기 위한 법적 권한과 의무에 대하여 책임을 지는 척도를 마련하였다. 항만당국은 규칙, 계획, 절차가 전면적 위험성 평가와 안전관리체제를 참조하여 유지될 때에만 자신의 의무를 효과적으로 이행할 수 있으며 따라서 PMSC를 준수할 수 있다. 위험성 평가 과정은 새로운 위험 요소와 변화된 위험이 적절히 식별되고 다루어지도록 지속적이어야 한다. 안전관리체제는 문서화되어야 하며 정기적으로 또는 상황이 요구할 때 공식적으로 검토되어야 한다. Sea Express 1호와 Alaska Rainbow호의 충돌은 항만 안전관리체제의 관련 부분에 대한 전면적 검토의 계기가 되어야 한다. 위험성 평가를 수행할 때 항만당국은 "해사 운영 우수실무 지침"을 참조하여야 한다. 이 문서는 PMSC에 부속되며 개별 위험성 평가에서 고려할 구체적 사항을 개괄한다. 리버풀항 VTS는 선박에 정보 제공 서비스를 제공하였으며, 이는 선내 의사결정에 필수적인 정보가 선박에 제때 제공되도록 보장하였어야 한다. 제한된 시계 때에도 통상의 VTS 절차가 개정되지 않았다는 사실은선원이 합리적으로 기대할 수 있었던 수준의 정보를 받지 못하고 있었음을 보여 준다. 더구나 리버풀항 VTS 구역에서 제한된 시계가 자주 발생하지 않는다는 점은, 제한된 시계가 발생했을 때 VTS 당직 인원이 제한된 시계에서의 운영이 요구하는 추가 업무량을 감당하도록 기대할 것이 아니라 강화된 통제 조치가 필요하다는 신호가 되었어야 한다. PMSC가 요구하는 리버풀항 안전관리체제의 독립적 감사가 있었다면 이러한 부족함이 확인되었을 수도 있다.
2.5충돌 후 조치 2.5.1 예선의 조치 충돌 당시 강에 있던 예선 4척은 신속하게 Sea Express 1호에 연결하고 이어 선박의 통제를 맡았다. Sea Express 1호는 트웰브 키스 터미널 쪽으로 표류하고 있었으며, 예선들의 조치가 이 구조물과의 충돌을 막았다. 예인이 이루어진 뒤 선박과 예선 사이의 교신은 최소한이었다. Sea Express 1호의 선장은 선박을 리버풀 부잔교로 가져가 좌현 접안하기를 원한다고 확인해 주었고, 예선들이 그 뜻대로 수행하였다. 선장이 통제하는 지시를 내리지는 않았으며, Sea Express 1호가 안전하게 접안한 것은 예선 선장들 사이의 협력 덕분이었다. 접안한 상태에서 Sea Express 1호를 돌릴 때에도 같은 방식이 채택되었다. 선장이 예선에 필요한 것을 알려 주었고 예선 선장들이 자신의 기량과 경험으로 선박을 안전하게 돌려놓았다. 2.5.2 승객 통제 비상 후 승객 통제는 Sea Express 1호에서 자주 훈련되는 동작이다. 이는 고속선 승무원에게 요구되는 추가 훈련의 일부이다. 비상 경보가 울리자 객실 승무원들은 비상 집합 위치에 집합하였다. CSO는 보관함에서 메가폰을 꺼내 승객에게 자리를 찾아 앉고 좌석 밑에 있는 구명조끼를 착용하라고 알렸다. 이는 비상 훈련의 일부이며, 방송 내용은 메가폰 보관함에 비치된 사전 작성 대본이다. 회수된 승객 설문 결과는 모든 승객이 방송을 분명히 들을 수 있었던 것은 아님을 보여 준다. 승객이 방송을 들었는지는 앉은 위치에 달려 있었다. 승객들이 현장에서 찍은 영상을 검토하면, 운영자는 메가폰을 한 방향으로만 향하여 든 채 있었고, 양쪽의 승객에게 방송하는 동안 말하는 사람의 머리는 움직였으나 메가폰은 움직이지 않았다. 그러나 승객들은 나머지 객실 승무원들의 격려와 안내로 자리에 앉아 구명조끼를 착용하였다. 승무원들은 또한 구명조끼 착용에 어려움을 겪는 승객들이 자리를 잡도록 돕고, 상부 선수 쪽 주 객실의 보관 장소에서 어린이용 구명조끼도 가져왔다. CSO는 충돌 9분 후에 모든 승객이 앉았고 모두 구명조끼를 착용했다고 선장에게 보고하였다. 이 시간에 승객을 주 객실 구역에 집합시키고, 모든 승객이 주 객실에 있도록 화장실과 기타 승객 구역을 점검하는 시간이 포함되었음을 고려하면, 이 9분은 잘 활용된 것이었다.
선장이 승객 구역 선내 방송(PA) 장치로 한 안내는 차분하고 권위 있는 어조로 전달되었으며, 가능한 한 많은 정보를 전하는 동시에 승객을 진정시키는 효과도 있었다. 이것이 바로 필요한 것이었고, 정기적인 상황 전달은 승객 사이의 공황을 막는 데 도움이 되었다. 페리가 접안하고 탑승교가 설치되자 승객들이 하선하기 시작하였다. 승객들은 상륙하기 전에 구명조끼를 벗어 탑승교 위쪽에 배치된 승무원에게 건네 달라는 요청을 받았다. 승객들이 탑승교 아래에 이르렀을 때 이들을 도울 안내 인력은 거의 없었다. 해상 소방대는 부잔교에 기지를 두고 있었고 통보를 받은 뒤 1분이 안 되어 현장에 도착하였다. 곧이어 소방차 2대, 구급차, 경찰 부대가 뒤따랐다. 그러나 처음 상륙한 승객들에게는 도와줄 직원이 없는 것처럼 보였다. 여객 터미널의 육상 직원이 처음 승객이 상륙한 지 몇 분 뒤에야 통제를 맡아 승객들을 터미널 건물 쪽으로 안내하기 시작하였다. 여객 터미널이 충돌 사실을 통보받은 때와 첫 승객이 상륙한 때 사이에는 시간이 거의 없었다. 그러나 비상 서비스가 지원을 시작할 수 있도록 사람들을 현장에서 서둘러 벗어나게 하려는 긴박함은 부족했던 것으로 보인다. 선박에서 승무원이 구역을 점검하여 승객이 모두 내렸음을 확인하였다. 그러나 이 방법으로는 충돌 후 승객이 뛰어내렸거나 바다에 떨어졌을 가능성을 알 수 없었다. 그런 경우였다면 이 방법으로는 승객이 한 명 없어졌다는 사실을 아무도 알지 못했을 것이다. 승객 정보를 수집하도록 육상에 설치된 지점은 세 가지 목적에 기여할 것이다. 첫째, 승객과 페리 회사 사이의 정보 교환의 구심점이 된다. 또한 부상자 분류 장소 역할도 한다. 셋째로, 아마 가장 중요하게, 모든 승객의 소재가 확인되었음을 확증해 준다. 2.5.3 구명조끼 MAIB에 회수된 승객 설문에는 어린이용 구명조끼의 비치와 성인용 구명조끼의 보관에 대한 우려가 제기되었다. 어린이용 구명조끼는 상부 선수 쪽 주 객실에 보관되어 있었고, 비상 훈련의 일부로 객실 승무원 한 명이 필요에 따라 이를 가져오도록 지정된다. 이로 인해 어린이용 구명조끼 제공이 지연되었으나, 승객 집합의 전체 소요 시간에 크게 영향을 주지는 않았다. 선박에는 두 가지 다른 종류의 구명조끼가 갖추어져 있었고 둘 다 착용 방법이 출항 안전 영상에서 설명되었다. 두 종류 모두 착용 시 착용자의 허리에 묶는 끈이 달려 있다. 승객 좌석 밑의 구명조끼 보관 장소에는 구명조끼를 접어 넣어야 한다. 끈은 구명조끼를 보관 장소에 맞는 작은 형태로 묶는 데 사용된다. 끈을 너무 느슨하게 묶으면 시간이 지나면서 풀리고, 늘어진 끈은 걸려 넘어질 위험이 되며 구명조끼를 손상시킬 수도 있다. 끈을 너무 꽉 묶으면 비상 시 구명조끼를 입기 어렵다. 일부 승객이 구명조끼가 묶인 방식 때문에 어려움을 겪었으나 이것도 승객 집합의 전체 소요 시간에 크게 영향을 주지는 않았다.
