MAIB 조사 보고서 20-2026: Arvia호MAIB investigation report 20-2026: Arvia
요약Summary
2025년 10월 26일 0552경, 버뮤다 등록 여객선 Arvia호에서 승무원 1명이 승객용 승강기를 점검하던 중 치명상을 입었다. 선박은 영국 잉글랜드 사우샘프턴(Southampton)에서 스페인 카나리아 제도의 산타크루스데테네리페(Santa Cruz de Tenerife)로 항해 중이었다.At about 0552 on 26 October 2025, a crew member on board the Bermuda registered passenger vessel Arvia was fatally injured while inspecting a passenger lift. The vessel was on passage from Southampton, England, to Santa Cruz de Tenerife, Canary Islands, Spain.
안전 쟁점Safety issues
점검에 대한 의사소통과 계획이 효과적이지 못하였다.Communication and planning for the inspection were ineffective.
승무원이 승강기 승강로에 들어가기 전에 승강기에 대한 통제가 확립되지 않았다.Control of the lift had not been established before the crew member entered the lift shaft.
자동 복귀형 문 연동장치(self-resetting door interlock)가 승강기 움직임에 대한 안전 방벽으로 의존되었다.Self-resetting door interlocks were relied on as a safety barrier against lift movement.
작업 허가 체계가 해당 작업이 승인된 작업 범위를 벗어났음을 식별하지 못하였다.Permit to work arrangements did not identify that the task had moved beyond the authorised scope of work.
승강기 정비 교육과 역량 보증이 일관되지 않았다.Lift maintenance training and competence assurance were inconsistent.
12 갑판 문이 해제 키로 안 열려 14 갑판에서 승강로로 진입
이동용 케이블 손상을 임시 수리. 승강기를 움직이려다 11·12 갑판 사이에 멈춤.
근거: 1.3.1
10-25 06:45
3ETO 가 PTW 를 완료로 서명 — 다음 야간에 작업 재개 합의
근거: 1.3.1
10-25 18:50
새 PTW 발급(18:55 승인), 22:20 무렵 작업 시작
끊어진 퓨즈 교체로 전원 복구, 여러 갑판에서 시험.
근거: 1.3.2
10-26 02:00
선박 시계 1시간 늦춤, 03:00 시험 재개
마찰음 → L자형 브래킷을 수공구로 조정, 카 상부에 탄 채 추가 시험.
근거: 1.3.2
05:30 무렵
승강기 점검 모드·비상정지 상태로 둠, 3ETO 가 SETO 에 작업 완료 알림
근거: 1.3.2
05:44
ET 가 승강기를 정상 모드로 돌리고 비상정지 해제, SETO 가 우선 모드로 운전 시험
근거: 1.3.2
05:48 무렵
SETO 가 3ETO·AET 를 돌려보내고 11·17 갑판 선택
11 갑판에서 SETO 가 브래킷 육안 점검이 필요하다고 판단, 문을 잡고 카 안에 남음.
근거: 1.3.3
05:51 무렵
12 갑판 문 안 열려 ET 가 14 갑판 문 열고 승강로에 들어감
'OK boss' 외침을 들은 SETO 는 카를 떠나 14 갑판으로 향함. 승강장 문이 ET 뒤에서 닫힘.
근거: 1.3.3
05:52
11 갑판 승강기 문이 닫히고 승강기가 위로 움직임
저장된 호출 신호에 반응.
근거: 1.3.3 · 요약
05:52 이후
SETO 가 비명 듣고 문 열려 했으나 실패, 3ETO 와 3 갑판 승강로에서 혈흔 확인
근거: 1.3.3
06:01
14 갑판 문 열어 ET 가 승강로 벽과 카 사이에 끼인 것 확인
근거: 1.3.3
06:02
응급 의료 상황 선포
근거: 1.3.3
06:07
선내 의사가 ET 사망 선고
아코루냐로 회항, 현지 응급 구조대가 시신 수습.
근거: 1.3.3
② 등장 요소와 관계
점선 상자는 있었지만 쓰이지 않았거나 쓰였는지 모르는 것, 점선 화살표는 보고서가 추정한 관계입니다.
③ 원인 사슬
왼쪽에서 오른쪽으로, 무엇이 무엇으로 이어졌는지입니다. 상자(원인)는 보고서 근거 대목에서 가져왔고, 상자 사이 화살표는 보고서가 직접 적지 않은 경우 모델이 판단해 이은 것입니다.
보고서가 밝히지 못한 것
권고·조치
Carnival UK Ltd: 정비·점검 중 승강기 작동 방지 방벽으로서 자동 복귀형 문 인터록 사용 검토
보고서 20/2026(2026-10). Carnival UK 는 사고 뒤 선단 전반의 승강기 정비 절차·의사소통·훈련 요건을 강화. 입력에는 결론·권고 본문이 빠져 있어 사이트 요약의 안전 쟁점으로 원인을 적었다.
권고Recommendations
Carnival UK Ltd에 정비 또는 점검 중 승강기 작동을 방지하기 위한 안전 방벽으로서 자동 복귀형 승강기 문 연동장치의 사용을 검토할 것을 권고하였다.Carnival UK Ltd has been recommended to review the use of self-resetting lift door interlocks as a safety barrier to prevent activation of lifts during maintenance or inspection.
한국어는 모델 번역(검수 전)입니다. 표의 값은 흔한 말만 옮기고 나머지는 원문 그대로 둡니다.
본문
PDF 에서 뽑은 글 — 쪽 나눔·단 배치 때문에 줄 순서가 어긋난 곳이 있을 수 있습니다
목차 약어 및 두문자어 용어집 요약 1 1절 사실 정보 2 1.1 Arvia호 및 사고의 개요 2 1.2 배경 3 1.3 경과 3 1.3.1 최초 점검 및 수리 3 1.3.2 후속 수리 작업 및 시험 6 1.3.3 사고에 이르기까지의 점검 및 시험 6 1.4 Arvia호 8 1.4.1 일반 사항 8 1.4.2 승무원 8 1.4.3 전기기술팀 9 1.4.4 사망자 9 1.5 Arvia호 승객용 승강기 9 1.5.1 승강기 인터록 9 1.5.2 해제 키 10 1.5.3 우선 모드 10 1.5.4 점검 모드 및 비상정지 제어장치 10 1.5.5 비상 구조 작업 10 1.5.6 수동 구조 작업 10 1.5.7 승강로 사다리 12 1.6 절차 13 1.6.1 Carnival Corporation 절차 13 1.6.2 Carnival UK 절차 13 1.6.3 작업 허가서 14 1.6.4 작업 안전 검토 14 1.6.5 잠금·표지 부착(lock-out/tag-out) 15 1.6.6 고소 작업 15 1.6.7 제조사 안전 문서 15 1.7 규정 16 1.7.1 설계 승인 16 1.7.2 안전관리 16 1.7.3 훈련 16 1.7.4 정비 및 고소 작업 16 1.8 이전/유사 사고 17 1.8.1 British Mallard호 - 승무원 사망 17 1.8.2 MSC Colombia호 - 승무원 사망 17 1.8.3 Carnival Ecstasy호 - 승무원 사망 17 2절 분석 18 2.1 목적 18 2.2 개관 18 2.3 사고 18 2.4 의사소통 및 계획 18 2.5 승강기 움직임의 통제 19 2.6 안전관리 19 2.7 훈련 20 2.8 장비 고장 21
3절 결론 22
3.1사고에 직접 기여하였으며 조치되었거나 권고로 이어진 안전 쟁점 223.2 사고에 직접 기여하지는 않았으나 조치되었거나 권고로 이어진 안전 쟁점 22 4절 조치 사항 23
4.1기타 기관의 조치 23 5절 권고 24 그림 그림 1: 승객용 승강기 14 위치 그림 2: 승강기 카 상부 그림 3: 승강기 카에서 승강로 위쪽을 올려다본 모습 그림 4: 승강기 움직임 그림 5: 문 해제 장치 그림 6: 갑판에서 본 승강로 사다리, 14
약어 및 두문자어 용어집 1ETO - 일등 전기기술사관(first electro-technical officer) 3ETO - 삼등 전기기술사관(third electro-technical officer) AET - 전기기술 보조원(assistant electrical technician) Carnival Corporation - Carnival Corporation 및 Carnival plc ERO - 비상 구조 작업(emergency rescue operation) ET - 전기기술원(electrical technician) JSR - 작업 안전 검토(job safety review) LOTO - 잠금·표지 부착(lock-out/tag-out) MAIB - 영국 해양사고조사국(Marine Accident Investigation Branch) MRO - 수동 구조 작업(manual rescue operation) OEM - 주문자 상표 부착 제조업체(original equipment manufacturer) OHS - 산업안전보건(occupational health and safety) PL - 승객용 승강기(passenger lift) PTW - 작업 허가서(permit to work) REG - 레드 엔사인 그룹(Red Ensign Group) SETO - 상급 전기기술사관(staff electro-technical officer) SMS - 안전관리체제(safety management system) UTC - 협정 세계시(universal time coordinated) 시각: 별도의 언급이 없는 한 이 보고서에 사용된 모든 시각은 선박 시각이다. 선박 시각은 2025년 10월 26일 0200까지 협정 세계시(UTC)+1이었으며, 그 시각에 선박 시각을 UTC로 1시간 늦추었다.
원문 보기
1ETO - first electro-technical 3ETO - third electro-technical officer AET - assistant electrical technician Carnival Corporation - Carnival Corporation and Carnival plc ERO - emergency rescue operation ET - electrical technician JSR - job safety review LOTO - lock-out/tag-out - Marine Accident Investigation Branch MRO - manual rescue operation OEM - original equipment manufacturer OHS - occupational health and safety PL - lift PTW - permit to work REG - Red Ensign Group SETO - staff electro-technical officer - safety management system
개요SYNOPSIS
한국어 번역 · 모델 · 검수 전
요약 2025년 10월 26일 약 0552에, 버뮤다 등록 여객선 Arvia호의 승무원 한 명이 야간 수리 후 승객용 승강기를 점검하던 중 치명적인 부상을 입었다. Arvia호는 영국 사우샘프턴에서 스페인 카나리아 제도 산타크루스데테네리페로 항행 중이었다. 승강기는 점검 전에 시험을 위해 정상 운전 상태로 복귀되어 있었으며, 승무원이 승강로 안에 있는 동안 저장된 호출 신호에 반응하여 움직였다. 조사 결과, 점검이 명확하게 전달되고 상호 이해된 계획의 뒷받침을 받지 못하였음이 밝혀졌다. 승무원이 승강로에 들어가기 전에 승강기에 대한 확실한 통제가 확립되지 않았으며, 작업은 승강기 움직임에 대한 효과적인 방벽을 제공하지 못하는 자동 복귀식 문 인터록에 의존하였다. 사고 이후 Arvia호의 관리회사인 Carnival UK Ltd는 선단 전반에 걸쳐 승강기 정비 절차, 의사소통 체계 및 훈련 요건을 강화하는 조치를 취하였다. Carnival UK Ltd에 승강기 정비 및 점검 중 안전 방벽으로서 자동 복귀식 승강기 문 인터록의 사용을 검토하도록 권고하였다. 스페인 영국
원문 보기
At about 0552 on 26 October 2025, a on board the Bermuda registered vessel Arvia was fatally injured while inspecting a passenger lift following overnight repairs. Arvia was on passage from Southampton, UK, to Santa Cruz de Tenerife, Canary Islands, Spain. The lift had been returned to normal operation for testing before the inspection and moved in response to a stored signal while the crew member was inside the lift shaft. The investigation found that the inspection was not supported by a clearly communicated and mutually understood plan. Positive control of the lift had not been established before the crew member entered the lift shaft, and the work relied on self-resetting door interlocks that did not provide an effective barrier against lift movement. Following the accident Arvia’s managers, Carnival UK Ltd, has taken action to reinforce lift maintenance procedures, communication arrangements and training requirements across its fleet. A recommendation has been made to Carnival UK Ltd to review the use of self-resetting lift door interlocks as a safety barrier during lift maintenance and inspection. Spain UK
사실SECTION 1 – FACTUAL INFORMATION
한국어 번역 · 모델 · 검수 전
1절 사실 정보
1.1ARVIA호 및 사고의 개요 선박 제원 선박명 Arvia 기국 버뮤다 선급 로이드선급 IMO 번호 9849693 종류 여객선 등록 선주 Carnival plc¹ 관리회사 Carnival plc 건조 연도 2022 구조 강재 전장 344.5m 등록 길이 320.1m 총톤수 185,581 최소 안전 승선 인원 49 허가 적재량 승객 6,600명 항해 제원 출항항 잉글랜드 사우샘프턴 입항항 카나리아 제도 산타크루스데테네리페(예정, 스페인 아코루냐로 회항) 항해 종류 크루즈 화물 정보 승객 5,299명 승무원 수 승무원 1,681명 해양사고 정보 일시 2025년 10월 26일 0552 해양사고 또는 사건의 종류 매우 심각한 해양사고 사고 위치 스페인 피니스테레곶(Cape Finisterre) 북서쪽 75해리 선내 장소 12 갑판과 14 갑판 사이 승강로 내 승객용 승강기 14 인명 피해/사망 사망 1명 손상/환경 영향 승객용 승강기 14에 경미한 손상 선박 운항 상태 항행 중 항해 구간 항해 중 외부 및 내부 환경 북풍, 풍력 5; 짧고 낮은 너울을 동반한 잔잔함에서 보통 정도의 파도; 건조; 시정 양호 승선 인원 6,980명 1 Carnival plc는 2026년 5월 21일 Carnival UK Ltd로 사명을 변경하였다.
1.2배경 이 사고에 대한 조사는 버뮤다 선박등록소를 대신하여 영국 해양사고조사국(MAIB)이 수행하였다. 버뮤다는 레드 엔사인 그룹(REG)의 회원이며, 조사는 MAIB와 REG 회원 관리 당국 간의 양해각서에 따라 완료되었다.
1.3경과 2025년 10월 21일, 버뮤다 등록 여객선 Arvia호는 스페인 카디스(Cádiz)를 출항하여 잉글랜드 사우샘프턴으로 항행하였다. 항해 중 이 선박은 보퍼트 풍력 계급 12에 이르는 거친 바다를 만났다. 손상 위험을 줄이기 위해 승객용 및 승무원용 승강기 17대의 운행을 중단하였다. 2025년 10월 24일 아침 Arvia호가 사우샘프턴에 도착하였고, 계속 운행 중이던 승강기 중 하나인 승객용 승강기(PL) 14가 작동 불능 상태로 11 갑판에 멈춰 있는 것이 확인되었다. 2000에 Arvia호는 사우샘프턴을 출항하여 스페인 카나리아 제도 산타크루스데테네리페로 향하였다. 1.3.1 최초 점검 및 수리 Arvia호가 사우샘프턴을 출항할 무렵, 삼등 전기기술사관(3ETO)이 이끄는, 전기기술원(ET)과 전기기술 보조원(AET)으로 구성된 수송팀(1.4.2절 참조)이 근무를 시작하였다. 3ETO는 PL14(그림 1)의 문제를 통보받고 2305에 승강기 고장 진단을 위한 작업 허가서(PTW)를 발급하였다. 이 PTW는 2310에 일등 전기기술사관(1ETO)이 승인하였다. 10월 25일 약 0055에 수송팀이 PL14에 도착하여 승강기가 11 갑판에서 작동 불능임을 확인하였다. ET와 AET는 12 갑판 승강장 문을 통해 PL14에 접근하려 하였다. 그러나 문 해제 장치가 작동하지 않았고 문 해제 키로도 승강장 문이 열리지 않아 실패하였다. 이에 ET는 14 갑판²에서 승강기 위쪽으로 승강로에 진입하여 승강로 사다리를 이용해 승강기 카 상부에 도달하였다. 카 상부에 올라간 ET는 비상정지 버튼을 누르고 승강기를 점검 모드로 전환한 뒤 승강로 안쪽에서 12 갑판 승강장 문을 열었다(그림 2). ET와 AET는 PL14를 점검하여 승강기 카에 전원을 공급하는 이동용 케이블(travelling cable)의 손상을 확인하였으며, 3ETO와 협의한 후 임시 수리로 이를 바로잡았다. 이후 팀은 카 상부의 비상 및 수동 제어장치와 19 갑판 승강기 기계실의 제어장치를 이용해 승강기를 움직이려 하였다. 이는 성공하지 못하였고, 이에 팀은 수동 구조 작업(MRO) 제어장치로 브레이크를 해제하여 승강기를 움직이려 하였다. 그 결과 승강기가 11 갑판과 12 갑판 중간 위치까지 약간 올라간 뒤 승강로 안에서 멈추었다. 팀의 근무가 끝나 가면서 작업은 그 시점에 중단되었다. 약 0630에 상급 전기기술사관(SETO)이 12 갑판에서 AE 및 AET를 만나 팀의 근무 중 완료된 작업을 점검하였다. SETO가 12 갑판 승강장 문을 열려고 하였을 때에도 해제 키로 문이 열리지 않았다. SETO, AE 및 AET는 14 갑판으로 이동하여 3ETO를 만났고, 이어 승강장 문을 열고 승강장에서 승강기 카 상부를 점검하였다. SETO가 점검하는 동안 다음 야간 근무 중에 추가 작업을 재개하기로 합의하였다. 0645에 3ETO는 PL14 고장 진단 PTW를 완료로 서명하였다. 2 Arvia호에는 13 갑판이 없었으므로 14 갑판은 12 갑판의 한 층 위였다.
분석SECTION 2 – ANALYSIS
한국어 번역 · 모델 · 검수 전
2절 분석
2.1목적 분석의 목적은 장래에 유사한 사고가 발생하는 것을 방지하기 위한 권고의 근거로서 사고의 기여 원인과 상황을 판단하는 것이다.
2.2개관 Arvia호의 ET는 그가 승강로 안에 있는 동안 승강기가 다시 작동하여 승강로 측면과 승강기 카 사이에 끼이면서 치명적인 부상을 입었다. 이 절에서는 의사소통, 통제, 안전관리 및 훈련을 포함하여 이 사고에 기여한 요인들을 논의한다.
2.3사고 수송팀이 PL14의 고장 진단과 시험을 마친 상태에서 SETO가 승강기를 시험하고 이동용 케이블 L자형 브래킷을 점검하기로 결정하였다. 그 시점에 PL14는 정상 운전 모드로 복귀되어 있었고 승강기 호출에 반응할 수 있는 상태였다. 즉흥적인 점검은 SETO가 11 갑판에서 승강기 문을 잡아 열어 둠으로써 문이 자동으로 닫히는 것을 막고, 안전 회로를 차단하여 승강기 움직임을 방지하는 동안 ET가 위 갑판으로 가는 방식에 의존하였다. ET는 12 갑판 승강장 문을 열 수 없자 14 갑판으로 가서 해제 키로 수동으로 문을 열었다. ET가 14 갑판에서 문을 열었을 때 이는 안전 회로에 대한 2차 차단을 제공하여 승강기 움직임을 막았다. 문 장치의 평형추 때문에 승강기 문은 잡아 열어 두어야 했으며, 그렇지 않으면 닫혔다. 이는 ET가 승강로에 들어가고 SETO가 11 갑판의 승강기에서 멀어졌을 때 승강기 카와 양쪽 갑판의 승강장 문이 닫혀 승강기 안전 회로가 완전히 복구되고 승강기가 움직일 수 있게 되었음을 의미하였다. 이 움직임은 승강기의 설계와 운전 논리에 부합하는 것이었다. 양쪽 문이 모두 닫혀 안전 회로가 복구되고 승강기가 움직일 수 있게 되었기 때문에 승강기가 다시 작동하였다. 이로 인해 ET는 움직이는 승강기의 위험에 노출되었고 치명적인 사고가 발생하였다.
2.4의사소통 및 계획 이동용 케이블 L자형 브래킷을 점검하기로 한 SETO의 결정은 야간 고장 진단 작업이 끝난 뒤 운전 시험 중에 나왔다. 이 점검은 승강기 정비 활동으로 계획된 것이 아니었으며, SETO와 ET는 ET가 위에서 접근하기 위해 승강기 카를 떠나기 전에 PTW를 수정하거나, JSR을 실시하거나, 작업 방법에 합의하기 위해 멈추지 않았다. SETO와 ET 사이에 서로 다른 정신 모형(mental model)이 형성되어 있었다. SETO는 갑판에서 L자형 브래킷 수리 부위를 점검할 생각이었고 승강로에 들어갈 의도도, ET가 들어갈 것이라는 예상도 없었다. 반대로 ET의 행동은 그가 승강기 카 상부에 대한 추가 접근이 필요하다고 믿었음을 나타낸다. SETO도 ET도 작업에 대한 각자의 이해가 상대방과 다르다는 것을 인식하지 못한 것으로 보이며, 작업을 어떻게 수행할 것인지에 관한 의사소통도 없었다.
ET가 12 갑판 승강장 문을 열 수 없어 대신 14 갑판으로 갔을 때, 계획된 일련의 사건에 중대한 변화가 발생하였다. 이 변화는 작업을 멈추고 의사소통을 다시 확립하며 안전한 작업 방법을 확인할 또 한 번의 기회를 제공하였다. 그러나 그러한 중단은 없었고 서로 다른 가정은 해소되지 않은 채 남았다. ET와 SETO 사이에는 의사소통이 거의 없었고, ET가 SETO를 향해 아래로 "OK boss"라고 외친 것이 무슨 의미였는지에 대한 확인도 없었다. SETO와 ET 사이의 의사소통은 효과적이지 못하였다. 이로 인해 작업에 대한 공유된 이해가 부족하였고, 승강기가 ET를 의도치 않은 승강기 움직임의 위험에 노출시키는 상태로 돌아가도록 하는 행동이 이루어졌다.
2.5승강기 움직임의 통제 제조사의 절차, PTW 및 Carnival UK의 안전 지침은 모두 승강기 카 상부에 접근하는 인원이 승강로에 들어가거나 정비 작업을 시작하기 전에 승강기에 대한 통제를 확립하고, 비상정지를 작동시키며, 승강기를 점검 모드로 전환하도록 요구하였다. PL14에 설치된 승강기 카 상부 점검 제어장치와 비상정지 스위치는 정비 중 통제되지 않는 움직임을 방지하기 위한 것이었다. 그러나 ET가 승강로에 들어가기 전의 점검 중에는 이러한 제어장치가 확립되지 않았다. 승강기 움직임을 막는 유일한 방벽은 열려 있는 승강장 문과 그에 따른 안전 회로의 차단이었다. 이 인터록은 승강장 문이 닫히면 자동으로 복귀되었으므로 잠금(lock-out)이 아니었다. 그 결과 승강기 움직임에 대한 보호는 인원이 의도한 승강기 구성을 유지하고 행동을 올바르게 조율하는 데 달려 있었다. 11 갑판과 14 갑판의 문이 닫히자 승강기 안전 회로가 복구되었고 승강기는 17 갑판으로의 미처리 호출에 설계대로 반응하였다. 인원이 승강로 안에 있는 동안 승강기가 통제되지 않고 움직이는 위험은 2007년 British Mallard호에서도 유사한 치명적 사고를 일으켰다. 목격자가 없었기 때문에 ET가 승강로에 들어간 이유는 확실하게 판단할 수 없었다. ET가 비상정지와 점검 제어장치를 이용해 승강기를 격리하기 위해, 또는 승강로 안에서 12 갑판 승강장 문을 열어 L자형 브래킷의 점검을 용이하게 하기 위해 승강기 카 상부에 접근하려 하였을 가능성이 있다. 그의 의도와 관계없이, ET는 승강로에 있는 동안 승강기가 정지 상태로 있을 것이라고 믿고 들어갔을 가능성이 거의 확실하다. 자동 복귀식 장치를 방벽으로 사용하는 경우 승강기가 정지 상태임을 보장할 수 없었다. 승강기 정비의 작업 체계는 승강기 카 상부에 접근할 때 움직임을 방지하기 위해 문 인터록의 사용에 의존하였다. 인터록은 문이 닫히면 자동으로 복귀되었으므로 이는 효과적인 안전 방벽을 제공하지 못하였고 승무원을 위험에 처하게 하였다.