각 승객 좌석에 비치된 안전 지침 카드에는 구명조끼 한 종류만 그려져 있었다. 이는 비치된 두 종류의 구명조끼 중 하나였으나, 일부 좌석에서는 안전 지침 카드가 좌석 밑에 보관된 구명조끼의 종류를 보여 주지 않는다는 뜻이었다. 승객이 다른 종류의 구명조끼를 마주한 채 지침을 따르려 했다면 혼란이 생길 가능성이 있었다. 2.5.4 VTS의 조치 위험성 평가 과정을 통해 VTS 서비스가 필요하다고 결정한 뒤, 머지 도크 앤 하버 컴퍼니는 선박에 정보 제공 서비스를 제공하기로 추가로 결정하였다. VTS 스테이션은 이 기능을 위해 인원과 장비를 갖추었다. VTS의 역할 일부는 VTS 구역 안의 비상 상황에 대응하는 것이다. 여기에는 사전에 계획된 대응의 개시와 항만 내 조치를 위한 조정 지점 역할이 포함될 것이다. 수립된 계획에는 효과적이고 조율된 비상 대응을 이룰 수 있도록 비상 서비스 및 지방 당국 비상 계획 담당자와의 상호작용이 포함되어야 한다. 민간 비상사태법 2004는 이 보고서 1.8.1절에 상술한 바와 같이 지방 당국이 계획을 마련하도록 요구한다. 협의를 거쳐 마련된 이 지역 계획은 해상 수색구조(SAR)에 대한 책임이 MCA에 있다고 선언하였다. 지방 당국과 비상 서비스는 해안경비대가 머지강에서 발생한 사건을 즉시 알게 될 것이라는 인식을 가지고 있었다. 그러나 해안경비대는 항만 운영 채널인 VHF 12번 채널을 정기적으로 청취하지 않았다. 따라서 해안경비대의 대응은 사건을 통보받는 데 달려 있었다. 이번 경우 해안경비대는 충돌 16분 후인 1154에야 통보를 받았으므로 대응이 지연되었다. 해안경비대가 상황에 대응하는 데 사용한 계획은 일반적인 절차였고 항만에 특화된 대응이 아니었다. VTS의 역할은 또한 VTS 구역 내 항행 위험 요소에 관한 정보를 선박에 제공하는 것이다. 다른 항만 이용자에게 운항 불능 선박의 존재와 예선들이 그 선박을 안전한 곳으로 예인하려는 노력을 알리는 구체적인 교통 방송은 이루어지지 않았다. 다만 사건과 무관한 선박이 VTS를 호출했을 때 운영자는 그들이 사건을 알고 있는지 확인을 요청하였으나 그 이상의 정보는 주지 않았다. 통항하는 선박의 승무원이 VHF 무선 작업 채널을 청취하고 있을 것이므로 모든 VHF 무선 대화를 들었을 것이라는 기대였다. 충돌 지점 일대의 시정이 약 100m에 머물렀다는 사실은, 접근하는 모든 선박이 VHF 무선 대화를 우연히 듣는 것으로만 상황을 알 수 있었음을 뜻한다. 이는 안전한 항행에 큰 장벽이었고, VTS 스테이션은 모든 항만 이용자에게 상황과 진전 사항을 알리는 데 적극적이지 않았다. PMSC에 부속된 "항만 해사운영 우수실무 지침"이라는 간행물은 항만당국이 위험성 평가를 수행할 때 이해관계자와의 충분하고 효과적인 협의가 중요함을 강조한다. 위험성 평가 과정은 지속적이어야 하므로, 항만당국이 위험성 평가가 유효하도록 보장할 만큼 충분히 자주 관련 이해관계자를 만나는 절차가 있어야 한다.
승객 운송과 관련된 구체적 위험, 특히 비상 대응에 관한 위험이 별도로 평가되지 않았다는 사실은, 앞으로 리버풀항에 여객선 기항 빈도를 크게 늘리려는 의도가 있었음을 감안하면 이러한 회의에서 외부 이해관계자들이 미리 지적했을 수도 있었다. 2.5.5 충돌 통보 Sea Express 1호의 선장은 사고 발생 몇 초 후 VTSO에게 사건을 올바르게 알렸다. 그러나 선박이 거의 즉시 우현으로 기울고 선미 쪽으로 트림이 졌으며 전원과 우현 기관을 사용할 수 없게 되었는데도, VTSO에게 한 그의 메시지는 "죄송합니다만, 앨프리드 갑문에서 나가던 선박과 접촉했습니다. 우리는 지금 이곳에 정지해 있습니다."였다. 이 메시지에는 긴박감이 거의 담겨 있지 않았고 상황이 얼마나 심각한지에 대한 암시도 없었다. 이 호출에는 응답이 없었는데, 응답이 이루어지기 전에 Alaska Rainbow호의 도선사가 VTSO를 호출하여 "방금 Sea Express 1호와 충돌했습니다"라고 말하였기 때문이다. 이 호출에 대한 VTSO의 대응은 도선사에게 호출 내용이 "항해일지에 기록되었다"고 말하는 것이었다. 이 단계에서 VTSO는 충돌이 얼마나 심각한지, 양 선박이 입은 손상이 어떤지 전혀 알지 못하였고 더 많은 정보를 알아내려는 시도도 하지 않았다. 이 지역의 구조 계획은 해안경비대가 조정 역할을 맡는 것에 의존하였다. 이 시점에서 육상에서 사건을 아는 사람은 VTSO뿐이었는데, 그가 리버풀 해안경비대에 정보를 전달하는 데 16분이 걸렸다. VTSO가 비상 상황에 대응하여 계획된 조치를 수행하도록 상기시켜 주는 비상 조치 점검표 한 벌을 갖추고 있었다면 도움이 되었을 것이다. 여기에는 연락해야 할 전화번호 목록이 포함될 수 있다. MCA에 대한 통보를 신속히 하기 위해 리버풀 해안경비대 상황 데스크에 직통 회선을 설치하여 해안경비대 당직 사관과의 통신이 거의 즉각 이루어지도록 할 수 있다.