결론SECTION 3 – CONCLUSIONS
한국어 번역 · 모델 · 검수 전
3절 결론
3.1사고에 직접 기여하였으며 조치되었거나 권고로 이어진 안전 쟁점 1. Arvia호의 ET는 그가 승강로 안에 있는 동안 승강기가 다시 작동하여 승강로 측면과 승강기 카 사이에 끼이면서 치명적인 부상을 입었다. [2.2] 2. 양쪽 문이 모두 닫혀 승강기 안전 회로가 복구되고 승강기가 움직일 수 있게 되었기 때문에 승강기가 다시 작동하였다. 이로 인해 ET는 승강기 움직임의 위험에 노출되었고 치명적인 사고가 발생하였다. [2.3] 3. SETO와 ET 사이의 의사소통은 효과적이지 못하였다. 이로 인해 작업에 대한 공유된 이해가 부족하였고, 승강기가 ET를 의도치 않은 승강기 움직임의 위험에 노출시키는 상태로 돌아가도록 하는 행동이 이루어졌다. [2.4] 4. 작업 체계는 승강기 카 상부에 접근할 때 움직임을 방지하기 위해 문 인터록의 사용에 의존하였다. 인터록은 문이 닫히면 자동으로 복귀되었으므로 이는 효과적인 안전 방벽을 제공하지 못하였고 승무원을 위험에 처하게 하였다. [2.5] 5. Arvia호의 PTW 체계는 승강기 점검 및 수리 작업 중에 비효율적으로 시행되었다. 이로 인해 안전 예방 조치에 대한 감독이 미흡하였고 작업이 승인된 작업 범위에서 벗어났음을 식별하지 못하여 승무원을 위험에 처하게 하였다. [2.6]
3.2사고에 직접 기여하지는 않았으나 조치되었거나 권고로 이어진 안전 쟁점 1. PTW 작성과 승강기 정비 감독을 맡은 사관이 공식적인 승강기 안전 교육을 받지 않았으며, 이는 승강기 정비 활동과 관련된 위험에 대한 인식을 낮추었을 수 있다. [2.7] 2. 결함 있는 승강장 문 해제 장치는 승강기 카 상부 접근 방식을 바꾸었다. 이는 승강기가 확실한 통제 아래 놓이기 전에 대체 접근 경로를 사용하도록 유도함으로써 사고의 상황에 간접적으로 기여하였다. [2.8]
원문 보기
3.1 SAFETY ISSUES DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS 1. Arvia’s ET was fatally injured when a lift reactivated while he was inside the lift shaft, resulting in him being crushed between the side of the shaft and the lift car. [2.2] 2. The lift reactivated because both sets of doors closed, restoring the lift safety circuit and allowing the lift to move. This exposed the ET to the hazard of lift movement and resulted in the fatal accident. [2.3] 3. Communication between the SETO and ET was ineffective. This resulted in a lack of shared understanding of the task and actions that allowed the lift to return to a state that exposed the ET to the risk of unintended lift movement. [2.4] 4. The system of work relied on the use of door interlocks to prevent movement when accessing the lift car top. This did not provide an effective safety barrier as the interlocks were self-resetting when the doors closed, placing the at risk. [2.5] 5. The PTW system on board Arvia was ineffectively implemented during the lift inspection and repair work. This resulted in inadequate oversight of the safety precautions and a failure to identify that the task had departed from the authorised scope of work, placing the
조치 사항SECTION 4 – ACTION TAKEN
한국어 번역 · 모델 · 검수 전
4절 조치 사항
4.1기타 기관의 조치 Carnival UK Ltd는 다음을 하였다. ● 선단 내 모든 SETO에게 팀원들과 승강기 정비 및 승강기 구조에 대한 요건을 논의하고 재확인하도록 지시하였다. 특히 정비를 수행하는 모든 승무원 간에 의사소통을 확립할 것, 승강로의 고정 사다리를 이용해 승강기 카 상부에 접근하는 것을 금지할 것, PTW를 올바르게 관리할 것이 강조되었다. ● CUK-OHS-1207-DI1 - CUK 전용 지침(CUK Specific Instructions)의 일반 교육 자료를 OEM별 안전 정보로 갱신하였다. ● 승강기 정비에 관여하는 모든 인원이 최근 6개월 이내에 OEM 또는 제3자 승강기 서비스 업체가 실시한 기초 안전 교육을 성공적으로 이수하도록 하는 잠정 요건을 시행하였다. 이 잠정 요건은 숙련도 체계 검토 후 Carnival UK Ltd가 재평가할 것이다. ● 승강기 정비 활동을 수행하는 인원에 대한 숙련도 확인 절차를 도입하였다. 기초 승강기 안전 교육을 이수하는 인원은 교육 후 평가를 성공적으로 완료하여야 하며, 교육 이수 증명과 평가 결과를 모두 공식적으로 기록한다.
원문 보기
4.1 ACTIONS TAKEN BY OTHER ORGANISATIONS Carnival UK Ltd has: ● Instructed all SETOs in its fleet to discuss and reiterate the requirements for lift maintenance and lift rescue with their teams. In particular, the requirement to establish communication between all members executing the maintenance, the prohibition of using the fixed ladder in the lift shaft to gain access to the lift car top and the correct management of the PTW. ● Updated the generic training materials in CUK-OHS-1207-DI1 – CUK Specific Instructions with OEM-specific safety information. ● Implemented an interim requirement for all personnel involved in lift maintenance to have successfully completed basic safety training conducted by the OEM or a third-party lift service supplier within the last 6 months. This interim requirement will be reassessed by Carnival UK Ltd after a competency framework review. ● Introduced a competency verification process for personnel undertaking lift maintenance activities. Personnel completing basic lift safety training are required to successfully complete a post-training assessment, with the outcome of both the training certification and assessment formally recorded.
권고SECTION 5 – RECOMMENDATIONS
한국어 번역 · 모델 · 검수 전
5절 권고 Carnival UK Ltd에 다음을 권고한다. 2026/159 정비 또는 점검 중 승강기의 작동을 방지하는 안전 방벽으로서 자동 복귀식 승강기 문 인터록의 사용을 검토할 것. 안전 권고는 어떠한 경우에도 책임이나 과실에 대한 추정을 낳지 아니한다
해양사고 보고서
원문 보기
Carnival UK Ltd is recommended to: 2026/159 Review the use of self-resetting lift door interlocks as a safety barrier to prevent activation of lifts during maintenance or inspection. Safety recommendations shall in no case create a presumption of blame or liability
Marine Accident Report
of Arvia and accident 2 1.2 Background 3 1.3 Narrative 3 1.3.1 Initial inspection and repairs 3 1.3.2 Follow-up repair work and testing 6 1.3.3 Inspection and testing leading up to accident 6 1.4 Arvia 8 1.4.1 General 8 1.4.2
Crew
8 1.4.3 Electro-technical team 9 1.4.4 The deceased 9 1.5 Arvia
passenger
lifts 9 1.5.1 Lift interlocks 9 1.5.2 Release key 10 1.5.3 Priority mode 10 1.5.4 Inspection mode and emergency stop controls 10 1.5.5 Emergency rescue operation 10 1.5.6 Manual rescue operation 10 1.5.7 Shaft ladder 12 1.6 Procedures 13 1.6.1 Carnival Corporation procedures 13 1.6.2 Carnival UK procedures 13 1.6.3 Permit to work 14 1.6.4 Job safety review 14 1.6.5 Lock-out/tag-out 15 1.6.6 Working at height 15 1.6.7 Manufacturer’s safety documentation 15 1.7 Regulations 16 1.7.1 Design approval 16 1.7.2 Safety management 16 1.7.3 Training 16 1.7.4 Maintenance and working at height 16 1.8 Previous/similar accidents 17 1.8.1 British Mallard –
crew member
fatality 17 1.8.2
Colombia –
crew member
fatality 17 1.8.3 Carnival Ecstasy –
crew member
fatality 17 SECTION 2 – ANALYSIS 18 2.1 Aim 18 2.2 Overview 18 2.3 The accident 18 2.4 Communication and planning 18 2.5 Control of lift movement 19 2.6 Safety management 19 2.7 Training 20 2.8 Equipment failure 21
SECTION 3 – CONCLUSIONS 22 3.1 Safety issues directly contributing to the accident that have been addressed or resulted in recommendations 22 3.2 Safety issues not directly contributing to the accident that have been addressed or resulted in recommendations 22 SECTION 4 – ACTION TAKEN 23 4.1 Actions taken by other organisations 23 SECTION 5 – RECOMMENDATIONS 24 FIGURES Figure 1:
Passenger
lift 14 location Figure 2: Lift car top Figure 3: View looking up lift shaft from lift car Figure 4: Lift movement Figure 5: Door release mechanism Figure 6: Lift shaft ladder viewed from
14
- universal time coordinated TIMES: all times used in this report are ship’s time unless otherwise stated. Ship’s time was universal coordinated time (
UTC
) +1 until 0200 on 26 October 2025, when ship’s time was retarded to
UTC
.
PL13 PL11 PL09 PL07 ERO DZI NORMAL STOP UP DOWN 그림 1: 승객용 승강기 14 위치 FORWARD DECK 11 AFT Image from Arvia Technical Operating Manual (March 2023) produced by Worldwide Marine Technology Limited Image from OTIS and Meyer Werft Image from OTIS and Meyer Werft PL13 PL11 PL09 PL07 ERO DZI NORMAL STOP UP DOWN
그림 2: 승강기 카 상부 점검 모드 스위치 및 비상정지 버튼 승강기 카 상부를 내려다본 모습 승강장 문 위의 승강장 문 인터록 비상정지 L자형 브래킷 패널 뒤의 이동용 케이블 승강장 문 Image from OTIS and Meyer Werft원본 PDF 10쪽
1.3.2후속 수리 작업 및 시험 10월 25일 1850에 3ETO는 11 갑판과 12 갑판 사이에 계속 멈춰 있던 PL14의 고장 진단을 이어 가기 위해 새 PTW를 발급하였다. 이 PTW는 1855에 1ETO가 승인하였다. 수송팀은 약 2220에 PL14 작업을 시작하였다. 전날 밤과 마찬가지로 12 갑판 승강장 문을 열 수 없었으므로 ET와 AET는 14 갑판에서 승강로 사다리를 통해 승강기 카 상부에 접근하였다. 19 갑판 기계 구역에서 점검한 뒤 3ETO는 끊어진 퓨즈를 찾아 교체하여 승강기에 전원을 복구하였다. 전원이 복구되자 수송팀은 비상 구조 작업(ERO) 제어장치를 사용하여 승강기를 움직일 수 있었고, 여러 갑판에 걸쳐 점검 모드와 정상 모드에서 시험하였다. 10월 26일 0200에 선박 시계를 1시간 늦추었다³. 이는 수송팀의 예정된 2시간 휴식과 겹쳤고, 팀은 0300에 PL14 시험을 재개하였다. 시험 중 팀은 승강로 안에서 마찰음을 확인하고 이를 이동용 케이블과 이를 지지하는 L자형 브래킷의 접촉 때문이라고 보았다. 팀은 수공구로 브래킷을 수동 조정하고, 팀원이 승강기 카 상부에 탑승한 채 점검 모드와 정상 모드 모두에서 추가 시험을 실시하였다. 약 0530에 승강기는 카의 비상정지가 눌린 상태로 점검 모드로 전환되었다. 얼마 뒤 3ETO는 선내 전화로 SETO와 메시지를 주고받으며 PL14 작업이 완료되었고 승강기를 시험하였음을 알렸다. SETO는 선박 시계 변경으로 일찍 깨어 있었으며, 3ETO와 팀에게 3 갑판에서 만나자고 답신하였다. 0544에 SETO는 ET가 기다리고 있던 3 갑판 선수 쪽 승객용 승강기 승강장에 도착하였다. 짧은 논의 후 ET는 4 갑판으로 가서 PL14 승강장 문을 열고, 승강기를 정상 모드로 전환하고 비상정지를 해제하여 승강기를 다시 작동시켰다. 이어 ET는 3 갑판으로 돌아와 승강기 카 안에서 SETO와 합류하였다. SETO는 전자 키(fob)을 사용해 승강기를 우선 모드로 전환하고 여러 갑판을 선택하여 운전 시험을 실시하였다. 시험 중 ET는 SETO에게 밤사이 촬영한 이동용 케이블 L자형 브래킷 사진을 보여 주었다. 한편 3ETO와 AET는 3 갑판에 도착하여 승강기가 움직였음을 알아차렸다. 그들이 ET에게 연락하자 ET는 3 갑판에서 만나겠다고 답하였다. 1.3.3 사고에 이르기까지의 점검 및 시험 약 0548에 PL14가 3 갑판으로 돌아왔다. SETO는 3ETO 및 AET와 잠시 이야기하며 추가 시험이 실시될 것이라고 알렸다. 이어 SETO는 3ETO와 AET를 돌려보냈고 그들은 작업장으로 돌아갔다. SETO와 ET는 PL14 시험을 계속하였다. 승강기가 우선 모드인 상태에서 SETO는 승강기 제어반에서 11 갑판과 17 갑판을 선택하였다. 승강기 카 안에서 SETO와 ET는 L자형 브래킷 수리에 관해 계속 논의하였다. 11 갑판에 도착하자 SETO는 수리 부위의 육안 점검이 필요하다고 판단하였다. SETO는 승강기 문을 잡아 연 채 카 안에 남았고, ET는 위 갑판에서 승강로에 접근하기 위해 계단으로 12 갑판에 올라갔다. 3 영국 하계 표준시(UTC+1)에서 UTC로의 시계 변경.