원문 보기
2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 EXPRESS 1 2.2.1 did not detect Alaska Rainbow a) Setup Sea Express 1’s recorded the radar display which was in use by the captain and trainee captain. The radar was set up with the display orientated north-up and off-centred, showing true trails, with the input from the log, giving . It was therefore sea-stabilised. This set up has the advantage that the “true trails” give an indication of and speed through the water and therefore of the aspect of a target. A major disadvantage to using a seastabilised display in confined waters is that everything that is moving relative to the water will create a true trail. This includes all land targets, and in a river situation, the radar screen will quickly become cluttered by these trails. A ground-stabilised display will indicate a target’s course and but, perhaps more importantly, the true trails will only be generated for returns that are moving over the ground. The land targets will not generate true trails, so the picture is much clearer. The VDR records images of the radar screen as seen by the bridge team, at 15 second intervals. Sea Express 1’s VDR replay showed that Alaska Rainbow and her attendant tugs were visible on the radar screen, and with the true trail showing that the vessel had moved initially to the west, come close to Seacombe Stage, and then moved towards mid-river in the moments before the (Figures 16a, 16b and 16c). However, the trails created by the radar return from Seacombe Stage and other land targets, partially obscure the return from Alaska Rainbow, making identification of the moving target difficult. Had the radar been set up to have a ground speed input, the trails from the land would not have been present, clearing the picture, and any target moving over the ground would have developed a trail, highlighting its presence to the bridge team. Although the trainee captain had identified the radar echoes of the tugs Svitzer Bidston and Thorngarth mid-river, and the first had suggested that the vessel stemming the tide was Alaska Rainbow 7 minutes before the collision, the bridge team did not detect the vessel’s movement back into the river after coming close to the Seacombe Stage. b) Distraction The captain, trainee captain and first officer of Sea Express 1 all held PECs for the of Liverpool. The approach to the port was being made in , a relatively infrequent event, and although the vessel was a very frequent visitor to Liverpool, it was not common for the approach to Liverpool to be made in fog. Preparations, therefore, took the format of a teaching session, with the
Figure 16a Radar display recorded on Sea Express 1's VDR at 11:33:25 Figure 16b Radar display recorded on Sea Express 1's VDR at 11:34:53 Sea Express 1 Keewhit Alaska Rainbow and tugs Sea Express 1 Keewhit Alaska Rainbow and tugs Tugs Oakgarth and Adsteam Waterloo
captain referring the trainee captain to methods for identifying the landing stage in fog. With the attention of the trainee captain now focussed on identifying the landing stage and preparing to be examined on berthing the vessel, and no other member of the bridge team allocated the task of support, other targets were not noticed or their movements tracked. 2.2.2 Bridge team did not hear Alaska Rainbow a) Windows open When Sea Express 1 initially entered the fog, the , who was standing on the port side of the was asked to open the bridge window. When the second lookout was called to the bridge, the starboard side window was also opened. The VDR record shows that the on Seacombe Stage was referred to as having been heard. Alaska Rainbow and her two attending tugs were not fog signals as required by and by the Mersey Channel Collision Rules because it was not the normal practice of the to do so. The decision not to sound the signals meant the possibility that Sea Express 1 would be alerted to the presence of Alaska Rainbow by this method was removed. Had Alaska Rainbow and her attending tugs been sounding fog signals, it is probable that the lookouts on Sea Express 1 would have heard them in time for Sea Express 1’s bridge team to react to the situation and take effective avoiding action. However, the degree of noise generated by a number of vessels sounding fog signals while manoeuvring in close Figure 16c Radar display recorded on Sea Express 1's VDR at 11:37:03 Sea Express 1 Keewhit Alaska Rainbow and tugs Tugs Oakgarth and Adsteam Waterloo
proximity in confined waters could potentially have an adverse effect on other forms of communication, such as radio communications, and on the concentration levels of ship staff. A review of the Mersey Channel Collision Rules on the sound signals required of vessels manoeuvring in close proximity during periods of restricted visibility would appear to be appropriate. b) VHF radio calls Although Sea Express 1 was not directly informed of the presence of Alaska Rainbow, the vessel was mentioned in a number of VHF radio conversations on Channel 12, the port’s working frequency, and received on board Sea Express 1. Significantly, Keewhit, the vessel of Sea Express 1, called the “vessel waiting off Alfred Lock”, to be told by that the vessel was Alaska Rainbow. This was 12 minutes before the collision and, although noted and mentioned by the first officer, was not acknowledged by the captain and trainee captain. 2.2.3 Examination of trainee captain a) Type system The Type Rating Examination procedure is a robust system to ensure that the additional competencies required of an officer on board a high speed ferry are examined, and the officer’s competence to the post is confirmed. The particular method employed by IOMSPC is held by the as a good example of the system required by the 1994 Code. b) Format of examination The examination itself is part practical, part oral. The candidate is observed as he or she carries out their normal routines and emergency drills, and is questioned on theoretical aspects. The examination procedure was left to the TRE, with no procedural guidance provided by the company. On the day of the collision, the trainee captain was an additional . The captain maintained a supervisory role and overall command. Specifically, the examination was to review the trainee captain’s ability, particularly with respect to the approach to the Liverpool Landing Stage. Part of the pre-sailing discussions, and the continuing conversations during the crossing from Douglas to Liverpool, involved the captain and trainee captain discussing methods of going alongside the stage under various weather conditions. It can be seen that the bridge team was concentrating on the approach to the stage. The presence of fog on the River Mersey had further heightened these discussions, since there was now a requirement to be able to identify the landing stage in fog, and attention was diverted to discussing the “blind” approach. c) Role of trainee captain The role of the trainee captain during the crossing was to take control of the vessel under the supervision of the captain. Once Sea Express 1 entered the River Mersey, this role continued, with the trainee captain remaining in the right-hand seat and the first officer in the seat, steering and controlling the engines. The captain positioned himself next to the trainee captain, so that he also could see the radar screen.
As the vessel continued into the river, the slowly worsened. The precautions for were implemented by the trainee captain, who, at this stage, remained in charge of the . However, during the period immediately leading up to the collision, the captain took over the VHF radio communications and started to affirm the instructions given by the trainee captain, and the trainee captain and first officer started to report navigational updates directly to the captain, as though a of control from the trainee captain to the captain was taking place or about to take place. At no time was this adjustment to the roles within the bridge team discussed, which would have been unnecessary had the trainee captain not been present and the vessel had been operating in her normal operational mode. Additionally, the captain engaged the trainee captain in discussions on the “blind” approach to the landing stage without giving a clear indication of when the examination was to start. In diverting his attention to the forthcoming , the trainee captain’s role of providing collision avoidance support was compromised. In a situation where no member of the team is entirely sure which roles other members of the team are carrying out, some of the duties are likely to be either duplicated or missed altogether. In this case, duplication of effort in identifying the landing stage and discussing the ‘blind approach’ led to Alaska Rainbow’s presence in the river being missed. 2.3 ALASKA RAINBOW 2.3.1 Expectation that Sea Express 1 would take avoiding action a) Reliance on ’s manoeuvre With Alaska Rainbow stopped over the ground with tugs attached and waiting for the visibility to improve, her pilot expected all other vessels to keep clear. As the other vessels passed, the pilot maintained the of Alaska Rainbow towards the west side of the river, and the ships generally kept to the east. This resulted in a starboard-to-starboardpassing. With the approach of Sea Express 1, the pilot of Alaska Rainbow was expecting the same procedure to occur. Alaska Rainbow’s pilot assumed that Sea Express 1’s captain would be expecting a starboard-to-starboardpassing manoeuvre, and would navigate his vessel accordingly. It was not until Sea Express 1 was very close ahead that the pilot of Alaska Rainbow became concerned because Sea Express 1 had not yet manoeuvred to keep clear. By this time, it was too late for any manoeuvre on the part of Alaska Rainbow to have an effect, and he made a VHF radio to Sea Express 1 in an attempt to confirm Alaska Rainbow had been detected and that Sea Express 1 was going to alter course. By leaving his VHF so late, the pilot had to rely on the manoeuvre of Sea Express 1 to avoid the collision. Since he could not be sure that the ferry was aware of Alaska Rainbow’s presence, and would keep clear, the pilot made the VHF radio call in an attempt to remedy the situation. A VHF radio exchange at a much earlier stage could have ensured that Sea Express 1 was aware of Alaska Rainbow’s presence and that Sea Express 1 would take avoiding