약 0551에 ET는 해제 키로 12 갑판 승강장 문을 열려고 하였으나 열 수 없었다. ET는 계단을 뛰어 14 갑판으로 올라가 해제 키로 그 층의 승강장 문을 열었다. ET가 승강로 쪽으로 몸을 기울였고(그림 3), 11 갑판에 남아 있던 SETO는 그가 "OK boss"라고 외치는 소리를 들었다. 얼마 후 SETO는 11 갑판 승강기 문에서 물러나 계단으로 14 갑판으로 향하기 시작하였다. 거의 같은 시각에 ET는 14 갑판에서 승강로에 들어갔고, 평형추식 승강장 문이 그의 뒤에서 닫혔다. 0552에 11 갑판의 승강기 문이 닫히고 승강기가 위로 움직이기 시작하였다(그림 4). SETO는 비명을 듣고 11 갑판으로 돌아와 승강장 문을 열려고 하였으나 성공하지 못하였다. SETO는 문 해제 키를 가지고 있던 3ETO에게 연락하였다. SETO와 3ETO는 3 갑판에서 만나 승강로에 접근하였고, 그곳에서 혈흔을 확인하였다. 이어 SETO와 3ETO는 14 갑판으로 돌아갔다. 0601에 SETO, 3ETO, AET 및 선내 의료팀원 한 명이 14 갑판 승강장 문을 열어, ET가 승강로 측면과 승강기 카 사이에 끼여 압착된 것을 확인하였다. 0602에 응급 의료 상황이 선포되었다. 0607에 선내 의사가 ET의 사망을 선고하였다. Arvia호는 스페인 아코루냐(A Coruña)로 회항하였으며, 그곳에서 ET의 시신이 승강로에서 수습되어 현지 응급 구조대에 의해 육지로 옮겨졌다. 그림 3: 승강기 카에서 승강로 위쪽을 올려다본 모습 ET SETO SETO가 올려다봄 승강기 카에서 본 ET에 대한 SETO의 시야 사고 직전 SETO의 CCTV 정지 화면 ET Images from OTIS and Meyer Werft
1.4ARVIA호 1.4.1 일반 사항 Carnival Corporation 및 Carnival plc⁴(Carnival Corporation)는 전 세계에서 여러 크루즈 브랜드를 소유하고 있었다. Carnival UK라는 상호로 영업하는 Carnival plc는 Arvia호를 포함한 여객선 11척을 소유·운항하였으며, Arvia호는 2022년 독일 마이어 베르프트(Meyer Werft) 조선소에서 건조되었다. Arvia호는 버뮤다에 등록되었고 로이드선급의 선급을 받았다. 1.4.2 승무원 Arvia호에는 선장이 이끄는 승무원 1,681명이 있었다. 조직 구조는 갑판부, 기술부, 호텔부로 구성되었다. 기술부는 추진, 발전 및 기관 계통을 담당하였다. SETO는 전기기술부를 이끌었으며 전력 배전, 자동화, 추진 제어, 승강기, 통신 계통 및 호텔 서비스를 포함한 선박의 전기·전자 계통을 담당하였다. 3ETO는 야간 근무 중 기술 지원을 제공하는 수송팀을 이끌었다. 3ETO는 정상 근무 시간 외에 발생하는 기술 및 전기 결함에 대한 첫 연락 창구 역할을 하였고, 야간에 수행되는 모든 전기기술 작업을 책임졌으며 기술부의 야간 근무자를 지원하였다. 수송팀은 0200에서 0300 사이의 예정된 휴식을 두고 2000부터 0800까지 근무하였다. 4 2026년 5월, Carnival Corporation과 Carnival plc는 이중 상장 회사 구조에서 Carnival Corporation Ltd로 통합되었다. 그림 4: 승강기 움직임 ET 사고 위치 ET Images from OTIS and Meyer Werft1.4.3 전기기술팀 AET는 2025년 4월 13일 첫 해상 근무 계약으로 Arvia호에 승선하였다. 그는 호텔 서비스 부서에서 6개월간 근무한 뒤 2025년 10월 19일 수송팀으로 옮겼다. AET는 2025년 8월 3일 Elevated Marine Services가 실시한 승강기 안전 교육을 이수하였다. 3ETO는 이전에 화물선에서 8년간 근무하였으며 Arvia호에서는 두 번째 계약으로 근무 중이었다. 3ETO는 Carnival UK에서 근무하는 동안 승강기 안전 교육을 이수한 적이 없었다. 1ETO는 Carnival UK에서 10년간 근무하였고 승강기 안전 교육을 여러 차례 이수하였다. SETO는 Carnival UK에서 전기기술사관으로 15년간 근무하였으며 직전 3년간 Arvia호에 승선하였다. SETO는 2023년 10월 22일 OTIS Marine의 16시간 교육 과정 'Elemental Safety Procedures, Technical Maintenance Processes Training for Lifts'를 이수하였다. 1.4.4 사망자 ET인 Lixter Dave Visaya Mahinay는 35세의 필리핀 국적자로 Carnival UK와의 두 번째 계약으로 근무 중이었다. 그는 2025년 9월 14일 AET로 Arvia호에 승선하였고 2025년 9월 15일부터 수송팀에서 근무하였다. 2025년 10월 19일 ET로 승진하였다. ET는 2025년 4월 12일 Arvia호 선상에서 Allied Lifts의 'Elevator Safety Training' 과정을 이수하였다. 부검은 스페인에서 실시되었다. 부검 보고서는 근본 사인을 압착으로 인한 손상으로 확인하였다.
1.5ARVIA호 승객용 승강기 Arvia호에는 승객용 승강기 24대, 승무원용 승강기 17대, 화물 적재용 승강기 2대가 있었으며, 모두 주문자 상표 부착 제조업체(OEM)인 OTIS Marine이 제조·설치하였다. 승객용 승강기는 선수, 선체 중앙, 선미의 세 구역에 나뉘어 배치되었다. PL14는 승객 갑판 3부터 18까지 운행하는 선수 쪽 승객용 승강기 중 하나였다. 11, 12 및 14 갑판의 승강장 층 사이 거리는 약 2.7m였다. 선수 쪽 승강기 군을 담당하는 기계실은 19 갑판에 있었다. 승강기 카는 강재 권상 로프에 매달려 있었고 평형추로 균형을 이루었다. 전력, 제어 신호 및 통신은 이동용 케이블을 통해 승강기 카에 공급되었다. 1.5.1 승강기 인터록 승객용 승강기에는 여러 전기적·기계적 안전 장치가 갖추어져 있었다. 각 승강장 문에는 승강기 카가 해당 승강장에 있거나 해제 키를 사용하지 않는 한 문이 열리지 않도록 하는 기계식 인터록이 설치되어 있었다. 승강장 문 인터록은 승강기 안전 회로의 일부를 이루었으며, 모든 승강장 문이 닫히고 그 인터록이 확실히 잠긴 것으로 확인되지 않으면 승강기는 운전할 수 없었다.
1.5.2해제 키 해제 키는 승강장 문 위쪽의 열쇠 구멍에 꽂았다. 이 장치는 키를 돌리면 핀이 회전하여 레버를 움직이는 방식으로 작동하였다. 이로써 회로가 끊어지고 승강기 문을 열 수 있게 되었다. PL14의 12 갑판 승강장 문 장치는 사고 후 시험되었다. 문 해제 키로 돌릴 때 핀이 레버를 건너뛰어, 안전 회로를 끊고 문을 열 수 있게 하는 움직임이 일어나지 않았으며 문은 닫힌 채로 있었다(그림 5). 1.5.3 우선 모드 승강기 제어 체계에는 전자 키로 작동하는 우선 모드가 있었으며, 이는 다른 층의 일반 호출보다 지정된 호출을 우선시함으로써 승강기의 정상 운전 논리를 바꾸었다. 1.5.4 점검 모드 및 비상정지 제어장치 승객용 승강기 14에는 승강기 카 상부에 점검 제어장치가 설치되어 있었다(그림 2 참조). 제어장치에는 점검 모드 선택 스위치와 비상정지 버튼이 포함되었다. 승강기를 점검 모드로 전환하면 정상적인 승객 운전이 비활성화되고, 승강기의 움직임은 카 상부의 점검 제어장치로만 통제할 수 있었다. 점검 모드에서는 정비 작업을 안전하게 수행할 수 있도록 승강기가 감속된 속도로 운행되었다. 비상정지 스위치는 승강기 카 상부와 기계 구역에 설치되어 있었다. 비상정지를 작동시키면 승강기 제어 회로가 차단되어 스위치가 재설정될 때까지 움직임이 방지되었다. 비상정지는 승강기 카 상부나 승강로 안에서 작업하는 사람들에게 승강기 움직임을 즉시 막을 수단을 제공하기 위한 것이었다. 1.5.5 비상 구조 작업 승객용 승강기 14에는 비상 구조 작업(ERO) 시스템이 갖추어져 있었다. ERO 시스템의 제어장치는 승강기 기계 구역에 있었으며, 고장 시 권한이 있는 인원이 승강기를 가장 가까운 승강장까지 전기적으로 구동할 수 있게 하였다. 이 시스템은 승강기의 전력 및 제어 회로를 이용하여 통제된 조건에서 승강기 카를 움직였다. ERO 시스템은 주로 정상적인 승강기 운전이 불가능할 때 갇힌 승객을 구출하기 위한 것이었다. 1.5.6 수동 구조 작업 수동 구조 작업(MRO) 시스템도 마련되어 있었다. MRO 시스템은 ERO 시스템을 사용할 수 없거나 효과가 없었을 때 사용하기 위한 것이었다. MRO 중에는 기계 구역에서 승강기 브레이크를 해제하여, 승강기 카와 평형추 사이의 불균형의 영향으로 승강기 카가 움직이도록 하였다. 움직임의 속도와 방향은 승강기 카와 평형추의 상대적인 무게에 따라 달라졌으며 작업을 수행하는 인원의 세심한 통제가 필요하였다.
그림 5: 문 해제 장치 설명용으로만 제시: 축척 아님 14 갑판 승강기 승강장 문 승강장 문 위 열쇠 구멍에 꽂은 문 해제 키 문 해제 키를 돌리자 회전한 핀이 레버를 가로질러 움직임 12 갑판 승강기 승강장 문: 회전한 핀이 레버를 건너뜀 문 해제 키를 돌림 문 해제 키 레버 핀 열쇠 구멍 1 2 3 레버 레버 레버 핀 핀이 레버를 건너뜀원본 PDF 16쪽
1.5.7승강로 사다리 승강로에는 비상 대피용으로 마련된 고정 사다리가 설치되어 있었다(그림 6). 그림 6: 14 갑판에서 본 승강로 사다리 승강로 사다리
1.6절차 1.6.1 Carnival Corporation 절차 Carnival Corporation의 안전관리체제(SMS)에는 산업안전보건(OHS) 절차 OHS-1207 - 승강기 작업(Working on Elevators)이 포함되어 있었다. 이 절차는 승강기 점검, 정비 및 구조 활동에 대한 최소 안전 요건을 정하였으며, 그 목적이 승강기 작업과 관련된 부상이나 인명 손실을 방지하는 것이라고 명시하였다. 절차 OHS-1207은 승강기 정비를 수행하는 인원이 안전한 승강기 작업 방법을 교육받았을 것을 요구하였다. 작업을 시작하기 전에 인원은 작업 안전 검토(JSR)를 실시하고 해당 위험성 평가와 관련된 선박별·장비별 안전 지침을 검토하여야 하였다. 절차 OHS-1207은 승강기 카가 갑판 사이에 위치한 상태에서 승강로에 들어가거나 승강로 안으로 몸을 기울여야 할 때마다 PTW를 요구하였다. OHS-1207은 또한 작업 구역을 무단 접근으로부터 보호하도록 요구하였고, 승강로와 피트 안에서 작업하는 동안의 감독 및 입회 체계를 명시하였다. 절차 OHS-1207은 승강기가 운행 중인 동안 승강기 안전 장치를 우회해서는 안 되며, 정비 목적으로 비활성화한 안전 장치는 승강기를 운행에 복귀시키기 전에 원상 복구하여야 한다고 명시하였다. 이 절차는 나아가 승강기 안전 회로를 비활성화하거나 우회해서는 안 된다고 명시하였다. 1.6.2 Carnival UK 절차 Carnival UK는 OHS-1207을 회사별 지침 CUK-OHS-1207-DI1 - CUK 전용 지침(CUK Specific Instructions)을 통해 시행하였다. 이 지침은 승강기 점검, 정비 및 구조 활동에 관한 보충 지침을 제공하는 CUK 승강기 안전 지침(CUK Elevator Safety Instructions)을 참조하였다. CUK 승강기 안전 지침에는 외부 업체가 작성한 'IMLS Safe Working on Lifts'라는 제목의, 제조사 특정이 아닌 안전 정보가 포함되어 있었다. 'IMLS Safe Working on Lifts' 지침은 정비 활동을 통제되고 안전한 작업 환경 안에서 수행하여야 한다고 명시하였다. 주요 예방 조치로는 작업 시작 전 승강기 계통의 격리 및 잠금, 적절한 PTW 체계의 사용, 작업에 관여하는 인원 간의 효과적인 의사소통, 정비가 진행되는 동안 승강기가 의도치 않게 작동하는 것을 방지하는 조치가 있었다. 이 지침은 또한 방벽, 안전한 접근 방법 및 비상정지 제어장치를 통해 승강로, 피트 및 승강기 카 상부에서 작업하는 인원을 보호하는 것도 다루었다. 승강기를 운행에 복귀시키기 전에 브레이크, 안전 회로, 문 인터록, 조속기 및 과속 방지 장치를 포함한 안전상 핵심 계통을 확인하는 것을 특히 강조하였다. 'IMLS Safe Working on Lifts' 지침은 나아가 위험성 평가의 필요성, 적격한 인원, 그리고 해당되는 경우 승객 구조 작업의 안전한 관리를 강조하였다. 이 지침은 또한 비상 해제 작업을 수행하는 인원이 해당 절차에 대한 숙련도를 입증하였어야 하며 작업을 통제할 권한이 있어야 한다고 명시하였다.
1.6.3작업 허가서 Carnival Corporation은 소속 선박의 위험 작업 활동을 통제하기 위해 PTW 체계를 운영하였다. 작업을 시작하기 전에 위험 요소를 식별하고, 통제 조치를 시행하며, 지정된 인원이 허가서를 승인하도록 요구되었다. PTW는 작업 현장에서 이용할 수 있어야 하였고 사본은 선교와 기관제어실에 비치하여야 하였다. Carnival Corporation의 절차는 승강기에 대한 어떠한 작업을 시작하기 전에도 전기부 책임자가 PTW 및/또는 잠금·표지 부착(LOTO)이 필요한지 판단하여야 한다고 명시하였다. OHS-1207-F1 PTW - 승강기 작업(Working on Elevators) 점검표는 JSR을 완료할 것을 요구하였고, 안전한 접근 방법이 마련되었는지, 승강기 안전 회로를 점검하였는지, 적절한 방벽과 표지판을 설치하였는지, 의사소통 방법이 합의되었는지, 승강기가 격리되었거나 상황에 따라 정비 모드로 전환되었는지를 확인하는 항목을 포함하였다. 허가서는 또한 안전 입회자를 지정하도록 요구하였다. 작업을 시작하기 전에 책임 사관은 작업 현장을 점검하고, 인원에게 작업과 관련 예방 조치를 브리핑하고 허가서에 서명하여야 하였다. 이후 승인 사관이 최종 승인을 하였다. 작업이 완료되면 허가서는 작업 구역이 안전한 상태로 남겨졌는지, 영향을 받은 모든 안전 계통이 원상 복구되었는지를 확인하도록 요구하였다. 책임 사관/감독자 서명란에는 다음과 같이 명시되어 있었다. 나는 이 허가서를 작업자/계약자와 함께 검토하였고 작업 활동 및 안전 예방 조치에 관해 이들에게 브리핑하였다. 나는 작업 현장과 인접 구역을 직접 점검하였고, 이 허가서에 따른 정보를 확인하였으며 안전 절차와 장비가 갖추어져 있음을 확인하였다. 승인 사관이 서명하도록 요구된 곳에는 허가서에 다음과 같이 명시되어 있었다. 나는 필요한 모든 예방 조치가 취해졌음에 만족하며 작업의 개시를 승인한다. 1.6.4 작업 안전 검토 Carnival Corporation의 OHS-1001 JSR 절차는 모든 작업을 수행하기 전에 JSR을 실시하도록 요구하였다. 이 절차는 계약자를 포함하여 작업에 관여하는 모든 인원에게 적용되었으며 개별적으로 또는 그룹으로 완료할 수 있었다. JSR은 위험 요소를 식별하고 인원이 작업을 진행하는 데 불안이 없음을 확인하기 위한 것이었다. 이 검토는 인원이 다섯 가지 질문에 답하도록 요구하였다. 나는 이 일을 어떻게 하는지 아는가? 나는 위험 요소를 알고 있는가? 무엇이 잘못될 수 있는가? 어떻게 안전하게 할 수 있는가? 나는 안전하다고 느끼는가?
검토 중에 식별된 모든 위험 요소나 우려 사항은 작업을 시작하기 전에 해소되어야 하였다. 이 절차는 인원이 검토 과정에서 편하게 의견을 말할 수 있어야 한다고 명시하였다. JSR 기록을 작성하거나 제출하는 것은 요구 사항이 아니었다. 부서장은 인원이 JSR 절차에 관해 교육을 받고 각 작업 전에 검토가 완료되도록 할 책임이 있었다. 작업 감독자는 JSR을 실시하고, 합의된 작업 계획이 준수되도록 작업을 감독하여야 하였다. 1.6.5 잠금·표지 부착 Carnival Corporation의 OHS-1101 LOTO 절차는 정비 및 수리 활동 중 위험 에너지를 포함한 기계와 계통을 격리하기 위한 안전 작업 체계를 정하였다. 작업을 시작하기 전에 JSR이 요구되었으며, 효과적인 격리가 확인될 때까지 모든 에너지원은 통전 상태로 간주되어야 하였다. LOTO 절차는 위험 에너지가 관련된 작업이 격리할 장비, 격리 경계 및 관련 위험 요소를 명시한 격리 계획의 뒷받침을 받도록 요구하였다. 작업을 수행하는 인원은 개인 잠금장치를 적용하고, 작업 시작 전에 장비의 에너지가 차단되었음을 확인하며, 작업 전반에 걸쳐 격리 과정에 대한 통제를 유지하여야 하였다. 모든 LOTO 활동은 승인 사관의 승인이 필요하였고 LOTO 양식에 기록되어 작업 현장 문서와 함께 보관되었다. 이 절차는 또한 작업 중단 후와 조건이 변경될 때마다 격리를 다시 확인하도록 요구하였다. 격리가 실행 불가능하거나 에너지 차단이 추가적인 위험을 초래하는 경우, 자격을 갖추고 권한을 부여받은 인원만 통전된 전기 장비에 대한 작업을 수행할 수 있었다. 1.6.6 고소 작업 Carnival UK의 OHS-1204 - 고소 작업(Working at Height) 절차는 고소 작업을 갑판 높이보다 2m를 초과하여 높은 곳에서 수행하는 작업, 또는 부상 위험이 식별된 경우 2m 미만의 작업으로 정의하였다. 이 절차는 작업 시작 전에 PTW 양식 OHS-1204-F1을 작성하도록 요구하였으며, 합리적으로 실행 가능한 대안이 없는 경우에만 고소 작업을 수행하여야 한다고 명시하였다. 1.6.7 제조사 안전 문서 OTIS Marine은 승객용 및 업무용 승강기에 대한 OEM 문서를 공급하였다. 이 문서에는 승강기의 사용 및 정비를 위한 지침서와, 승강기 정비 위험, 안전 회로, 승강기 카 상부 접근, 피트 접근 및 전기 에너지 통제를 다루는 안전 교육 자료가 포함되어 있었다. OTIS 지침서는 정비를 자격을 갖춘 정비 조직이 수행하여야 하며 위험성 평가는 권한을 부여받은 자격 있는 인원이 실시하여야 한다고 명시하였다. OTIS 지침서는 또한 ERO와 MRO는 교육을 받고 권한을 부여받은 인원만 수행하여야 한다고 명시하였다.
OTIS 안전 교육 자료는 승강기 정비와 관련된 위험 요소로 움직이는 기계, 전기 계통, 추락 위험, 인접한 카와 평형추, 제한된 공간, 전기 배선 등을 식별하였다. 교육 자료는 또한 작업 시작 전에 인원이 작업 위험 분석을 실시할 필요성을 다루었다. OTIS 교육 자료에는 승강기 정비 활동에 대한 '핵심 수칙(cardinal rules)'이 포함되어 있었다. 여기에는 승강기 카 상부에 접근하거나 그곳에서 작업할 때 승강기에 대한 통제를 유지할 것, 적절한 경우 LOTO 통제를 사용할 것, 필요한 경우 추락 방지 조치를 사용할 것, 승강기가 정상 운행 중일 때 카 상부에 타지 않을 것이 포함되었다. 교육 자료에 수록된 OTIS의 승강기 카 상부 접근 절차는 인원이 승강로에 들어가기 전에 승강기에 대한 통제를 어떻게 확립하여야 하는지를 상세히 설명하였다. 여기에는 승강장 문이 열려 있는 동안 승강기가 움직일 수 없음을 확인하는 것, 승강기를 점검 모드로 전환하는 것, 비상정지를 작동시키는 것, 접근하기 전에 승강기 움직임이 방지되었음을 확인하는 점검을 수행하는 것이 포함되었다.
1.7규정 1.7.1 설계 승인 Arvia호의 승강기 설비와 관련 안전 계통은 건조 당시 버뮤다 기국 당국을 대신하여 인정 대행기관⁵으로 활동한 로이드선급(Lloyd's Register)의 설계 승인, 시험 및 검사를 받았다. 1.7.2 안전관리 국제안전관리(ISM) 코드는 승강기 계통을 회사의 SMS를 통해 관리하도록 요구하였다. 여기에는 계획 정비, 점검, 결함 보고, 시정 조치 및 비상 대응을 위한 체계가 포함되었다. 1.7.3 훈련 버뮤다 상선·어선(작업장비의 제공 및 사용) 규칙 2019(Bermuda Merchant Shipping and Fishing Vessels (Provision and Use of Work Equipment) Regulations 2019)는 고용주가 작업 장비를 사용하는 인원이 그 사용과 관련된 위험 및 취하여야 할 예방 조치에 관해 적절한 교육과 지시를 받도록 보장할 것을 요구하였다. 1.7.4 정비 및 고소 작업 승강로 안에서 수행되는 정비 및 고장 진단 활동에는 버뮤다 상선·어선(작업 중 보건 및 안전)(고소 작업) 규칙 2019(Bermuda Merchant Shipping and Fishing Vessels (Health and Safety at Work) (Work at Height) Regulations 2019)가 적용되었다. 이 규칙은 고소 작업이 적절히 계획되고, 적절히 감독되며, 적합한 장비를 사용하여 수행되도록 요구하였다. 이 규칙은 적절한 통제 조치가 없으면 부상을 초래할 수 있는 거리를 사람이 추락할 수 있는 모든 곳에 적용되었다. 5 인정 대행기관: 기국을 대신하여 법정 검사를 수행하고 증서를 발급하도록 기국의 권한을 부여받은 기관.
1.8이전/유사 사고 1.8.1 British Mallard호 - 승무원 사망 2007년 1월 27일 유조선 British Mallard호에서 전기기술원 한 명이 승강기 결함을 바로잡으려다 치명적인 부상을 입었다. 승강기 문 스위치를 조정한 뒤 이 기술원은 사다리를 이용해 승강로에 들어갔다. 승강기 문이 닫힌 직후 승강기 카가 위로 움직여 기술원이 승강기 카와 사다리 사이에 끼었다. 이 사고는 호주 교통안전국(Australian Transport Safety Bureau)⁶이 조사하였다. 조사 결과 승강기 지침서가 충분히 상세한 안전 지침을 제공하지 않았고, 선박의 PTW 및 위험성 평가 절차가 사용되지 않았으며, 관련 인원이 승강로 안 작업과 관련된 위험을 충분히 식별하지도 이해하지도 못하였음이 밝혀졌다. 1.8.2 MSC Colombia호 - 승무원 사망 2007년 8월 8일 컨테이너선 MSC Colombia호에서 전기 실습생 한 명이 승강기 정비 작업 중 치명적인 부상을 입었다. MAIB의 예비 평가⁷는 이 전기 실습생이 승강기의 작동을 충분히 이해하지 못하였고 회사의 위험성 평가 및 PTW 절차가 준수되지 않았음을 밝혔다. 1.8.3 Carnival Ecstasy호 - 승무원 사망 2015년 12월 27일 여객선 Carnival Ecstasy호의 전기장(chief electrician)이 승강로 안에서 작업하던 중 승강기 평형추에 부딪혔다. 그는 부상으로 사망하였다. 사고 후 선박 운영사는 승강기 정비를 교육받은 전기팀원이 수행하여야 한다고 명시한 선단 전체 권고 통지를 발행하였다. 이 통지는 나아가 전기팀원이 사전에 위험을 식별하고 평가하며, 안전 작업 절차를 따르고, 고위험 작업에는 2인 1조 체계를 사용하며, 승강기 위에서 작업하기 전에 승강기가 점검 모드에 있도록 하고, 정기적으로 검토되는 위험성 평가와 안전 절차의 뒷받침을 받아야 한다고 권고하였다. 6 ATSB 보고서 235: British Mallard 7 MAIB 예비 평가: MSC Colombia
원문 보기
1.1 OF ARVIA AND ACCIDENT VESSEL PARTICULARS Vessel’s name Arvia Flag Bermuda number 9849693 Type Registered owner Carnival plc1 Manager(s) Carnival plc Year of build 2022 344.5m 320.1m 185,581 49 Authorised cargo 6,600 PARTICULARS of departure Southampton, England Port of arrival Santa Cruz de Tenerife, Canary Islands (intended, diverted to A Coruña, Spain) Type of voyage Cruise Cargo information 5,299 passengers 1,681 INFORMATION Date and time 26 October 2025 at 0552 Type of marine casualty or incident Very Serious Marine Casualty Location of incident 75nm north-west of Cape Finisterre, Spain Place on board Passenger lift 14 in the lift shaft between decks 12 and 14 Injuries/fatalities 1 fatality Damage/environmental impact Minor damage to passenger lift 14 Ship operation On passage Voyage segment Mid-water External & internal environment Northerly winds, force 5; slight to moderate seas with short low ; dry; good Persons on board 6,980 1 Carnival plc changed its name to Carnival UK Ltd on 21 May 2026.