action in good time. Even when the pilot of Alaska Rainbow made the VHF radio call he failed to mention where Alaska Rainbow was, and although the reply from Sea Express 1 confirmed that Alaska Rainbow had been detected, it did not confirm whether Sea Express 1 intended to take any action to avoid the imminent collision. b) PortCollision Regulations In June 2002, the MDHC issued a publication entitled Mersey Channel Collision Rules. These rules are in addition to the COLREGS, and among other arrangements detail the lights to be carried by vessels alongside jetties in the river, and special requirements for ship . These rules require compliance with COLREGS except where the rules require otherwise. There is no specific mention in the Mersey Channel Collision Rules of actions to be taken in restricted visibility, and therefore COLREGS apply, particularly Rule 19 . Rule 19(c) of the COLREGS requires a vessel which detects by radar alone the presence of another vessel, and determines that a is developing and/or exists, to take avoiding action in ample time. Rule 19(e) additionally requires a vessel that cannot avoid a close-quarters situation with another vessel forward of her to reduce her speed to a minimum at which she can be kept on her course, to take all way off if necessary, and in any event navigate with extreme caution until the danger of collision is over. Although Alaska Rainbow’s pilot was aware that a close quarters situation was developing with Sea Express 1, he took no avoiding action, contrary to Rule 19(c), on the incorrect assumption that Sea Express 1 was aware of the presence of Alaska Rainbow and would keep clear. Although the pilot attempted to keep Alaska Rainbow in position and on course, the vessel nevertheless moved laterally from a position close to the west bank to almost mid-river. Rule 2(a) of the COLREGS requires precautions to be taken in the or in special circumstances. In view of the restricted of Alaska Rainbow, and the difficulty the pilot was having in maintaining position, it would have been wise for him to have taken the precautionary measure of proactively communicating with both Sea Express 1 and VTS to ensure that both were aware of Alaska Rainbow’s position, identity and intentions, and the hazard that the vessel presented to other traffic. 2.3.2 Inappropriate manoeuvre close to Seacombe Stage a) Tidal effects Vessels which are required to enter Alfred Lock are routinely required to enter the River Mersey on the and arrive off the lock before . The vessel will then make fast to tugs forward and aft with a third tug standing by, as required, before entering the lock. Such vessels will normally be swung to the tide, and positioned off the lock between Seacombe Stage and Twelve Quays Terminal to the west side of the river, and clear of the main channel. However, as high water approaches, the ebb starts to run close to the , and the tidal progressively increases in width. Waiting vessels therefore experience a continually changing tide line between the last of the flood tide in the centre of the river and the
start of the ebb near the bank, which requires periodic manoeuvring to counter the effects on the vessel’s position and . Stemming the flood tide, the engines would be set to give approximately 3 knots ahead for a vessel to remain stationary over the ground. With a small movement towards the bank, the vessel would enter the ebb stream, and would move over the ground due to its own speed and the rate of the ebb flow. The vessel would start moving ahead, requiring a vigorous manoeuvre to arrest the ahead movement, particularly as the vessel closes with Seacombe Stage. The movements of Alaska Rainbow, as recorded by VTSradar, the radar display of Sea Express 1’s VDR and data (Figure 17), indicate that the pilot was not maintaining position and during a manoeuvre to the west, overshot the optimum position and entered the developing ebb stream. This caused the vessel to move north, requiring a large manoeuvre with both engines and steering, and the tugs to assist in avoiding Seacombe Stage, resulting in a significant move towards midriver. Figure 17 AIS data from Sea Express 1 (red) and Alaska Rainbow (blue)
b) Ship handling with tugs attached The training scheme for pilots in Liverpool acknowledged that manoeuvring a with tugs is a skill that has to be developed since a particular requirement for advancement is leadsman trips working with tugs. It was also recognised that pilots needed good knowledge of the use of radar, and blind techniques, since the refresher course at Lairdside Simulation Centre concentrated on these skills. However, these two important skills were not brought together in bespoke training, to specifically prepare a pilot for maintaining position with tugs attached in fog. Due to the relatively low frequency of fog in the port, demonstration of this skill may not be experienced by the before advancement to the next class of pilot, and, in any event, it is not extensively practised by those pilots already authorised. c) Attention to ship’s position Once Alaska Rainbow had swung around to stem the tide, the pilot set up the radar to monitor the vessel’s position in the river. To monitor any east/west movement, a was set at 1.5 cables as this was the distance off the bank that the pilot attempted to keep the vessel. To monitor north/south movement, the radar was used to line up with the line of the Birkenhead docks, which was identifiable on the radar. This system had the benefit that it could be used on any radar, without resource to additional functions, such as parallel index lines, whose use may not be immediately apparent to the pilot using the radar equipment for the first time. When monitoring a ship’s position by radar alone, a close watch would need to be kept on the apparent movement of the bearing and range markers against the radar returns of the land. The observer has to estimate the rate at which the range to the land or the bearing is changing to decide how fast and how large the reaction is needed to counter the movement and maintain position. In clear weather, any movement of the ship would be readily apparent, due to the wealth of natural transits in the area. Small changes in position can be countered very quickly. However, in restricted visibility, when these visual clues are not available, the first that the observer knows that the vessel is moving is a change in range or bearing seen on the radar. This change has to be assessed to decide on the size of the corrective action to take. There is therefore a delay inherent in the use of the radar in taking corrective action, even assuming that the radar display is under continuous observation. Due to the difficulty in assessing small movements, the chance of over- the optimum position is increased, requiring further large alterations to regain the position. The pilot of Alaska Rainbow was using the radar to monitor the vessel’s position, as well as for collision avoidance, and, at the same time, was communicating by radio with tugs and “Mersey Radio” on different VHF radio frequencies. Given his workload and the importance of continuously monitoring the vessel’s position in the prevailing circumstances, the pilot would have benefited from increased support from Alaska Rainbow’s bridge team.
2.3.3 Lack of support to the pilot from the bridge team a) requirements The safety management system in use on Alaska Rainbow contained a procedure entitled Pilot on Board. This described the responsibilities of the bridge team and pilot and described the procedures and record keeping requirements. In detailing the responsibilities, the procedure quoted Resolution A.285 (VIII), Annex A(v), which states: Despite the duties and obligations of a pilot, his presence on board does not relieve the or from their duties and obligations for the safety of the ship. The procedure also required a master-pilot information exchange and for the pilot to sight the pilot card. On this occasion, the procedure was carried out and recorded in the bridge. The procedure also required the officer of the watch (OOW) to frequently plot the position on the chart, ensure that the radar was properly adjusted and that the pilot was aware of the in use, and that the pilot’s orders were correctly understood and carried out. The OOW was positioned at the telegraph and additionally tasked with maintaining the bell book. Due to the layout of the bridge, the OOW could not see the radar screen from where he was standing, so was unable to assist the pilot in carrying out the . The master’s responsibility and actions were also described in the procedure. It stated that the master was ultimately responsible for the safety of the vessel, and that the pilot was on board to assist with the navigation. In the minutes before the collision, the master had been pacing on the , and occasionally returning to the wheelhouse to look at the radar and chart. He was therefore not assisting the pilot in his task of navigating the vessel, nor was he assisting in keeping a continuous radar lookout. As a consequence, the pilot was carrying out the navigation and radar lookout alone, with no oversight from the vessel’s bridge team. Although Alaska Rainbow’s safety management system required the OOW to provide reactive support by carrying out the pilot’s orders, it included no specific instructions for the master and OOW to give proactive support. b) Pilot not proactive in requiring support The pilot had stationed himself on the bridge in such a position that he could see the portradar and observe the and the third officer at the engine room telegraph. He therefore was in a position to monitor the navigation and visually verify that any orders he gave were carried out correctly. Had he requested assistance from the bridge team, the on the bridge was such that it would have been possible for either the master or OOW to assist. The trainee pilot could also have assisted the pilot, but was not called upon to do so.
2.4 VESSEL TRAFFIC SERVICES 2.4.1 Perception Between 1034 and the time of the collision, Sea Express 1 and the VTS station communicated with each other four times by VHF radio. On each occasion traffic movements were passed to the vessel, but in none of the messages was Alaska Rainbow mentioned. A little over a minute before the collision, the captain called VTS to inform the operator that Sea Express 1 was about to turn to port towards the landing stage. With Alaska Rainbow less than 2 cables off the of Sea Express 1, the warned only of one ship, Leistein, which might, in his opinion, conflict with the turn, and this was south of Pluckington Bank and over 2 miles away. During the period leading up to the collision, the information serviceVTSO did not specifically communicate the proximity of Alaska Rainbow to Sea Express 1 because, in addition to the number of references made to Alaska Rainbow on VHF Channel 12, Alaska Rainbow appeared to be proceeding inward to Alfred Lock, and Sea Express 1 appeared to be passing clear. His attention was then taken by Leistein, which had turned around and was now outbound, and the need to make Sea Express 1’s captain aware of this change. The VTSO had misinterpreted the situation with respect to Alaska Rainbow. In restricted visibility, increased VTS monitoring and communication are essential to maintain an accurate overview and to overcome the inability of approaching vessels to determine each other’s circumstances by sight. 2.4.2 Workload Traffic movement in the Port of Liverpool was largely restricted to a period around high water, at which time the workload of both VTSOs was at a peak. On a Saturday or Sunday morning, when the was between 0800 and 1000, the normally busy period coincided with the desk VTSO having to additionally take pilotage bookings. It was normal practice for the information serviceVTSO to assist the pilotage desk VTSO by occasionally answering the phone or operating the VHF radio for him. Although not significant in this particular case, the additional workload created by taking pilotage bookings during a period when, given the time of high water, the normal workload of both VTSOs was likely to be at a peak, had the potential to result in the information serviceVTSO becoming distracted from his main function of providing an information service to vessels in the River Mersey on the position, identity and intentions of other traffic in the river. 2.4.3 Manning The VTS station manning with two VTSOs may be sufficient to cover the working week day-to-day operation of the station under normal conditions. However, the workload can be significantly increased for the pilotage desk VTSO if he is additionally required to take many bookings for future acts of pilotage, and for the Mersey Radio VTSO if there is restricted visibility, necessitating a closer watch on vessel movements to ensure safe traffic flow. At such times, there may be no opportunity for either VTSO to assist the other.