1.2 BACKGROUND The investigation into the accident was conducted by the (MAIB) on behalf of the Bermuda Ship Registry. Bermuda is a member of the Red Ensign Group (REG) and the investigation was completed in accordance with the memorandum of understanding between the MAIB and the REG member administrations. 1.3 NARRATIVE On 21 October 2025, the Bermuda registered passenger vessel Arvia departed Cádiz, Spain, on passage to Southampton, England. During the voyage, the vessel encountered rough seas with conditions reaching Beaufort force 12. To reduce the risk of damage, 17 passenger and crew lifts were taken out of service. On the morning of 24 October 2025, Arvia arrived in Southampton, where one of the lifts that had remained in service, passenger lift (PL) 14, was found to be inoperative and stuck at 11. At 2000, Arvia departed Southampton for Santa Cruz de Tenerife, Canary Islands, Spain. 1.3.1 Initial inspection and repairs As Arvia was departing Southampton, the transport team (see section 1.4.2) comprising the electrical technician (ET) and the assistant electrical technician (AET) led by the third electro-technical (3ETO) started their shift. The 3ETO was notified about the issue with PL14 (Figure 1) and at 2305 raised a permit to work (PTW) for troubleshooting the lift. The PTW was authorised by the first electro-technical officer (1ETO) at 2310. At about 0055 on 25 October, the transport team attended PL14 and confirmed that the lift was inoperable at deck 11. The ET and AET tried to access PL14 via the deck 12 doors. This was unsuccessful as the door release mechanism did not function and the door release key failed to open the landing doors. The ET then accessed the lift shaft from above the lift on deck 142 and used the shaft ladder to reach the lift car top. Once on the lift car top, the ET pressed the emergency stop button, switched the lift to inspection mode and opened the deck 12 landing doors from inside the lift shaft (Figure 2). The ET and AET inspected PL14 and identified damage to the travelling cable supplying the lift car, which they rectified with a temporary repair after consulting with the 3ETO. The team then attempted to move the lift using emergency and manual controls on the lift car top and controls in the lift room on deck 19. This was unsuccessful so the team then tried to move the lift by releasing the brakes using the manual rescue operation (MRO) control. This resulted in the lift raising slightly to a halfway between decks 11 and 12 before stopping in the shaft. Work then stopped as the team neared the end of their shift. At about 0630, the staff electro-technical officer (SETO) met the AE and AET on deck 12 to inspect the work completed during the team’s shift. The release key again failed to open the deck 12 landing doors when the SETO attempted to open them. The SETO, AE and AET moved to deck 14, where they met the 3ETO; they then opened the landing doors and inspected the lift car top from the landing. During the SETO’s inspection it was agreed that further work would resume during the next night shift. At 0645, the 3ETO signed the PTW for troubleshooting PL14 as complete. 2 Deck 14 was one deck above deck 12 as there was no deck 13 on board Arvia.
PL13 PL11 PL09 PL07 ERO DZI NORMAL STOP UP DOWN Figure 1: Passenger lift 14 location FORWARD DECK 11 AFT Image from Arvia Technical Operating Manual (March 2023) produced by Worldwide Marine Technology Limited Image from OTIS and Meyer Werft Image from OTIS and Meyer Werft PL13 PL11 PL09 PL07 ERO DZI NORMAL STOP UP DOWN
Figure 2: Lift car top Inspection mode switch and emergency stop button View looking down onto lift car top Landing door interlock above landing door Emergency stop L-bracket Travelling cable behind panelling Landing door Image from OTIS and Meyer Werft
1.3.2 Follow-up repair work and testing At 1850 on 25 October, the 3ETO raised a new PTW for continued troubleshooting of PL14, which had remained stopped between deck 11 and deck 12. The PTW was authorised by the 1ETO at 1855. The transport team started work on PL14 at about 2220. As with the previous night, the deck 12 landing doors could not be opened and the ET and AET accessed the lift car top from deck 14 via the shaft ladder. Following checks in the on deck 19 the 3ETO identified and replaced a blown fuse, restoring power to the lift. With power restored the transport team were able to move the lift using the emergency rescue operation (ERO) controls and tested it in inspection and normal modes across several decks. At 0200 on 26 October, the ship’s clocks were retarded one hour3. This coincided with the transports team’s scheduled 2-hour break and they resumed testing PL14 at 0300. During testing, the team identified a rubbing noise within the shaft and attributed it to contact between the travelling cable and its supporting L-bracket. The team made manual adjustments to the bracket using hand tools and carried out further testing in both inspection and normal modes with team members riding on the lift car top. At about 0530, the lift was switched to inspection mode with the emergency stop on the car pressed. Shortly afterwards, the 3ETO exchanged messages with the SETO via internal ship’s phone advising that the work on PL14 was complete and the lift had been tested. The SETO was awake early following the ship’s clocks change and replied, instructing the 3ETO and the team to meet the SETO on deck 3. At 0544, the SETO arrived at the deck 3 forward passenger lift landing, where the ET was waiting. Following a brief discussion, the ET went to deck 4, opened the PL14 landing doors and reactivated the lift by switching it to normal mode and releasing the emergency stop. The ET then returned to deck 3 and joined the SETO in the lift car. The SETO conducted a test by using a fob to switch the lift to priority mode and selecting several decks. During the test, the ET showed the SETO photographs of the travelling cable L-bracket taken during the night. Meanwhile, the 3ETO and AET arrived at deck 3 and noticed the lift had moved. They called the ET, who advised he would meet them on deck 3. 1.3.3 Inspection and testing leading up to accident At about 0548, PL14 returned to deck 3. The SETO spoke briefly with the 3ETO and AET and advised them that further testing would be carried out. The SETO then dismissed the 3ETO and AET and they returned to their workshop. The SETO and ET continued testing PL14. With the lift in priority mode, the SETO selected decks 11 and 17 on the lift control panel. Inside the lift car the SETO and ET continued to discuss the repairs on the L-bracket. On arrival at deck 11 the SETO decided a visual inspection of the repairs was necessary. The SETO remained in the lift car, holding the lift doors open, while the ET proceeded to deck 12 via the stairs to gain access to the lift shaft from the deck above. 3 Clock change from British Summer Time (+1) to UTC.
At about 0551, the ET attempted to open the deck 12 landing doors using his release key but was unable to do so. The ET jogged up the stairs to deck 14 and used his release key to open those landing doors. The ET leaned into the lift shaft (Figure 3) and the SETO, who had remained at deck 11, heard him shout “OK ”. Shortly afterwards, the SETO moved away from the deck 11 lift doors and started to proceed to deck 14 via the stairs. At about the same time, the ET entered the lift shaft from deck 14 and the counterweighted landing doors closed behind him. At 0552, the lift doors at deck 11 closed and the lift began to move up (Figure 4). The SETO heard a scream, returned to deck 11 and tried without success to open the landing doors. The SETO called the 3ETO, who had a door release key. The SETO and 3ETO met on deck 3 and accessed the lift shaft, where they identified blood. The SETO and 3ETO then returned to deck 14. At 0601, the SETO, 3ETO, AET and a member of the ship’s medical team opened the deck 14 landing doors and observed that the ET was crushed between the side of the shaft and the lift car. At 0602, a medical emergency was declared. At 0607, the ET was pronounced deceased by the ship’s doctor. Arvia was diverted to A Coruña, Spain, where the ET’s body was recovered from the lift shaft and taken ashore by local emergency services. Figure 3: View looking up lift shaft from lift car ET SETO SETO looking up SETO's view of ET from lift car still of SETO just before accident ET Images from OTIS and Meyer Werft
1.4 ARVIA 1.4.1 General Carnival Corporation and Carnival plc4 (Carnival Corporation) owned multiple cruise brands worldwide. Carnival plc, trading as Carnival UK, owned and operated 11 passenger ships including Arvia, which was built in 2022 at the Meyer Werft shipyard, Germany. Arvia was registered in Bermuda and classed by Lloyd’s Register. 1.4.2 Crew Arvia had 1,681 crew, led by the captain. The organisational structure comprised deck, technical and hotel departments. The technical department was responsible for propulsion, electrical generation and engineering systems. The SETO led the electro-technical department and was responsible for the ship’s electrical and electronic systems, including power distribution, automation, propulsion controls, lifts, communications systems and hotel services. The 3ETO led the transport team, which provided technical support during night-time operations. The 3ETO acted as the first point of contact for technical and electrical defects arising outside normal and was responsible for all electro-technical work undertaken at night and for supporting night workers in the technical department. The transport team worked from 2000 to 0800 with a scheduled break between 0200 and 0300. 4 In May 2026, Carnival Corporation and Carnival plc unified from a dual-listed company structure into Carnival Corporation Ltd. Figure 4: Lift movement ET accident location ET Images from OTIS and Meyer Werft
1.4.3 Electro-technical team The AET joined Arvia on 13 April 2025 for his first seagoing contract. He moved to the transport team on 19 October 2025, after 6 months working in hotel services. The AET had completed lift safety training delivered by Elevated Marine Services on 3 August 2025. The 3ETO had previously worked for 8 years on cargo ships and was serving their second contract on Arvia. The 3ETO had not completed any lift safety training during their time with Carnival UK. The 1ETO had worked for Carnival UK for 10 years and had completed lift safety training on several occasions. The SETO had worked for Carnival UK as an electro-technical officer for 15 years and had served on board Arvia for the previous 3 years. The SETO had completed the OTIS Marine 16-hour training ‘Elemental Safety Procedures, Technical Maintenance Processes Training for Lifts’ on 22 October 2023. 1.4.4 The deceased The ET, Lixter Dave Visaya Mahinay, was a 35-year-old Filipino national who was serving his second contract with Carnival UK. He had joined Arvia as an AET on 14 September 2025 and had worked in the transport team since 15 September 2025. He was promoted to ET on 19 October 2025. The ET had completed the Allied Lifts ‘Elevator Safety Training’ course on board Arvia on 12 April 2025. The postmortem examination was carried out in Spain. Its report identified the underlying cause of death as injuries resulting from being crushed. 1.5 ARVIA PASSENGER LIFTS There were 24 passenger lifts, 17 crew lifts and 2 loading lifts on board Arvia, all manufactured and installed by OTIS Marine, the original equipment manufacturer (OEM). The passenger lifts were arranged in three groups located forward, midships and aft. PL14 was one of the forward passenger lifts, which served passenger decks 3 to 18. The distance between the landing levels on decks 11, 12 and 14 was approximately 2.7m. The machinery room serving the forward lift group was located on deck 19. The lift car was suspended by steel hoisting ropes and balanced by a counterweight. Electrical power, control signals and communications were supplied to the lift car via a travelling cable. 1.5.1 Lift interlocks The passenger lifts incorporated a number of electrical and mechanical safety systems. Each landing door was fitted with a mechanical interlock that prevented the doors from being opened unless the lift car was at the landing, or a release key was used. The landing door interlocks formed part of the lift safety circuit and lifts could not operate unless all landing doors were closed and their interlocks confirmed as secure.
1.5.2 Release key The release key was inserted into a keyhole above the landing doors. The mechanism functioned by rotating a pin that moved a lever when the key was turned. This broke the circuit and allowed the lift doors to be opened. The mechanism on the deck 12 landing doors for PL14 was tested after the accident. The pin jumped past the lever as it was rotated with the door release key, preventing the movement that would allow the safety circuit to be broken and the doors to be opened, and the doors remained shut (Figure 5). 1.5.3 Priority mode The lift control system incorporated a fob-activated priority mode that altered the lift’s normal operating logic by prioritising designated calls over routine calls from other decks. 1.5.4 Inspection mode and emergency stop controls Passenger lift 14 was fitted with inspection controls located on the lift car top (see Figure 2). The controls included an inspection mode selector switch and an emergency stop button. When the lift was placed into inspection mode, normal passenger operation was disabled and lift movement could only be controlled using the inspection controls on the lift car top. The lift travelled at reduced in inspection mode to allow maintenance activities to be conducted safely. Emergency stop switches were installed on the lift car top and in the machinery space. When operated, the emergency stop interrupted the lift control circuit and prevented movement until the switch was reset. The emergency stop was intended to provide those working on the lift car top or within the shaft with a means of immediately preventing lift movement. 1.5.5 Emergency rescue operation Passenger lift 14 was fitted with an emergency rescue operation (ERO) system. The ERO system’s controls were located in the lift machinery space and enabled authorised personnel to electrically drive the lift to the nearest landing in the event of a malfunction. The system used the lift’s electrical power and control circuits to move the lift car under controlled conditions. The ERO system was primarily intended for the recovery of trapped passengers when normal lift operation was unavailable. 1.5.6 Manual rescue operation A manual rescue operation (MRO) system was also provided. The MRO system was intended for use when the ERO system could not be used or had proved unsuccessful. During MRO, the lift brakes were released from the machinery space, allowing the lift car to move under the influence of the imbalance between the lift car and the counterweight. The rate and direction of movement depended on the relative weights of the lift car and counterweight and required careful control by personnel conducting the operation.
Figure 5: Door release mechanism For illustrative purposes only: not to scale Deck 14 lift landing doors Door release key inserted into keyhole above lift landing doors Turned door release key rotated pin that moved a lever across Deck 12 lift landing doors: rotated pin jumped past the lever Door release key turned Door release key Lever Pin Keyhole 1 2 3Lever Lever Lever Pin Pin jumped past lever
1.5.7 Shaft ladder The lift shaft was fitted with a fixed ladder that was intended for emergency evacuation (Figure 6). Figure 6: Lift shaft ladder viewed from deck 14 Lift shaft ladder
1.6 PROCEDURES 1.6.1 Carnival Corporation procedures Carnival Corporation’s (SMS) included occupational health and safety (OHS) procedure OHS-1207 – Working on Elevators. The procedure established minimum safety requirements for lift inspection, maintenance and rescue activities and stated that its purpose was to prevent injury or of life associated with lift work. Procedure OHS-1207 required personnel undertaking lift maintenance to have been instructed in safe lift working practices. Before starting work, personnel were required to conduct a job safety review (JSR) and review applicable and relevant ship-specific and equipment-specific safety instructions. Procedure OHS-1207 required a PTW whenever personnel were required to enter a lift shaft or lean into a shaft while the lift car was positioned between decks. OHS-1207 also required work areas to be protected against unauthorised access and specified arrangements for supervision and attendance during work inside lift shafts and pits. Procedure OHS-1207 stated that lift safety devices were not to be bypassed while a lift was in service and that any safety devices disabled for maintenance purposes were to be reinstated before the lift was returned to service. The procedure further stated that the lift safety circuit was not to be disabled or bypassed. 1.6.2 Carnival UK procedures Carnival UK implemented OHS-1207 through company-specific instruction CUK-OHS-1207-DI1 – CUK Specific Instructions. The instruction referenced the CUK Elevator Safety Instructions, which provided supplementary guidance for lift inspection, maintenance and rescue activities. The CUK Elevator Safety Instructions contained non-manufacturer specific safety information titled IMLS Safe Working on Lifts, which an external company had produced. The IMLS Safe Working on Lifts guidance stated that maintenance activities should be conducted within a controlled and safe working environment. Key precautions included the isolation and lock-off of lift systems before work started, the use of appropriate PTW arrangements, effective communication between personnel involved in the task and measures to prevent inadvertent operation of the lift while maintenance was in progress. The guidance also covered the protection of personnel working within lift shafts, pits and on lift car tops through the use of barriers, safe access arrangements and emergency stop controls. Particular emphasis was placed on the verification of safety-critical systems, including brakes, safety circuits, door interlocks, governors and overspeed protection devices, before a lift was returned to service. The IMLS Safe Working on Lifts guidance further highlighted the need for risk assessment, competent personnel and the safe management of passenger rescue operations where applicable. The guidance also stated that personnel carrying out emergency release operations should have demonstrated competence in the procedures and be authorised to take control of the operation.
1.6.3 Permit to work Carnival Corporation operated a PTW system to control hazardous work activities on its vessels. Before work started, hazards were required to be identified, control measures implemented and the permit authorised by designated personnel. PTWs were required to be available at the worksite and copies held on the and in the . Carnival Corporation’s procedures stated that, before any work on lifts started, the head of the electrical department was to determine whether a PTW and/or lock-out/ tag-out (LOTO) was required. The OHS-1207-F1 PTW – Working on Elevators checklist required a JSR to be completed and included checks to confirm that safe access arrangements were in place, the lift safety circuit had been inspected, appropriate barriers and signage had been erected, communications had been agreed and the lift had been isolated or placed in maintenance mode as appropriate. The permit also required a safety attendant to be appointed. Before work could begin, the responsible officer was required to inspect the worksite, brief personnel on the task and associated precautions and sign the permit. Final authorisation was then provided by an authorising officer. On completion of the work, the permit required confirmation that the work area had been left safe and that any affected safety systems had been reinstated. The signature space for the responsible officer/supervisor stated: I have reviewed this permit with the workers/contractors and briefed them on work activity and safety precautions. I have personally inspected the work site and adjacent spaces and verified the information as per this permit and that safety procedures and equipment are in place. Where the authorising officer was required to sign, the permit stated: I am satisfied all the necessary precautions have been taken and I authorize the work to commence. 1.6.4 Job safety review Carnival Corporation’s OHS-1001 JSR procedure required that a JSR was undertaken before any job was carried out. The procedure applied to all personnel involved in the work, including contractors and could be completed individually or as a group. The JSR was intended to identify hazards and confirm that personnel were comfortable to proceed with the task. The review required personnel to answer five questions: Do I know how to do the job? Am I aware of the… hazards? What could go wrong? How can I make it safe? Do I feel safe?
Any hazards or concerns identified during the review were to be addressed before work started. The procedure stated that personnel should feel comfortable to speak up during the process. It was not a requirement to complete or submit a record of the JSR. Heads of department were responsible for ensuring that personnel were trained in the JSR process and that reviews were completed before each job. Work supervisors were required to conduct JSRs and supervise the work to ensure that the agreed work plan was followed. 1.6.5 Lock-out/tag-out Carnival Corporation’s OHS-1101 LOTO procedure established a safe system of work for the isolation of machinery and systems containing hazardous energy during maintenance and repair activities. A JSR was required before work started and all energy sources were to be considered live until effective isolation had been verified. The LOTO procedure required work involving hazardous energy to be supported by an isolation plan that identified the equipment to be isolated, the isolation boundaries and any associated hazards. Personnel undertaking the work were required to apply personal lock-out devices, verify that equipment had been de-energised before work started and maintain control of the isolation process throughout the task. All LOTO activities required approval from an authorising officer and were recorded on a LOTO form, which was retained with the worksite’s documentation. The procedure also required isolations to be reverified following breaks in the work and whenever conditions changed. Only qualified and authorised personnel were permitted to carry out work on energised electrical equipment where isolation was not practicable or de-energisation would introduce additional hazards. 1.6.6 Working at height Carnival UK’s OHS-1204 – Working at Height procedure defined working at height as work conducted more than 2m above deck level, or less than 2m if risk of injury had been identified. The procedure required PTW form OHS-1204-F1 to be completed before the work started and stated that work at height was only to be undertaken where there was no reasonably practicable alternative. 1.6.7 Manufacturer’s safety documentation OTIS Marine had supplied OEM documentation for the passenger and service lifts. This documentation included an instruction manual for the use and maintenance of the lifts and safety training material covering lift maintenance hazards, safety circuits, lift car top access, pit access and electrical energy control. The OTIS instruction manual stated that maintenance was to be carried out by a qualified maintenance organisation and that risk assessments were to be undertaken by authorised and qualified personnel. The OTIS instruction manual also stated that ERO and MRO were only to be undertaken by trained and authorised personnel.
The OTIS safety training material identified hazards associated with lift maintenance that included moving machinery, electrical systems, fall hazards, adjacent cars and counterweights, limited space and electrical wiring. The training material also covered the need for personnel to undertake a job hazard analysis before starting work. The OTIS training material included 'cardinal rules' for lift maintenance activities. These included requirements to maintain control of the lift when accessing or working on the lift car top, use LOTO controls where appropriate and fall protection when required and not ride on the lift car top while the lift was operating in normal service. The OTIS lift car top access procedure included in the training material detailed how personnel should establish control of the lift before entering the lift shaft. This included verifying that the lift could not move with the landing doors open, placing the lift in inspection mode, operating the emergency stop and carrying out checks to confirm that lift movement was prevented before access was gained. 1.7 REGULATIONS 1.7.1 Design approval Arvia’s lift installations and associated safety systems were subject to design approval, testing and survey at construction by Lloyd’s Register, acting as a Recognised Organisation5 on behalf of the Bermuda flag administration. 1.7.2 Safety management The Code required lift systems to be managed through the company’s SMS. This included arrangements for planned maintenance, inspection, defect reporting, corrective action and emergency response. 1.7.3 Training The Bermuda Merchant Shipping and Vessels (Provision and Use of Work Equipment) Regulations 2019 required employers to ensure that personnel using work equipment received adequate training and instruction on the hazards associated with its use and the precautions to be taken. 1.7.4 Maintenance and working at height Maintenance and troubleshooting activities undertaken within lift shafts were subject to the Bermuda Merchant Shipping and Fishing Vessels (Health and Safety at Work) (Work at Height) Regulations 2019. These regulations required work at height to be properly planned, appropriately supervised and carried out using suitable equipment. The regulations applied wherever a person could fall a distance liable to cause injury if appropriate control measures were not in place. 5 : An organisation authorised by a flag state to perform statutory surveys and issue certificates on its behalf.
1.8 PREVIOUS/SIMILAR ACCIDENTS 1.8.1 British Mallard – crew member fatality On 27 January 2007, an electrical technician was fatally injured while attempting to rectify a lift defect on board the British Mallard. After adjustments had been made to the lift door switches, the technician entered the lift shaft using a ladder. Shortly after the lift doors were closed, the lift car travelled upwards and trapped the technician between the lift car and the ladder. The accident was investigated by the Australian Transport Safety Bureau6. The investigation found that the lift instruction manuals did not provide sufficiently detailed safety guidance, the vessel’s PTW and risk assessment processes had not been used and the personnel involved had neither fully identified nor understood the hazards associated with working in the lift shaft. 1.8.2 Colombia – crew member fatality On 8 August 2007, an electrical was fatally injured while carrying out lift maintenance on board the MSC Colombia. The MAIB preliminary assessment7 found that the electrical cadet did not fully understand the operation of the lift and that the company’s risk assessment and PTW procedures had not been followed. 1.8.3 Carnival Ecstasy – crew member fatality On 27 December 2015, the chief electrician on board the passenger vessel Carnival Ecstasy was struck by a lift counterweight while working inside a lift shaft. He died from his injuries. Following the accident the vessel operator issued a fleetwide advisory notice stating that lift maintenance was to be carried out by trained electrical team members. The notice further advised that electrical team members were to identify and assess risks beforehand, follow safe working procedures, use a two-person buddy system for high-risk tasks, ensure lifts were in inspection mode before working on top of them and be supported by regularly reviewed risk assessments and safety procedures. 6 ATSB report 235: British Mallard 7 MAIB preliminary assessment: MSC Colombia
2.6안전관리 PL14의 고장 진단 및 수리에는 PTW 체계, JSR, LOTO 절차, 고소 작업 통제, 그리고 OHS-1207과 OTIS 정비 절차에 포함된 승강기 관련 요건을 포함한 여러 안전관리 통제가 적용되었다. 이러한 통제는 위험 요소가 식별되고, 적절한 예방 조치가 시행되며, 작업 범위의 변경이 인식되고 관리되도록 하기 위한 것이었다.
고장 진단 기간 중 PTW는 3ETO가 발급하였고 주간 근무를 하던 1ETO가 승인하였다. 3ETO와 1ETO는 정비 활동이 시작되기 몇 시간 전에 필요한 예방 조치가 취해졌음을 확인하는 PTW에 서명하였다. 그러나 실제로 승인 사관인 1ETO는 작업이 수행되는 시점에 명시된 예방 조치가 갖추어져 있는지 확인할 수 없었다. 고장 진단 활동은 추가 결함이 확인되고 대체 접근 방법이 채택되면서 이틀 밤에 걸쳐 진행되었고, SETO의 즉흥적인 수리 부위 점검으로 귀결되었다. 12 갑판의 승강장 문 해제 장치 결함 때문에 의도한 고장 진단 작업과 점검을 완료할 수 없었다. 이러한 변화는 위 갑판에서의 접근, 승강로 사다리의 사용, 고소 작업, 그리고 공식 방벽이 아닌 비공식 조율에 대한 의존을 포함한 추가적인 위험 요소를 불러왔다. 따라서 통제 조치의 효과는 공식적인 안전 방벽보다 관련자들의 판단과 조율에 점점 더 의존하게 되었다. 2007년 MSC Colombia호의 치명적 사고 후에도 작업 허가 및 위험성 평가 절차의 적용에서 유사한 결함이 확인된 바 있다. PL14의 고장 진단 및 수리에 적용되는 안전관리 통제는 작업 범위의 변경으로 인해 발생한 위험 요소를 식별하고 관리하는 데 비효율적으로 사용되었다. 통제 수단이 갖추어지기 전에, 그리고 작업자가 근무에 들어가기 전에 필요한 모든 예방 조치가 취해졌음을 확인하는 허가서를 승인하는 관행은 독립적인 감독 통제로서 PTW 체계의 효과를 떨어뜨렸으며, SETO의 계획되지 않은 점검은 승인된 작업 범위를 벗어나는 활동을 도입하였다. 공식적인 재평가가 없었기 때문에, 14 갑판에서 승강로에 접근하고 승강로 사다리를 사용하며 고소에서 작업하는 것과 관련된 추가 위험 요소가 체계적으로 식별되고 통제되지 않았다. Arvia호의 PTW 체계는 승강기 점검 및 수리 작업 중에 비효율적으로 시행되었다. 이로 인해 안전 예방 조치에 대한 감독이 미흡하였고 작업이 승인된 작업 범위를 벗어났음을 식별하지 못하여 승무원을 위험에 처하게 하였다.