2.4.4 Fog routine The presence of fog in the is a considerable barrier to safe navigation. The risks involved in navigating in confined waters in restricted visibility can be mitigated by the additional assistance that VTS can provide in keeping all vessels frequently updated with the position, identity, intentions and movements of other traffic, as well as providing vessels in the area with frequent updates on the state of visibility. This increased level of support requires additional VTSO actions which can be detailed by a port authority in the form of a “fog routine”. At the time of the collision, the Port of Liverpool VTS station did not have an established “fog routine”. Work carried on as normal, with no additional actions being taken because of the fog other than those listed in the Initial Response Card for Restricted Visibility. The rationale for this was that fog is a relatively rare occurrence in the River Mersey, and so the introduction of a specific “fog routine” was considered unnecessary. However, although fog is rare, where the consequent risks associated with it are nevertheless unacceptably high, a routine should be established to mitigate the risks. Measures that could be introduced by VTS stations as part of a “fog routine” include: • Diversion of incoming telephone calls to an answer machine. • Providing additional duty staff. • Detailed reports on the state of visibility from vessels navigating through the VTS area. • Regular, more frequent broadcasts on the prevailing visibility and traffic movements in the VTS area. • Restrictions on ship movements. 2.4.5 The introduced a national standard for every aspect of port marine safety. It established a measure by which harbour authorities are accountable for their legal powers and duties by which they run their ports safely. A harbour authority can only effectively its duties, and therefore comply with the PMSC, if its rules, plans and procedures are maintained by reference to a full risk assessment and safety management system. The process of risk assessment must be continuous such that new hazards and changed risks are properly identified and addressed. The safety management system should be documented and formally reviewed periodically or when circumstances require. The collision between Sea Express 1 and Alaska Rainbow should trigger a full review of the relevant aspects of the port’s safety management system. When undertaking risk assessments, harbour authorities should refer to “A guide to good practice on marine operations”. This document accompanies the PMSC and outlines the specific points to be considered for individual risk assessments. The Port of Liverpool’s VTS provided an Information Service to vessels; this should have ensured that essential information was made available to vessels in time for onboard decision-making. The fact that the normal VTS procedures were not revised
at times of restricted visibility indicates that the mariner was not receiving the level of information he could reasonably have expected. Further, that restricted visibility does not occur frequently in the Port of Liverpool VTS area should have triggered the need for enhanced control measures when it did occur, rather than expecting VTS duty staff to absorb the additional workload that operation in restricted visibility demands. An independent audit of the Port of Liverpool’s safety management system as required by the PMSC might have identified this shortfall. 2.5 ACTIONS FOLLOWING THE COLLISION 2.5.1 Actions by tugs The four tugs available on the river at the time of the collision acted with speed in connecting to Sea Express 1 and then taking control of the vessel. Sea Express 1 was towards the Twelve Quays Terminal, and the action of the tugs prevented a collision with this structure. Once the tow was established, the communication between vessel and tugs was minimal. Sea Express 1’s captain confirmed that he wanted the vessel to be taken to the Liverpool Landing Stage, and to port-side-to, and the tugs carried out these wishes. There were no controlling directions given by the captain, and it was through the co-operation between the tug masters that Sea Express 1 was safely berthed. When Sea Express 1 was turned round on the berth, the same system was adopted. The captain told the tugs what was required, and the tugmasters, using their skill and experience, turned the vessel round safely. 2.5.2 control The control of passengers following an emergency is an often exercised evolution on Sea Express 1. It is part of the additional training required of staff on high speed craft. When the emergency alarm sounded, the staff mustered at their positions. The CSO took a megaphone from its stowage and informed the passengers that they should find a seat, sit down and put on the which could be found under the seat. This is part of the emergency drill, and the announcement made is a prepared script kept in the megaphone stowage. Returned passenger questionnaires indicate that not all the passengers could clearly hear the announcements made. Whether or not the passengers heard the announcements depended on where they were sitting. A review of video taken on scene by passengers, shows that the operator was holding the megaphone pointing in one direction only, and as announcements were made to passengers on either side, the speaker’s head moved but the megaphone did not. However, the passengers were encouraged and guided by the rest of the cabin staff to sit down and put on their lifejackets. The staff also assisted those passengers who were having problems donning their lifejackets to get settled, and also collected lifejackets for children from their stowage in the upper forward main cabin. The CSO reported to the captain 9 minutes after the collision that all the passengers were seated and that they all had lifejackets on. Considering that this included the time taken to muster the passengers in the main cabin area, and carry out a sweep of the toilets and other passenger areas, to ensure all passengers were in the main cabins, these 9 minutes had been well used.
Announcements from the captain over the passenger space were delivered in a calm and authoritative tone, and while passing on as much information as was available, also had the effect of calming the passengers. This was precisely what was needed, and the regular updates provided assisted in preventing panic among the passengers. Once the ferry was alongside, and the gangway rigged, the passengers began to disembark. They were asked to remove their lifejackets before getting ashore, and hand them to crew members stationed at the top of the gangway. Once the passengers got to the of the gangway, there was little in the way of reception staff to assist. The marine brigade units were based at the Landing Stage, and once alerted were on scene in under a minute. They were shortly followed by two fire tenders, ambulance and police units. But for the first passengers ashore there did not appear to be any staff to assist. Shore staff from the passenger terminal did start to take charge and usher the passengers towards the terminal building some minutes after the first passengers were ashore. There was little time between the passenger terminal being informed of the collision, and the first passengers coming ashore. However, there appears to have been little urgency in getting people away from the scene so that the emergency services could start to assist. The vessel was confirmed clear of passengers when the crew swept through the spaces. However, this method did not account for any passenger who might have jumped or fallen overboard after the collision. Had that been the case, no-one would have had any idea that a passenger was missing using this method. A position ashore, set up to collect passenger details, would serve three purposes. Firstly it would provide a focus for the exchange of information between passengers and the ferry company. It would also act as a clearing station for any injuries. Thirdly, and perhaps most importantly, it would confirm that all the passengers were accounted for. 2.5.3 LifejacketsPassenger Questionnaires returned to the raised concerns over the provision of children’s lifejackets and the stowage of adult lifejackets. The children’s lifejackets were stowed in the upper forward main cabin, and part of the emergency drill is for a member of the cabincrew to be assigned to collect them as necessary. This caused a delay in the provision of children’s lifejackets, but one which did not significantly affect the overall time for passenger muster. The vessel was equipped with two different types of lifejacket, the wearing of both being explained in the departure safety film. Both are fitted with tapes to tie around the wearer’s waist when worn. The lifejacket stowage, below the passengers’ seats, requires that the lifejackets are folded. The tapes are used to tie the lifejacket into a compact shape to fit the stowage. If the tapes are tied too loosely, over time they will undo, and the trailing tapes will present a trip hazard, which may also damage the lifejacket. If the tapes are tied too tightly, then in an emergency the lifejacket will be difficult to don. Although difficulty was experienced by some passengers with the way the lifejackets were tied up, it again did not significantly affect the overall time for passenger muster.
The safety instruction card provided in each passenger seat illustrated only one type of lifejacket. This was one of two types of lifejacket carried, but it meant that at some of the seats the safety instruction card did not illustrate the type of lifejacket stowed beneath the seat. There existed a potential for confusion if passengers had attempted to follow the instructions while faced with the alternative type of lifejacket. 2.5.4 Actions by VTS Having decided through the risk assessment process that a VTS service was required, Mersey Docks and Harbour Company further decided that it would offer an information service to shipping. The VTS station was manned and equipped for this function. Part of the role of VTS is to react to emergency situations within the VTS area. This would include the initiation of pre-planned reactions, and acting as a co-ordinating point for the actions within the port. The plans produced should include the interaction with the emergency services and local authority emergency planners, such that an effective, co-ordinated response to the emergency can be achieved. The Civil Contingencies Act 2004 requires local authorities to have plans available as detailed in Section 1.8.1 of this report. These local plans which were developed after consultation, declare that the responsibility for (SAR) at sea lies with the MCA. The local authorities and emergency services were under the impression that the would be immediately aware of an incident occurring on the River Mersey. However, the coastguard did not routinely monitor the port operations channel, VHF radio Channel 12. Its reaction was therefore dependent on being informed of the incident. On this occasion, the coastguard response was delayed, since it was not informed until 1154, 16 minutes after the collision. The plan the coastguard used to respond to the situation was a generic procedure and not a port-specific response. The role of VTS is also to provide information to shipping concerning hazards to navigation in the VTS area. No specific traffic broadcasts were made to alert other port users to the presence of a disabled vessel and of the efforts of the tugs to tow the vessel to safety. However, where a vessel not associated with the incident called VTS, the operator did ask for confirmation that they were aware of the incident, but gave no further information. The expectation was that the transiting ships’ staff would be monitoring the VHF radio working channel and therefore would have heard all the VHF radio conversations. The fact that the visibility remained at about 100m in the area of the collision meant that any approaching vessel would only be aware of the situation through overhearing the VHF radio conversations. This was a significant barrier to safe navigation, and the VTS station was not proactive in informing all port users of the situation and of developments. The publication entitled “”, which accompanies the PMSC, highlights the importance of full and effective consultation with stakeholders when a harbour authority undertakes its risk assessments. As the risk assessment process should be continuous, there should be a process for ensuring that the harbour authority meets relevant stakeholders sufficiently regularly to ensure
that its risk assessments remain valid. The fact that the specific risks associated with the carriage of passengers had not been separately assessed, particularly with regard to emergency response, might well have been highlighted in advance by external stakeholders at such meetings, especially given the intention to significantly increase the frequency of calls to the Port of Liverpool in the future. 2.5.5 Notification of collision The captain of Sea Express 1 correctly informed the VTSO of the incident seconds after it had happened. However, even though the vessel had almost immediately listed to starboard and trimmed by the , had lost electrical power and the use of the starboard engines, his message to the VTSO was “I’m afraid we’ve made contact with the vessel outbound from Alfred Lock. We’re just stopped here for the moment”. There was little sense of urgency contained in this message, or any indication of how serious the situation was. This call was not replied to, because before a reply could be made, the pilot of Alaska Rainbow called the VTSO and stated “Just had a collision with Sea Express 1”. The VTSO’s response to this call was to tell the pilot that the call had been “noted in the logbook”. At this stage, the VTSO had no idea how serious the collision was, or of the damage sustained by either vessel, and made no attempt to discover any further information. The rescue plans for the area depended on the coastguard taking a co-ordinating role. At this moment, the only person ashore who knew of the incident was the VTSO, and he then took 16 minutes to pass the information to Liverpool Coastguard. It would have benefited the VTSO to have available a set of emergency action checklists, to prompt the VTSO to carry out planned actions in response to an emergency. This could include a of telephone contacts to be made. To expedite informing the MCA, a direct line to the Liverpool Coastguard incident desk could be installed, such that communication to the Coastguard watch officer is almost instantaneous.
radar
returns. [2.2.1] Factors related to Alaska Rainbow: 2. The
did not proactively communicate with
Sea
Express 1 and
at an early stage to ensure that all parties were aware of the hazard that Alaska Rainbow presented to other traffic, resulting unnecessarily in the development of a
. [2.3.1] 3. The
pilot
was not proactive in requiring support, and neither the
nor the
was proactive in providing support to the
pilot
, thereby unnecessarily increasing the
pilot
’s workload. [2.3.3] 4. Neither the
pilot
nor the
master
ordered fog signals to be sounded, thereby omitting a means by which
Sea
Express 1 might have been alerted to the presence of Alaska Rainbow. [2.2.2] Factors related to the
VTS
station: 5. No fog routine was in place, thereby preventing a closer watch on vessel movements being maintained to ensure safe traffic flow at times of
. [2.4.3] [2.4.4] 6. The
VTS
duty staff were expected to absorb the additional workload that operation in
restricted visibility
demands; an independent audit of the
of Liverpool’s
might have identified this shortfall. [2.4.5] 7. A review of the Mersey Channel
Rules on the sound signals required of vessels manoeuvring in close proximity during periods of
restricted visibility
would appear to be appropriate. [2.2.2] 3.2 OTHER SAFETY ISSUES IDENTIFIED DURING THE INVESTIGATION ALSO LEADING TO RECOMMENDATIONS Factors related to
Sea
Express 1: 1. The initial communication made by
Sea
Express 1’s captain to
VTS
lacked urgency and detail as to the seriousness of the situation, thereby delaying an appropriate external emergency response. [2.5.5] Factors related to the
VTS
station: 2. The VTSOs were not proactive in ascertaining further information following the initial report of the
collision
and in notifying Liverpool
, thereby delaying an appropriate emergency response. [2.5.4] [2.5.5]
3.3 SAFETY ISSUES IDENTIFIED DURING THE INVESTIGATION WHICH HAVE NOT RESULTED IN RECOMMENDATIONS BUT HAVE BEEN ADDRESSED (SEE SECTION 4) Factors related to
Sea
Express 1: 1. The allocation of
duties in preparation for the type
examination was unclear, resulting in the presence of other vessels in the vicinity to be missed during the period immediately leading up to the
collision
. [2.2.1] [2.2.2] [2.2.3] Factors related to Alaska Rainbow: 2. The
pilot
was insufficiently practiced in maintaining Alaska Rainbow’s
in the prevailing circumstances, resulting in the vessel moving significantly between the west bank and mid-river. [2.3.2] Factors related to the
VTS
station: 3. Additional workload created by the VTSOs having to take
bookings at a time when performance of their normal duties was at a peak, had the potential to result in the
responsible for the
becoming distracted. [2.4.2] 4. Specific risks associated with the carriage of
had not been separately assessed, particularly with regard to emergency response. [2.5.4]
which will be followed by an audit. The review will: - Include
on ships as part of the formal
risk assessment
process - Add a procedure for
in
to the
Safety Management System
(see Annex 5), and - Determine whether the risks require an upgrade of the
VTS
to a
. • Requested Liverpool
Services Ltd to include in its simulator training use of tugs in
, especially when stemming the tide. • Commenced a system of annual audits of Liverpool
Pilotage
Services Ltd. • Issued
9-2007 concerning procedures for
navigation
in
restricted visibility
(see Annex 5). 4.2 ISLE OF MAN STEAM PACKET COMPANY LIMITED HAS ARRANGED FOR: • Captain, trainee captain and first
to attend a
at a UK College, with specific reference to
,
restricted visibility
and
. •
Bridge Team Management
Training, already in place, to be extended to all captains and navigating
officers
throughout the fleet. • Customer services personnel involved to complete a refresher
course
in Crowd Management Training, which included discussion of the lessons learnt. • A Service Engineer to test the
functionality of
Sea
Express 1 (found to be satisfactory). In addition, the company has: • Issued a memorandum to all of its vessels with a view to amending its Route Operating Manual, requiring masters to clearly stipulate roles and duties of all concerned prior to, and during, type
instruction and examination. • Carried out an independent audit of
management and
navigation
equipment on board the company’s other vessels. • Undertaken a technical evaluation of the possibility of integrating
information with
radar
/
. • Introduced
Cards to its procedures which will form part of its Emergency Procedures in case of evacuation.
to: • be proactive in providing support to pilots; • challenge decisions or actions taken by pilots at an early stage so that, when required, effective corrective action can be taken to prevent accidents. Mersey Docks and Harbour Company is recommended to: 2007/188 Complete its review of compliance with the requirements of the
with particular reference to: •
operations, ensuring that an effective fog routine is established and that the
VTS
station is sufficiently manned to absorb the additional workload that operation in
demands, and that VTSOs are proactive in ascertaining further information in the event of incident; •
best practice, highlighting the need for pilots to proactively communicate with approaching vessels and
VTS
at an early stage to avoid unnecessary development of a
; to be proactive in requiring support from the ship’s
bridge team
; and to sound appropriate fog signals in
restricted visibility
. 2007/189 Following satisfactory completion of its review into
PMSC
compliance, invite the
to conduct a
PMSC
verification visit to the
of Liverpool. 2007/190 Review the Mersey Channel
Rules with respect to sound signals required by vessels manoeuvring in close proximity during periods of
restricted visibility
.