2.7훈련 정비 작업에 관여한 수송팀 구성원 사이에서 승강기 관련 훈련과 경험의 수준은 다양하였다. SETO는 OTIS 교육을 이수하였고 ET와 AET는 다른 기관의 승강기 안전 과정을 이수하였다. 승강기 정비의 감독과 PTW 작성을 맡았던 3ETO는 Carnival UK에서 근무하는 동안 공식적인 승강기 안전 교육을 이수한 적이 없었다. 승강기 정비에는 다른 전기 정비 활동에서 일상적으로 마주치는 것과는 다른 위험이 따른다. 작업을 안전하게 수행하려면 승강기 안전 회로, 문 인터록, 점검 모드 제어장치, 비상정지, 승강로 접근 방법, 그리고 이러한 통제 수단이 무력화되거나 복구될 수 있는 상황에 대한 상세한 이해가 필요하다. 현장 경험이 숙련도에 기여할 수 있기는 하나, 운영 경험에만 의존하면 관련자들이 위험과 허용되는 작업 방식에 대해 서로 다른 이해를 형성할 가능성이 높아졌다. 특히 3ETO의 이해는 훈련의 뒷받침 없이 전적으로 경험에 의존하였다. 승강기 관련 숙련도의 중요성은2015년 Carnival Ecstasy호의 치명적 사고 이후 인식되었으며, 그 후 선박 운영사는 승강기 정비 인원에 대한 훈련과 안전 작업 요건을 강화하였다. 수송팀 구성원 사이의 훈련과 경험 수준의 차이는 인원이 승강기 정비와 관련된 위험, 또는 의도치 않은 승강기 움직임을 방지하는 데 필요한 통제 수단에 대해 공통된 이해를 공유하고 있다는 확신을 낮추었다. PTW 작성과 승강기 정비 감독을 맡은 사관이 공식적인 승강기 안전 교육을 받지 않았다는 점은 승강기 정비 활동과 관련된 위험에 대한 인식을 낮추었을 수 있다.
2.8장비 고장 PL14의 12 갑판 승강장 문 해제 장치는 해제 키를 사용했을 때 작동하지 않았으며, 사고 후 시험에서 이 장치가 결함이 있음이 확인되었다. 따라서 12 갑판에서 승강기 카 상부로 접근하는 것은 불가능하였고, ET는 대신 승강로의 고정 사다리를 이용해 위 갑판에서 승강로에 접근하였다. ET는 앞선 고장 진단 작업 중 승강기 카 상부에 접근하기 위해 승강로 사다리를 여러 번 사용한 바 있었다. 처음에는 승강기가 11 갑판에 멈춰 있어 접근을 쉽게 하도록 움직이는 것이 선택지가 아니었기 때문일 것이다. 그러나 사고 시점에는 승강기가 자유롭게 움직일 수 있었으므로 문 해제 장치가 작동하는 다른 갑판으로 이동시키는 것이 가능하였다. 승강기 카 상부에 직접 접근하는 이점은 승강로에 들어가지 않고도 비상정지와 점검 제어장치에 접근할 수 있다는 것이었다. 위 갑판에서 접근할 때는 이것이 불가능하였지만, ET는 수리 기간 중 14 갑판에서 접근하는 방법이 부정적인 결과 없이 여러 차례 사용되었기 때문에 이 방법이 실행 가능하고 안전하다고 생각했을 것이다. 결함 있는 승강장 문 해제 장치는 승강기 카 상부 접근 방식을 바꾸었다. 이는 승강기가 확실한 통제 아래 놓이기 전에 대체 접근 경로를 사용하도록 유도함으로써 사고의 상황에 간접적으로 기여하였다.
원문 보기
2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future. 2.2 OVERVIEW Arvia’s ET was fatally injured when a lift reactivated while he was inside the lift shaft, resulting in him being crushed between the side of the shaft and the lift car. This section of the report will discuss the factors contributing to this accident, including communication, control, safety management and training. 2.3 THE ACCIDENT The transport team had completed their troubleshooting and testing of PL14 when the SETO decided to test the lift and inspect the travelling cable L-bracket. At that stage, PL14 had been returned to normal operating mode and remained capable of responding to lift calls. The impromptu inspection relied on the SETO holding the lift doors open on 11 to prevent their automatic closure by interrupting the safety circuit and preventing lift movement while the ET went to the deck above. The ET, unable to open the deck 12 doors, instead proceeded to deck 14, where he manually opened the doors with his release key. When the ET opened the doors on deck 14 this provided a secondary interruption of the safety circuit preventing lift movement. Because of the counterweight on the door mechanism the lift doors had to be held open, otherwise they would close. This meant that when the ET entered the lift shaft and the SETO moved away from the lift on deck 11, the lift car and landing doors on both decks closed, fully restoring the lift safety circuit and allowing the lift to move. This movement was in line with the lift’s design and operating logic. The lift reactivated because both sets of doors closed, restoring the safety circuit and allowing the lift to move. This exposed the ET to the hazard of the moving lift and resulted in the fatal accident. 2.4 COMMUNICATION AND PLANNING The SETO’s decision to inspect the travelling cable L-bracket arose during a test after the night troubleshooting work had been completed. The inspection was not planned as a lift maintenance activity and the SETO and ET did not revise the PTW, conduct a JSR or stop to agree a method of work before the ET left the lift car to gain access from above. A different mental model had developed between the SETO and the ET. The SETO intended to inspect the repairs to the L-bracket from the deck and did not intend to enter the lift shaft or expect the ET to do so. Conversely, the ET’s actions indicate that he believed further access to the lift car top was required. Neither the SETO nor the ET appears to have recognised that their individual understanding of the task differed from that of the other and there was no communication as to how the task would be carried out.
When the ET was unable to open the deck 12 landing doors and instead proceeded to deck 14, a significant change occurred in the planned sequence of events. This change provided a further opportunity to pause the task, re-establish communications and confirm a safe method of work. However, no such pause occurred, and the differing assumptions remained unresolved. There was scant communication between the ET and the SETO and no clarification of what the ET meant when he shouted “OK ” down to the SETO. Communication between the SETO and ET was ineffective. This resulted in a lack of shared understanding of the task and actions that allowed the lift to return to a state that exposed the ET to the risk of unintended lift movement. 2.5 CONTROL OF LIFT MOVEMENT The manufacturer’s procedures, the PTW and Carnival UK’s safety instructions all required personnel accessing the lift car top to establish control of the lift, activate the emergency stop and place the lift into inspection mode before entering the lift shaft or starting maintenance work. The lift car top inspection controls and emergency stop switches fitted to PL14 were intended to prevent uncontrolled movement during maintenance. However, those controls had not been established during the inspection before the ET entered the shaft. The only barriers preventing lift movement were the open landing doors and the associated interruption of the safety circuit. Those interlocks were not a lock-out because they reset automatically when the landing doors closed. Consequently, protection against lift movement depended on personnel maintaining the intended configuration of the lift and coordinating their actions correctly. Once the deck 11 and deck 14 doors closed, the lift safety circuit was restored and the lift responded as designed to the outstanding for deck 17. The hazard of uncontrolled lift movement while personnel were in a lift shaft resulted in a similar fatal accident on board British Mallard in 2007. The reason why the ET entered the shaft could not be determined with certainty because there were no witnesses. It is possible that the ET intended to gain access to the lift car top to either isolate the lift using the emergency stop and inspection controls or facilitate the inspection of the L-bracket by the deck 12 landing doors from inside the lift shaft. Regardless of his intent, the ET almost certainly entered the shaft believing that the lift would remain stationary while he was in the shaft. With the use of self-resetting systems as a barrier the lift’s stationary status could not be assured. The system of work for lift maintenance relied on the use of door interlocks to prevent movement when accessing the lift car top. This did not provide an effective safety barrier as the interlocks were self-resetting when the doors closed, placing the at risk. 2.6 SAFETY MANAGEMENT The troubleshooting and repair of PL14 was subject to several safety management controls, including the PTW system, JSRs, LOTO procedures, working at height controls and the lift-specific requirements contained within OHS-1207 and the OTIS maintenance procedures. These controls were intended to ensure that hazards were identified, appropriate precautions were implemented and changes to the scope of work were recognised and managed.
During the troubleshooting period, PTWs were raised by the 3ETO and authorised by the 1ETO, who was working day shifts. The 3ETO and 1ETO signed the PTW several hours before the maintenance activity started to confirm that the necessary precautions had been taken. However, in practice, the 1ETO as the authorising could not verify that the stated precautions were in place at the time the work was undertaken. The troubleshooting activity evolved over two nights as additional faults were identified and alternative methods of access were adopted culminating with the SETO’s impromptu inspection of the repairs. The intended troubleshooting work and inspection could not be completed because of the defective landing door release mechanism on deck 12. Those changes introduced additional hazards, including access from a higher deck, use of the lift shaft ladder, work at height and reliance on informal coordination rather than formal barriers. The effectiveness of the control measures therefore became increasingly dependent upon the judgement and coordination of those involved rather than on formal safety barriers. Similar deficiencies in the application of permit to work and processes were identified following the fatal accident on board Colombia in 2007. The safety management controls applicable to the troubleshooting and repair of PL14 were used ineffectively to identify and manage the hazards created by changes to the work scope. The practice of authorising permits to confirm all the necessary precautions had been taken before the controls were in place and before the workers were on duty reduced the effectiveness of the PTW system as an independent supervisory control, while the SETO’s unplanned inspection introduced activities that fell outside the authorised scope of work. The absence of formal reassessment meant that additional hazards associated with accessing the lift shaft from deck 14, using the lift shaft ladder and working at height, were not systematically identified and controlled. The PTW system on board Arvia was implemented ineffectively during the lift inspection and repair work. This resulted in inadequate oversight of the safety precautions and a failure to identify that the task had fallen outside the authorised scope of work, placing the crew at risk. 2.7 TRAINING The level of lift-specific training and experience varied among the transport team involved in the maintenance work. The SETO had completed OTIS training and the ET and AET had completed lift safety courses from other providers. The 3ETO, who was responsible for the supervision of the lift maintenance and the creation of the PTW, had not completed any formal lift safety training during their employment with Carnival UK. Lift maintenance involves hazards that differ from those routinely encountered during other electrical maintenance activities. Safe execution of the work requires a detailed understanding of lift safety circuits, door interlocks, inspection mode controls, emergency stops, lift shaft access arrangements and the circumstances in which those controls can be defeated or restored. Although on-the-job experience can contribute to competency, sole reliance on operational experience increased the likelihood that those involved had developed different understandings of hazards and acceptable working practices. In particular, the 3ETO’s understanding was wholly dependent on experience rather than supported by training. The importance of
lift-specific competence was recognised following the fatal Carnival Ecstasy accident in 2015, after which the vessel operator reinforced training and safe working requirements for lift maintenance personnel. The varying level of training and experience among the transport team reduced assurance that personnel shared a common understanding of the risks associated with lift maintenance, or of the controls necessary to prevent unintended lift movement. The officer responsible for creating the PTW and for supervising the lift maintenance had not received formal lift safety training, which may have reduced their awareness of the hazards associated with lift maintenance activities. 2.8 EQUIPMENT FAILURE The deck 12 landing door release mechanism for PL14 did not operate when the release key was used and post-accident testing confirmed that the mechanism was defective. Access to the lift car top from deck 12 was therefore not possible and the ET instead used the lift shaft’s fixed ladder to access the lift shaft from the deck above. The ET had used the lift shaft ladder several times during the preceding troubleshooting work to gain access to the lift car top. Initially, this was probably because the lift was stuck at deck 11 so moving it to facilitate access was not an option. However, the lift was able to move freely by the time of the accident so it was therefore possible to move it to another deck with a working door release. The advantage of directly accessing the lift car top was to access emergency stop and inspection controls without entering the lift shaft. While this was not possible when accessing from the deck above, the ET probably considered this method to be achievable and safe because the practice of access from deck 14 had been used multiple times during the repair period without adverse outcomes. The defective landing door release mechanism changed the lift car top access arrangements. This indirectly contributed to the circumstances of the accident by prompting use of an alternative access route before the lift had been placed under positive control.
crew
at risk. [2.6] 3.2 SAFETY ISSUES NOT DIRECTLY CONTRIBUTING TO THE ACCIDENT THAT HAVE BEEN ADDRESSED OR RESULTED IN RECOMMENDATIONS 1. The
responsible for creating the PTW and supervising the lift maintenance had not received formal lift safety training, which may have reduced their awareness of the hazards associated with lift maintenance activities. [2.7] 2. The defective
door release mechanism changed the lift car top access arrangements. This indirectly contributed to the circumstances of the accident by prompting use of an alternative access route before the lift had been placed under positive control. [2.8]