September 2007 Safety recommendations shall in no case create a presumption of blame or liability
complement required for operating the craft, deploying and
survival craft, the supervision of
, vehicles and cargo in both normal and emergency conditions as defined in the Permit to Operate. The
crew
complement should be such that two
are on duty in the operating
when the craft is
, one of whom may be the
; .7.
crew
qualifications and training, including competence in relation to the particular type of craft and service intended, and their instructions in regard to safe operational procedures; .8. restrictions with regard to
, rostering of crews and any other arrangements to prevent
including adequate rest periods; .9. the training of
crew
in craft operation and emergency procedures; .10. the maintenance of
crew
competence in regard to operation and emergency procedures; .11. safety arrangements at terminals and compliance with any existing safety arrangements, as appropriate; .12. traffic control arrangements and compliance with any existing traffic control, as appropriate; .13. restrictions and/or provisions relating to
, to operation by night or in
, including the use of
and/or other electronic aids to
, as appropriate; .14. additional equipment which may be required, due to the specific characteristics of the service intended, for example, night operation; .15. communication arrangements between craft,
radio stations, base ports radio stations, emergency services and other ships, including radio frequencies to be used and watch to be kept; .16. the keeping of records to enable the Administration to verify: .16.1. that the craft is operated within the specified parameters; .16.2. the observance of emergency and safety drills/procedures;
.16.3. the hours worked by the operating ; .16.4. the number of on board; .16.5. compliance with any law to which the craft is subject; .16.6. craft operations; and .16.7. maintenance of the craft and its in accordance with approved schedules; .17. arrangements to ensure that equipment is maintained in compliance with the Administration’s requirements, and to ensure co-ordination of information as to the serviceability of the craft and equipment between the operating and maintenance elements of the operator’s organization; .18. the existence and use of adequate instructions regarding: .18.1. loading of the craft so that weight and centre of gravity limitations can be effectively observed and cargo is, when necessary, adequately secured; .18.2. the provision of adequate fuel reserves; .18.3. action in the event of reasonable foreseeable emergencies; and .19. provision of contingency plans by operators for foreseeable incidents including all land-based activities for each scenario. The plans should provide operating crews with information regarding (SAR) authorities and local administrations and organizations which may complement the tasks undertaken by crews with the equipment available to them see footnote . 18.1.4. The Administration should determine the maximum allowable distance from a base or after assessing the provisions made under 18.1.3.
18.2Craft documentation . The Administration should ensure that the craft is provided with adequate information and guidance in the form of technical manual(s) to enable the craft to be operated and maintained safely. The technical manual(s) should consist of a Route Operational Manual, Craft Operating Manual, Training Manual, Maintenance Manual and Servicing Schedule. Arrangements should be made for such information to be updated as necessary. 18.2.1 Craft operating manual . The craft operating manual should contain at least the following information: .1. leading of the craft; .2. description of the craft and its equipment; .3. procedures for checking the integrity of compartments; .4. details arising from compliance with the requirements of chapter 2 likely to be of direct practical use to the in an emergency; .5. damage control procedures; .6. description and operation of systems; .7. description and operation of auxiliary systems; .8. description and operation of and warning systems; .9. description and operation of electrical equipment;
.10. loading procedures and limitations including maximum operational weight, centre of gravity and distribution of load; .11. description and operation of detection and fire-extinguishing equipment; .12. drawings indicating the structural fire protection arrangements; .13. description and operation of radio equipment and navigational aids: .14. information regarding the handling of the craft as determined in accordance with chapter 17; .15. maximum permissible speeds and towing loads, where applicable; .16. procedure for dry-docking or lifting, including limitations; .17. in particular, the manual should provide information, in clearly defined chapters approved specifically by the Administration, relating to: .17.1. indication of emergency situations or malfunctions jeopardizing safety, required actions to be taken and any consequential restrictions on operation of the craft or its ; .17.2. evacuation procedures; .17.3. operating limitations including the worst intended conditions; .17.4. limiting values of all machinery parameters requiring compliance for safe operation. In regard to information on machinery or system failures, data should take into account the results of any FMEA reports developed during the craft design. 18.2.2 Route operational manual . The route operational manual should include at least the following information: .1. evacuation procedures; .2. operating limitations including the worst intended conditions such as sea height, sea and air temperatures, and wind conditions; .3. procedures for operation of the craft within the limitations of .2; .4. the elements of applicable contingency plans for primary and secondary rescue assistance in the case of foreseeable incidents, including land-based arrangements and activities for each incident; .5. arrangements for obtaining weather information; .6. identification of the "base (s)"; .7. identification of the person responsible for decisions to cancel or delay voyages; .8. identification of complement, functions and qualifications; .9. restrictions on of crew; .10. safety arrangements at terminals; .11. traffic control arrangements and limitations, as appropriate; .12. specific route conditions or requirements relating to , operations by night and in , including the use of or other electronic aids to ; and.13. communication arrangements between craft, radio stations, base ports radio stations, emergency services and other ships, including radio frequencies to be used and watch to be kept. 18.2.3 Training manual . The training manual, which may comprise several volumes, should contain instructions and information, in easily understood terms illustrated wherever possible, on evacuation, and damage control appliances and systems and on the best methods of survival. Any part of such information may be provided in the form of audio-visual aids in lieu of the manual. Where appropriate the contents of the training manual may be included in the craft operating manual. The following should be explained in detail: .1. donning and immersion suits, as appropriate; .2. muster at the assigned stations; .3. boarding, and clearing the survival craft and rescue boats; .4. method of launching from within the survival craft; .5. release from launching appliances; .6. methods and use of devices for protection in launching areas, where appropriate; .7. illumination in launching areas; .8. use of all survival equipment; .9. use of all detection equipment; .10. with the assistance of illustrations, the use of radio life-saving appliances; .11. use of drogues; .12. use of and accessories; .13. recovery of survival craft and rescue boats including stowage and ; .14. hazards of exposure and the need for warm clothing; .15. best use of the survival craft facilities in order to survive; .16. methods of retrieval, including the use of helicopter rescue (slings, baskets, stretchers), breeches-
18.2.4Maintenance and servicing manual . The craft maintenance and servicing manual should contain as a minimum: .1. detailed, illustrated description of all craft structure, installations and all installed equipment and systems required for safe operation of the craft; .2. specifications and quantities of all replenishable fluids, and of structural materials which may be required for repairs; .3. operational limitations of machinery in terms of values of parameters, vibration and consumption of replenished fluids; .4. limitations of of structure or machinery components, including lives of components requiring calendar or operating time replacement; .5. detailed description of procedures, including any safety precautions to be taken or special equipment required, to remove and install main and auxiliary machinery, transmissions, propulsion and lift devices and flexible structure components; .6. test procedures to be followed subsequent to replacement of machinery or system components or for malfunction diagnosis; .7. procedure for lifting or dry-docking the craft, including any weight or attitude limitations; .8. procedure for weighing the craft and establishing the of (LCG); .9. where craft may be dismantled for transportation, instructions should be provided for dismantling, transport and reassembly; .10. a servicing schedule, included in the maintenance manual or published separately, detailing the routine servicing and maintenance operations required to maintain the operational safety of the craft and its machinery and systems.
18.3Training and qualifications 18.3.1. The level of competence and the training considered necessary in respect of the and each should be laid down and demonstrated in the light of the following guidelines to the satisfaction of the Administration in respect of the particular type and model of craft concerned and the service intended. More than one crew member should be trained to perform all essential operational tasks in both normal and emergency situations. 18.3.2. The Administration should specify an appropriate period of operational training for the master and each member of the crew and, if necessary, the periods at which appropriate re-training should be carried out. 18.3.3. The Administration should issue a type certificate to the master and all having an operational role following an appropriate period of operational/simulator training and on the conclusion of an examination including practical test commensurate with the operational tasks on board the particular type and model of craft concerned and the route followed. The type rating training should cover at least the following items: .1. knowledge of all on-board propulsion and control systems, including communication and , steering, electrical, hydraulic and pneumatic systems and and pumping; .2. the failure mode of the control, steering and propulsion systems and proper response to such failures; .3. handling characteristics of the craft and the limiting operational conditions; .4. communication and procedures; .5. intact and damage and survivability of the craft in damage condition; .6. location and use of the craft’s life-saving appliances, including survival craft equipment; .7. location and use of escapes in the craft and the evacuation of ;
.8. location and use of protection and fire-extinguishing appliances and systems in the event of fire on board; .9. location and use of damage control appliances and systems including operation of doors and pumps; .10. cargo and vehicle stowage securement systems; .11. methods for control of and communication with in an emergency; and .12. location and use of all other items listed in the training manual. 18.3.4. The type certificate for a particular type and model of craft should only be valid for service on the route to be followed when it is so endorsed by the Administration following the completion of a practical test over that route. 18.3.5. The type rating certificate should be re-validated every two years and the Administration should lay down the procedures for re-validation. 18.3.6. All members should receive instructions and training, as specified in 18.3.3.6 to 12. 18.3.7. The Administration should specify standards of physical fitness and frequency of medical examinations having regard to the route and craft concerned. 18.3.8. The Administration of the country in which the craft is to operate, if other than the flag State, should be satisfied with the training, experience and qualifications of the and each crew member. A valid type rating certificate appropriately endorsed and held by a master or crew member, in conjunction with the current and valid licence or certificate issued by a flag State which is signatory to the International Convention on Standards of Training, Certification and () in force for those who are required to such a licence or certificate, should be acceptable as evidence of satisfactory training, experience and qualification to the Administration of the country in which the craft is to operate.
18.4 of survival craft and supervision 18.4.1. There should be a sufficient number of trained persons on board for mustering and assisting untrained persons. 18.4.2. There should be a sufficient number of members, who may be or certificated persons, on board for operating the survival craft, rescue boats and arrangements required for by the total number of persons on board. 18.4.3. A or certificated person should be placed in charge of each survival craft to be used. However, the Administration, having due regard to the nature of the , the number of persons on board and the characteristics of the craft, may permit a deck officer, certificated person or persons practised in the handling and operation of liferafts to be placed in charge of each or group of liferafts. 18.4.4. The person in charge of survival craft should have a of the survival craft crew and should see that the crew under command are acquainted with their duties. 18.4.5. Every rescue boat and motorized survival craft should have a person assigned who is capable of operating the and carrying out minor adjustments. 18.4.6. The should ensure the equitable distribution of persons referred to in 18.4.1 to 18.4.3 among the craft’s survival craft.
18.5Emergency instructions and drills 18.5.1. On or before departure, should be instructed in the use of and the action to be taken in an emergency. The attention of the passengers should be drawn to the emergency instructions required by 8.4.1 and 8.4.3. 18.5.2. Emergency and evacuation drills for the should be held on board the craft at intervals not exceeding one week for passenger craft and one month for cargo craft. 18.5.3. Each member of each crew should participate in at least one evacuation, fire and damage control drill per month.
18.5.4. On-board drills should, as far as practicable, be conducted to simulate an actual emergency. Such simulations should include instruction and operation of the craft’s evacuation, and damage control appliances and systems. 18.5.5. On-board instruction and operation of the craft’s evacuation, fire and damage control appliances and systems should include appropriate cross-training of members. 18.5.6. Emergency instructions including a general diagram of the craft showing the location of all exits, routes of evacuation, emergency equipment, life-saving equipment and appliances and illustration of donning should be available to each and crew member. It should be placed near each passenger and crew seat. 18.5.7. Records The date when musters are held, details of abandon craft drills and fire drills, drills of other life-saving appliances and onboard training should be recorded in such log-book as may be prescribed by the Administration. If a full muster, drill or training session is not held at the appointed time, an entry should be made in the log-book stating the circumstances and the extent of the muster, drill or training session held. A copy of such information should be forwarded to the operator’s management. 18.5.8. Evacuation drills 18.5.8.1. Evacuation drill scenarios should vary each week so that different emergency conditions are simulated. 18.5.8.2. Each evacuation craft drill should include: .1. summoning of crew to muster stations with the alarm required by 8.2.2.2 and ensuring that they are made aware of the order to abandon craft specified in the ; .2. reporting to stations and preparing for the duties described in the muster list; .3. checking that crew are suitably dressed; .4. checking that lifejackets are correctly donned; .5. operation of davits if any used for liferafts; .6. donning of immersion suits or thermal protective clothing by appropriate crew members; .7. testing of emergency lighting for mustering and ; and .8. giving instructions in the use of the craft’s life-saving appliances and in survival at sea. 18.5.8.3. Rescue boat drill .1. As far as is reasonable and practicable, rescue boats should be launched each month as part of the evacuation drill, with their assigned crew aboard, and manoeuvred in the water. In all cases this requirement should be complied with at least once every three months. .2. If rescue boat launching drills are carried out with the craft making , such drills should, because of the dangers involved, be practised in sheltered waters only and under the supervision of an experienced in such drills see footnote . 18.5.8.4. Individual instructions may cover different parts of the craft’s life-saving system, but all the craft’s life-saving equipment and appliances should be covered within any period of one month on passenger craft and two months on cargo craft. Each member of the crew should be given instructions which should include but not necessarily be limited to: .1. operation and use of the craft’s inflatable liferafts; .2. problems of hypothermia, first-aid treatment of hypothermia and other appropriate first-aid procedures; .3. special instructions necessary for use of the craft’s life-saving appliances in severe weather and severe sea conditions.
18.5.8.5. On-board training in the use of davit-launched liferafts should take place at intervals of not more than four months on every craft fitted with such appliances. Whenever practicable, this should include the inflation and lowering of a . This liferaft may be a special liferaft intended for training purposes only, which is not part of the craft’s lifesaving equipment. Such a special liferaft should be conspicuously marked. 18.5.9. drills 18.5.9.1. scenarios should vary each week so that emergency conditions are simulated for different vessel compartments; 18.5.9.2. Each fire drill should include: .1. summoning of to fire stations; .2. reporting to stations and preparing for the duties described in the : .3. donning of fireman’s outfits; .4. operation of fire doors and fire dampers: .5. operation of fire pumps and ; .6. operation of communication equipment, emergency signals and general alarm; .7. operation of ; and .8. instruction in the use of the craft’s fire-fighting equipment and sprinkler and drencher systems, if fitted. 18.5.10. Damage control drills 18.5.10.1. Damage control drill scenarios should vary each week so that emergency conditions are simulated for different damage conditions. 18.5.10.2. Each damage control drill should include: .1. summoning of crew to damage control stations; .2. reporting to stations and preparing for the duties described in the muster list; .3. operation of doors and other watertight closures; .4. operation of pumps and testing of bilge alarms and automatic starting systems; and .5. instruction in damage survey, use of the craft damage control systems and control in the event of an emergency. Part B- Requirements for Passenger Craft
18.6Type training 18.6.1. For all members, the type rating training should cover the control and evacuation of additionally to 18.3.6. 18.6.2. When the craft carry cargoes, the craft should comply with the requirements of part C of this chapter in addition to this part.
18.7Emergency instructions and drills 18.7.1. Emergency instructions including a general diagram of the craft showing the location of all exits, routes of evacuation, emergency equipment, life-saving equipment and appliances and illustration of donning should be available to each and placed near each passenger’s seat. 18.7.2. Attention of passengers should be drawn to the provisions of the emergency instructions on boarding. Part C - Requirements for Cargo Craft
18.8Type training . For all members, the type rating training should cover knowledge of cargo and vehicles storage area securement systems.
18.9Emergency instructions and drills . Emergency instructions including a general diagram of the craft showing the location of all exits, routes of evacuation, emergency equipment, life-saving equipment and appliances and illustration of donning should be available to each Annex 2 Extracts from the Isle of Man Steam Packet Company Limited’s Type Programme Record BookAnnex 3 Safety Instruction CardsAnnex 4 Summary of comments from questionnaires 1/3/255 Sea Express 1 v Alaska Rainbow questionnaires – summary of comments Comment Location of passenger 1 Stewardess was panicky Stb’d side 2 Stewardess could not be heard clearly - was holding the megaphone too far from her mouth All areas 3 were different to those featured on the safety video. Stb’d & Central area 4 No head count/checking of passengers when disembarking all 5 Stewardess failed to help locate a lifejacket when requested Central area 6 Lifejacket straps knotted and took 4 – 5 minutes to untangle before the jacket could be donned All areas – multiple comments 7 Captain’s tannoy announcements clear and calm all 8 General Alarm signal heard clearly all 9 Lifejackets difficult to pull out from under the seats. All areas 10 Some of the were crying and hysterical – exacerbating the situation. All 11 Delay in being provided with baby/childrens’ lifejackets All 12 Announcements were muffled by the sound of other passengers on their mobile phones 13 IoM Steam Packet staff at Liverpool were disorganised and ill tempered Central area 14 IoM SP need to review their staff training and company procedures for dealing with emergencies. No muster was taken and the reaction was poor Port side 15 staff displayed signs of panic – were not reassuring Port SideAnnex 5 of Liverpool new procedures
and
shore
life-saving apparatus and craft’s line-throwing apparatus; .17. all other functions contained in the
and emergency instructions; and .18. instructions for
of the life-saving appliances. .19. instructions in the use of
fire
protection and
fire
-extinguishing appliances and systems; .20. guidelines for use of fireman’s outfit in a
fire
, if fitted; .21. use of alarms and communications associated with
fire
safety; .22. methods for surveying damage; .23. use of damage control appliances and systems including operation of